SECTION 017329 -CUTTING AND PATCHING
1.1 SUMMARY
A. CUTTING AND PATCHING REQUIRED BY'f HE FOLLOWING:
1. INSTALLATION OF OTHER MATERIALS.
2. FINISHING.
3. ALTERATIONS.
4. TESTS AND INSPECTIONS.
1.2 QUALITY ASSURANCE
A. LIMITATIONS ON CUTTING AND PATCHING:
1. STRUCTURAL ELEMENTS: DO NOT CUT AND PATCH STRUCTURAL ELEMENTS IN A MANNER THAT COULD CHANGE THEIR LOAD -
CARRYING CAPACITY OR LOAD- DEFLECTION RATIO.
2. OPERATIONAL ELEMENTS: DO NOT CUT AND PATCH OPERATING ELEMENTS AND RELATED COMPONENTS IN A MANNER THAT RESULTS
IN REDUCING THEIR CAPACITY TO PERFORM AS INTENDED OR THAT RESULTS IN INCREASED MAINTENANCE OR DECREASED
OPERATIONAL LIFE OR SAFETY.
3. MISCELLANEOUS ELEMENTS: DO NOT CUT AND PATCH MISCELLANEOUS ELEMENTS OR RELATED COMPONENTS IN A MANNER THAT
COULD CHANGE THEIR LOAD- CARRYING CAPACITY, THAT RESULTS IN REDUCING THEIR CAPACITY TO PERFORM AS INTENDED, OR THAT
RESULTS IN INCREASED MAINTENANCE OR DECREASED OPERATIONAL LIFE OR SAFETY.
4. VISUAL REQUIREMENTS: DO NOT CUT AND PATCH CONSTRUCTION IN A MANNER THAT RESULTS IN VISUAL EVIDENCE OF CUTTING
AND PATCHING. DO NOT CUT AND PATCH CONSTRUCTION EXPOSED ON THE EXTERIOR OR IN OCCUPIED SPACES IN A MANNER THAT
WOULD, IN ARCHITECTS OPINION, REDUCE THE BUILDING'S AESTHETIC QUALITIES. REMOVE AND REPLACE CONSTRUCTION THAT HAS
BEEN CUT AND PATCHED IN A VISUALLY UNSATISFACTORY MANNER.
a. WHERE APPLICABLE - REMOVE AND REPLACE EXISTING WALL COVERING, EXISTING CORRIDOR HANDRAIL, GUARDRAILS,
ACOUSTICAL CEILING PANELS AND GRID, AND EXISTING FLOORING.
1.3 WARRANTY
A. EXISTING WARRANTIES: REMOVE, REPLACE, PATCH, AND REPAIR MATERIALS AND SURFACES CUT OR DAMAGED DURING CUTTING AND
PATCHING OPERATIONS, BY METHODS AND WITH MATERIALS SO AS NOT TO VOID EXISTING WARRANTIES, INCLUDING ROOFING IF APPLICABLE.
1.4 MATERIALS
A. GENERAL: COMPLY WITH REQUIREMENTS SPECIFIED IN OTHER SECTIONS.
B. IN -PLACE MATERIALS: USE MATERIALS IDENTICAL TO IN -PLACE MATERIALS. FOR EXPOSED SURFACES, USE MATERIALS THATVISUALLY
MATCH WPLACE ADJACENT SURFACES TO THE FULLEST EXTENT POSSIBLE.
1. IF IDENTICAL MATERIALS ARE UNAVAILABLE OR CANNOT BE USED, USE MATERIALS THAT, WHEN INSTALLED, WILL MATCH THE VISUAL
AND FUNCTIONAL PERFORMANCE OF IN -PLACE MATERIALS.
C. PROVIDE FIRE - RESISTIVE MATERIALS AND FIRESTOPPING MATERIALS THAT ARE COMPATIBLE WITH EXISTING AND SUBSTRATES AND ARE
APPROVED BY UL OR ANOTHER TESTING AND INSPECTING AGENCY ACCEPTABLE TO AUTHORITIES HAVE JURISDICTION FOR USE IN FIRE -
RESISTIVE DESIGNS INDICATED.
D. CONCRETE WORK SHALL CONFORM TO AMERICAN CONCRETE INSTITUTE STANDARD 301 SPECIFICATION. USE PORTLAND CEMENT TYPE 1
PER ASTM C150 AND NORMAL WEIGHT AGGREGATES PER ASTM C33. DESIGN MINIMUM TO BE 3000 LBS. NORMAL WEIGHT CONCRETE.
READY -MIX TO COMPLY WITH ASTM C94.
E. ROOFING MATERIAL, FLASHING, AND ROOF SPECIALTIES MATERIAL: SELECTION SHOULD BE ON THE COMPATIBILITY WITH THE EXISTING
ROOFING SYSTEM COMPONENTS AND APPROVED BY THE EXISTING ROOFING MANUFACTURER SO THEY ARE IN COMPLIANCE WITH THE
EXISTING WARRANTY.
1.5 EXECUTION
A. TEMPORARY SUPPORT OF WORK BEING CUT.
B. PROTECTION: PROTECT IN -PLACE CONSTRUCTION DURING CUTTING AND PATCHING TO PREVENT DAMAGE. PROVIDE PROTECTION FROM
ADVERSE= WEATHER CONDITIONS FOR PORTIONS OF PROJECT THAT MIGHT BE EXPOSED DURING CUTTING AND PATCHING OPERATIONS.
C. ADJOINING AREAS: AVOID INTERFERENCE WITH USE OF ADJOINING AREAS OR INTERRUPTION OF FREE PASSAGE TO ADJOINING AREAS.
D. EXISTING SERVICES: SERVICES BYPASSED BEFORE CUTTING TO AVOID INTERRUPTION TO OCCUPIED AREAS.
E. EMPLOY SKILLED WORKERS TO PERFORM CUTTING AND PATCHING. PROCEED WITH CUTTING AND PATCHING AT THE EARLIEST FEASIBLE TIME,
AND COMPLETE WITHOUT DELAY.
1. CUT IN -PLACE CONSTRUCTION TO PROVIDE FOR INSTALLATION OF OTHER COMPONENTS OR PERFORMANCE OF OTHER
CONSTRUCTION, AND SUBSEQUENTLY PATCH AS REQUIRED TO RESTORE SURFACES TO THEIR ORIGINAL CONDITION.
2. ALL EXISTING WALLS WITHIN THE SCOPE OF THIS PROJECT SHALL BE PATCHED AND REPAIRED TO REMOVE ALL VISIBLE DEFECTS PRIOR
TO PAINTING OR FINISHING OF THE WALL.
3. PATCHING AND REPAIR SHALL CONSIST OF REMOVING ALL LOOSE, CRACKED AND UNSOUND GYPSUM BOARD OR OTHER MATERIALS AND
SUPPORTS, AND INSTALLING NEW MATERIAL TO MATCH THE EXISTING CONSTRUCTION, ACCORDING TO THE MANUFACTURERS
RECOMMENDATIONS. REPAIRED AREAS SHALL NOT BE VISIBLY APPARENT FROM ADJACENT AREAS.
4. ALL HOLES SHALL BE FILLED AND VISIBLE JOINTS, CRACKS, CRAZES, TOOL MARKS, WAVES, STAINS OR OTHER DEFECTS SHALL NOT
APPEAR ON THE FINISHED WORK.
F. CUTTING: CUT IN -PLACE CONSTRUCTION BY SAWING, DRILLING, BREAKING, CHIPPING, GRINDING, AND SIMILAR OPERATIONS, INCLUDING
EXCAVATION, USING METHODS LEAST LIKELY TO DAMAGE ELEMENTS RETAINED OR ADJOINING CONSTRUCTION. IF POSSIBLE, REVIEW
PROPOSED PROCEDURES WTH ORIGINAL INSTALLER; COMPLY WITH ORIGINAL INSTALLER'S WRITTEN RECOMMENDATIONS.
G. PATCHING: PATCH CONSTRUCTION BY FILLING, REPAIRING, REFINISHING, CLOSING UP, AND SIMILAR OPERATIONS FOLLOWING
PERFORMANCE OF OTHER WORK. PATCH WITH DURABLE SEAMS THATARE AS INVISIBLE AS POSSIBLE. PROVIDE MATERIALS AND COMPLY WITH
INSTALLATION REQUIREMENTS SPECIFIED IN OTHER SECTIONS.
1. PATCH VOIDS IN FLOOR AND WALLS AT REMOVED WALLS TO PROVIDE A SMOOTH SURFACE AS REQUIRED TO MATCH EXISTING AND FOR
NEWFINISHES.
2. GRIND HIGH SPOTS AND FILL LOW AREAS IN FLOOR WITH LATEX CONCRETE TO PROVIDE A SURFACE FREE FROM RIDGES, DEPRESSIONS
AND BLEMISHES WHICH CAN BE SEEN OR FELT AFTER NEW FLOOR COVERING IS INSTALLED.
3. WHERE WALLS ARE REMOVED THE CONTRACTOR SHALL VERIFY THAT THE EXISTING WALLS AND FLOORS ARE IN THE SAME PLANE OR
ELEVATION. SAND, GRIND OR FILL AS REQUIRED TO PROVIDE A SMOOTH TRANSITION AT ALL SUCH DIFFERENCES.
H. CLEANING: CLEAN AREAS AND SPACES WHERE CUTTING AND PATCHING ARE PERFORMED. COMPLETELY REMOVE PAINT, MORTAR, OILS,
PUTTY, AND SIMILAR MATERIALS.
END OF SECTION 017329
3 4
SECTION 017315 - HOSPITAL PROCEDURES
1.1
REGULATIONS
A. THE CONTRACTOR SHALL AT ALL TIMES ABIDE BY THE REGULATIONS OF (STATE AGENCY OR APPLICABLE CODES) AND ALL
AMENDMENTS, INCLUDING THOSE THAT MAY BE ISSUED DURING THE DURATION OF THE CONTRACT. PARTICULAR ATTENTION IS CALLED
TO THOSE REGULATIONS PERTAINING TO CIRCULATION, NOISE, SANITATION, SAFETY AND BEHAVIOR.
B. THE CONTRACTOR SHALL AT ALL TIMES ABIDE BY THE INTERIM LIFE SAFETY MEASURES AND INFECTION CONTROL REQUIREMENT
OUTLINED IN THE CONTRACT DOCUMENTS, APPLICABLE CODES (NFPA 95 AND NFPA 101) AND AIA GUIDELINES FOR DESIGN AND
CONSTRUCTION OF HOSPITAL AND HEALTHCARE FACILITIES.
1.2 BAPTIST HEALTH SOUTH FLORIDA - CORPORATE CONSTRUCTION MANAGEMENT
A. THE CONTRACTOR SHALL ABIDE BY THE DIRECTIONS OF BAPTIST HEALTH SOUTH FLORIDA - CORPORATE CONSTRUCTION
MANAGEMENT IN MATTERS AFFECTING THE OPERATION, SAFETY, AND SECURITY OF THE HOSPITAL, ITS PATIENTS AND ITS
VISITORS.
B. THE CONTRACTOR SHALL ABIDE BY ALL DIRECTIONS OF BAPTIST HEALTH SOUTH FLORIDA -CORPORATE CONSTRUCTION
MANAGEMENT WHICH SHALL BE IMPLEMENTED IMMEDIATELY. CONFIRMATION OR EXPLANATION OF ORAL INSTRUCTION WILL BE
MADE BY SOUTH MIAMI HOSPITAL IN WRITING OR INCLUDED IN THE MEETING MINUTES AT THE NEXT SCHEDULED PROGRESS
MEETING.
C. ALL PERSONNEL EMPLOYED BY THE CONTRACTOR, INCLUDING SUBCONTRACTORS AND THEIR EMPLOYEES, SHALL BE
INSTRUCTED TO ABIDE BY ALL PUBLISHED REGULATIONS, AND ALL DIRECTIVES OF BAPTIST HEALTH SOUTH FLORIDA - CORPORATE
CONSTRUCTION MANAGEMENT.
1.3 NOISE CONTROL
A. THE CONTRACTOR SHALL EXECUTE THE WORK IN THIS CONTRACT AS QUIETLY AS PRACTICABLE TO AVOID UNNECESSARY
DISTURBANCES TO PATIENTS WITHIN THE HOSPITAL PREMISES.
B. ANY COMPLAINTS DULY REGISTERED BY SOUTH MIAMI HOSPITAL OF UNACCEPTABLE NOISE LEVELS SHALL BE CAUSE FOR THE
USE OF SPECIAL PRECAUTIONS AND METHODS OF OPERATION BY THE CONTRACTOR TO REDUCE NOISE TO AN ACCEPTABLE
LEVEL.
C. SOUTH MIAMI HOSPITAL SHALL BE THE SOLE JUDGE OF THE TOLERABILITY OF NOISE LEVEL.
D. THE CONTRACTOR SHALL PREPARE A "NOISE SCHEDULE" AS SOON AS PRACTICABLE INDICATING THE TYPE OF DEMOLITION
AND/OR NOISE INDUCING WORK SHOWING THE DATES, TIMES AND DURATION OF SUCH WORK.
1.2 PERSONNEL IDENTIFICATION
A. ALL CONTRACTORS ARE REQUIRED TO FOLLOW PROCEDURES ESTABLISHED BY BAPTIST HEALTH SOUTH FLORIDA - CORPORATE
CONSTRUCTION MANAGEMENT FOR CONTRACTOR IDENTIFICATION.
B. ANY OF THE CONTRACTOR'S OR SUBCONTRACTOR'S PERSONNEL WHO DO NOT COMPLY WITH THESE REQUIREMENTS AT ALL
TIMES, WILL BE DENIED ACCESS TO THE HOSPITAL OR WILL BE ESCORTED OFF THE PREMISES BY THE HOSPITAL SECURITY
GUARDS.
13 PERSONNEL PARKING
A. THE CONTRACTOR SHALL COORDINATE WITH BAPTIST HEALTH SOUTH FLORIDA - CORPORATE CONSTRUCTION MANAGEMENT
APPROPRIATE AREAS FOR PARKING OF HIS PERSONNEL AND EMPLOYEES. LOCATION WILL BE AS DIRECTED BY BAPTIST
HEALTH SOUTH FLORIDA - CORPORATE CONSTRUCTION MANAGEMENT.
1.4 PERSONNEL DEPORTMENT
A. ALTHOUGH INVOLVED IN CONSTRUCTION ACTIVITIES, PERSONNEL MUST RECOGNIZE THAT THEY ARE WORKING IN A HEALTHCARE
FACILITY AND GOVERN THEMSELVES ACCORDINGLY. VULGAR OR SEXUAL COMMENTS DIRECTED AT HOSPITAL STAFF OR VISITORS OR
ANY OTHER OFFENSIVE BEHAVIOR WILL BE GROUNDS FOR IMMEDIATE REMOVAL FROM THE HOSPITAL. SINCE HOSPITAL PATIENTS ARE
FREQUENTLY ON THE OTHER SIDE OF THE TEMPORARY CONSTRUCTION WALLS, EXCESSIVE SOUND TRANSMISSION WILL NOT BE
TOLERATED.
1.5 NORMAL LIMIT OF OPERATIONS
A. THE CONTRACTOR'S NORMAL LIMIT OF OPERATIONS SHALL BE CONFINED WITHIN THE LIMIT OF CONSTRUCTION AS DESIGNATED ON
THE DRAWINGS OR AS DIRECTED BY BAPTIST HEALTH SOUTH FLORIDA - CORPORATE CONSTRUCTION MANAGEMENT.
B. SOUTH MIAMI HOSPITAL, ARCHITECT, AND OTHER CONTRACTORS PERFORMING WORK SHALL BE ALLOWED ACCESS TO THE
CONSTRUCTION AREA AT ALL TIMES,
1.6 PERIODIC OPERATIONS OUTSIDE LIMITS OF OPERATION
A. USE OF CERTAIN LOADING DOCKS, PASSAGEWAYS, ELEVATOR, AND OTHER AREAS, OUTSIDE THE LIMITS OF CONSTRUCTION (AS
DEFINED), WILL BE GRANTED TO THE CONTRACTOR BY SOUTH MIAMI HOSPITAL ON AN INTERMITTENT BASIS AS REQUIRED AND
REQUESTED IN ADVANCE BY THE CONTRACTOR. SOUTH MIAMI HOSPITAL WILL JUDGE THE PROPER TIME AND EXTENT OF SUCH USE.
1.7 SCHEDULING
A. ALL ARRANGEMENTS FOR WORK WHICH WILL INVOLVE INTERFERENCE WITH NORMAL HOSPITAL FUNCTIONING, PARTICULARLY IN
OCCUPIED PATIENT AREAS, OR ADJACENT THERETO, SHALL BE SCHEDULED IN ADVANCE WITH BAPTIST HEALTH SOUTH FLORIDA -
CORPORATE CONSTRUCTION MANAGEMENT TO PROVIDE MINIMUM DISRUPTION AND INCONVENIENCE.
1.8 UTILITY TIE -INS AND OUTAGES
A. THE CONTRACT DOCUMENTS AND/OR FIELD CONSTRUCTION CIRCUMSTANCES MAY REQUIRE A SHUTDOWN OF ONE OR MORE
UTILITY SYSTEMS SUCH AS WATER SERVICE, ELECTRIC POWER, MEDICAL GASES OR HVAC PIPING /SYSTEMS. ANYTIME THATA
UTILITY SHUTDOWN IS REQUIRED FOR TIE -IN OR OTHER PURPOSE THE CONTRACTOR MUST PROVIDE SOUTH MIAMI HOSPITAL WTH A
MINIMUM OF 72 HOURS PRIOR WRITTEN NOTICE OF INTENT. THE NOTICE SHALL BE IN THE FORM OF AN OUTAGE REQUEST AND MUST
DETAIL THE REASON, SCOPE AND DURATION. PROVISIONS FOR SUPPORTING ANY CRITICAL LOADS WHICH MAYBE AFFECTED
MUST BE DESCRIBED, EVEN IF SOUTH MIAMI HOSPITAL STAFF WILL BE ASSISTING WITH
SETUP AND COORDINATION.
B. THE CONTRACTOR SHALL BE RESPONSIBLE FOR SEARCHING OUT UTILITY AND SERVICE LINES TO DETERMINE IF THEY WOULD
RESULT IN AN OUTAGE IN THE HOSPITAL. APPROVAL SHALL BE OBTAINED FROM BAPTIST HEALTH SOUTH FLORIDA - CORPORATE
CONSTRUCTION MANAGEMENT TO EXECUTE SUCH SEARCHES IN ADVANCE.
1.9 WORKING HOURS AND OVERTIME NOTIFICATION
A. THE CONTRACTOR SHALL RECEIVE PERMISSION FROM BAPTIST HEALTH SOUTH FLORIDA - CORPORATE CONSTRUCTION
MANAGEMENT FOR THE CONTRACTOR'S PERSONNEL TO WORK OUTSIDE OF NORMAL DAYTIME HOURS EITHER WITHIN OR OUTSIDE
THE LIMITS OF CONSTRUCTION. NORMAL WORKING HOURS ARE CONSIDERED TO BE 7:30 A.M. TO 4:00 P.M., MONDAY THROUGH
FRIDAY.
1.10 MAINTAINING BUILDING INTEGRITY
A. THE INTEGRITY OF FIRE STOP PARTITIONS, SMOKE COMPARTMENTS AND FIRE DOORS IS A MAJOR CONCERN. BREECHES OF THESE
BARRIERS DURING CONSTRUCTION MUST BE MINIMIZED IN BOTH QUANTITY AND DURATION. ALL PIPE, CONDUIT, DUCT OR OTHER
PENETRATIONS OF WALLS OR FLOORS MUST BE SEALED. THE HOSPITAL WILL NOT BE RESPONSIBLE FOR SEALING OR REPAIRING
WALLS AND FLOOR BREACHED BY THE CONTRACTOR OR CONNECTED WITH HIS WORK. THE CONTRACTOR MAY NOT REMOVE OR PROP
OPEN FIRE DOORS UNLESS IT IS REQUIRED TO PERFORM THE WORK AND PERSONNEL ARE CONTINUALLY PRESENT TO SECURE THE
OPENING IN THE EVENT OF AN EMERGENCY.
1.11 USE OF FACILITIES: THE CONTRACTOR'S EMPLOYEES SHALL CONFINE THEIR ACTIVITIES TO THE WORK AREA AND SHALL NOT ENTER
OTHER PORTIONS OF THE BUILDING WITHOUT PERMISSION FROM
SOUTH MIAMI HOSPITAL.
END OF SECTION 017315
J
SECTION 017700 - CLOSEOUT PROCEDURES
1.1 SUMMARY
A. SUBSTANTIAL COMPLETION PROCEDURES.
B. FINAL COMPLETION PROCEDURES.
C. WARRANTIES.
D. FINAL CLEANING.
1.2 SUBSTANTIAL COMPLETION PROCEDURES: BEFORE FINAL INSPECTION BY ARCHITECT:
A. FINAL APPLICATION FOR PAYMENT SUBMITTED.
B. LIST OF INCOMPLETE ITEMS (PUNCH LIST) ENDORSED BY ARCHITECT AS COMPLETED.
C. EVIDENCE OF CONTINUING INSURANCE COVERAGE SUBMITTED.
D. FINAL PEST - CONTROL INSPECTION REPORTAND WARRANTY SUBMITTED.
1.3 FINAL COMPLETION
A. PRELIMINARY PROCEDURES: BEFORE REQUESTING FINAL INSPECTION FOR DETERMINING FINAL COMPLETION, COMPLETE THE
FOLLOWING:
1. SUBMITA FINAL APPLICATION FOR PAYMENT ACCORDING TO DIVISION 01 SECTION "PAYMENT PROCEDURES"
2. SUBMIT CERTIFIED COPY OF ARCHITECTS SUBSTANTIAL COMPLETION INSPECTION LIST OF ITEMS TO BE COMPLETED OR
CORRECTED (PUNCH LIST), ENDORSED AND DATED BY ARCHITECT. THE CERTIFIED COPY OF THE LIST SHALL
STATE THAT EACH ITEM HAS BEEN COMPLETED OR OTHERWISE RESOLVED FOR ACCEPTANCE.
3. SUBMIT EVIDENCE OF FINAL, CONTINUING INSURANCE COVERAGE COMPLYING WITH INSURANCE REQUIREMENTS.
4. INSTRUCT OWNER'S PERSONNEL IN OPERATION, ADJUSTMENT, AND MAINTENANCE OF PRODUCTS, EQUIPMENT, AND
SYSTEMS. SUBMIT DEMONSTRATION AND TRAINING VIDEO RECORDINGSIF REQUIRED.
B. INSPECTION: SUBMIT WRITTEN REQUEST FOR FINAL INSPECTION FOR ACCEPTANCE. ON RECEIPT OF REQUEST, ARCHITECT
[AND CONSTRUCTION MANAGER] WILL EITHER PROCEED WITH INSPECTION OR NOTIFY CONTRACTOR OF UNFULFILLED REQUIREMENTS.
ARCHITECT WILL PREPARE A FINAL PUNCH LIST AFTER INSPECTION AND WI LL NOTIFY CONTRACTOR OF CONSTRUCTION THAT
MUST BE COMPLETED.
1. REINSPECTION: REQUEST REINSPECTION WHEN THE WORK IDENTIFIED IN PREVIOUS INSPECTIONS AS INCOMPLETE IS
COMPLETED OR CORRECTED
1.4 WARRANTIES: SUBMITTED WITHIN 15 DAYS FOR AREAS OF PARTIAL OCCUPANCY.
A. ORGANIZED AND BOUND IN HEAVY -DUTY, THREE -RING, VINYL - COVERED, LOOSE -LEAF BINDERS, WITH PAPER DIVIDERS.
BINDER FRONT AND SPINE IDENTIFIED WITH TITLE, PROJECT NAME, AND NAME OF CONTRACTOR.
1.5 FINAL CLEANING:
A. EACH SURFACE OR UNIT CLEANED TO CONDITION EXPECTED IN AN AVERAGE COMMERCIAL BUILDING CLEANING AND
MAINTENANCE PROGRAM.
B. CLEAN DUCTS, BLOWERS, AND COILS FOR UNITS OPERATED WITHOUT FILTERS DURING CONSTRUCTION.1.1 MATERIALS
C. CLEANING AGENTS: USE CLEANING MATERIALS AND AGENTS RECOMMENDED BY MANUFACTURER OR FABRICATOR OF THE
SURFACE TO BE CLEANED. DO NOT USE CLEANING AGENTS THAT ARE POTENTIALLY HAZARDOUS TO HEALTH OR PROPERTY OR THAT
MIGHT DAMAGE FINISHED SURFACES.
END OF SECTION 017700
SECTION 017823 - OPERATION AND MAINTENANCE DATA
1.1 SECTION INCLUDES ADMINISTRATIVE AND PROCEDURAL REQUIREMENTS FOR PREPARING OPERATION AND MAINTENANCE MANUALS,
A. PRODUCT MAINTENANCE MANUALS.
1.2 EMERGENCY, OPERATION AND MAINTENANCE MANUALS.
A. FORMAT:. PDF ELECTRONIC FILES VATH COMPOSITE ELECTRONIC INDEX ON DIGITAL MEDIA ACCEPTABLE TO ARCHITECT.
INCLUDE A COMPLETE ELECTRONICALLY- LINKED OPERATION AND MAINTENANCE DIRECTORY.
B. HEAVY -DUTY, THREE -RING, VINYL - COVERED, LOOSE -LEAF BINDERS,THREE (3) SETS) OF COPIES. (INCLUDE LAMINATE SAMPLES.)
C. PRODUCT MAINTENANCE MANUALS: SOURCE INFORMATION, PRODUCT INFORMATION, MAINTENANCE PROCEDURES, REPAIR
MATERIALS AND SOURCES, AND WARRANTIES AND BONDS.
END OF SECTION 017823
SECTION 017839 - PROJECT RECORD DOCUMENTS
1.1 RECORD DRAWINGS:
A. ONE OF MARKED -UP RECORD PRINTS.
B. INITIAL SUBMITTAL: ONE PAPER COPY SET, PDF ELECTRONIC FILES OF MARKED -UP RECORD PRINTS AND ONE SETS) OF PLOTS FROM
CORRECTED RECORD DIGITAL DATA FILES.
C. FINAL SUBMITTAL: SUBMIT ONE PAPER COPY SETAND PDF ELECTRONIC FILES OF MARKED -UP RECORD PRINTS,
D. RECORD SPECIFICATIONS: ANNOTATED PDF ELECTRONIC FILES,
1.2. RECORD PRODUCT DATA:
A. ONE PAPER COPY, ANNOTATED PDF ELECTRONIC FILES AND DIRECTORIES.
B. MISCELLANEOUS RECORD SUBMITTALS: ONE PAPER COPY AND ANNOTATED PDF ELECTRONIC FILES AND DIRECTORIES.
1.3 PRODUCTS
A. RECORD PRINTS: ONE SET OF PAPER COPIES OF CONTRACT DOCUMENTS AND SHOP DRAWINGS, MARKED TO SHOW ACTUAL
INSTALLATION.
B. RECORD DIGITAL DATA FILES: CORRECTED DIGITAL DATA FILES OF THE CONTRACT DRAWINGS, AS FOLLOWS:
1. FORMAT: ANNOTATED PDF ELECTRONIC FILE WITH COMMENT FUNCTION ENABLED.
END OF SECTION 017839
6 7
SECTION 064023 - INTERIOR ARCHITECTURAL WOODWORK
1.1 THIS SECTION INCLUDES THE FOLLOWING: INTERIOR STANDING AND RUNNING TRIM. PLASTIC - LAMINATE CABINETS. CABINET
HARDWARE AND ACCESSORIES, PLASTIC-LAMINATE COUN E TOPS. SOLID- SURFACING - MATERIAL COUNTERTOPS.
A. FIRE- TEST - RESPONSE CHARACTERISTICS: WHERE FIRE - RETARDANT MATERIALS OR PRODUCTS ARE INDICATED, PROVIDE
MATERIALS AND PRODUCTS 100TH SPECIFIED FIRE - TEST - RESPONSE CHARACTERISTICS AS DETERMINED BY TESTING IDENTICAL
PRODUCTS PER TE STMETHOD INDICATED B UL ITS OR ANOTHER T ESTING AN D INSPECTING AGENCY ACCEPTABLE TO
AUTHORITIES HAVING JURISDICTION. IDENTIFY WITH APPROPRIATE MARKINGS OF APPLICABLE TESTING AND INSPECTING GENCY
IN THE FORM OF SEPARABLE PAPER LABEL OR, WHERE REQUIRED BY AUTHORITIES HAVING JURISDICTION, IMPRINT ON SURFACES OF
MATERIALS THAT WILL BE CONCEALED FROM VIEW AFTER INSTALLATION.
1.2 MATERIALS
A. GENERAL: PROVIDE MATERIALS THAT COMPLY WITH REQUIREMENTS OF AN'S QUALITY STANDARD FOR EACH TYPE OF
WOODWORK AND Q UALITY GRADE SPECIFIED UNLESS OTHERWISE INDICATED.
B. MEDIUM - DENSITY FIBERBOARD: ANSI A208.2, GRADE MD, MADE WITH BINDER CONTAINING NO UREA FORMALDEHYDE.
C. HIGH - PRESSURE DECORATIVE LAMINATE: NEMA LID 3, GRADES AS INDICATED OR, IF NOT INDICATED, AS REQUIRED BY
WOODWORK QUALITY STANDARD.
D. SOLID- SURFACING MATERIAL: HOMOGENEOUS SOLID SHEETS OF FILLED PLASTIC RESIN COMPLYING WITH ISSFA -2.
1.3 CABINET HARDWARE
A. GENERAL: PROVIDE CABINET HARDWARE AND ACCESSORY MATERIALS ASSOCIATED WITH ARCHITECTURAL CABINETS,
EXCEPT FOR ITEMS SPECIFIED IN DIVISION 08 SECTION "DOOR HARDWARE (SCHEDULED BY DESCRIBING PRODUCTS)."
B. BUTT HINGES: 2 -314 -INCH (70 -MM), 5- KNUCKLE STEEL HINGES MADE FROM 0.095 -INCH- (2.4-MM-) THICK METAL, AND AS
FOLLOWS:
1. SEMI - CONCEALED HINGES FOR OVERLAY DOORS. BHMA A156.9, 601521.
C. FRAMELESS CONCEALED HINGES (EUROPEAN TYPE): BHMAA156.9, B01602,135 DEGREES OF OPENING, HINGES SHALL BE
CAM ADJUSTABLE FOR ALIGNMENT.
D. BACK- MOUNTED PULLS: BHMA A156.9, B02011. SATIN CHROME FINISH.
E. WIRE PULLS: BACK MOUNTED, SOLID METAL 4 INCHES LONG, 5116 INCH IN DIAMETER.
F. CATCHES: MAGNETIC CATCHES, BHMA A156.9, B03141.
G. ADJUSTABLE SHELF STANDARDS AND SUPPORTS: BHMA Al56A B04071; WITH SHELF RESTS, B04081 BHMA Al 56.9, B04102,
WITH SHELF BRACKETS, B04112.
H. SHELF RESTS: BHMA A156.9, B04013; METAL.
I. DRAWER SLIDES: BHMA A156.9, B05091.
1. HEAVY DUTY (GRADE 1HD 100 AND GRADE 1HD-200): SIDE MOUNTED; FULL - EXTENSION TYPE, ZINC PLATED STEEL
BALL - BEARING SLIDES.
2. BOX DRAWER SLIDES: GRADE 1 HD -100; FOR DRAWERS NOT MORE THAN 6INCHES (150 MM) HIGH AND 24 INCHES (600
MM) WIDE.
3. FILE DRAWER SLIDES: GRADE 1HD -200; FOR DRAWERS MORE THAN 13 INCHES (150 MM) HIGH OR 24 INCHES (600 MM)
WIDE.
4. PENCIL DRAWER SLIDES: GRADE 1; FOR DRAWERS NOT MORE THAN 3 INCHES (15 MM) HIGH AND 24 INCHES (600 MM)
WIDE.
J. DOOR LOCKS: BHMA A156.11, E07121.
K. DRAWER LOCKS: BHMA Al 56.11, E07041.
L. GROMMETS FOR CABLE PASSAGE THROUGH COUNTERTOPS: 2 - INCH OD, CHROME GROMMETS AND MATCHING CAPS WITH
SLOT FOR WIRE PASSAGE.
1. PRODUCT: SUBJECT TO COMPLIANCE WITH REQUIREMENTS, PROVIDE "SG SERIES" BY DOUG MOCKETT & COMPANY,
INC.
2. EXPOSED HARDWARE FINISHES: FOR EXPOSED HARDWARE, PROVIDE FINISH THAT COMPLIES NTH BHMA A156.18
FOR BHMA FINISH NUMBER INDICATING SATIN CHROMIUM PLATED: BHMA 626 FOR BRASS OR BRONZE BASE, BHMA
652 FOR STEEL BASE.
1.4 CABINET HARDWARE
A. GENERAL: PROVIDE CABINET HARDWARE AND ACCESSORY MATERIALS ASSOCIATED WITH ARCHITECTURAL CABINETS,
B. BUTT HINGES: 2- 314 -INCH (70-MM), 5- KNUCKLE STEEL HINGES MADE FROM 0.095 -INCH- (2.4-MM-) THICK METAL, AND AS
FOLLOWS:
1. SEMI - CONCEALED HINGES FOR OVERLAY DOORS: BFIMA A156.9,1301521.
C. FRAMELESS CONCEALED HINGES (EUROPEAN TYPE): BHMAA156.9, B01602,135 DEGREES OF OPENING, HINGES SHALL BE
CAM ADJUSTABLE FOR ALIGNMENT.
D. BACK - MOUNTED PULLS: BHMA A156.9, B02011. SATIN CHROME FINISH.
E. WIRE PULLS: BACK MOUNTED, SOLID METAL 4 INCHES LONG, 5116 INCH IN DIAMETER.
F. CATCHES: MAGNETIC CATCHES, BHMA A156.9, B03141.
G. ADJUSTABLE SHELF STANDARDS AND SUPPORTS: BHMA A156.9, B04071; WITH SHELF RESTS, B04081 BHMA 0156.9, 604102;
WITH SHELF BRACKETS, B04112.
H. SHELF RESTS: BHMA Al 56.9, B04013; METAL.
I. DRAWER SLIDES: BHMA A156.9, B05091.
1. HEAVY DUTY (GRADE 1 HD -100 AND GRADE 1FID -200): SIDE MOUNTED; FULL - EXTENSION TYPE; ZINC - PLATED STEEL
BALL- BEARING SLIDES.
2. BOX DRAWER SLIDES: GRADE 1 HD -100; FOR DRAWERS NOT MORE THAN 6 INCHES (150 MM) HIGH AND 24 INCHES (600
MM) WIDE.
3. FILE DRAWER SLIDES: GRADE 1HD -200; FOR DRAWERS MORE THAN 13 INCHES (150 MM) HIGH OR24INCHES (600 MM)
WIDE.
4. PENCIL DRAWER SLIDES: GRADE 1; FOR DRAWERS NOT MORE THAN 3 INCHES (75 MM) HIGH AND 24 INCHES (600 MM)
WIDE.
J. DOOR LOCKS: BHMAA156.11, E07121.
K. DRAWER LOCKS: BHMA Al56.11, E07041.
L. GROMMETS FOR CABLE PASSAGE THROUGH COUNTERTOPS: 2 - INCH OD, CHROME GROMMETS AND MATCHING CAPS WITH
SLOT FOR WIRE PASSAGE.
1. PRODUCT: SUBJECT TO COMPLIANCE WTH REQUIREMENTS, PROVIDE "SG SERIES" BY DOUG MOCKETT & COMPANY,
INC.
2. EXPOSED HARDWARE FINISHES: FOR EXPOSED HARDWARE, PROVIDE FINISH THAT COMPLIES NTH BHMA A156.18
FOR BHMA FINISH NUMBER INDICATING SATIN CHROMIUM PLATED: BHMA 626 FOR BRASS OR BRONZE BASE; BHMA
652 FOR STEEL BASE.
h
r,
,
A R R A Y
L �
healthcare facilities solutions
6800 Broken Sound Boulevard NW
Suite 125
Boca Raton, FL 33487
t: 561.995.1700
f: 561.995.1701
www.arrayhfs.com
SEAL:
MARK D. TAUDIEN
CONSULTANTS:
Smith Seckman Reid, Inc.
600 West Hillsboro Blvd., Suite 300
Deerfield Beach, FL 33441
firm license number
AA26000880
AR001 1821
OWNER:
BAPTIST HEALTH SOUTH
FLORIDA
HOSPITAL:
SOUTH MIAMI
END OF SECTION 064023
Ihi; rJocurneiit n; a ell Ohi Protected instrui lien cl uervre, property of BRAY and
licensed for use in the Utlr_d project only. ReProdui_tion or use of !his rlocurnont
without written Permission of ARRAY is illeyfud and swill be prosecuted under the luw.
(C)COPYRIGHT - 2012 ARRAY HFS
w 4
HOSPITAL
1.5 CABINET
HARDWARE AND ACCESSORY MATERIALS
A. GENERAL: PROVIDE CABINET HARDWARE AND ACCESSORY MATERIALS FOR CABINETS AS INDICATED AND TO COMPLY WITH
ADA'. HARDWARE ITEMS NOT SHOWN BUT REQUIRED FOR FUNCTION INDICATED SHALL BE FURNISHED IN THE SAME FINISH AND
QUALITY
1. PULLS: IVES NO. 530. COLOR SELECTED BY INTERIOR DESIGNER.
2. FLUSH - MOUNTED SHELF SUPPORT: KV NO. 255 SHELF STANDARDS WITH KV NO. 239 SHELF SUPPORT CLIPS, BRIGHT
PROJECT:
ZINC PLATED STEEL UNLESS OTHERWISE INDICATED.
3. CABINET CATCHES SINGLE MAGNETIC TYPE: STANLEY 46 U PLAIN FINISHED ALUMINUM.
S
I Desk Coffee
h 0
4. DRAWER SLIDES:
0
p
a. SHALLOW DRAWERS (6" DEEP MAXIMUM): KV1300, SIDE MOUNTING, BALL - BEARING NYLON ROLLERS.
b. HEAVY DUTY DRAWERS: KV1429, RATED 100 LBS., FULL EXTENSION.
5. HINGES:
a CONCEALED HINGES FOR OVERLAY DOORS: STANLEY 1560 SERIES, SIZE AS REQUIRED.
b. LOCKS: CORBIN CABINET LOCK NO. 02065.
1.6
PLASTIC- LAMINATE CABINETS
A. GRADE: PREMIUM.
ADDRESS:
B. AW TYPE OF CABINET CONSTRUCTION: FLUSH OVERLAY
C. REVEAL DIMENSION: 112 INCH (13 MM).
6200 Southwest 73rd Street
D. LAMINATE CLADDING FOR EXPOSED SURFACES: HIGH - PRESSURE DECORATIVE LAMINATE COMPLYING WITH THE
FOLLOWING REQUIREMENTS:
South Miami, FL 33143
1. HORIZONTAL SURFACES OTHER THAN TOPS: GRADE FIGS.
2. POSTFORMED SURFACES: GRADE HGP.
3. VERTICAL SURFACES: GRADE FIGS.
4. EDGES: GRADE FIGS EDGE BANDING, 0.12 INCH (3 MM) THICK, MATCHING LAMINATE IN COLOR, PATTERN, AND FINISH.
E. MATERIALS FOR SEMIEXPOSED SURFACES:
1. SURFACES OTHER THAN DRAWER BODIES: HIGH - PRESSURE DECORATIVE LAMINATE, GRADE VGS.
2. EDGES OF PLASTIC- LAMINATE SHELVES: PVC EDGE BANDING, 0.12 INCH (3 MM) THICK, MATCHING LAMINATE IN COLOR,
PATTERN, AND FINISH.
3. FOR SEMIEXPOSED BACKS OF PANELS WITH EXPOSED PLASTIC- LAMINATE SURFACES, PROVIDE SURFACE OF HIGH-
PRESSURE DECORATIVE LAMINATE, GRADE VGS.
N0.
DESCRIPTION
DATE
4. DRAWER SIDES AND BACKS: THERMOSET DECORATIVE PANELS.
5. DRAWER BOTTOMS: THERMOSET DECORATIVE PANELS.
REVISIONSfISSUES
F. CONCEALED BACKS OF PANELS NTH EXPOSED PLASTIC LAMINATE SURFACES: HIGH - PRESSURE DECORATIVE LAMINATE,
- - - - - -- -
GRADE BKL.
SHEET TITLE:
G. COLORS, PATTERNS, AND FINISHES: PROVIDE MATERIALS AND PRODUCTS THAT RESULT IN COLORS AND TEXTURES OF
EXPOSED LAMINATE SURFACES COMPLYING WITH THE FOLLOWING REQUIREMENTS: ] a° `q1;
'y'� Al
API
1. AS INDICATED BY LAMINATE MANUFACTURER'S DESIGNATIONS. i',1 1�9, ;#")IN G TDr P`
Z AS SELECTED BY ARCHITECT FROM LAMINATE MANUFACTURER'S FULL RANGE OF PRODUCTS.
SPECIFICATIONS
3. SEE FINISH DRAWINGS FOR MANUFACTURER, STYLE AND COLOR. ,I.� ft- MIAI..SF
-C I)PI
H. PROVIDE DUST PANELS OF 114 -INCH (6.4 -MM) PLYWOOD OR TEMPERED HARDBOARD ABOVE COMPARTMENTS AND
DRAWERS, UNLESS LOCATED DIRECTLY UNDER TOPS.
1.7
PLASTIC - LAMINATE COUNTERTOPS 1vr =r' `3Y
A. GRADE: PREMIUM.
B. HIGH - PRESSURE DECORATIVE LAMINATE GRADE: HGS,
C. COLORS, PATTERNS, AND FINISHES: PROVIDE MATERIALS AND PRODUCTS THAT RESULT IN COLORS AND TEXTURES OF
EXPOSED LAMINATE SURFACES COMPLYING WITH THE FOLLOWING REQUIREMENTS:
1. SEE FINISH DRAWINGS FOR MANUFACTURER, STYLE AND COLOR.
DRAWN: FL CHECKED: MDT
1.8
SOLID- SURFACING - MATERIAL COUNTERTOPS
CON/REF No. 00000
A. GRADE: PREMIUM.
B. SOLID - SURFACING - MATERIAL THICKNESS: 1/2 INCH (13 MM)
PROJECT No. 3601
C- COLORS, PATTERNS, AND FINISHES: PROVIDE MATERIALS AND PRODUCTS THAT RESULT IN COLORS OF SOLID - SURFACING
MATERIAL COMPLYING NTH THE FOLLOWING REQUIREMENTS:
DATE: 07/30/2012 SCALE: 12" = V -0"
1. SEE FINISH DRAWINGS FOR MANUFACTURER, STYLE AND COLOR.
D. CORE MATERIAL AT NURSING STATION: MFDIUM- DENSITY FIBERBOARD MADE WITH EXTERIOR GLUE.
E. RECEPTION AREAS /NURSES STATION: VERTICAL SURFACES OF 112 INCH THICK SOLID POLYMER MATERIAL AND HORIZONTAL
SHEET NO.
SURFACES OF 112 INCH THICK SOLID POLYMER MATERIAL, ADHESIVELY JOINED WITH INCONSPICUOUS SEAMS, HAVING EDGE
DETAILS AS INDICATED ON THE DRAWINGS.
1.9
INSTALLATION
A802
A. INSTALL WOODWORK LEVEL, PLUMB, TRUE, AND STRAIGHT. SHIM AS REQUIRED WITH CONCEALED SHIMS. INSTALL LEVEL
AND PLUMB (INCLUDING TOPS) TO A TOLERANCE OF 118 INCH IN 96 INCHES (3 MM IN 2400 MM).
B. SCRIBE AND CUT WOODWORK TO FIT ADJOINING WORK, REFINISH CUT SURFACES, AND REPAIR DAMAGED FINISH AT CUTS,
END OF SECTION 064023
Ihi; rJocurneiit n; a ell Ohi Protected instrui lien cl uervre, property of BRAY and
licensed for use in the Utlr_d project only. ReProdui_tion or use of !his rlocurnont
without written Permission of ARRAY is illeyfud and swill be prosecuted under the luw.
(C)COPYRIGHT - 2012 ARRAY HFS
w 4