Loading...
12-939-021N C In I�1 J LL 1 2 3 4 5 6 7 15010 - BASIC MECHANICAL REQUIREMENTS A. CODES & REFERENCES 1. FLORIDA STATE BUILDING CODE 2010. 2. SMACNA 1990 3. NFPA 101 (2009) 4. NFPA 90A (2009) 5. NFPA 99 (2005) 6. FACILITIES GUIDELINE INSTITUTE GUIDELINES FOR DESIGN & CONSTRUCTION OF HEALTHCARE FACILITIES, 2010. B. SCOPE OF WORK 1. PROVIDE ALL REQUIRED PERMITS, LABOR, MATERIAL AND EQUIPMENT REQUIRED TO COMPLETE THE SCOPE OF THE PROJECT SHOWN ON THE DRAWINGS COMPLETE AND READY FOR OCCUPANCY AND USE BY OWNER. THE WORK SHALL INCLUDE BUT IS NOT LIMITED TO: a. REMOVAL, RELOCATION AND RE- INSTALLATION OF EXISTING EQUIPMENT AND SYSTEM. b. CONNECTIONS TO EXISTING OR NEW EQUIPMENT AND SYSTEMS. c. MODIFICATION OF EXISTING CHILLED WATER SYSTEMS, CONDENSATE DRAINAGE, DUCTWORK, TEMPERATURE CONTROLS AND LIFE- SAFETY SYSTEMS. d. CUTTING AND PATCHING TO REMOVE EXISTING OR INSTALL NEW WORK. e. CLEANING AND TESTING. -f. INSTRUCTION TO OWNER'S PERSONNEL. 2, PROVIDE ALL BUILDING PENETRATIONS REQUIRED TO COMPLETE PROJECT. ALL PENETRATIONS SHALL BE PATCHED AND SEALED WATERTIGHT. MAINTAIN FIRE RATINGS OF EXISTING STRUCTURE. 3. PROVIDE ALL NECESSARY DUCT, EQUIPMENT, PIPE SUPPORTS AND MATERIALS REQUIRED FOR INSTALLATION PER THE REQUIREMENTS OF LOCAL, STATE OR FEDERAL CODES. C. REQUIRED SHOP DRAWINGS 1. INSULATION. 2. AIR DEVICES. 3• CONTROLS. 4. FAN COIL UNIT 5. DUCTWORK FITTING, FLEX DUCT AND MASTIC. D. MAINTENANCE MANUALS 1. PROVIDE MAINTENANCE MANUALS FOR ALL NEW EQUIPMENT CONTAINING ALL OPERATING AND MAINTENANCE DATA, SUBMITTALS, WARRANTEES, DIAGRAMS, INSPECTION REPORTS AND VALVE LISTS IN A 3 RING BINDER WITH POCKETS FOR DRAWINGS. PROVIDE OWNER WITH MINIMUM OF 2 COPIES. E. SUBSTITUTIONS 1. EQUIPMENT AND DESIGN OF SYSTEMS INDICATED ON THE DESIGN DRAWINGS AND WITHIN THESE SPECIFICATIONS SHALL BE CONSIDERED AS "SPECIFIED STANDARD" OF QUALITY. NO SUBSTITUTIONS SHALL BE MADE WITHOUT PRIOR WRITTEN APPROVAL OF THE ENGINEER 10 DAYS PRIOR TO BID DATE. 2.ANY DEVIATION FROM SPECIFIED EQUIPMENT THAT AFFECTS THE ELECTRICAL REQUIREMENTS SHALL BE COORDINATED BY THE MECHANICAL CONTRACTOR AND EQUIPMENT VENDOR WITH THE ELECTRICAL CONTRACTOR PRIOR TO SUBMITTING BIDS. 15050 - BASIC MATERIALS AND METHODS A. ACCESS PANELS - FURNISHED BY MECHANICAL CONTRACTOR, INSTALLED BY GENERAL CONTRACTOR. 1. PROVIDE ACCESS TO ALL SERVICEABLE EQUIPMENT IN WALLS AND CEILINGS. 2. MICOR STYLE M FOR DRYWALL. 3. MICOR STYLE K FOR PLASTER. 4. MINIMUM SIZE 16 "x16" . 5. NYSTROM, KARP, J.L. INDUSTRIES OR WILLIAMS PAINT. B. LABELING I. PROVIDE RIGID PLASTIC EMBOSSED EQUIPMENT NAME TAGS FOR ALL NEW EQUIPMENT AND DISCONNECTS. SETON NAMEPLATE CORPORATION. 2. PROVIDE VALVE TAGS ON ALL NEW AND RELOCATED VALVES. VALVE TAGS SHALL MATCH TAGS USED AT THE EXISTING FACILITY. TAGS SHALL BE SECURED TO VALVES WITH BRASS CHAINS. PROVIDE UPDATED INFORMATION ON ALL NEW VALVES TO THE EXISTING VALVE CHART. 3. PROVIDE SETON SNAP ON PIPE LABELS ON ALL NEW PIPING. PIPE LABELS TO MATCH SIZE AND TYPE USED AT THE EXISTING FACILITY AND COMPLY WITH ANSI Al 3.1. LABELS SHALL BE APPLIED CLOSE TO VALVES, CHANGES IN PIPE DIRECTIONS, BRANCHES, PIPES PASSING THROUGH WALLS OR FLOORS AND EVERY 20 FEET IN STRAIGHT RUNS OF PIPING AND AT LEAST ONE TIME PER ROOM. C. HANGERS AND SUPPORTS 1. PROVIDE ALL NECESSARY DUCTWORK, PIPE SUPPORTS, HANGERS, RODS, CLAMPS AND ATTACHMENTS TO PROPERLY INSTALL AND SUPPORT DUCTWORK, PIPING AND EQUIPMENT FROM THE BUILDING STRUCTURE. 2. PROVIDE ANY ANGLE IRON OR UNISTRUT AND SUSPENSION RODS REQUIRED TO INSTALL EQUIPMENT, PIPING AND DUCTWORK. 3• THE USE OF BAILING WIRE OR PERFORATED METAL STRAPPING IS NOT PERMITTED FOR SUPPORTS. D. WARRANTY /GUARANTEE 1. THE CONTRACTOR SHALL WARRANTY /GUARANTEE AND MAINTAIN THE STABILITY OF WORK AND MATERIALS AND KEEP SAME IN PERFECT REPAIR AND CONDITION OF THE PERIOD OF ONE YEAR. 2. DEFECTS OF ANY KIND DUE TO THE FAULTY WORK OR MATERIALS APPEARING DURING THE ABOVE MENTIONED PERIOD MUST BE IMMEDIATELY MADE GOOD BY THE CONTRACTOR AT HIS OWN EXPENSE TO THE ENTIRE SATISFACTION OF THE OWNER AND ENGINEER. SUCH RECONSTRUCTION AND REPAIRS SHALL INCLUDE DAMAGE TO THE FINISH OR FURNISHING OF THE BUILDING RESULTING FROM THE ORIGINAL DEFECT OR REPAIR THERETO. A. DO NOT USE MECHANICALLY COUPLED JOINTS OR T- DRILLED TEES ON HVAC SYSTEMS. B. SCHEDULE 40 ASTM A53 GRADE B SEAMLESS BLACK STEEL PIPE WITH CLASS 150 MALLEABLE IRON FITTINGS USED FOR: 1. CHILLED WATER 2" BELOW, THREADED JOINTS. C. TYPE L HARD COPPER PIPE WITH WROUGHT COPPER FITTINGS AND SOLDERED JOINTS USED FOR: 1. HVAC CHILLED WATER UP TO 2 ". D. PVC PIPE IS NOT TO BE USED ON MECHANICAL SYSTEMS. 15250 - INSULATION A. INSULATION, ADHESIVES, COATINGS, SEALERS, TAPES, ETC. SHALL HAVE A FLAME SPREAD OF 25 OR LESS AND SMOKE DEVELOPMENT OF 50 OR LESS IN ACCORDANCE WITH ASTM E -84, NFPA 225, UL 723 AND MEET THE REQUIREMENTS OF NFPA 90A. ALL INSULATING R- VALUES TO MEET THE REQUIREMENTS OF THE FLORIDA ENERGY CODE. C. CELLULAR GLASS PIPE INSULATION, PITTSBURGH CORNING "FOAMGLASS" WITH ASJ. 1. CHILLED WATER PIPING 2" AND UNDER - 11/ THICK. D. FLEXIBLE ELASTOMERIC INSULATION, ARMSTRONG "AP ARMAFLEX ", MITCHEL, RUBATEX : 1. CONDENSATE DRAINS - 3/4" THICK. E. BLANKET TYPE DUCT INSULATION, JOHNS MANVILLE, CERTAINTEED, KNAUF, OWENS CORNING, MINIMUM R =6.0, FOIL FACED KRAFT VAPOR BARRIER : GLASS FABRIC & MASTIC ALL JOINTS. 1. ALL SUPPLY AND RETURN WHERE CONCEALED FROM VIEW, R -6. 2. MINIMUM DUCT INSULATION THICKNESS AND R VALUES ARE AS FOLLOWS: a. SUPPLY AND RETURN AIR IN UNCONDITIONED SPACE: 2.25" (R -6 MIN.) 15890 - SHEET METAL DUCTWORK A. ALL DUCT TO BE INSTALLED ACCORDING TO 1990 EDITION OF SMACNA STANDARDS. B. ALL DUCT EXCEPT THAT SPECIFICALLY SHOWN IS TO BE GALVANIZED. SUPPLY, RETURN AND EXHAUST DUCTWORK SHALL BE FABRICATED TO 2" PRESSURE CLASS. SUPPLY DUCT FROM FAN TO CV OR VAV BOX TO BE 4" CLASS. C. ALL SYSTEMS SHALL BE SEALED WITH U.L.LISTED MASTIC FOR A CLASS "A" SEAL. D. DUCTWORK ROUTED PARALLEL TO A WALL, RATED OR CORRIDOR SHALL BE INSTALLED WITH MINIMUM 6" CLEARANCE TO ALLOW FOR INSPECTION OF WALL PENETRATIONS. CONTRACTOR SHALL PROVIDE 12" CLEARANCE WHERE POSSIBLE, COORDINATE. E. BUTTON SNAPLOCK JOINTS OR SEAMS ARE NOT PERMITTED. 15910 - SHEET METAL ACCESSORIES A. AIR INLETS AND OUTLET. 1. REFER TO SCHEDULE. 2. ALL ALUMINUM CONSTRUCTION. J. ACCEPTABLE MANUFACTURERS: TITUS, PRICE, METAL -AIRE AND NAILOR. B. FLEXIBLE DUCTWORK 1. FLEX DUCTWORK BE FLEXMASTER 8MM OR THERMAFLEX M -KE. 2. FLEXIBLE DUCTWORK SHALL BE ACOUSTICAL LOW PRESSURE TYPE FIBERGLASS INSULATION WITH AN R VALUE OF 6.0 OR GREATER AND COPOLYMER SEAMLESS OUTSIDE SLEEVE. THE ENTIRE FLEXIBLE DUCT ASSEMBLY SHALL BE LISTED IN ACCORDANCE WITH UL -181 CLASS 1 AIR DUCT MATERIAL. THE LENGTH OF ANY FLEX DUCT SHALL BE MAXIMUM 8'-0", MINIMUM 4' -0 ". FLEXIBLE DUCTWORK SHALL MEET THE FLORIDA MODEL ENERGY EFFICIENCY CODE. ALL JOINTS AT CONNECTIONS TO DIFFUSERS AND DUCTWORK SHALL BE SEALED WITH GLASS, FABRIC AND MASTIC. C. BALANCING DAMPERS ( RUSKIN MD -35 SERIES) 1. GENERAL - IN ALL DUCTWORK SYSTEMS, PROVIDE DAMPERS FOR PROPER CONTROL AND BALANCING OF AIR QUANTITIES. CONCEALED DAMPERS SHALL HAVE CONCEALED DAMPER REGULATOR. ALL COMPONENTS FOR PROPER OPERATION, (i.e. GEARS, LINKAGES, CABLE, ETC.) SHALL BE INCLUDED. 2. TYPE: FACTORY MANUFACTURED ONLY, OPPOSED BLADE FOR 12" AND LARGER AND SINGLE BLADE UP TO 11" IN HEIGHT. 3. MATERIAL: STEEL, 3V TYPE BLADES MOUNTED IN STEEL CHANNEL FRAME. 4. SHAFT: 3 /9' SQUARE ROD OPERATOR WITH END BEARINGS AND GASKET SEAL AT DUCT PENETRATIONS. TERMINATE SHAFT IN DAMPER FRAME WITH BUSHINGS. 5. OPERATOR: LOCKING QUADRANT HANDLE WITH DAMPER POSITION INDICATOR AND INSULATION STAND OFF MOUNTING BRACKET FOR EXTERNALLY INSULATED DUCTWORK. 6. MANUFACTURER: RUSKIN MODEL MD -35 SERIES OR EQUAL BY AIR BALANCE, NAILOR OR GREENHECK. 15853 - FAN COIL UNITS A. PROVIDE FAN COIL UNITS IN SIZES AND CAPACITIES SHOWN ON MECHANICAL DRAWINGS AND IN LOCATIONS SHOWN ON DRAWINGS. CHARACTERISTICS OF EQUIPMENT SHALL BE AS SHOWN HEREIN. B. UNITS TO BE COMPLETE WITH FAN, MOTOR, OUTSIDE CASING, INTERNAL FOIL FACED INSULATION, INSULATED DRAIN PAN, AND COPPER TUBE ALUMINUM FINNED COOLING COIL, ALL ARRANGED FOR MOUNTING AS CALLED FOR ON SCHEDULE. CABINETS TO HAVE REMOVABLE PANELS FOR ACCESS. C. FAN MOTORS: TAP -WOUND PERMANENT SPLIT - CAPACITOR TYPE. MOTOR WATT DRAW NOT TO EXCEED MAXIMUM SCHEDULED ON DRAWINGS. D. MANUAL AIR VENT TO BE LOCATED AT HIGHEST POINT OF SUPPLY OR RETURN LINES. E. AUXILIARY INSULATED DRAIN PANS TO BE SUFFICIENT TO COLLECT CONDENSATION FROM COIL CONNECTIONS AND SHUTOFF VALVES. DRAIN PAN SHALL NOT BLOCK ACCESS AREAS ON BOTTOM OF UNIT. F. UNIT HANGER SUSPENSION AND ACCESSORIES. G. DO NOT PROVIDE FILTERS AT TIME BUILDING IS TURNED OVER TO OWNER. 15970 - TEMPERATURE CONTROLS A. EXTEND EXISTING CONTROL SYSTEM TO NEW EQUIPMENT AND PROVIDE ALL MODIFICATIONS NECESSARY FOR A FULLY FUNCTIONING SYSTEM. B. AIR HANDLING UNIT PER DIAGRAM ON M3.2. 1. THE EXISTING CONTROL SYSTEM IS TO BE MODIFIED BY THE OWNERS EXISTING CONTROL VENDOR, SIEMENS. 2. CONTROL CONTRACTOR SHALL PROVIDE ALL WIRING REQUIRED FOR THE CONTROL SYSTEM TO OPERATE. 4. MOUNT THERMOSTATS 48" A.F.F. ALIGN WITH LIGHT SWITCHES, DOOR SWINGS AND OTHER WALL MOUNTED DEVICES. 5. COORDINATE FINAL LOCATION OF THERMOSTATS WITH THE OWNER PRIOR TO INSTALLATION. 15990 - TEST AND BALANCE A. PROVIDE COMPLETE TEST AND BALANCE OF ALL WATER AND AIR SYSTEMS IN ACCORDANCE WITH NEBB (NATIONAL ENVIRONMENTAL BALANCING BUREAU) OR AABC (ASSOCIATED AIR BALANCE COUNCIL) STANDARDS. B. BY OWNER'S TEST AND BALANCE CONTRACTOR (GFS CONSULTING INC.) C. CONTRACTOR SHALL: 1. VISIT SITE AT START OF PROJECT AND COORDINATE REQUIRED BALANCING EQUIPMENT AND DAMPERS WITH MECHANICAL CONTRACTOR. 2. AIR SYSTEMS: a. MAKE CHANGES TO BELTS, PULLEYS, DAMPERS TO OBTAIN DESIGN CONDITIONS AS REQUIRED BY TAB PROCEDURES. b. BALANCE SUPPLY, RETURN AND EXHAUST AIR OUTLETS WITHIN 107 OF DESIGN WHILE MAINTAINING REQUIRED PRESSURE RELATIONSHIPS. RECORD DESIGN AND ACTUAL TOTALS. c. MEASURE AND REPORT FAN RPM, FAN SUCTION PRESSURE, FAN DISCHARGE PRESSURE, FAN TOTAL PRESSURE AND PRESSURE DROP ACROSS COMPONENTS. DESIGN AND ACTUAL SUPPLY, RETURN, OUTSIDE AND EXHAUST AIR. d. ACTUAL AND DESIGN NAMEPLATE AMPERAGE ON FAN MOTORS. e. ADJUST FANS FOR LOWEST STATIC PRESSURE REQUIRED TO DELIVER TO OUTLETS AS NOTED IN NEBB OR AABC PROCEDURES. �llARRAY � healthcare facilities solutions 6800 Broken Sound Boulevard NW Suite 125 Boca Raton, FL 33487 t:561.995.1700 f :561.995.1701 firm license number www.arraylifs.com AA26000880 SEAL: 3� mq®r� * ®, OF � t9- 10444% k CONSULTANTS: SS1Smith Seckman Reid, Inc. 600 West .Hillsboro, Suite 300 Deerfield Beach, FL 33441 (954) 421 -1260 FAX: (954) 421 -1466 www,ssr- inc.coix> Firm Certification - LB- 0000857 Michael A. Steward PE - 65701 John E. Moulder PE - 33200 SSR JOB # 1232003.0 OWNER: BAPTIST HEALTH HOSPITAL: SOUTH MIAMI HOSPITAL PROJECT: Info Desk and Coffee Shop ADDRESS: 6200 Southwest 73rd Street South Miami, FL 33143 1 BID AND PERMIT SET 07 -30 -12 NO. DESCRIPTION DATE REVISIONS /ISSUES SHEET TITLE: MECHANICAL SPECIFICATIONS DRAWN: FL CHECKED: CON /REF No. 00000 PROJECT No. 3601 DATE: 07/30/12 SCALE: As indicated SHEET NO. MO.2 Trn do ?i_irn'nt i5 ❑ coVyi,P ! � er -d ifl :T n�i n w .:,r „r�i ;t AFFA i and he n ed nor use In the tided proje,t onl ,r -js, of tl Jacamen: houf nrlt .0 p�rmis_i,i of APR i_ illaa,_d r1 �1 viill t ©COPYRIGHT - 2012 ARRAY HFS