Loading...
12-565-008ROOM M.I.C.U. ROOM M.I.C.U. ROOM M.I.C.U. ROOM M.I.C.U. ROOM M.I.C.U. ROOM M.I.C.U. ROOM M.I.C.U. ROOM M.I.C.U. ROOM M.I.C.U. ROOM M.I.C.U. ROOM M.I.C.U. ROOM M.I.C.U. NT -STAIR EQUIPEMENT .JVf 1 f_1 I J 1 ❑ VIEWING EQPM. LL-iii DICT. ❑ DOCTOR' DICTATION EQUIP. DOCTOR'S STOR. IVR PROC. E PREP. CO TROL -E MEDICAL ROOM ONTR L CONSULT. ROOM c IUTRITION SOILED UTILITY SCRUB Im ❑ EQUIP. FrEll c CORR HOLDING IVR PROC. D ONTR L THERAPY 1I LOUNGE :SPIRATOR STAFF 0 CORRIDOR J luul FUTURE FUTURE ELEV.14 ELEV.15 OMM. LOSETI NINE HOLDING CLEAN OFFICE OFFICE SCRL OLDING TROL -DU c TROL -F ONTR L CONSTRUCTION MATERIALS & FERRIS ROUTING CORR I0 EMPORARY AIR FIRE DAMP R CEILING SLAB ❑ SEE DETAIL IN SHEET E -5�. N FD Im I o 12 "0 EP LAB CEILING GRID PROC. C IQ 12 "0 Iw 175 CFM WHERE 12 "0 o SHOWN 00 VD � v RAWINGS ry 675 CFM WORK AREA N AI FLOW W — I 10 "0 CATH ROOM CATH. I 3 CORRIDOR 12 "0 PROC. B t SCRUB PREDATOR 1200 I PORTABLE AIR [850 CFM STRET. �;. SCRUBBER WITH HOLIDING 4 HEPA FILTER PORTABLE ROOM PRESSURE ` " ' MONITOR "HCPDPM2 ". AS ` ;� < ti 0 wo — — — — — — — MANUF. BY ABATEMENT It ��.�. TECHNOLOGIES rf° ;1i ,� NV'GATI*E"•AIR. MACHINE DETAIL ❑ j (1- 800 - 634 -9091 E` ) (TYP.). NOT TO SCALE DUST MAT. CATH. (TYP.) � PROC. A i + "` t i COMPLIANT, FLAME CONST�U� hON WORK READ I "ECsATIVE PRESSURE: SCRUB 1---ICRA RETARDANT, 6 -MIL POLY SHEETING WITH BOLD BLUE AND MINIMUM AIR CHANGES: STET. IMPRINTED TEXT "HCNC1001 ". 1. MINIMUM NEGATIVE PRESSURE IN CONSTRUCTION ZONE PER OWNER'S I.C.R.A. REQUIREMENTS = OFFICE -� HO DING (PART OF BASIC ZIPWALL KIT 0.02" W.G.. CHECK "HC4PL "). MANUFACTURED BY 2. ADJUST DISCHARGE AIR VOLUME ON HEPA NEGATIVE PRESSURE MACHINE TO MAINTAIN A MINIMUM OF DICT. CONTROL I ABATEMENT TECHNOLOGIES 0.02" W.G. NEGATIVE PRESSURE AS MEASURED BY ROOM PRESSURE DIFFERENTIAL MONITOR(S) UP TO ❑ ❑ — — — — (1- 800 - 634 -9091) (TYP.). A MAXIMUM OF 0.04" W.G. NEGATIVE PRESSURE. ❑ HOLDING ❑ I 3. AS PER OWNER'S I.C.R.A., MINIMUM AIR CHANGES WITHIN WORK AREAS SHALL BE 6. CLEAN CORf� NEGATIVE AIR MACHINE ONSTRUCTION MATERIALS & DEBRIS ROUTING PERD1200 BY ABATEMENT --------------- - - - - -- —� TECHNOLOGIES CONSTRUCTION WORK AREA VENTILATION NOTES (1- 800 - 634 -9091) (TYP.). ;7 CONTRACTOR SHALL USE TYPE "B" HIGHEST RISK, CLASS III /IV. MANAGER CLEAN Y %` Y MOBILE CONTAINMENT CUBE PHARMACY TLT RECOV. FOR ALL WORK BETWEEN THE ' 1. CONTRACTOR SHALL BECOME FAMILIAR W /HOSPITAL'S INFECTION CONTROL RISK ASSESSMENT (I.C.R.A.) SATELLITE I CHEDUL (2) ASSIST PANELBOARD AND THE ROOM. PREPARED BY OWNER FOR THIS PROJECT. CONTRACTOR SHALL PERFORM ALL WORK IN ACCORDANCE SEE EQUIPMENT WITH SAID REQUIREMENTS. CONTRACTOR SHALL ADHERE TO THE LIMITS OF THE CONSTRUCTION AREA. REPORT SPECIFICATIONS IN THIS WHERE PHASING IS SHOWN, CONTRACTOR SHALL ADHERE TO THE PHASING DRAWINGS. PREP `.' DICTATION I / SHEET. 2. AS MAY BE REQUIRED BY THE ICRA, THE CONTRACTOR SHALL MAKE EVERY EFFORT TO MAINTAIN DOCTOR'S ASSI T. RY SOIL RECOV. EXIST. LEVELS OF INDOOR AIR QUALITY IN AREAS SURROUNDING CONSTRUCTION AREA. CONTRACTOR TOILET I MANG. MANAGER SHALL ERECT ALL CONSTRUCTION BARRIERS AND PROVISIONS OF NEGATIVE PRESSURE IN THE ® ❑ ❑ ❑ 1 4 CONSTRUCTION AREA RELATIVE TO OTHER AREAS. ASS STO. ❑ CORK 3. IN ADDITION TO COMPLYING WITH THE REQUIREMENT OF THE I.C.R.A., THE CONTRACTOR SHALL ALSO VIEWING PREP/ PREP PROVIDE ALL THE NECESSARY COMPONENTS AND EQUIPMENT AS SHOWN ON THE I.C.R.A. DRAWINGS DOCTOR'S TOILET I MANAGER FILES RECOV RY R / PREP RECOV. TO CREATE A NEGATIVE PRESSURE IN THE CONSTRUCTION AREA RELATIVE TO ADJACENT AREAS. EXIST. ® RECD HVAC SYSTEM(S) SHALL NOT BE USED FOR THIS FUNCTION, UNLESS SPECIFICALLY APPROVED BY THE ;91 R OWNER'S INFECTION CONTROL OFFICER AND ONLY TO THE EXTENT INDICATED ON THE I.C.R.A. DWGS.. SOILED I EQUIP. STO CORR THE CONCEPT AND ALL ASPECTS OF THIS WORK SHALL BE DONE IN ACCORDANCE WITH THE I.C.R.A. UTILITY SUPPORT REQUIREMENTS AND AT A MINIMUM ARE AS FOLLOWS: FILM PREP/ PREP VERIFY THAT ALL EXISTING DUCTWORK WHICH PASSES THROUGH THE WORK AREA AND WORKR / RECOV RY PREP/ PREP/ RECOV. REMAIN ARE SEALED, AND PROTECTED DURING THE CONSTRUCTION WORK. COVER OR BLANK OFF APER W R CO V. ALL SUPPLY RETURN /EXHAUST OPENINGS. STO. AIR REMOVED FROM THE CONSTRUCTION ZONE SHALL BE FILTERED AND /OR DISCHARGED AS CORRIDOR I INDICATED ON THE CONSTRUCTION WORK AREAS. DMS ❑ L AT. T ❑ MONITOR AND VERIFY NEGATIVE PRESSURE IS BEING MAINTAINED IN ACCORDANCE WITH THE ICRA ROOM I ❑ I RECOV. REPORT, AND PROVIDE DOCUMENTATION TO THE OWNER AS REQUIRED. ELECTRICAL #11 4. ANY REQUIRED EQUIP. SHUTDOWN SHALL BE COORDINATED W/THE OWNER, IN ADVANCE TO ASSURE THAT SHUTDOWN WILL NOT ADVERSALLY AFFECT AIR PRESSURE RELATIONSHIPS. ROOM ROOM CORK 5. CONTRACTOR SHALL HAVE AIR NEGATIVE AIR MACHINES, PRES. MONITORS, ALARMS, DISCHARGE AIR UTRITION MEDICINE z NURSES TILT ICI ELEV.1 ELEV.2 ELEV.13 P I P -STAIR 1L- -- Ij DUCTS & ANY MODIFICATIONS TO EXISTING HVAC SYSTEMS READY PRIOR TO DEMOLITION AND READY ❑ ❑ ❑ ❑ STATION FOR TEST &BALANCE. CONTRACTOR TO PERFORM CONSTRUCITON WORK AREAS) VENTILATION PLAN TESTING, ADJUSTING, AND BALANCING. IN PREP FE-1 6. DEMOLITION WORK SHALL NOT BEGIN UNTIL CONSTRUCTION WORK AREA(S) T & B REPORT HAS BEEN m # 1 RECOV. REVIEWED & ACCEPTED BY THE ARCH., ENGINEER, & THE OWNER'S INFECTION CONTROL MANAGER. ROOM Iwo EXIST. CORR #10 7. VISQUEEN CUBE CONSTRUCTION ISOLATION SHALL BE CREATED WHERE WORK IS PERMITTED IN THE CORRIDORS. H.E.P.A. VACUUM SHALL BE USED TO CLEAN WITHIN THE CUBE AFTER THE WORK HAS EQUIPMENT WAITING I� MECH. BEEN COMPLETED. FAMILY J PACS V DMS TEST AND BALANCE NOTES: PREP/ PREP/ PREP/ PREP/ PREP/ PREP/ PREP/ R CO R C V. R CO . RECOV. R C V. R CO . R C V. 1. PRE - DEMOLITION ROOM Z 3 #4 #5 #6 #7 #8 #9 PRIOR TO COMMENCEMENT OF ANY DEMOLITION WORK IN THE CONSTRUCTION AREA AN INDEPENDENT ANITO ELECTRICA TLT AABC OR NEBB CERIFIED TESTING, ADJUSTINC AND BALANCING (TAB) CONTRACTOR SHALL MEASURE I� AND DOCUMENT IN A TYPED REPORT, THE FOLLOWING INFORMATION: v~i A.) SPEED SETTING AND AIRFLOW OF ALL NEGATIVE AIR MACHINES, RECIRCULATING AND EXHAUST. 'Af AREA EFRESHMEN ROOM zo B.) DIFFERENTIAL PRESSUE READING OF ALL NEGATIVE AIR MACHINE FILTER GAUGES. TREATMENT IU WATER N C.) DIFFERENTIAL PRESSURE BETWEEN CONSTRUCTION WORK AREA(S) & ADJACENT AREAS AT EACH D A DT I A I c D r n kI n VIII O O D DOORWAY ENTRANCE TO THE CONSTRUCTION WORK AREA ICRA PLAN CONSTRUCTION MATERIALS _ [MR7S_R67U0_ I TOILET I MECHANICAL ROOM Li I I JAN. I CLO . 0 I I TOILET �I I I CONSTRUCTION MATERIALS & DEBrrRMIN� SCAM am 1-w D.) VERIFY ROOM PRESSURE DIFFERENTIAL MONITORS LOCATED NEAR DOORWAY ENTRANCE TO CONSTRUCTION WORK AREA ARE READING WITHIN +/- 10% OF FIELD READINGS OF ITEM 3 ABOVE. F.) ANY DEFICIENCIES IN MEETING THE OWNER'S ICRA REQUIREMENTS FOR AIR CHANGES, RELATIVE NEGATIVE PRESSURE OR FAULTY EQUIPMENT SHALL BE IDENTIFIED IN THE FINAL REPORT. EQUIPMENT SPECIFICATIONS: D. COOR . CAROL 1. NEGATIVE AIR MACHINES - ABATEMENT TECHNOLOGIES MODEL HEPA -AIRE PAS (800- 634 -9091) SEC. MD. EXAM HYSICIA HYSICIA CLINICIAN OFFICE ADMIN. PBX ROOM SUPPORT OFFICE OF OFFICE SUPPORT BIGGS OR EQUIVALENT. PROVIDE WITH THE FOLLOWING FEATURES: OFFICE A.) U.L. OR E.T.L. LISTED. n N.I.- ASSIST B.) STAINLESS STEEL CABINET WITH INTEGRAL TRANSPORT DOLLY AND EXHAUST COLLAR. I I CORR ADMINISTRATION M I N I S TR A TI 0 N C.) UP TO FOUR STAGES OF FILTRATION WITH ZERO BYPASS CABINET CONSTRUCTION. TL Q EXISTING PBX TELEPHONE RM. CORR LOUNGE COI OFFICE EXIST. �, �„ ELECT. "N.I.- ECH a.) FIRST STAGE 1" PARTICULATE FILTER. b.) SECOND STAGE 2" PLEATED FILTER. c.) OPTION CARBON FILTER TRACK. R VS EARCH d.) 99.97% EFFICIENT DOP HEPA FILTER. OFFICE D.) FILTER CHANGE INDICATOR LAMP FOR PRE - FILTER AND FINAL FILTERS. E.) POWER CORD FOR 120 VAC POWER CONNECTION, OPERATING HOUR METER, TWO SPEED OR VARIABLE SPEED BLOWER. OFFICE 2. PORTABLE CONTAINMENT CUBE - ABATEMENT TECHNOLOGIES MODEL #AG3000MCCK WITH I.C.R.A. PHYSICIANS PACKAGE (1- 888 - 634 -9091) U.L. OR E.T.L. LISTED OR EQUIVALENT. 3. PRESSURE MONITORING KIT - ABATEMENT TECHNOLOGIES MODEL #HCPDPM2(OR ACCEPTED lip EQUAL. ECHO ROOM - lYi ACTIONS TO BE PERFORMED QURING ----- _ = -- CONSTRUCTION. 1- COMPLETE ALL CRITICAL BARRIERS (BASIC ZIPWALL KIT: HC4PL. WITH CASE "ICRA" COMPLIANT, FLAME - RETARDANT, 6 -MIL POLY SHEETING. ABATEMENT TECHNOLOGIES). 2- MANTAIN NEGATIVE AIR PRESSURE WITHIN WORK AREA UTILIZING "HEPA" EQUIPPED AIR FILTRATION UNITS. 3- CONTAIN CONSTRUCTION WASTE IN TIGHTLY COVERED CONTAINERS BEFORE TRANSPORTING. 4- COVER TRANSPORT RECEPTACLES OR CARTS. TAPE COVERING UNLESS SOLID LID. 5- PLACE DUST MAT AT ENTRANCE AND EXIT OF WORK AREA. 6- ALL PERSONNEL ENTERING WORK SITE ARE REQUIRED TO WEAR SHOE COVERS. SHOE COVERS MUST BE CHANGED EACH TIME THE WORKER EXITS THE WORK AREA. ACTIONS TO BE PERFORMED UPON WORK COMPLETION /PRIOR TO OCCUPANCY 1- VACUUM WORK AREA WITH "HEPA" FILTERED VACUUMS. 2- CONTAIN CONSTRUCTION WASTE IN TIGHTLY COVERED CONTAINERS BEFORE TRANSPORTING. 3- COVER TRANSPORT RECEPTACLES OR CARTS. TAPE COVERING UNLESS SOLID LID. 4- FINAL CLEANING BY ENVIRONMENTAL SERVICES PRIOR TO OCCUPANCY. 5- REMOVE FLEX DUCT AND PATCH PARTITION AND EXTERIOR WALL TO "AS -WAS" CONDITION BEFORE CONSTRUCTION BEGAN. HVAC DESIGN REQUIRES: YES NO DUCT SMOKE DETECTOR X FIRE DAMPER(S) X SMOKE DAMPER(S) X FIRE RATED ENCLOSURE X FIRE RATED ROOF /FLOOR CEILING ASSEMBLY X FIRE STOPPING X SMOKE CONTROL X COMBINATION FIRE /SMOKE DAMPER(S) X ICRA NOTES: 1.) ALL PATIENT EQUIPMENT INCLUDING BED SHALL BE REMOVED FROM CATH ROOM PRIOR TO START OF CONSTRUCTION WORK. 2.) CONTRACTOR SHALL INSTALL A PLASTIC WALL WITH ZIPPER OUTSIDE EACH CATH ROOM RIGHT BEHIND THE DOOR AND ANOTHER PLASTIC WALL WITH ZIPPER INSIDE ROOM TO CREATE AN ANTE -ROOM. A STICKY MAT SHALL BE PLACED IN EACH ANTE -ROOM TO AVOID DUST OUTSIDE THE CONSTRUCTION AREA. A NEGATIVE AIR MACHINE WITH HEPA FILTER SHALL BE LOCATED INSIDE EACH PATIENT ROOM DURING THE CONSTRUCTION AND THIS MACHINE WILL EXHAUST AIR TO THE OUTSIDE THRU THE WINDOW. 3.) CONTRACTOR SHALL USE A MOBILE CONTAINMENT CUBE FOR ALL CONSTRUCTION WORK TAKING PLACE IN CORRIDORS & IN THE SPACE BETWEEN ELECTRICAL PANEL IN CONTROL ARE & CATH ROOM. 4.) CONSTRUCTION MATERIALS AND DEBRIS CAN ONLY COME OUT FOLLOWING THE ROUTING SHOWN IN THIS DRAWING AND DEBRIS SHALL BE TRANSPORTED IN AHCA /SMH APPROVED CLEAN AND COVERED CARTS FOLLOWING THE ROUTING SHOWN IN THIS DRAWING. 5.) SEE NEGATIVE AIR MACHINE DETAIL IN THIS SHEET. ALL EXISTING AIR DISTRIBUTION DEVICES (WHETHER SHOWN ON THIS DWG. OR NOT WITHIN WORK AREAS SHALL BE SEALED AIRTIGHT DURING CONSTR CTION & SHALL BE RESTORED TO "AS -WAS" CONDITION "AFTER" ALL WORK IS COMPLETED. MINIMUM 6 AIR CHANGES /HOUR (EACH AREA) KEY PLAN JL AREA OF WORK HM AL N r , Ana;" 92 F vs. p tie 0i w N i � N 0 z 0 U Z U o° o (Ito: ` . W N NOVA �: 'WV O W' 0 Z �— m °. O O w Q N U O O Z 0 z � O U Q W N CIO.: U_ J a � a Z � 0 FILE' JOB NO.: 212 -1009 DATE : 04 -25 -12 PLOT SIZE' AS NOTED DESIGNED /DRAWN BY: A-V. j CHECKED BY. F.A. .i. SHEET No.: P ICRA -31