12-565-005* * * * * * * * * * * * * * * ** F A U L T A N A L Y S I S S U M M A R Y * * * * * * * * * * * * * ** BUS NAME VOLTAGE REMARKS -------------------------------------- FAULT CKT. NO. AFC (AMPS) LE AIC (AMPS) 2CL1A 208. 3303 10000 2CL1B 208. 3303 10000 2CL2A 208. 2237 10000 2CL213 208. 2154 10000 2CLD1 208. 4964 10000 CDP 480. 20328 35000 MDP1 480. 21918 65000 * * * * * * * * * * * * * * * * * * * * * ** FAULT ANALYSIS REPORT COMPLETED * * * * * * * * * * * * * * * * * * * * * ** NOTE: FAULT CURRENT ANALYSIS WAS TAKEN FROM ORIGINAL COORDINATION & SHORT CIRCUIT STUDY DATED 11/30/2011 PROVIDED BY SMH. A.) THE EQUIPMENT GROUNDING TERMINAL BARS OF THE NORMAL AND EMERGENCY ELECTRICAL SYSTEM (CRITICAL & LIFE SAFETY) PANELBOARDS THAT SERVE THE SAME PATIENT AREA SHALL BE BONDED TOGETHER WITH AN INSULATED CONTINUOUS COPPER CONDUCTOR NOT SMALLER THAN #8 AWG (N.E.C. ART. 517.14). B.) SEE RISER DIAGRAM FOR FEEDER SIZES. C.) CONTRACTOR SHALL FIELD VERIFY THAT ALL PANELBOARDS SERVING "CRITICAL CARE" AREAS ARE GROUNDED IN ACCORDANCE WITH N.E.C. ART. 517- 19(d). METAL FEEDER RACEWAYS SHALL HAVE GROUNDING BUSHING AND A CONTINUOUS COPPER BONDING JUMPER SIZED IN ACCORDANCE WITH N.E.C. TABLE 250 -95. D.) REFER TO PANELBOARD SCHEDULES FOR REQUIRED PANELBOARD AIC RATINGS. E.) FOR PANEL SHOWN IN THIS SHEET CONTRACTOR SHALL PROVIDE NEW UPDATED TYPE WRITTEN DIRECTORY. F.) ALL CIRCUITS EXISTING AND NEW SHALL HAVE DEDICATED NEUTRAL IN ORDER TO COMPLY WITH NEC ART. 210.46. ca 100 10 CURRENT IN AMPERES M;,; j. ,i; . .... . ... ..................... . ,'g .. ...... .. ..... .. • s. 9 ",Ti......... •. Yj yy.tSyt , yf � •3, ... .4 syw, %p s4s�k ' '!.`4 . ............. .: ..... ........... : . y ... /. , . ......... .. nks y�j ....... ... : 1K 10K NT, - 2CLDl Acc Ref.Voftage.208V Current fn Ampa x 1 COORDINATION: 2CLB2 m NDC CITTI FR- HAMMFR PRI 1A (EXISTING) \IA1 \1 fL 11 ,nnA 111 n mnnl uv.r . vv.. yaw VOLTAGE 120/208V, 3 PH, 4W PANEL "2CL2B "SECT.2 AIC 1OKAIC MOUNTING WALL FED FROM: CLD1 THRU 100A BKR. LOCATION 2ND FL, HEART CENTER VOLT AMP POLE TRIP CON DUIT WIRE REMARKS CKT NO. CKT. NO. REMARKS WIRE CON DUI TRIP POLE VOLT AMP 1 20 a EP BI RM.2059 LIGHTS 43 42 NR RM.2075 LIGHTS 20 1 1 20 C:) CATH RM.2061 LIGHTS 45 46 SIEMENS MMV COLUMN 20 1 O 1 20 CATH RM.2062 LIGHTS 47 48 SIEMENS MW COLUMN 20 1 W 1 20 SIEMENS CEILING RECEPT. 49 50 MOTORIZED COL. RM.2075 20 1 Q 1 20 RM.2073 CEILING RECEPT. 51 52 MOTORIZED COL. RM.2073 20 1 1 20 RM.2075 CEILING RECEPT. 53 54 MOTORIZED COL. RM.2076 20 1 1 20 RM.2076 CEILING RECEPT. 55 56 SPARE 20 1 2 20 RM.2075 LASER RECEPT. 208V 57 59 58 ICARD ACCESS POWER 20 1 60 EP LAB CONT. REC. 20 1 2 20 RM.2073 LASER RECEPT. 208V 61 63 62 EP LAB CONT. REC. 20 1 64 EP LAB COLUMN REC. 20 1 2 20 RM.2076 LASER RECEPT. 208V 65 67 66 EP LAB COLUMN REC. 20 1 1 68 70 CATH PROC. A RECEPTACLE 3#1212' 20 2 720 1 20 ROOM CAM PHILLIPS 69 1 20 ROOM CAM SIEMENS 71 72 74 CATH PROC. B RECEPTACLE 3112112' 20 2 720 1 20 RM.2061 RECEPTACLE 73 1 20 RM.2062 RECEPTACLE 75 76 78 EP LAB PROC. C RECEPTACLE 31121/2' 20 2 720 SPARE 77 SPARE 79 80 SPARE 20 1 SPARE 81 82 SPARE 20 1 SPARE 83 84 SPARE 20 1 TOTAL DEMAND LOAD: 11.5KVA x 125% (READINGS) + 2.88KVA(NEW LOAD ADDED) = 17.2KVA I = 17.2KVA = 48A 0 208V 0.360V NOTE: 1Q CONTRACTOR SHALL PROVIDE /INSTALL NEW 2 -POLE, 20A, CUTLER - HAMMER BAB CIRCUIT BREAKER AND RUN NEW CONDUIT & WIRES AS PER PANEL SCHEDULE. PANEL SCHEDULE & FAULT CURRENT ANALYSIS. w m W.1mm !M. Ml a o ma -14 to CO CIO mg a� ^ cq'6'oc�o co 8 a 1 v 020 to •U }Q E °` a. � o I w N i O N i 0 z 0 �i z U 0 0 a 8 U N o � o W Z J F- O Z� Lu Q M wz U D0N N 0 W � 0 >, W _J _j Z �UQ CD Q Z 0 CL LL. 8d Q FILE: JOB NO.: 212 -1009 DATE : 04 -25 -12 PLOT SIZE: AS NOTED DESIGNED /DRAWN BY: A.V. CHECKED BY: F.A. SHEET No.: E -3 SHEET 4 OF 7 W N W O -j a a C:) M =ZLd c O Q0z - W in �VH O W Q W Z J F- O Z� Lu Q M wz U D0N N 0 W � 0 >, W _J _j Z �UQ CD Q Z 0 CL LL. 8d Q FILE: JOB NO.: 212 -1009 DATE : 04 -25 -12 PLOT SIZE: AS NOTED DESIGNED /DRAWN BY: A.V. CHECKED BY: F.A. SHEET No.: E -3 SHEET 4 OF 7