Loading...
12-939-006E I C 0 1 2 3 4 5 6 - - — -- WIZ I V FIRST FLOOR - PHASE TWO 114" = T -0`' 7 PHASING GENERAL NOTES 1. CONTRACTOR TO COORDINATE WITH HOSPITAL ANY SHUT- DOW/IN (MPE, BLOCKING OF ENTRANCES) TO INSURE THE OPERATION AND SERVICES OF ALL OCCUPIED AREAS OUTSIDE CONSTRUCTION AREA. 2. CONSTRUCT TEMPORARY PARTITIONS 1 BARRIERS AS PER SPECIFICATIONS TO SEPARATE CONSTRUCTION WORK FROM OTHER AREAS OF THE BUILDING. ALL TEMPORARY PARTITIONS MUST STAY IN PLACE UNTIL THE CEILING IS INSTALLED AND THE ONLY WORK LEFT TO BE DONE IS MINOR FINISHES AND PUNCH LIST ITEMS. 3. PRIOR TO PARTIAL OWNER OCCUPANCY OF EACH PHASE, MECHANICAL AND ELECTRICAL SYSTEMS ARE TO BE FULLY OPERATIONAL. 4. PROVIDE SCHEDULE TO OWNER t ARCHITECT THAT SHOWS THE FOLLOWING: BEGINNING AND END DATES OF EACH PHASE DATES THAT COORDINATE SHUT -DOWN AND TIE -INS ALL OTHER IMPORTANT INFORMATION THAT WILL AFFECT THE OWNERS OCCUPANCY OF AREAS OUTSIDE THE LIMIT OF WORK. 5. NOTIFY IN WRITING TO OWNER AND ARCHITECT, WITHIN SEVEN WORKING DAYS, AREAS OF THE BUILDING TO BE TURNED -OVER FOR CONSTRUCTION. 6. PERFORM THE NECESSARY DEMOLITION WORK REQUIRED TO COMPLETE THE NEWWORK ON EACH PHASE, REFER TO DEMOLITION PLANS AND NOTES ON SHEETAD111 IT IS THE CONTRACTORS RESPONSIBILITY TO DETERMINE WHAT PORTION OF THE OVERALL DEMOLITION WORK IS REQUIRED FOR EACH PHASE, PHASING KEYNOTES PH -1 PROVIDE 10LB ABC FIRE EXTINGUISHER DURING CONSTRUCTION ACTIVITIES. PH 2 PROVIDE STICKY WALK OFF MAT ON BOTH SIDE OF ENTRANCE TO CONSTRUCTION AREA. E-3 CONTRACTOR SHALL PROVIDE NEGATIVE AIR MACHINE DURING CONSTRUCTION ACTIVITIES. PH-4 CONTRACTOR TO PROVIDE "ZIP -ALL" ENTRANCE INTO CONSTRUCTION AREA. PH 5 TEMPORARY 1 -HOUR RATED PARTITION PH 6 CONTRACTOR TO PROVIDE TEMPORARY 20 MINUTE FIRE RATED DOOR WITH CLOSER AND CONSTRUCTION LOCK -SET. 0F Sty L) T I., A MIAND BUILDING DI-PT. 6 M4 ARRAY k4 k healthcare facilities solutions. 6800 Broken Sound Boulevard NW Suite 125 Boca Raton, FL 33487 t: 561.995.1700 f: 561.995.1701 www.arrayhfs.com SEAL: firm license number AA26000880 a�htpP P � Md NO. DESCRIPTION DATE REVISIONSJISSUES MARK D. TAUDIEN AR0011821 CONSULTANTS: SE C f101`4 SHEET TITLE: E y PHASI N G I CRA PLAN Smith Seckman Reid, Inc. 600 West Hillsboro Blvd., Suite 300 Deerfield Beach, FL 33441 OWNER: BAPTIST HEALTH SOUTH FLORIDA HOSPITAL: SOUTH MIAMI HOSPITAL PROJECT: Info Desk Et Coffee Shop ADDRESS: 6200 Southwest 73rd Street South Miami, FL 33143 r 1 BID AND PERMIT SET _ _ 07 -30 -12 NO. DESCRIPTION DATE REVISIONSJISSUES DRAWN: FL CHECKED: MDT CON /REF No. 00000 PROJECT No. 3601 DATE: 07/30/2012 SHEET NO. SCALE: As indicated A001 This docurnent is o copyright piulected instrument of service, pirupeiIy of ARRAY and licensed for use in the tilled project only. Reprodudion or use of lhis document vMhout written permissiun of ARRAY is Illgal and ,All be Proeeculed under the av,. (C)COPYRIGHT-20112 ARRAY HFS