12-939-020A
0
C
N�
I�1
I
Ll..
1
HVAC DESIGN REQUIRES
COIL UNIT SCHEDULE
YES
NO
DUCT SMOKE DETECTOR(S)
SHEET TITLE
X
FIRE DAMPER(S)
-
X
SMOKE DAMPER(S)
HWR
X
FIRE RATED ENCLOSURE
RETURN R EXHAUST
X
FIRE RATED ROOF /FLOOR CEILING ASSEMBLY
4. PROVIDE VIBRATION ISOLATION.
X
FIRE STOPPING (SEE ARCH.)
SUPPLY
X
SMOKE CONTROL
5. PROVIDE CONDENSATE PUMP.
X
3
9
5 6 7
FAN
COIL UNIT SCHEDULE
HVAC LEGEND
SHEET
NUMBER
UNITS SHALL BE PROVIDED WITH THE FOLLOWING:
I. SEE PLANS FOR R/L HAND PIPING CONNECTIONS.
SHEET TITLE
DUCTWORK
HWS
-
MO.2
2. PROVIDE STAINLESS STEEL DRAIN PAN.
3. PROVIDE OVERFLOW PROTECTION. WATERGUARD OR EQUAL.
HWR
HOT WATER RETURN
MECHANICAL
RETURN R EXHAUST
CHS
CHILLED WATER
4. PROVIDE VIBRATION ISOLATION.
DUCTWORK
FIRST FLOOR
SUPPLY
M2.1
FIRST FLOOR
5. PROVIDE CONDENSATE PUMP.
CHILLED WATER
R
MECHANICAL
ANT TY DIFFUSER &
340 AP QUANTITY
M3.2
RETURN
DETAILS AND CONTROLS
120 R. RETURN GRILLE & AIR
FAN
FAN MOTOR
QUANTITY
COOLING COIL
ELECTRICAL
OPERATING
IDENT.
AREA SERVED
TYPE
MANUFACTURER
MODEL NO.
WEIGHT
LBS.
REMARKS
CFM
RPM
ESP
H.P.
ELECTRIC
E.A.T. OF
TOTAL
SENSIBLE
GPM
E.W.T. OF
L.W.T. OF
RO
W.P.D.
BRANCH
FLA
WSA
OPD
A. RISE IN DUCTWORK
D. DROP IN DUCTWORK
IN. WG
s
VOLTS/ 0 /HZ
DB /WB
MBH
MBH
FINS /INCH
(FT.)
SIZE
RADIUS ELBOW R /W =1.5
R
FCU -1
COFFEE SHOP
CEILING MOUNTED
TRANE
BCHC036A2
800
1245
0.5
1/3
120/1/60
78/65
34.7
24.1
7.1
45
55
6/12
10.0
1"
5.8A
7.25A
15A
180
,--I
-
I
T
I
I --I-
I
L -
.
I
HVAC GENERAL NOTES
1. HVAC DRAWINGS ARE DIAGRAMMATICAL IN NATURE AND REPRESENT
EXISTING CONDITIONS BASED ON DRAWINGS AND SITE OBSERVATIONS.
CONTRACTOR IS RESPONSIBLE FOR FIELD VERIFICATION OF ALL ACTUAL
CONDITIONS INCLUDING, DUCTWORK AND PIPING LOCATIONS AND SIZES.
2. DUE TO DRAWINGS BEING DIAGRAMMATICAL IN NATURE RISERS AND
DROPS ARE NOT SHOWN - CONTRACTOR SHALL INCLUDE THESE IN THE
BID - WHERE POSSIBLE ALL RISERS AND DROPS SHALL BE CONSTRUCTED
USING 45 DEGREE OR LONG RADIUS ELBOWS.
3. PROVIDE AND INSTALL NECESSARY DUCTWORK TRANSITIONS AND PIPING
INCREASERS /REDUCERS AS REQUIRED FOR EQUIPMENT CONNECTIONS.
CONSULT MANUFACTURER'S DATA FOR ACTUAL DUCTWORK AND PIPING
CONNECTIONS SIZES, INCLUDING, BUT NOT LIMITED TO THOSE SHOWN.
4, PROVIDE MANUAL VOLUME DAMPERS AT ALL LOW PRESSURE BRANCH
DUCTS TO INDIVIDUAL DIFFUSERS AND GRILLES AND TO ALL LOW
PRESSURE BRANCH DUCTS TO REHEAT COILS. PROVIDE DAMPERS AS
CLOSE AS POSSIBLE TO MAIN IN BRANCH CONNECTION. SEE DIFFUSER
AND GRILLE SCHEDULE AND SPECIFICATIONS FOR ADDITIONAL
INFORMATION.
5. SCHEDULE NEW CONSTRUCTION WORK WITH THE OWNER WELL IN
ADVANCE.
6. ALL FINISHES AND SURFACES TO REMAIN WHICH ARE DAMAGED DURING
CONSTRUCTION WORK SHALL BE REPAIRED OR REPLACED TO THE
SATISFACTION OF THE OWNER AT NO ADDITIONAL COST TO THE OWNER.
7. DO NOT BLOCK TUBE PULL OR SERVICE SPACE ON EQUIPMENT WITH
PIPING, DUCTWORK, ETC.. (FLANGED OR REMOVABLE SECTIONS MAY BE
USED IN SOME INSTANCES WHERE TIGHT CLEARANCES EXISTS).
8. NO PIPING, DUCTWORK, OR CONDUIT SHALL BE INSTALLED UNTIL IT IS
COORDINATED WITH ALL OTHER TRADES AFFECTED. PROVIDE ALL
OFFSETS REQUIRED TO AVOID INTERFERENCE WITH OTHER TRADES;
EXISTING CONDITIONS AND WITH THE STRUCTURE, INCLUDING, BUT NOT
LIMITED TO, THOSE SHOWN.
9. IF NO SIZE IS SHOWN FOR DUCT SERVING DIFFUSER OR GRILLES, USE
SIZE SHOWN ON DIFFUSER AND GRILLE SCHEDULE.
10. DUCTWORK ROUTED PARALLEL TO A WALL, RATED OR CORRIDOR SHALL
BE INSTALLED WITH MINIMUM 6" CLEARANCE TO ALLOW FOR INSPECTION
OF WALL PENETRATIONS. CONTRACTOR SHALL PROVIDE 12" CLEARANCE
WHERE POSSIBLE, COORDINATE.
11. REFER TO DETAIL SHEETS AND SPECIFICATIONS FOR ADDITIONAL
INSTALLATION REQUIREMENTS.
12. CONTRACTOR SHALL SUBMIT A COMPLETE LIST OF EQUIPMENT AND
ITEMS TO BE REMOVED TO THE OWNER. ALL ITEMS THAT THE OWNER
WISHES TO RETAIN SHALL BE TURNED OVER TO OWNER AND THE
REMAINDER SHALL BE REMOVED FROM THE SITE AND DISPOSED OF IN A
PROPER MANNER BY CONTRACTOR.
13. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO PERFORM ALL WORK
NECESSARY TO PREPARE THE STRUCTURE FOR THE INSTALLATION
AND /OR DEMOLITION WORK OF THE MECHANICAL SYSTEMS. ALL HOLES,
OPENINGS AND ANY DAMAGED MATERIALS OR SURFACES SHALL BE
REPAIRED AND FINISHED TO MATCH EXISTING.
14. ALL DEMOLITION WORK SHALL COMPLY WITH NFPA 241 AND THE
REQUIREMENTS OF THE OWNER.
15. PROVIDE TEMPORARY FILTERS ON ALL RETURN AIR GRILLES AND
TRANSFER OPENINGS IN THE WORK AREA.
16. EXISTING SYSTEMS SHOWN ON THE DRAWINGS ARE BASED ON
AVAILABLE RECORD DRAWINGS. THIS INFORMATION IS ONLY PARTIALLY
VERIFIED. THE CONTRACTOR IS RESPONSIBLE TO FIELD VERIFY AND
INVESTIGATE ALL CONDITIONS THAT AFFECTS THE WORK PRIOR TO
SUBMITTING THE BID.
17. ALL DIFFUSERS IN SAME SPACE SHALL HAVE THE SAME FULL FACE SIZE
USING LARGEST SIZE REQUIRED FROM DIFFUSER AND GRILLE SCHEDULE.
18. PROVIDE CLEAR ACCESS TO VALVES.
19. ALL DUCTWORK AND PIPING MATERIALS SHALL BE PROTECTED WHILE BEING
SHIPPED TO THE SITE, STORED ON SITE AND AS INSTALLATION PROGRESSES.
DUCTWORK AND PIPING STORED ON SITE PRIOR TO INSTALLATION SHALL BE
OFF THE FLOOR. PIPING SHALL BE END CAPPED. COVER ALL DIFFUSERS AND
GRILLES AFTER INSTALLATION PRIOR TO EQUIPMENT START UP AND TEST
AND BALANCE.
20. PROVIDE MAINTENANCE MANUALS FOR ALL PIECES OF EQUIPMENT FOR
OWNERS USE FOR PREVENTATIVE MAINTENANCE AND GENERAL RECORDS.
IDENTIFY EACH PIECE OF EQUIPMENT IN A TABBED, 3 RING BINDER
THAT MATCHES THE LABELS ON THE EQUIPMENT.
AHU OPERATION DURING CONSTRUCTION
THE USE OF NEW OR EXISTING AIR HANDLING UNITS DURING CONSTRUCTION IS PROHIBITED
UNLESS APPROVED BY THE OWNER AND THE PROCEDURES OUTLINED IN THIS PARAGRAPH
ARE FOLLOWED RIGIDLY.
1. THE CONTRACTOR SHALL PROTECT THE INTERIOR OF ALL DUCTWORK AND AIR
HANDLING UNITS FROM THE ACCUMULATION OF DIRT AND DUST USUALLY
ASSOCIATED WITH THE FINISHING STAGES OF THECONSTRUCTION WORK.
2. DUCTWORK STORED ON SITE AWAITING INSTALLATION SHALL BE CAREFULLY
EXAMINED AND THOROUGHLY CLEANED BEFORE PLACEMENT IN ITS FINAL LOCATION.
THE ENDS OF DUCTWORK SHALL BE CLOSED DURING CONSTRUCTION.
3. THE AIR HANDLING UNITS WILL BE ALLOWED TO OPERATE DURING THE FINISHING
STAGES OF THE GENERAL WORK PROVIDED THE PRE - FILTERS ARE IN PLACE AND
THE ENDS OF ALL RETURN AIR INLETS ARE COVERED WITH ROLL-UP FILTER MATERIAL.
4. WHEN THE SPACE IS TURNED OVER TO THE OWNER, THE CONTRACTOR SHALL REMOVE
ALL FILTERS USED DURING CONSTRUCTION AND REPLACE THEM WITH NEW FILTERS.
5. USE OF NEW AHU'S DURING CONSTRUCTION IS NOT ALLOWED.
6. FSD'S SHALL BE INTERLOCKED WITH ASSOCIATED AHU (AND /OR EF) AND SHALL OPERATE I
PER CONTROL SEQUENCE.
HAZARDOUS MATERIAL NOTES
1. PORTIONS OF THE EXISTING SYSTEM MAY CONTAIN HAZARDOUS MATERIAL
(ASBESTOS). COORDINATE WITH THE OWNER TO DETERMINE THE LOCATION
AND TYPES OF HAZARDOUS MATERIALS.
2. THE OWNER IS RESPONSIBLE FOR THE IDENTIFICATION, REMOVAL AND
DISPOSAL OF HAZARDOUS MATERIAL AND IS NOT TO BE INCLUDED AS
PART OF THE WORK OF THIS CONTRACT UNLESS SPECIFICALLY IDENTIFIED
AS SUCH.
3. IF ANY MATERIAL APPEARS TO CONTAIN HAZARDOUS MATERIAL AND WAS
NOT PREVIOUSLY IDENTIFIED. THE CONTRACTOR IS TO INFORM THE OWNER
TO RECEIVE INSTRUCTIONS ON HOW TO PROCEED.
MECHANICAL AS- BUILTS NOTE
MECHANICAL CONTRACTOR IS REQUIRED TO SUMBIT MECHANICAL AS BUILT PLANS
UPON COMPLETION OF THE PROJECT. COMPLETION IS DEFINED AS THE OWNER
RECEIVING A "CO" AND MECHANICAL INSPECTOR HAS FINALIZED AND APPROVED THE
INSTALLATION.
AS BUILTS SHALL BE SUBMITTED IN ELECTRONIC FASHION IN EITHER AUTOCAD FORMAT
OR SCANNED FILES IN PDF FORMAT.
AS BUILTS SHALL BE LEGIBLE AND NEAT. AS BUILTS WILL BE RETAINED BY
ARCHITECT AND ENGINEER FOR RECORD OF CHANGES TO THE SYSTEM. AS BUILTS WILL
BE SUBMITTED TO OWNER THROUGH ARCHITECT AND ENGINEER.
MECHANICAL EXISTING FIELD CONDITIONS
MECHANICAL CONTRACTOR IS REQUIRED PRIOR TO FINAL INSPECTIONS TO LABEL ALL
NEW AND EXISTING PIPES, VALVES, BOXES, AHU'S, FAN COILS, ETC. WITH
PROPER TAGS AND LABELS. (SEE BOOK SPECIFICATIONS FOR LABELING).
CONTRACTOR SHALL WORK WITH OWNER /FACILITIES STAFF TO DETERMINE ALL
EXISTING SERVICES FUNCTIONS, SOURCES, NAMES, ETC FOR PROPER IDENTIFICATION.
ALL IDENTIFICATIONS SHALL BE CLEARLY NOTED ON AS BUILT CONDITIONS AND SHALL
BE TURNED OVER TO OWNER AND DESIGN TEAM FOR FINAL RECORDS.
CONTRACTOR IS REQUIRED TO HAVE LABELING AND IDENTIFICATION COMPLETED
PRIOR TO 75% INSPECTIONS AND /OR COMPLETION OF CONSTRUCTION.
SEQUENCE OF OPERATION
UPON ACTIVATION OF ANY FIRE ALARM DEVICE IN THE AREA SERVED
BY ANY AIR HANDLING UNIT OR EXHAUST FAN, ALL EQUIPMENT AND
ASSOCIATED FSD'S SHALL DE- ENERGIZE. FANS IDENTIFIED AS EXHAUSTING
HAZARDOUS MATERIAL SHALL RUN CONTINUOUSLY.
MECHANICAL DEMOLITION NOTES
1. FOR EQUIPMENT AND SYSTEMS TO REMAIN IT SHALL BE THE CONTRACTOR'S
RESPONSIBILITY TO VERIFY THE CONDITION OF, EXACT SIZES AND LOCATION OF
EXISTING DUCT AND PIPING ETC. BEFORE DEMOLITION WORK IS BEGUN. REPORT
ANY DISCREPANCIES BETWEEN PLANS AND ACTUAL FIELD CONDITIONS TO THE
OWNER AND ENGINEER PRIOR TO THE COMMENCEMENT OF DEMOLITION WORK.
2. REMOVE THE INDICATED HVAC ITEMS AS SHOWN ON PLANS, THIS INCLUDES ALL
HANGERS, STRAPS AND RELATED MATERIAL. AS DIRECTED THIS MATERIAL
SHALL BE REMOVED FROM THE SITE OR TURNED OVER TO THE OWNER ( AS
DIRECTED BY THE OWNER).
3. CAP AND SEAL AIR TIGHT ALL POINTS AT WHICH DUCTWORK IS REMOVED FROM
DUCTWORK THAT WILL REMAIN.
4. PATCH AND MATCH OPENINGS IN WALLS TO MAINTAIN THE INTEGRITY OF THE
WALL WHERE AIR DEVICES, DUCTS, PIPING, ETC. HAVE BEEN REMOVED.
(MAINTAIN THE EXISTING RATINGS).
5. CONTRACTOR SHALL VERIFY CLEARANCE REQUIREMENTS AND INDICATE
ROUTING OF NEW DUCTWORK BEFORE FABRICATION BEGINS AS RISES AND
DROPS MAY BE NECESSARY DUE TO EXISTING FIELD CONDITIONS.
6. ALL DEMOLITION WORK SHALL COMPLY WITH NFPA 241 AND THE REQUIREMENTS
OF THE OWNER.
TEST & BALANCE NOTES
1. PRECONSTRUCTION:
PRIOR TO COMMENCEMENT OF ANY HVAC WORK AN INDEPENDENT AABC OR NEBB
CERTIFIED T &B CONTRACTOR SHALL MEASURE AND DOCUMENT, IN A TYPED REPORT
THE AIRFLOW QUANTITIES PROVIDED OR EXHAUSTED BY ALL EXISTING
EQUIPMENT AND DUCTS TO REMAIN THAT SERVE OR ARE SERVED FROM THE
RENOVATED AREA. SUBMIT TYPE WRITTEN DATA TO ENGINEER FOR REVIEW.
THE FOLLOWING INFORMATION IS REQUIRED:
- AIR FLOW OF ALL AIR DEVICES IN RENOVATED AREA(S).
- AIR FLOW (TRAVERSE) AT MAINS AND BRANCH DUCTS SERVING THE RENOVATED
AREA(S).
- AIR FLOW AT UNITS (TRAVERSE) AT MAINS AND BRANCH DUCTS SERVING THE
RENOVATED AREA(S).
- SUCTION AND DISCHARGE STATIC AT UNITS SERVING THE RENOVATED AREA(S).
- MEASURED FAN RPM, MOTOR AMPERAGE FOR ALL UNITS SERVING THE RENOVATED
AREA(S).
- PROVIDE EXISTING UNIT AND MOTOR NAME PLATE DATE.
- WATERFLOW TO COILS AS APPLICABLE.
2. FINAL CONSTRUCTION.
UPON COMPLETION OF THE HVAC RENOVATION WORK, THE SAME CONTRACTOR SHALL
REBALANCE THE NEW AND EXISTING EQUIPMENT AND DUCTS TO PROVIDE INDICATED
AIR QUANTITIES TO THE RENOVATED SPACE. ANY ADDITION OF DAMPERS,
ADJUSTMENTS, (FAN SPEED, CHANGE OUT OF PULLEYS, ETC.) REQUIRED FOR THIS SHALL
BE INCLUDED IN THIS CONTRACTORS PROPOSAL.
3. FINAL REPORT-.
SUBMIT FINAL TEST AND BALANCE REPORT TO ENGINEER FOR REVIEW AND ACCEPTANCE
ONE WEEK PRIOR TO FINAL AHCA INSPECTION FOR EACH PHASE.
4. PRE -TEST & BALANCE:
IF PRE TEST AND BALANCE IS NOT COMPLETED IT IS THE SOLE RESPONSIBILITY OF
THE CONTRACTOR TO BALANCE ANY AND ALL SYSTEMS REQUIRED TO CREATE A
PROPERLY BALANCED SYSTEM.
5. TEST AND BALANCE BY OWNER'S CONTRACTOR (GFS CONSULTING INC.)
DUCT AND PIPE INSULATION
DUCTWORK
1.INTERIOR SUPPLY AND RETURN AIR DUCTWORK IN CEILING SPACE
2�" THICK, R -6.0 MIN, FIBERGLASS.
ninir.in
1. CHILLED WATER PIPING: (FOAM THICK
GLASS MIN. K =.27)
PI 2' 1 i
BID AND PERMIT SET
HVAC LEGEND
SHEET
NUMBER
PIPING
SHEET TITLE
DUCTWORK
HWS
HOT WATER SUPPLY
MO.2
°�--- SUPPLY DUCTWORK
HWR
HOT WATER RETURN
MECHANICAL
RETURN R EXHAUST
CHS
CHILLED WATER
CONSTRUCTION ZONE VENTILATION PLAN
DUCTWORK
FIRST FLOOR
SUPPLY
M2.1
FIRST FLOOR
CHR
CHILLED WATER
R
MECHANICAL
ANT TY DIFFUSER &
340 AP QUANTITY
M3.2
RETURN
DETAILS AND CONTROLS
120 R. RETURN GRILLE & AIR
QUANTITY
160 E EXHAUST GRILLE & AIR
QUANTITY
sD �- DUCT MOUNTED
SMOKE DETECTOR
T� WALL MOUNTED
TEMPERATURE SENSOR
REHEAT BOX & SYMBOL
A. RISE IN DUCTWORK
D. DROP IN DUCTWORK
s
45 "THROAT TAP
-�- L BRANCH CONNECTION
W
RADIUS ELBOW R /W =1.5
R
TURNING VANES IN
1 ELBOW
JJ DIVIDED FLOW
FITTINGS
M.V.D. MANUAL VOL. DAMPER
FD FIRE DAMPER
NOTE: NOT ALL SYMBOLS MAY APPLY.
AHU OPERATION DURING CONSTRUCTION
THE USE OF NEW OR EXISTING AIR HANDLING UNITS DURING CONSTRUCTION IS PROHIBITED
UNLESS APPROVED BY THE OWNER AND THE PROCEDURES OUTLINED IN THIS PARAGRAPH
ARE FOLLOWED RIGIDLY.
1. THE CONTRACTOR SHALL PROTECT THE INTERIOR OF ALL DUCTWORK AND AIR
HANDLING UNITS FROM THE ACCUMULATION OF DIRT AND DUST USUALLY
ASSOCIATED WITH THE FINISHING STAGES OF THECONSTRUCTION WORK.
2. DUCTWORK STORED ON SITE AWAITING INSTALLATION SHALL BE CAREFULLY
EXAMINED AND THOROUGHLY CLEANED BEFORE PLACEMENT IN ITS FINAL LOCATION.
THE ENDS OF DUCTWORK SHALL BE CLOSED DURING CONSTRUCTION.
3. THE AIR HANDLING UNITS WILL BE ALLOWED TO OPERATE DURING THE FINISHING
STAGES OF THE GENERAL WORK PROVIDED THE PRE - FILTERS ARE IN PLACE AND
THE ENDS OF ALL RETURN AIR INLETS ARE COVERED WITH ROLL-UP FILTER MATERIAL.
4. WHEN THE SPACE IS TURNED OVER TO THE OWNER, THE CONTRACTOR SHALL REMOVE
ALL FILTERS USED DURING CONSTRUCTION AND REPLACE THEM WITH NEW FILTERS.
5. USE OF NEW AHU'S DURING CONSTRUCTION IS NOT ALLOWED.
6. FSD'S SHALL BE INTERLOCKED WITH ASSOCIATED AHU (AND /OR EF) AND SHALL OPERATE I
PER CONTROL SEQUENCE.
HAZARDOUS MATERIAL NOTES
1. PORTIONS OF THE EXISTING SYSTEM MAY CONTAIN HAZARDOUS MATERIAL
(ASBESTOS). COORDINATE WITH THE OWNER TO DETERMINE THE LOCATION
AND TYPES OF HAZARDOUS MATERIALS.
2. THE OWNER IS RESPONSIBLE FOR THE IDENTIFICATION, REMOVAL AND
DISPOSAL OF HAZARDOUS MATERIAL AND IS NOT TO BE INCLUDED AS
PART OF THE WORK OF THIS CONTRACT UNLESS SPECIFICALLY IDENTIFIED
AS SUCH.
3. IF ANY MATERIAL APPEARS TO CONTAIN HAZARDOUS MATERIAL AND WAS
NOT PREVIOUSLY IDENTIFIED. THE CONTRACTOR IS TO INFORM THE OWNER
TO RECEIVE INSTRUCTIONS ON HOW TO PROCEED.
MECHANICAL AS- BUILTS NOTE
MECHANICAL CONTRACTOR IS REQUIRED TO SUMBIT MECHANICAL AS BUILT PLANS
UPON COMPLETION OF THE PROJECT. COMPLETION IS DEFINED AS THE OWNER
RECEIVING A "CO" AND MECHANICAL INSPECTOR HAS FINALIZED AND APPROVED THE
INSTALLATION.
AS BUILTS SHALL BE SUBMITTED IN ELECTRONIC FASHION IN EITHER AUTOCAD FORMAT
OR SCANNED FILES IN PDF FORMAT.
AS BUILTS SHALL BE LEGIBLE AND NEAT. AS BUILTS WILL BE RETAINED BY
ARCHITECT AND ENGINEER FOR RECORD OF CHANGES TO THE SYSTEM. AS BUILTS WILL
BE SUBMITTED TO OWNER THROUGH ARCHITECT AND ENGINEER.
MECHANICAL EXISTING FIELD CONDITIONS
MECHANICAL CONTRACTOR IS REQUIRED PRIOR TO FINAL INSPECTIONS TO LABEL ALL
NEW AND EXISTING PIPES, VALVES, BOXES, AHU'S, FAN COILS, ETC. WITH
PROPER TAGS AND LABELS. (SEE BOOK SPECIFICATIONS FOR LABELING).
CONTRACTOR SHALL WORK WITH OWNER /FACILITIES STAFF TO DETERMINE ALL
EXISTING SERVICES FUNCTIONS, SOURCES, NAMES, ETC FOR PROPER IDENTIFICATION.
ALL IDENTIFICATIONS SHALL BE CLEARLY NOTED ON AS BUILT CONDITIONS AND SHALL
BE TURNED OVER TO OWNER AND DESIGN TEAM FOR FINAL RECORDS.
CONTRACTOR IS REQUIRED TO HAVE LABELING AND IDENTIFICATION COMPLETED
PRIOR TO 75% INSPECTIONS AND /OR COMPLETION OF CONSTRUCTION.
SEQUENCE OF OPERATION
UPON ACTIVATION OF ANY FIRE ALARM DEVICE IN THE AREA SERVED
BY ANY AIR HANDLING UNIT OR EXHAUST FAN, ALL EQUIPMENT AND
ASSOCIATED FSD'S SHALL DE- ENERGIZE. FANS IDENTIFIED AS EXHAUSTING
HAZARDOUS MATERIAL SHALL RUN CONTINUOUSLY.
MECHANICAL DEMOLITION NOTES
1. FOR EQUIPMENT AND SYSTEMS TO REMAIN IT SHALL BE THE CONTRACTOR'S
RESPONSIBILITY TO VERIFY THE CONDITION OF, EXACT SIZES AND LOCATION OF
EXISTING DUCT AND PIPING ETC. BEFORE DEMOLITION WORK IS BEGUN. REPORT
ANY DISCREPANCIES BETWEEN PLANS AND ACTUAL FIELD CONDITIONS TO THE
OWNER AND ENGINEER PRIOR TO THE COMMENCEMENT OF DEMOLITION WORK.
2. REMOVE THE INDICATED HVAC ITEMS AS SHOWN ON PLANS, THIS INCLUDES ALL
HANGERS, STRAPS AND RELATED MATERIAL. AS DIRECTED THIS MATERIAL
SHALL BE REMOVED FROM THE SITE OR TURNED OVER TO THE OWNER ( AS
DIRECTED BY THE OWNER).
3. CAP AND SEAL AIR TIGHT ALL POINTS AT WHICH DUCTWORK IS REMOVED FROM
DUCTWORK THAT WILL REMAIN.
4. PATCH AND MATCH OPENINGS IN WALLS TO MAINTAIN THE INTEGRITY OF THE
WALL WHERE AIR DEVICES, DUCTS, PIPING, ETC. HAVE BEEN REMOVED.
(MAINTAIN THE EXISTING RATINGS).
5. CONTRACTOR SHALL VERIFY CLEARANCE REQUIREMENTS AND INDICATE
ROUTING OF NEW DUCTWORK BEFORE FABRICATION BEGINS AS RISES AND
DROPS MAY BE NECESSARY DUE TO EXISTING FIELD CONDITIONS.
6. ALL DEMOLITION WORK SHALL COMPLY WITH NFPA 241 AND THE REQUIREMENTS
OF THE OWNER.
TEST & BALANCE NOTES
1. PRECONSTRUCTION:
PRIOR TO COMMENCEMENT OF ANY HVAC WORK AN INDEPENDENT AABC OR NEBB
CERTIFIED T &B CONTRACTOR SHALL MEASURE AND DOCUMENT, IN A TYPED REPORT
THE AIRFLOW QUANTITIES PROVIDED OR EXHAUSTED BY ALL EXISTING
EQUIPMENT AND DUCTS TO REMAIN THAT SERVE OR ARE SERVED FROM THE
RENOVATED AREA. SUBMIT TYPE WRITTEN DATA TO ENGINEER FOR REVIEW.
THE FOLLOWING INFORMATION IS REQUIRED:
- AIR FLOW OF ALL AIR DEVICES IN RENOVATED AREA(S).
- AIR FLOW (TRAVERSE) AT MAINS AND BRANCH DUCTS SERVING THE RENOVATED
AREA(S).
- AIR FLOW AT UNITS (TRAVERSE) AT MAINS AND BRANCH DUCTS SERVING THE
RENOVATED AREA(S).
- SUCTION AND DISCHARGE STATIC AT UNITS SERVING THE RENOVATED AREA(S).
- MEASURED FAN RPM, MOTOR AMPERAGE FOR ALL UNITS SERVING THE RENOVATED
AREA(S).
- PROVIDE EXISTING UNIT AND MOTOR NAME PLATE DATE.
- WATERFLOW TO COILS AS APPLICABLE.
2. FINAL CONSTRUCTION.
UPON COMPLETION OF THE HVAC RENOVATION WORK, THE SAME CONTRACTOR SHALL
REBALANCE THE NEW AND EXISTING EQUIPMENT AND DUCTS TO PROVIDE INDICATED
AIR QUANTITIES TO THE RENOVATED SPACE. ANY ADDITION OF DAMPERS,
ADJUSTMENTS, (FAN SPEED, CHANGE OUT OF PULLEYS, ETC.) REQUIRED FOR THIS SHALL
BE INCLUDED IN THIS CONTRACTORS PROPOSAL.
3. FINAL REPORT-.
SUBMIT FINAL TEST AND BALANCE REPORT TO ENGINEER FOR REVIEW AND ACCEPTANCE
ONE WEEK PRIOR TO FINAL AHCA INSPECTION FOR EACH PHASE.
4. PRE -TEST & BALANCE:
IF PRE TEST AND BALANCE IS NOT COMPLETED IT IS THE SOLE RESPONSIBILITY OF
THE CONTRACTOR TO BALANCE ANY AND ALL SYSTEMS REQUIRED TO CREATE A
PROPERLY BALANCED SYSTEM.
5. TEST AND BALANCE BY OWNER'S CONTRACTOR (GFS CONSULTING INC.)
DUCT AND PIPE INSULATION
DUCTWORK
1.INTERIOR SUPPLY AND RETURN AIR DUCTWORK IN CEILING SPACE
2�" THICK, R -6.0 MIN, FIBERGLASS.
ninir.in
1. CHILLED WATER PIPING: (FOAM THICK
GLASS MIN. K =.27)
PI 2' 1 i
A R R A Y
II healthcare facilities solutions
6800 Broken Sound Boulevard NW
Suite 125
Boca Raton, FL 33487
t:561.995.1700
f :561.995.1701 firm license number
www.arrayhfs.com AA26000880
SEAL:
jj
� P
M.Q.
®�1f -.ER918,
CONSULTANTS:
SRSmith
Seckman
Reid, Inc.
600 West .Hillsboro, Suite 300
Deerfield Beach, FL 33441
(954) 421 -1260
FAX: (954) 421 -1466
www.ssr- ino.com
Firm Certification - EB- 0000857
Michael A. Steward PE - 65701
John E. Moulder PE - 33200
SSR JOB # 1232003.0
OWNER:
BAPTIST HEALTH
HOSPITAL:
SOUTH MIAMI
HOSPITAL
PROJECT:
Info Desk and Coffee
Shop
ADDRESS:
6200 Southwest 73rd Street
South Miami, FL 33143
1
BID AND PERMIT SET
DRAWING INDEX
SHEET
NUMBER
N0.
SHEET TITLE
MO.1
MECHANICAL
LEGENDS, SCHEDULES AND DRAWING INDEX
MO.2
MECHANICAL
SPECIFICATIONS
MO.3
MECHANICAL
CONSTRUCTION ZONE VENTILATION PLAN
MO.4
MECHANICAL
CONSTRUCTION ZONE VENTILATION PLAN
M1.1
FIRST FLOOR
PLAN - DEMOLITION - MECHANICAL
M2.1
FIRST FLOOR
PLAN - NEW CONSTRUCTION - MECHANICAL
M3.1
MECHANICAL
DETAILS
M3.2
MECHANICAL
DETAILS AND CONTROLS
A R R A Y
II healthcare facilities solutions
6800 Broken Sound Boulevard NW
Suite 125
Boca Raton, FL 33487
t:561.995.1700
f :561.995.1701 firm license number
www.arrayhfs.com AA26000880
SEAL:
jj
� P
M.Q.
®�1f -.ER918,
CONSULTANTS:
SRSmith
Seckman
Reid, Inc.
600 West .Hillsboro, Suite 300
Deerfield Beach, FL 33441
(954) 421 -1260
FAX: (954) 421 -1466
www.ssr- ino.com
Firm Certification - EB- 0000857
Michael A. Steward PE - 65701
John E. Moulder PE - 33200
SSR JOB # 1232003.0
OWNER:
BAPTIST HEALTH
HOSPITAL:
SOUTH MIAMI
HOSPITAL
PROJECT:
Info Desk and Coffee
Shop
ADDRESS:
6200 Southwest 73rd Street
South Miami, FL 33143
1
BID AND PERMIT SET
07 -30 -12
N0.
F DESCRIPTION
DATE
REVISIONS /ISSUES
SHEET TITLE:
MECHANICAL LEGENDS,
SCHEDULES AND
DRAWING INDEX
DRAWN: FL CHECKED:
CON /REF No. 00000
PROJECT No. 3601
DATE: 07/30/12 SCALE: As indicated
SHEET NO.
M0.1
Tri; -.::urn ?nl i_ .i :)py l q I ,r 1 if 1 i n-i -1r i 7y ;I "nf.Ai and
Ih:ensed 'or jee In the ;ia d Project a111 eon,d r, rr or i of IFij 1 c Ian I" -
ni'I i- nrit:�n P i I sip-" of tPR�`: I ill.�xII nr l nlll h� , ItLd I di -Ie I.ic
(6)COPYRIGHT - 2012 ARRAY HFS