12-559-001Abbreviations Symbol Legend
AL ALUMINUM HORZ. HORIZONTAL NORTH ARROW
APPROX. APPROXIMATE Hp HIGH POINT
ARCH. ARCHITECTURAL ARCHITECT |NSUL INSULATE, INSULATION
AVG. AVERACE INT. INTERIOR DIRECTION
SECTION NUMBER
BD. BOARD JT' JOINT SHEET NUMBER
B.O. BOTTOM OF LB. POUND
B.O.B. BOTTOM OF BEAM LP LOW POINT
B.O.C. BOTTOM OF CE|UNC MAX' MAXIMUM DETAIL NUMBER
TNUMBER
BOTT BOTTOM MECH. MECHANICAL
CEW. PLS. CEMENT PLASTER MEWB. MEMBRANE SHEET NUMBER
CCTV CLOSED CIRCUIT TELEVISION MET. METAL ° ELEVATION NUMBER
___
CLO. CEILING M&NF. MANUFACTURER DIRECTION
CMU CONCRETE MASONRY UNIT MIN. MINIMUM
FLOOR NUMBER
COL COLUMN W|SC. MISCELLANEOUS (WHEN NECESSARY)
CONC. CONCRETE NAT MATERIAL
`------DOOR NUMBER
CONT. CONTINUOUS N|C N0T|N CONTRACT
D!A. DIAMETER NO. NUMBER FLOOR NUMBER
DIM. DIMENSION N.T.S. NOT T0 SCALE (MEN NECESSARY)
DN. O�w PLS. LAM. PLASTIC LAMINATE `--»\______
' � ' WINDOW NUMBER
DBL. D0UBLE PL. PLATE
' FLOOR NUMBER
DWG. DRAWING PLYY0}. PLYWOOD (MEN NECESSARY)
EA. EACH PREFAB. PREFABRICATED boo
ELEV. ELEVATION PVC POLYVINYL CHLORIDE PIPE `------R0OM NUMBER
ELEC. ELECTRICAL R. RADIUS
PARTITION TYPE
EMERG. EMERGENCY REQ. REQUIRED E7
EQP7. EQUIPMENT R[|NE REINFORCEMENT
EQ. EQUAL SC. SOLID CORE REVISION MARK
EXH. EXHAUST Sim. SIMILAR
SHT� SHEET
EXIST. EXISTING
TOILET ROOM ACCESSORY
SPEC. SPECIFICATION
E.J. EXPANSION JOINT ~
� � S.S. STAINLESS STEEL
E.W. EACH WAY SUSp. SUSPEND, SUSPENDED
(OOO) FURN|TURE/EQU|PMENT|ND|CATOR
EWC ELECTRIC WATER COOLER SYS. SYSTEM
FD. FLOOR DRAIN TEMP. TEMPERED
' ' ' ' . ' ' . ' LINE OF OBJECT ABOVE
FIN. FINISH ��� TONGUE AND GROOVE
FL FLOOR T.O.B. TOP OF BEAN ''..'.''' ' EQUIPMENT/FURNITURE N.I.C.
F[ FOOT T.O.S. TOP OF SLAB
-------------- HIDDEN UNE
FTG. F001ING T.O.P. TOP OF PARAPET
CA. GAUGE T.O.W. TOP OF WALL ------- ------ BOUNDARY LINE
GALV. GALVANIZED TYp. TYPICAL
---- -- -- ---- DEMOU11DN LINE
C.C. GENERAL CONTRACTOR U.O.N. UNLESS OTHERWISE NOTED
GL. GLASS VERT VERTICAL CENTER LINE
GYP. GYPSUM W/ WITH
-------------- PROPERTY LINE
HC. HOLLOW CORE WD. WOOD
HOW. HARDWARE W/o WITHOUT
HM. HOLLOW METAL WWF WIRE WELDED FABRIC 5^-0" DIAMETER TURNING RADIUS
CLEAR
List of Consultants
FORBES ARCHITECTS
4565 PONCE DE LEON BOULEVARD
CORAL GABLES, FL 33146
DDA ENGINEERS, P.A.
4930 SW 74TH COURT
MIAMI, FL 33155
Mechanical & Electrical:
PUGA AND ASSOCIATES, INC.
7326 SW 48TH STREET
MIAMI, FL 33155
/
�
/
'
^
'
General N otes'and Specifications
1. ALL WORK IS TO CONFORM TO THE FLORIDA BUILDING CODE, THE AMERICANS WITH
DISABILITY ACT AND ALL OTHER APPLICABLE CODES AND REGULATIONS
2. ALL CONTRACTORS ARE TO FAMILIARIZE THEMSELVES WITH, AND CONFIRM ALL EXISTING MATERIALS,
0UANTITIES, DIMENSIONS AND COND111ONS PRIOR TO SUBMITTING THEIR BID. NOTIFY THE �
ARCHITECT IMMEDIATELY OF ANY DISCREPANCIES.
3. NO SUBSTITUTIONS UNLESS AUTHORIZED BY THE ARCHITECT, IN WRITING, PRIOR TO THE BID OPENING.
4. ALL MATERIALS FURNISHED ON THE JOB SITE SHALL BE NEW AND STORED IN SUCH A MANNER AS TO
PROTECT THEM FROM THE ELEMENTS,
5. ALL CONTRACTORS ARE TO KEEP THE JOB SITE CLEAN AND FREE OF ALL DEBRIS AT ALL TIMES.
8' DO NOT SCALE DRAWINGS. DIMENSION EXISTING CONDITIONS GOVERN. NOTIFY THE
ARCHITECT IMMEDIATELY OF ANY DISCREPANCIES.
7. ALL WORK SHALL 8E|N STRICT ACCORDANCE WITH THE BEST PRACTICES OF THE CDN3TRUC11ON TRADE.
8. ALL LUMBER IN CONTACT WITH CONCRETE OR MASONRY SHALL BE PRESSURE TREATED.
Q' DURING CONSTRUCTION THE CONTRACTOR SHALL COORDINATE ALL ACTIVITIES WITH THE OWNER'S
PROJECT MANAGER.
10. ALL TRADE CONTRACTORS SHALL VERIFY ALL UTILITIES, AND PLACEMEWTLDCAllONS OF PIPE
CONDUIT, EQUIPMENT, DUCTWORK, ETC.` PRIOR TO SUBMITTING THEIR BID.
11' ALL GYPSUM BOARD CORNERS SHALL RECEIVE METAL CORNER BEADS. ALL EXPOSED GYPSUM BOARD
EDGES SHALL HAVE METAL CASING BEADS.
12' MERE CONRJCTS EXIST AND VARIANCES EXIST IN THE DRAWINGS, THE ARRANGEMENT DFBETTER
qVAUT( GREATER QUANTITY, AND HIGHER COST SHALL BE INCLUDED IN THE BID PRICE. THE ARCHITECT
WILL HAVE FINAL DECISION REGARDING ITEM AND MANNER IN WHICH WORK SHALL BE INSTALLED.
13' SUBMIT FOUR SETS MINIMUM OF DETAILED SHOP DRAWINGS, CUT SHEETS SAMPLES FOR ALL
PROCURED, MANUFACTURED OR SHOP CREATED ITEMS FOR REVIEW AND APPROVAL BY THE ARCHITECT.
14. ALL DETAILS, SECTIONS, DIAGRAMS, ETC. ARE INTENDED TO BE TYPICAL AND SHALL BE CONSTRUED TO
APPLY TO ANY SIMILAR SITUATION ELSEWHERE IN THE PROJECT.
15' THE CONTRACTOR SHALL ARRANGE FOR ALL INSPECTIONS BY THE BUILDING AUTHORITIES. COST OF SPECIAL
INSPECTORS SHALL BE INCLUDED IN THE PROJECT COST |FNECESSARY.
Product Approval Schedule
COMPONENT
APPROVAL
NUMBER
COMPANYNAME
EXPIRATION
DATE
METAL DOOR SINGLE OR DOUBLE
09-0112.03
NEXT DOOR COMPANY
05-13-14
STOREFRONT WINDOW WALL SYSTEM — IMPACT RESISTANT
09-1022.01
ARCH ALUMINUM & GLASS CO., INC.
03-31-15
STOREFRONT DOOR — IMPACT RESISTANT
09-1110.04
ARCH ALUMINUM & GLASS CO., INC.
03-17-15
FIXED METAL LOUVRE DOOR
10-0727.02
NEXT DOOR COMPANY
01-13-15
2'X2' FIXED METAL LOUVRE DOOR
10-0217.04
DAYBAR INDUSTRIES LIMITED
04-22-15
ROOF EDGE TERMINATION SYSTEM(COPING CAP)
—10-0603.02
WP HICKMAN COMPANY
10-18-12
NOTE SU8S71T8TIONS TO PRODUCTS ABOVE MUST BE APPROVED BY OWNER AND ARCHITECT
WA
Project =^�
8�~��~�U��K�U »~��U���M��h�����
" u*~*Uw�'~~� n����U UUU�U��o ��
� �
Project Description:
SELECTIVE REFURBISHMENTS TO AN EXISTING
PARKING GARAGE.
Occupancy and Occupant Load:
EMPLOYEES
IMPROVEMENT AREA:
858 SPACES
245,628 SF
OCCUPANCY:
GROUP S-2: STORAGE
898 SPACES
WITH
INCIDENTAL OFFICE
788 SPACES
SPACE
EMPLOYEE EMERGENCY /RADIATION/
81
18
LEVEL 1 41,192
SF/500 =
83 PEOPLE
LEVEL 2 42,813
SF/500 =
86 PEOPLE
LEVEL 3 42,813
SF/500 =
86 PEOPLE
LEVEL 4 42,813
SF/500 =
86 PEOPLE
LEVEL 5 42,813
SF/500 =
86 PEOPLE
LEVEL 6 33,184
SF/500 =
67 PEOPLE
Parking Summary:
ED
_ --- -
FORB���� ��«�.
- - -
TS List of Drawings - ]EC
- ","^n°�"c,° --- ---
/""u m="mu
,emn ue°w"
Information oxom���K��«o�v��K� __`_ __spaou v�"omu
— ��������^��U co~m.,cn",m"r�ou"�"'
I General Notes, Location Map, Key Plan �---` -�4ano v'J "c"�°./""`4�n-
/\bbrevatlonm, Typical Mounting Heights K4p-10[> ��\�\[� and �»1urnbinq (�eDenJ| Notes and [}efoi|m w"/m,v» gables, n",m"no,*v
let .uoo~**a^oam
,",'oon~4w^unm
MP-110 HVAC and Notes and Details n=m°"egu,,"mon
n ^x-pmmxw
����^�������U
^ ~^ -~^ "^==`~~—^-~^ MP-200 Ground Floor Mechanical Plan
, " , , 0 " " °
A-1 Level 1 Floor Plan and Details
MP-210 Second Floor Mechanical Plan
A-2 Level 2 Floor Plan and Partition Type
�NP—|72[) Third [�nOr ��echon}cO! Plan
/\--�� ��m�� �� Floor ��|on
K4�� ����[> Fourth Floor Mechanical Plan
/\—^� Level 4 Floor P��O —
/\-5 Level 5 Floor Plan MP-24(] Fifth Floor Mechanical Plan , " , , , , ° ,
/\—G Level 8 Floor Plan and Existing Conditions K�p_��5[) Sixth Floor Mechanical Plan
~ = °^�`'"��~���^ °
/\-7 Door Schedule and [}efO1lS
MP-26[} Roof Mechanical Plan
/\-8 Elevator Enclosure Plans and Elevations
A-9 Exterior Elevations and Details Fire Alarm
A--1[} Partition Type, |nf�y��r �
�^, ` �'~`~~~''~ ~''~ ~~`~^~
FA-1 00 Ground Floor Fire A|orrn F�|mn -,
' .
A-11 Elevator Enclosure Wall Sections � �
FA-200 Second Floor [�ro /\lonn Plan ?
A-1|� Incinerator F�oorn Roof Plan, Section �` ^ �� � �Y '� `
. ' .
FA-300 Third Floor ��me Alarm Plan ��n Roberts
����0|^��U8K��U ��� """""="'"
=^^^~-=�~~~~^ ~��' F/\-4{][) Fourth Floor Fire Alarm Plan OWNERSHIP AND USE OF THE DOCUMENTS:-
AND EXPRESSED IDEAS AS INSTRUMENTS OF
SERVICE ARE SHALL REMAIN THE
S-1 Level 1 Structural Repair F�oor Pion ~~
' F/\—��O{} Fifth Floor Fire �\|arr� Plan '"^"�='^"""°='"==� PREPARED
S-2 Level 2 Structural Repair Floor Plan COPIES OF THESE DRAWNGS. SCHEDULES,
TENANT SMALL ONLY BE PERMITTED To RETAIN
SPECIFICATIONS AND EXPRESSED IDEAS FOR
INFORMATION AND REFERENCE. THE DRAVANGS,
FA-60[} Sixth Floor Fire Alarm Plan SCHEDULES, SPECIFICATIONS AND EXPRESSED
S-3 Level 3 Structural Repair Floor Plan IDEAS SHALL NOT BE USED BY THE OYMER
AND/OR TENANT ON 07HER PRMCTS FOR
ADDITIONS To THIS PROJECT OR FOR
S-4 Level 4 Structural Repair Floor Plan FA-7[)[) Fire Alarm Riser COMPLETION OF THE PROJECT BY 07HERS WITH
APPROPRIATE COMPENSAT19N TO FORBES
ARCHITECTS. COPYRIGHT (9) 201 Z JOHN
��--�� Level 5 Structural Repair Floor Plan FA--'�1{} Fire Alarm Riser Continued p�
S-6 Level 6 Structural Repair Floor Plan
FA-72[} Fire /\laD0 Riser Continued
S-7 SfrUofUrol Repair Sections
S-8 -fr-rf—rn| Aenrn~i^ r [pfni|q F\-730 Fire Alarm, Schedules, Notes, and Details NN |
EMPLOYEES
2'575/3
858 SPACES
'--
FOURTH
r/F/n
FY\RK|NC PROVIDED:
38
38
898 SPACES
P|U000Dg Fixture Count:
EMPLOYEE GARAGE
788 SPACES
E-1 00
EMPLOYEE EMERGENCY /RADIATION/
81
18
ONCOLOGY SURFACE
PARKING
111 SPACES
^
| 1 2
,
EMPLOYEE PARKING GARAGE SUMMARY:
Second Floor Electrical Power Plan
SUB-TOTAL
PROVIDED
EXISTING EXISTING
EXISTING
MALE
LEVEL
STANDARD COMPACT
ACCESSIBLE
m/*L
FIRST
86 40
4
FEMALE
| SECOND
93 JB
3
�*
�
� THIRD
00 sn
�
ED
_ --- -
FORB���� ��«�.
- - -
TS List of Drawings - ]EC
- ","^n°�"c,° --- ---
/""u m="mu
,emn ue°w"
Information oxom���K��«o�v��K� __`_ __spaou v�"omu
— ��������^��U co~m.,cn",m"r�ou"�"'
I General Notes, Location Map, Key Plan �---` -�4ano v'J "c"�°./""`4�n-
/\bbrevatlonm, Typical Mounting Heights K4p-10[> ��\�\[� and �»1urnbinq (�eDenJ| Notes and [}efoi|m w"/m,v» gables, n",m"no,*v
let .uoo~**a^oam
,",'oon~4w^unm
MP-110 HVAC and Notes and Details n=m°"egu,,"mon
n ^x-pmmxw
����^�������U
^ ~^ -~^ "^==`~~—^-~^ MP-200 Ground Floor Mechanical Plan
, " , , 0 " " °
A-1 Level 1 Floor Plan and Details
MP-210 Second Floor Mechanical Plan
A-2 Level 2 Floor Plan and Partition Type
�NP—|72[) Third [�nOr ��echon}cO! Plan
/\--�� ��m�� �� Floor ��|on
K4�� ����[> Fourth Floor Mechanical Plan
/\—^� Level 4 Floor P��O —
/\-5 Level 5 Floor Plan MP-24(] Fifth Floor Mechanical Plan , " , , , , ° ,
/\—G Level 8 Floor Plan and Existing Conditions K�p_��5[) Sixth Floor Mechanical Plan
~ = °^�`'"��~���^ °
/\-7 Door Schedule and [}efO1lS
MP-26[} Roof Mechanical Plan
/\-8 Elevator Enclosure Plans and Elevations
A-9 Exterior Elevations and Details Fire Alarm
A--1[} Partition Type, |nf�y��r �
�^, ` �'~`~~~''~ ~''~ ~~`~^~
FA-1 00 Ground Floor Fire A|orrn F�|mn -,
' .
A-11 Elevator Enclosure Wall Sections � �
FA-200 Second Floor [�ro /\lonn Plan ?
A-1|� Incinerator F�oorn Roof Plan, Section �` ^ �� � �Y '� `
. ' .
FA-300 Third Floor ��me Alarm Plan ��n Roberts
����0|^��U8K��U ��� """""="'"
=^^^~-=�~~~~^ ~��' F/\-4{][) Fourth Floor Fire Alarm Plan OWNERSHIP AND USE OF THE DOCUMENTS:-
AND EXPRESSED IDEAS AS INSTRUMENTS OF
SERVICE ARE SHALL REMAIN THE
S-1 Level 1 Structural Repair F�oor Pion ~~
' F/\—��O{} Fifth Floor Fire �\|arr� Plan '"^"�='^"""°='"==� PREPARED
S-2 Level 2 Structural Repair Floor Plan COPIES OF THESE DRAWNGS. SCHEDULES,
TENANT SMALL ONLY BE PERMITTED To RETAIN
SPECIFICATIONS AND EXPRESSED IDEAS FOR
INFORMATION AND REFERENCE. THE DRAVANGS,
FA-60[} Sixth Floor Fire Alarm Plan SCHEDULES, SPECIFICATIONS AND EXPRESSED
S-3 Level 3 Structural Repair Floor Plan IDEAS SHALL NOT BE USED BY THE OYMER
AND/OR TENANT ON 07HER PRMCTS FOR
ADDITIONS To THIS PROJECT OR FOR
S-4 Level 4 Structural Repair Floor Plan FA-7[)[) Fire Alarm Riser COMPLETION OF THE PROJECT BY 07HERS WITH
APPROPRIATE COMPENSAT19N TO FORBES
ARCHITECTS. COPYRIGHT (9) 201 Z JOHN
��--�� Level 5 Structural Repair Floor Plan FA--'�1{} Fire Alarm Riser Continued p�
S-6 Level 6 Structural Repair Floor Plan
FA-72[} Fire /\laD0 Riser Continued
S-7 SfrUofUrol Repair Sections
S-8 -fr-rf—rn| Aenrn~i^ r [pfni|q F\-730 Fire Alarm, Schedules, Notes, and Details NN |
02-22-12
Commission
11070
Revisions
'--
FOURTH
r/F/n
98
89
38
38
3
3
P|U000Dg Fixture Count:
E-1 00
Electrical Symbols and Notes
81
18
3
PLUMBING FIXTURES REQUIRED: OF PEOPLE DF WC UR LAV
TOTAL
^
| 1 2
,
_ 2
Second Floor Electrical Power Plan
SUB-TOTAL
562
210
19
MALE
1
X 1
Fourth Floor Electrical Power Plan
m/*L
788
E-240
Fifth Floor Electrical Power Plan
FEMALE
1
- 1
Sixth Floor ElecfricO. P-)w8r Plan
�*
�
PLUMBING FIXTURES PROVIDED:
E-26[}
E|eofrioo| Room Plan, Rmof E|eo ian and Panel Schedule
TOTAL
1 %
- 2
MALE
1
X 1
��
���
ED
_ --- -
FORB���� ��«�.
- - -
TS List of Drawings - ]EC
- ","^n°�"c,° --- ---
/""u m="mu
,emn ue°w"
Information oxom���K��«o�v��K� __`_ __spaou v�"omu
— ��������^��U co~m.,cn",m"r�ou"�"'
I General Notes, Location Map, Key Plan �---` -�4ano v'J "c"�°./""`4�n-
/\bbrevatlonm, Typical Mounting Heights K4p-10[> ��\�\[� and �»1urnbinq (�eDenJ| Notes and [}efoi|m w"/m,v» gables, n",m"no,*v
let .uoo~**a^oam
,",'oon~4w^unm
MP-110 HVAC and Notes and Details n=m°"egu,,"mon
n ^x-pmmxw
����^�������U
^ ~^ -~^ "^==`~~—^-~^ MP-200 Ground Floor Mechanical Plan
, " , , 0 " " °
A-1 Level 1 Floor Plan and Details
MP-210 Second Floor Mechanical Plan
A-2 Level 2 Floor Plan and Partition Type
�NP—|72[) Third [�nOr ��echon}cO! Plan
/\--�� ��m�� �� Floor ��|on
K4�� ����[> Fourth Floor Mechanical Plan
/\—^� Level 4 Floor P��O —
/\-5 Level 5 Floor Plan MP-24(] Fifth Floor Mechanical Plan , " , , , , ° ,
/\—G Level 8 Floor Plan and Existing Conditions K�p_��5[) Sixth Floor Mechanical Plan
~ = °^�`'"��~���^ °
/\-7 Door Schedule and [}efO1lS
MP-26[} Roof Mechanical Plan
/\-8 Elevator Enclosure Plans and Elevations
A-9 Exterior Elevations and Details Fire Alarm
A--1[} Partition Type, |nf�y��r �
�^, ` �'~`~~~''~ ~''~ ~~`~^~
FA-1 00 Ground Floor Fire A|orrn F�|mn -,
' .
A-11 Elevator Enclosure Wall Sections � �
FA-200 Second Floor [�ro /\lonn Plan ?
A-1|� Incinerator F�oorn Roof Plan, Section �` ^ �� � �Y '� `
. ' .
FA-300 Third Floor ��me Alarm Plan ��n Roberts
����0|^��U8K��U ��� """""="'"
=^^^~-=�~~~~^ ~��' F/\-4{][) Fourth Floor Fire Alarm Plan OWNERSHIP AND USE OF THE DOCUMENTS:-
AND EXPRESSED IDEAS AS INSTRUMENTS OF
SERVICE ARE SHALL REMAIN THE
S-1 Level 1 Structural Repair F�oor Pion ~~
' F/\—��O{} Fifth Floor Fire �\|arr� Plan '"^"�='^"""°='"==� PREPARED
S-2 Level 2 Structural Repair Floor Plan COPIES OF THESE DRAWNGS. SCHEDULES,
TENANT SMALL ONLY BE PERMITTED To RETAIN
SPECIFICATIONS AND EXPRESSED IDEAS FOR
INFORMATION AND REFERENCE. THE DRAVANGS,
FA-60[} Sixth Floor Fire Alarm Plan SCHEDULES, SPECIFICATIONS AND EXPRESSED
S-3 Level 3 Structural Repair Floor Plan IDEAS SHALL NOT BE USED BY THE OYMER
AND/OR TENANT ON 07HER PRMCTS FOR
ADDITIONS To THIS PROJECT OR FOR
S-4 Level 4 Structural Repair Floor Plan FA-7[)[) Fire Alarm Riser COMPLETION OF THE PROJECT BY 07HERS WITH
APPROPRIATE COMPENSAT19N TO FORBES
ARCHITECTS. COPYRIGHT (9) 201 Z JOHN
��--�� Level 5 Structural Repair Floor Plan FA--'�1{} Fire Alarm Riser Continued p�
S-6 Level 6 Structural Repair Floor Plan
FA-72[} Fire /\laD0 Riser Continued
S-7 SfrUofUrol Repair Sections
S-8 -fr-rf—rn| Aenrn~i^ r [pfni|q F\-730 Fire Alarm, Schedules, Notes, and Details NN |
PROJECT LOCATION: -----'
SOUTH MIAMI HOSPITAL
EMPLOYEE PARKING GARAGE
7400 SW 62ND AVE
SOUTH MIAMI, FL J3143
/,-U Location Map nts
OF
UILDING DEPT.
02-22-12
Commission
11070
Revisions
S-9
Elevator Enclosure Structural Plan
and Details
05-14-12 MD FIRE
Electrical
--``~~~~^^~~~~~
E-1 00
Electrical Symbols and Notes
E-200
Ground Floor Electrical Power Plan
E-21[}
Second Floor Electrical Power Plan
E-220
Third Floor Electrical Power Plan
E-230
Fourth Floor Electrical Power Plan
E-240
Fifth Floor Electrical Power Plan
E-250
Sixth Floor ElecfricO. P-)w8r Plan
�*
�
E-26[}
E|eofrioo| Room Plan, Rmof E|eo ian and Panel Schedule
PROJECT LOCATION: -----'
SOUTH MIAMI HOSPITAL
EMPLOYEE PARKING GARAGE
7400 SW 62ND AVE
SOUTH MIAMI, FL J3143
/,-U Location Map nts
OF
UILDING DEPT.
_
Date
. . .
�
_on_
02-22-12
Commission
11070
Revisions
04-24-12 ADDENDUM 2
05-14-12 MD FIRE
mp�
LM
��
���
CD
nn
L=
�
� 7
CN
��
~mm
nn
no
CD
N�
<
_�
�.
�
b-
' ~
C\1 n
�
Co
cn
W
j�
C�
0
-0 |
_
Date
. . .
�
_on_
�
Sheet
i
___
02-22-12
Commission
11070
Revisions
04-24-12 ADDENDUM 2
05-14-12 MD FIRE
�
Sheet
i
___