DEMOLITION NOTES:
A. ALL EQUIPMENT SHOWN DASHED IS EXISTING TO BE REMOVED. CONTRACTOR
SHALL DISCONNECT AND REMOVE ALL DISCONNECT SWITCHES, CIRCUIT
BREAKERS, MOTOR CONNECTIONS` STARTERS, ELECTRICAL PANELS, NURSE
CALL SYSTEM EQUIPMENT, ETC. WITHIN THE AREA OF WORK, UNLESS
OTHERWISE INDICATED. ALSO, REMOVE ALL CONDUIT AND WIRE BACK TO
POWER SOURCE CIRCUIT SHALL REMAIN AS SPARE OR SPACE IN THOR
RESPECTIVE PANELS, OR BE REUSED AS INDICATED ON PANEL SCHEDULES.
WHERE CONDUIT IS INACCESSIBLE, REMOVE CONDUCTORS AND CUT BACK
CONDUIT FLUSH WITH SLAB OR WALL. PATCH OPENING TO MATCH E)0S7ING
FINISH. WHERE EXISTING WIRING EXTENDS OUTSIDE OF THE AREA BY NATURE
OF THE ORIGINAL INSTALLATION, CONTRACTOR SHALL MODIFY EXISTING WIRING
AS REQUIRED TO MAINTAIN CONTINUITY OF EXISTING CIRCUITRY SUCH THAT
NO EQUIPMENT TO REMAIN IS LEFT WITHOUT SERVICE
B• PRIOR TO BID, THE EXTENT AND UNDERSTANDING OF THE WORK TO BE
PERFORMED SHALL BE CLEARLY ESTABLISHED SUCH THAT NO ADDITIONAL
COSTS WILL BE INCURRED BY THE OIMER. ANY WORK, OTHER THAN AS
DESCRIBED ON ANY ITEM OR SYSTEMS SHALL BE QUALIFIED WITHIN THE BID.
C. CONTRACTOR SHALL EXERCISE EXTREME CAUTION DURING DEMOLITION WORK.
EXISTING FEEDERS AND PANELS ARE SHOWN SCHEMATIC FOR REFMCE
PURPOSES ONLY. CONTRACTOR SHALL VERIFY IN FIELD ROUTING OF ALL
EXISTING FEEDERS PRIOR TO DEMOLITION.
D. CONTRACTOR SHALL PROVIDE TEMPORARY POWER. LIGHTING COMM., ETC.,
WHERE REQUIRED DURING DEMOLITION AND CONSTRUCTION SCOPE OF WORK.
E ALL WORK SHALL BE PERFORMED BY A LICENSED ELECTRICAL CONTRACTOR
AND SHALL BE COORDINATED WITH OTHER TRADES.
F CONTRACTOR SHALL PROVIDE ALL REQUIRED INSURANCE FOR PROTECTION
AGAINST PUBLIC LIABILITY FOR THE DURATION OF THE WORK.
G. CONTRACTOR SHALL PAY FOR THE PERMITS, FEES do INSPECTIONS.
H. CONTRACTOR SHALL NOT DISRUPT SERVICE TO ELECTRICAL APPURTENANCES
TO REMAIN.
L ALL CIRCUITS SHOWN ARE FOR R01RENCE PURPOSES ONLY. CONTRACTOR
SHALL VERIFY ALL CIRCUITS TO BE REMOVED PRIOR TO COMMENCEMENT OF
WORK.
J. THE CONTRACT DOCUMENTS DO NOT PROPOSE TO SHOW ALL EXISTING
SYSTEMS, MATERIAL OR EQUIPMENT. IT IS THE RESPONSIBILITY OF THE
ELECTRICAL CONTRACTOR TO OBTAIN DATA RELATED TO EXISTING CONDITIONS
FROM EXISTING DOCUMENTS, NOTATIONS, PHOTOGRAPHS, SURVEYS AND OTHER
OBSERVATIONS AT THE SITE
K REMOVE EXISTING WIRE, CONDUIT, EQUIPMENT, FIXTURES AND OTHER ITEMS TO
PROVIDE ACCESS FOR WORK IN EXISTING FACIUTES. REINSTALL AND REFINISH
ITEMS REMOVED, OR OTHERWISE DAMAGED, TO MATCH EXISTING AT NO
ADDITIONAL COST M OWNER.
L WHERE EXISTING FUNCTIONS TO REMAIN IN USE ARE DISRUPTED, THEY SHALL
BE FULLY RESTORED AFTER DISRUPTION, IN FULL COMPLIANCE WITH
APPLICABLE CODES AND STANDARDS.
M. MODIFY , REMOVE, OR RELOCATE MATERIALS AND ITEMS INDICATED ON THE
DRAWINGS OR REQUIRED WE TO THE DEMOLITION WORK.
K WORK JOINTLY WITH THE ARCHITECT, ESTABLISH AND MARK SALVAGE AND
DEMOLITION ITEMS BEFORE COMMENCING WORK. REPORT ITEMS SCHEDULE FOR
RELOCATION, REINSTALLATION OR REUSE, WHICH ARE FOUND TO BE IN
DAMAGED CONDITION; AWAIT FURTHER INSTRUCTIONS FROM THE ARCHITECT
BEFORE COMMENCING WITH WORK.
0. DEMOLITION EQUIPMENT, DEVICES AND MATERIAL SHALL BE REMOVED FROM
THE SITE AND DISPOSED OF BY THE CONTRACTOR. SALVAGED EQUIPMENT AND
DEVICES SHALL BE THE PROPERTY OF THE OWNER UNLESS NOTED OTHERWISE
P. MAKE RELOCATION NECESSITATED BY THE CONDITIONS AT THE SITE OR AS
DIRECTED BY THE ARCHITECT, WITHOUT ADDITIONAL COST TO THE OWNER
REPAIR, REPLACE AND /OR RESTORE TO GOOD FUNCTIONAL CONDITION.
EQUIPMENT, MATERIAL AND ITEMS SCHEDULE FOR RELOCATION. WHICH ARE
DAMAGED DURING DISMANTLING OR REASSEMBLE OPERATIONS. PROVIDE NEW
MATERIALS, FITTINGS AND APPURTENANCES REQUIRED TO COMPLETE THE
RELOCATION AND TD RESTORE TED GOOD OPERATING ORDER. PERFORM THE
RELOCATION WORK IN ACCORDANCE TO APPLICABLE CODES ASD STANDARDS,
USING SKILLED WORKERS
Q. RELOCATING DEVICES: REMOVE AND REINSTALL IN LOCATIONS DESIGNATED BY
THE ARCHITECT, TEMPERATURE CONTROL SYSTEM DEVICES, RELAYS, WIRE
CONDUIT. FIXTURES,, EQUIPMENT AND OTHER DEVICES REQUIRED FOR THE
OPERATION OF THE VARIOUS SYSTEMS THAT ARE INSTALLED IN EXISTING TO
BE REMOVED CONSTRUCTION.
R CONTRACTOR SHALL KEEP A CLEAN SET OF DRAWINGS ON THE JOB, NOTING
DAILY, ALL CHANGES MADE IN THESE DRAWINGS IN CONNECTION WITH THE
DEMOLITION PHASE, INCLUDING EXACT DIMENSIONED LOCATIONS OF ALL
UNCOVERED EXISTING UTILITIES AND SHALL. WITH THIS, REQUEST FOR FINAL
PAYMENT. TURN OVER A CLEAN, NEATLY MARKED SET OF REPRODUCIBLE
MYLARS SHOWING 'DOSTING CONDITIONS' WORK TO THE ARCHITECT FOR
SUBSEQUENT REVIEW AND TRANSMITTAL TO THE OWNER. CONTRACTOR SHALL
NOTE ALL CONSTRUCTION CHANGES. DATE EACH AND LABEL 'AS— BUILTS' IN
THE REVISION BLOCK ON THE DRAWINGS CONTRACTOR SHALL ALSO FURNISH
ONE SET OF 'AS— GUILTS' BLUEPRINTS.
S DEVICES SHOWN IN SOLID LIGHT LINES ARE EXISTING TO REMAIN.
T CONTRACTOR SHALL UPDATE ALL ELECTRICAL PANEL SCHEDULES AFFECTED BY
THIS DEMOUTION. HAND WRITTEN SCHEDULES ARE NOT ACCEPTED. SCHEDULES
SHALL BE TYPED OR COMPUTER GENERATED.
93
12
11
NOTE:
R
IT IS THE RESPONSIBILITY OF MECHANICAL, ELECTRICAL. PLUMBING AND FIRE
PROTECTION CONTRACTORS TO VISIT THE STE AND EXAMINEE IN DETAIL THE
SCOPE OF WORK OF THIS PROJECT PRIOR TO BID AND SHALL NOTIFY THE
ARCHITECT AND /OR ENGINEER IF A CONDITION EXISTS WHICH PREVENTS
HIM/HER FROM ACCOMPLISHING THE WORK INDICATED AND INTENDED BY
THESE DRAWINGS, SO NO ADDITIONAL COST IS INCURRED BY THE OWNER.
AFTER CONTRACT IS AWARDED IT WILL BE ASSUMED THAT THE SITE WAS
VISITED AND EXAMINED AND ALL PARTIES ARE IN AGREEMENT WITH THE SCOPE
OF THE WORK.
9 8 7 8 6 4 3
Project #:411447.000
, 2121 Ponce de Leon Boulward
tom. a Suite 350
Coral Gables, FL 33134
+ phone: 305.569.1692
fax: 305.EE9.1693 -----
Professional Consultlng Engineers
Austin . Dallas • Denver . Houston-: liansas City . ?1iami ^_ Q�r -
Nashville . Phoenix . Richmond,. WoLhingtor. D.C. �G I- ;
EB00007658 ^ - DATES 323.12
NOTES: FLOOR
A. CONTRACTOR SHAW. PROVIDE AND INSTALL AN IDENTIFICATION NAMEPLATE FOR
EACH ELECTRICAL EQUIPMENT / APPURTENMCES DEPICTING THE DESIGNATION
INDICATED ON THE DRAWINGS.
B. ALL EMPTY CONDUITS SYSTEMS SHALL CONTAIN A PULL WIRE FOR FUTURE
PUWNG OF CONDUCTORS.
C. CONTRACTOR SHALL COORDINATE ALL REWIRED ENERGY MANAGEMENT SYSTEM
POINTS AND CONTACTS CONNECTIONS TO ENSURE THE COMPLETE AND PROPER
OPERATION OF ALL SYSTEMS.
D. CONTRACTOR SHALL PROVIDE AND INSTALL A 1' CONDUIT WVPULL WIRE FROM
EACH WALL MOUNTED TELEPHONE MID /OR DATA OUTLET STUB UP 6' ABOVE
FINISHED CEILING.
E THE CONTRACOOR SHALL COORDINATE WITH OTHER TRADES ALL NECESSARY
WIRING AND CONNECTIONS REQUIRDE PRIOR TO PULLING CONDUCTOTRS INTO
NEW CONDUITS.
F. CONTRACTOR SHALL PROVIDE ALL EQUIPMENT AND MATERIAL NECESSARY FOR
A COMPLETE AND OPERATIONAL INSTALLATION.
G, CONTRACTOR SHALL NOT DISRUPT SERVICE TO ELECTRICAL APPURTENMICES
TO REMAIN.
H. CONTRACTOR SHALL PROVIDE EQUIP07EINTIAL TEST FOR ALL ELECTRICAL
DEVICES AND EQUIPMENT WITHIN THE AREA OF WORK.
I, ALL RECEPTACLES AND SWITCH PLATES SHALL HAVE ENGRAVED COVER
PLATES TO INDICATE THE PANEL BOARD AND CIRCUIT NUMBERS POWERING THE
DEVICE
J, ALL EMERGENCY RECEPTACLES AND LIGHT SWITCHES FACE PLATES SHALL BE
RED.
K• THE ELECTRICAL CONTRACTOR SHALL VERIFY THAT THE AIC RATING OF ALL EXISTING CIRCUIT
BREAKERS IN PANELS AFFECTED BY THIS PROJECT ARE ABOVE THE FAULT CURRENT VALUES
PROVIDED IN THE SHORT CIRCUIT CALCULATIONS. IF THE AIC RATINGS ARE BELOW THE FAULT
CURRENT VALUES, THE ELECTRICAL CONTRACTOR SHALL REPLACE ALL BREAKERS WITH NEW
BREAKERS WITH AIC RATINGS ABOVE THE FAULT CURRENT VALUES.
L CONTRACTOR SHALL UPDATE ALL ELECTRICAL PANEL SCHEDULES AFFECTED BY THIS PROJECT.
HAND WRITTEN SCHEDULES ARE NOT ACCEPTED. SCHEDULES SHALL BE TYPED OR COMPUTER
GENERATED.
NOTES: (VOICE/bATA)
1. CONTRACTOR SHALL VERIFY EXACT LOCATION OF ALL EQUIPMENT PRIOR TO INSTALLATION.
2. CONTRACTOR SHALL PROVIDE AND INSTALL ALL CONDUIT, JUNCTION BOXES, TERMINAL
CABINETS, ECT., AS- REQUIRED AND NECESSARY AND AS INDICATED ON CONTRACT
DOCUMENTS, FOR A COMPLETE AND OPERATIONAL INSTALLATION .
3. CONTRACTOR SHALL PROVIDE PULL WIRE IN EMPTY CONDUIT SYSTEM.
4. REFER TO FLOOR PLAN DRAWINGS FOR LOCATION AND QUANTITY OF DEVICES.
PROVIDE INSULATED
PLASTIC BUSHING.
(TYPICAL)
EXISTING TELEPHONE ROOM
CEILING GRID
EXISTING 4 C.
TELEPHONE (TYP•)
BACKBOARD
ILA
LAB FIFTH FLOOR
NEW
EXISTING
PARTIAL DATAXOMM RISER DIAGRAM
0,1 SCALE: NTS
(EMPTY CONDUIT SYSTEM)
JG�PS T cq 4�6-
QO 2
57882
1110
ru
Z
� =fig
DA
JOB 1 , 4=
E0.01
0 oopr*t LMA 6, ho.
J