12-565-008ROOM
M.I.C.U.
ROOM
M.I.C.U.
ROOM
M.I.C.U.
ROOM
M.I.C.U.
ROOM
M.I.C.U.
ROOM
M.I.C.U.
ROOM
M.I.C.U.
ROOM
M.I.C.U.
ROOM
M.I.C.U.
ROOM
M.I.C.U.
ROOM
M.I.C.U.
ROOM
M.I.C.U.
NT -STAIR
EQUIPEMENT
.JVf 1 f_1 I J 1
❑ VIEWING EQPM. LL-iii DICT. ❑
DOCTOR'
DICTATION EQUIP.
DOCTOR'S STOR. IVR PROC. E
PREP. CO TROL -E
MEDICAL ROOM ONTR L
CONSULT.
ROOM c
IUTRITION SOILED
UTILITY
SCRUB Im
❑ EQUIP. FrEll
c
CORR
HOLDING IVR PROC. D ONTR L
THERAPY 1I LOUNGE
:SPIRATOR STAFF
0
CORRIDOR
J
luul
FUTURE FUTURE
ELEV.14 ELEV.15
OMM.
LOSETI
NINE
HOLDING
CLEAN
OFFICE
OFFICE
SCRL
OLDING
TROL -DU
c
TROL -F
ONTR L
CONSTRUCTION MATERIALS &
FERRIS ROUTING
CORR
I0 EMPORARY AIR FIRE DAMP R CEILING SLAB
❑ SEE DETAIL IN SHEET E -5�.
N FD
Im
I o 12 "0
EP LAB CEILING GRID
PROC. C IQ 12 "0
Iw 175 CFM
WHERE 12 "0
o SHOWN 00 VD
� v RAWINGS ry
675 CFM WORK AREA
N AI FLOW
W
— I 10 "0 CATH ROOM
CATH. I 3 CORRIDOR 12 "0
PROC. B t
SCRUB
PREDATOR 1200
I PORTABLE AIR [850 CFM
STRET. �;. SCRUBBER WITH
HOLIDING 4 HEPA FILTER
PORTABLE ROOM PRESSURE ` " '
MONITOR "HCPDPM2 ". AS ` ;� < ti
0 wo
— — — — — — — MANUF. BY ABATEMENT
It ��.�.
TECHNOLOGIES rf° ;1i ,� NV'GATI*E"•AIR. MACHINE DETAIL
❑ j (1- 800 - 634 -9091 E`
) (TYP.). NOT TO SCALE
DUST MAT.
CATH.
(TYP.) �
PROC. A i + "` t i
COMPLIANT, FLAME CONST�U� hON WORK READ I "ECsATIVE PRESSURE:
SCRUB 1---ICRA
RETARDANT, 6 -MIL POLY
SHEETING WITH BOLD BLUE AND MINIMUM AIR CHANGES:
STET. IMPRINTED TEXT "HCNC1001 ". 1. MINIMUM NEGATIVE PRESSURE IN CONSTRUCTION ZONE PER OWNER'S I.C.R.A. REQUIREMENTS =
OFFICE -� HO DING (PART OF BASIC ZIPWALL KIT 0.02" W.G..
CHECK "HC4PL "). MANUFACTURED BY 2. ADJUST DISCHARGE AIR VOLUME ON HEPA NEGATIVE PRESSURE MACHINE TO MAINTAIN A MINIMUM OF
DICT. CONTROL I ABATEMENT TECHNOLOGIES 0.02" W.G. NEGATIVE PRESSURE AS MEASURED BY ROOM PRESSURE DIFFERENTIAL MONITOR(S) UP TO
❑ ❑ — — — — (1- 800 - 634 -9091) (TYP.). A MAXIMUM OF 0.04" W.G. NEGATIVE PRESSURE.
❑ HOLDING ❑ I 3. AS PER OWNER'S I.C.R.A., MINIMUM AIR CHANGES WITHIN WORK AREAS SHALL BE 6.
CLEAN CORf� NEGATIVE AIR MACHINE
ONSTRUCTION MATERIALS & DEBRIS ROUTING PERD1200 BY ABATEMENT
--------------- - - - - -- —� TECHNOLOGIES CONSTRUCTION WORK AREA VENTILATION NOTES
(1- 800 - 634 -9091) (TYP.).
;7 CONTRACTOR SHALL USE TYPE "B" HIGHEST RISK, CLASS III /IV.
MANAGER CLEAN Y %` Y MOBILE CONTAINMENT CUBE
PHARMACY TLT RECOV. FOR ALL WORK BETWEEN THE ' 1. CONTRACTOR SHALL BECOME FAMILIAR W /HOSPITAL'S INFECTION CONTROL RISK ASSESSMENT (I.C.R.A.)
SATELLITE I CHEDUL (2) ASSIST PANELBOARD AND THE ROOM. PREPARED BY OWNER FOR THIS PROJECT. CONTRACTOR SHALL PERFORM ALL WORK IN ACCORDANCE
SEE EQUIPMENT WITH SAID REQUIREMENTS. CONTRACTOR SHALL ADHERE TO THE LIMITS OF THE CONSTRUCTION AREA.
REPORT SPECIFICATIONS IN THIS WHERE PHASING IS SHOWN, CONTRACTOR SHALL ADHERE TO THE PHASING DRAWINGS.
PREP `.'
DICTATION I / SHEET. 2. AS MAY BE REQUIRED BY THE ICRA, THE CONTRACTOR SHALL MAKE EVERY EFFORT TO MAINTAIN
DOCTOR'S ASSI T. RY SOIL RECOV. EXIST. LEVELS OF INDOOR AIR QUALITY IN AREAS SURROUNDING CONSTRUCTION AREA. CONTRACTOR
TOILET I MANG. MANAGER SHALL ERECT ALL CONSTRUCTION BARRIERS AND PROVISIONS OF NEGATIVE PRESSURE IN THE
® ❑ ❑ ❑ 1 4 CONSTRUCTION AREA RELATIVE TO OTHER AREAS.
ASS STO. ❑
CORK 3. IN ADDITION TO COMPLYING WITH THE REQUIREMENT OF THE I.C.R.A., THE CONTRACTOR SHALL ALSO
VIEWING PREP/ PREP PROVIDE ALL THE NECESSARY COMPONENTS AND EQUIPMENT AS SHOWN ON THE I.C.R.A. DRAWINGS
DOCTOR'S TOILET I MANAGER FILES RECOV RY R / PREP RECOV. TO CREATE A NEGATIVE PRESSURE IN THE CONSTRUCTION AREA RELATIVE TO ADJACENT AREAS. EXIST.
® RECD HVAC SYSTEM(S) SHALL NOT BE USED FOR THIS FUNCTION, UNLESS SPECIFICALLY APPROVED BY THE
;91 R OWNER'S INFECTION CONTROL OFFICER AND ONLY TO THE EXTENT INDICATED ON THE I.C.R.A. DWGS..
SOILED I EQUIP. STO CORR THE CONCEPT AND ALL ASPECTS OF THIS WORK SHALL BE DONE IN ACCORDANCE WITH THE I.C.R.A.
UTILITY SUPPORT REQUIREMENTS AND AT A MINIMUM ARE AS FOLLOWS:
FILM PREP/ PREP VERIFY THAT ALL EXISTING DUCTWORK WHICH PASSES THROUGH THE WORK AREA AND
WORKR / RECOV RY PREP/ PREP/ RECOV. REMAIN ARE SEALED, AND PROTECTED DURING THE CONSTRUCTION WORK. COVER OR BLANK OFF
APER W R CO V. ALL SUPPLY RETURN /EXHAUST OPENINGS.
STO. AIR REMOVED FROM THE CONSTRUCTION ZONE SHALL BE FILTERED AND /OR DISCHARGED AS
CORRIDOR I INDICATED ON THE CONSTRUCTION WORK AREAS.
DMS
❑ L AT. T ❑ MONITOR AND VERIFY NEGATIVE PRESSURE IS BEING MAINTAINED IN ACCORDANCE WITH THE ICRA
ROOM I ❑ I RECOV. REPORT, AND PROVIDE DOCUMENTATION TO THE OWNER AS REQUIRED.
ELECTRICAL
#11 4. ANY REQUIRED EQUIP. SHUTDOWN SHALL BE COORDINATED W/THE OWNER, IN ADVANCE TO ASSURE
THAT SHUTDOWN WILL NOT ADVERSALLY AFFECT AIR PRESSURE RELATIONSHIPS.
ROOM ROOM CORK 5. CONTRACTOR SHALL HAVE AIR NEGATIVE AIR MACHINES, PRES. MONITORS, ALARMS, DISCHARGE AIR
UTRITION MEDICINE z NURSES TILT
ICI
ELEV.1 ELEV.2 ELEV.13
P I
P -STAIR
1L- --
Ij DUCTS & ANY MODIFICATIONS TO EXISTING HVAC SYSTEMS READY PRIOR TO DEMOLITION AND READY
❑ ❑ ❑ ❑ STATION FOR TEST &BALANCE. CONTRACTOR TO PERFORM CONSTRUCITON WORK AREAS) VENTILATION PLAN
TESTING, ADJUSTING, AND BALANCING.
IN PREP
FE-1 6. DEMOLITION WORK SHALL NOT BEGIN UNTIL CONSTRUCTION WORK AREA(S) T & B REPORT HAS BEEN
m # 1 RECOV. REVIEWED & ACCEPTED BY THE ARCH., ENGINEER, & THE OWNER'S INFECTION CONTROL MANAGER.
ROOM Iwo EXIST. CORR #10 7. VISQUEEN CUBE CONSTRUCTION ISOLATION SHALL BE CREATED WHERE WORK IS PERMITTED IN THE
CORRIDORS. H.E.P.A. VACUUM SHALL BE USED TO CLEAN WITHIN THE CUBE AFTER THE WORK HAS
EQUIPMENT WAITING I� MECH. BEEN COMPLETED.
FAMILY J PACS
V DMS TEST AND BALANCE NOTES:
PREP/ PREP/ PREP/ PREP/ PREP/ PREP/ PREP/
R CO R C V. R CO . RECOV. R C V. R CO . R C V. 1. PRE - DEMOLITION
ROOM
Z 3 #4 #5 #6 #7 #8 #9 PRIOR TO COMMENCEMENT OF ANY DEMOLITION WORK IN THE CONSTRUCTION AREA AN INDEPENDENT
ANITO ELECTRICA TLT AABC OR NEBB CERIFIED TESTING, ADJUSTINC AND BALANCING (TAB) CONTRACTOR SHALL MEASURE
I� AND DOCUMENT IN A TYPED REPORT, THE FOLLOWING INFORMATION:
v~i A.) SPEED SETTING AND AIRFLOW OF ALL NEGATIVE AIR MACHINES, RECIRCULATING AND EXHAUST.
'Af AREA EFRESHMEN ROOM zo B.) DIFFERENTIAL PRESSUE READING OF ALL NEGATIVE AIR MACHINE FILTER GAUGES.
TREATMENT IU
WATER N C.) DIFFERENTIAL PRESSURE BETWEEN CONSTRUCTION WORK AREA(S) & ADJACENT AREAS AT EACH
D A DT I A I c D r n kI n VIII O O D DOORWAY ENTRANCE TO THE CONSTRUCTION WORK AREA
ICRA PLAN
CONSTRUCTION MATERIALS _
[MR7S_R67U0_
I
TOILET
I
MECHANICAL
ROOM
Li I
I JAN.
I CLO .
0
I
I
TOILET
�I I
I
CONSTRUCTION MATERIALS &
DEBrrRMIN�
SCAM am 1-w
D.) VERIFY ROOM PRESSURE DIFFERENTIAL MONITORS LOCATED NEAR DOORWAY ENTRANCE TO
CONSTRUCTION WORK AREA ARE READING WITHIN +/- 10% OF FIELD READINGS OF ITEM 3 ABOVE.
F.) ANY DEFICIENCIES IN MEETING THE OWNER'S ICRA REQUIREMENTS FOR AIR CHANGES, RELATIVE
NEGATIVE PRESSURE OR FAULTY EQUIPMENT SHALL BE IDENTIFIED IN THE FINAL REPORT.
EQUIPMENT SPECIFICATIONS:
D. COOR . CAROL 1. NEGATIVE AIR MACHINES - ABATEMENT TECHNOLOGIES MODEL HEPA -AIRE PAS (800- 634 -9091)
SEC. MD. EXAM HYSICIA HYSICIA CLINICIAN OFFICE ADMIN.
PBX ROOM SUPPORT OFFICE OF OFFICE SUPPORT BIGGS OR EQUIVALENT. PROVIDE WITH THE FOLLOWING FEATURES:
OFFICE A.) U.L. OR E.T.L. LISTED.
n N.I.- ASSIST B.) STAINLESS STEEL CABINET WITH INTEGRAL TRANSPORT DOLLY AND EXHAUST COLLAR.
I I
CORR ADMINISTRATION M I N I S TR A TI 0 N C.) UP TO FOUR STAGES OF FILTRATION WITH ZERO BYPASS CABINET CONSTRUCTION.
TL
Q
EXISTING PBX
TELEPHONE
RM.
CORR
LOUNGE
COI
OFFICE
EXIST.
�, �„ ELECT. "N.I.- ECH
a.) FIRST STAGE 1" PARTICULATE FILTER.
b.) SECOND STAGE 2" PLEATED FILTER.
c.) OPTION CARBON FILTER TRACK.
R VS EARCH d.) 99.97% EFFICIENT DOP HEPA FILTER.
OFFICE
D.) FILTER CHANGE INDICATOR LAMP FOR PRE - FILTER AND FINAL FILTERS.
E.) POWER CORD FOR 120 VAC POWER CONNECTION, OPERATING HOUR METER, TWO SPEED OR
VARIABLE SPEED BLOWER.
OFFICE 2. PORTABLE CONTAINMENT CUBE - ABATEMENT TECHNOLOGIES MODEL #AG3000MCCK WITH I.C.R.A.
PHYSICIANS PACKAGE (1- 888 - 634 -9091) U.L. OR E.T.L. LISTED OR EQUIVALENT.
3. PRESSURE MONITORING KIT - ABATEMENT TECHNOLOGIES MODEL #HCPDPM2(OR ACCEPTED
lip EQUAL.
ECHO
ROOM
- lYi
ACTIONS TO BE PERFORMED QURING ----- _ = --
CONSTRUCTION.
1- COMPLETE ALL CRITICAL BARRIERS (BASIC ZIPWALL KIT: HC4PL.
WITH CASE "ICRA" COMPLIANT, FLAME - RETARDANT, 6 -MIL POLY
SHEETING. ABATEMENT TECHNOLOGIES).
2- MANTAIN NEGATIVE AIR PRESSURE WITHIN WORK AREA UTILIZING
"HEPA" EQUIPPED AIR FILTRATION UNITS.
3- CONTAIN CONSTRUCTION WASTE IN TIGHTLY COVERED
CONTAINERS BEFORE TRANSPORTING.
4- COVER TRANSPORT RECEPTACLES OR CARTS. TAPE
COVERING UNLESS SOLID LID.
5- PLACE DUST MAT AT ENTRANCE AND EXIT OF WORK AREA.
6- ALL PERSONNEL ENTERING WORK SITE ARE REQUIRED TO WEAR
SHOE COVERS. SHOE COVERS MUST BE CHANGED EACH TIME
THE WORKER EXITS THE WORK AREA.
ACTIONS TO BE PERFORMED UPON WORK
COMPLETION /PRIOR TO OCCUPANCY
1- VACUUM WORK AREA WITH "HEPA" FILTERED VACUUMS.
2- CONTAIN CONSTRUCTION WASTE IN TIGHTLY COVERED
CONTAINERS BEFORE TRANSPORTING.
3- COVER TRANSPORT RECEPTACLES OR CARTS. TAPE
COVERING UNLESS SOLID LID.
4- FINAL CLEANING BY ENVIRONMENTAL SERVICES PRIOR
TO OCCUPANCY.
5- REMOVE FLEX DUCT AND PATCH PARTITION AND EXTERIOR WALL
TO "AS -WAS" CONDITION BEFORE CONSTRUCTION BEGAN.
HVAC DESIGN REQUIRES:
YES
NO
DUCT SMOKE DETECTOR
X
FIRE DAMPER(S)
X
SMOKE DAMPER(S)
X
FIRE RATED ENCLOSURE
X
FIRE RATED ROOF /FLOOR CEILING ASSEMBLY
X
FIRE STOPPING
X
SMOKE CONTROL
X
COMBINATION FIRE /SMOKE DAMPER(S)
X
ICRA NOTES:
1.) ALL PATIENT EQUIPMENT INCLUDING BED SHALL BE REMOVED FROM CATH ROOM
PRIOR TO START OF CONSTRUCTION WORK.
2.) CONTRACTOR SHALL INSTALL A PLASTIC WALL WITH ZIPPER OUTSIDE EACH CATH ROOM
RIGHT BEHIND THE DOOR AND ANOTHER PLASTIC WALL WITH ZIPPER INSIDE ROOM TO
CREATE AN ANTE -ROOM. A STICKY MAT SHALL BE PLACED IN EACH ANTE -ROOM TO
AVOID DUST OUTSIDE THE CONSTRUCTION AREA. A NEGATIVE AIR MACHINE WITH HEPA
FILTER SHALL BE LOCATED INSIDE EACH PATIENT ROOM DURING THE CONSTRUCTION AND
THIS MACHINE WILL EXHAUST AIR TO THE OUTSIDE THRU THE WINDOW.
3.) CONTRACTOR SHALL USE A MOBILE CONTAINMENT CUBE FOR ALL CONSTRUCTION
WORK TAKING PLACE IN CORRIDORS & IN THE SPACE BETWEEN ELECTRICAL PANEL IN
CONTROL ARE & CATH ROOM.
4.) CONSTRUCTION MATERIALS AND DEBRIS CAN ONLY COME OUT FOLLOWING THE
ROUTING SHOWN IN THIS DRAWING AND DEBRIS SHALL BE TRANSPORTED IN AHCA /SMH
APPROVED CLEAN AND COVERED CARTS FOLLOWING THE ROUTING SHOWN IN THIS
DRAWING.
5.) SEE NEGATIVE AIR MACHINE DETAIL IN THIS SHEET.
ALL EXISTING AIR DISTRIBUTION DEVICES (WHETHER SHOWN ON THIS DWG.
OR NOT WITHIN WORK AREAS SHALL BE SEALED AIRTIGHT DURING
CONSTR CTION & SHALL BE RESTORED TO "AS -WAS" CONDITION "AFTER"
ALL WORK IS COMPLETED.
MINIMUM 6 AIR CHANGES /HOUR (EACH AREA)
KEY PLAN
JL
AREA OF WORK
HM AL
N
r ,
Ana;"
92 F
vs. p tie
0i w
N
i
� N
0
z
0
U
Z
U
o°
o
(Ito: ` .
W N
NOVA
�:
'WV
O W'
0 Z �—
m
°.
O O
w Q
N U
O
O
Z
0
z �
O
U Q
W
N CIO.:
U_
J
a
� a
Z �
0
FILE'
JOB NO.: 212 -1009
DATE : 04 -25 -12
PLOT SIZE' AS NOTED
DESIGNED /DRAWN BY: A-V. j
CHECKED BY. F.A. .i.
SHEET No.:
P
ICRA -31