Loading...
12-521-019J F E 0 0 14 43 92 11 a GENERAL NOTES 0 1. TYPE V, HIGHEST RISK CLASS IV 2. OBTAIN INFECTION CONTROL PERMIT BEFORE CONSTRUCTION BEGINS 3. ISOLATE HVAC SYSTEM IN AREA WHERE WORK IS BEING DONE TO PREVENT CONTAMINATION OF THE DUCT SYSTEM. 4. COMPLETE ALL CRITICAL BARRIERS LE SHEET ROCK, PLYWOOD, PLASTIC, TO SEAL AREA FROM NON WORK AREA OR IMPLEMENT CONTROL CUBE METHOD (CART WITH PLASTIC COVERING AND SEALED CONNECTION TO WORK SITE WITH HEPA VACUUM FOR VACUUMING PRIOR TO W BEFORE CONSTRUCTION BEGINS 5. MAINTAIN NEGATIVE NR PRESSURE WITHIN WORK SITE UTILIZING HEPA /CARBON EQUIPPED AIR FILTRATION UNITS. 6. SEAL HOLES„ PIPES, CONDUITS~ AND PUNCTURES. 7. CONSTRUCT ANTEROOM AND REQUIRE ALL PERSONNEL TO PASS THROUGH THIS ROOM SO THEY CAN BE VACUUMED USING A HEPA VACUUM CLEANER BEFORE LEAVING WORK SITE OR THEY CAN WEAR CLOTH OR PAPER COVERALLS THAT ARE REMOVED EACH TiME THEY LEAVE WORK SITE B. ALL PERSONNEL ENTERING WORK SITE ARE REQUIRED TO WEAR SHOE COVERS. SHOE COVERS MUST BE CHANGED EACH TiME THE WORKER EXITS THE WORK AREA. 9. DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL COMPLETED PROJECT IS INSPECTED BY THE OWNER'S SAFETY DEPARTMENT AND INFECTION PREVENTION & CONTROL DEPARTMENT AND THOROUGHLY (LEANED BY THE OWNER'S ENVIRONMENTAL SERVICES DEPT. 10. REMOVE BARRIER MATERIALS CAREFULLY TO MMIMIZE SPREADING OF DIRT AND DEBRIS ASSOCIATED WITH CONSTRUCTION. 11. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINERS. 12. COVER TRANSPORT RECEPTACLES OR CARTS. TAPE COVERING UNLESS SOLID LID. 13. VACUUM WORK AREA WITH HEPA FILTERED VACUUMS 14. WET MOP AREA WiTH CLEANER/MNFECTANT. 15. UPON COMPLETION, RESTORE HVAC SYSTEM WHERE WORK WAS PERFORMED. 16. VISQUEEN CUBE CONSTRUCTION ISOLATION SHALL BE CREATED WHEN WORK IS REQUIRED IN AREAS THAT DO NOT REQUIRE NEGATIVE AiR MACHINES AND /OR CONSTRUCTION BARRIER ISOLATION. HEPA VACUUM SHALL BE USED TO CLEAN WITHIN THE CUBE AFTER THE WORK HAS BEEN COMPLETED. 17. PORTABLE HEPA /CARBON FILTER NEGATIVE AIR MACHINE(S) SHALL BE INSTALLED TO CLEAN THE AIR IN THE ROOM. AIR QUANTITY SHALL BE ADJUSTED TO MAINTAIN A MINIMUM OF 0.02' W.g. NEGATIVE PRESSURE. VISUAL PRESSURE INDICATOR WILL BE INSTALLED AT THE ENTRANCE. AFTER INSTALLATION OF CONSTRUCTION BARRIER WALLS AND THE ABOVE MEASURES, A CERTIFIED TEST AND BALANCE FIRM SHALL CONFIRM THAT THE ABOVE ITEMS ARE IN PLACE AND WORKING PRIOR TO STARTING DEMOLITION. STiO(Y MAT SHALL ALSO BE INSTALLED. VISQUEEN SHALL BE INSTALLED AT THE EXISTING DOORS CONTRACTOR SHALL COMPLY WITH OMER REQUIREMENTS FOR INFECTION CONTROL FINAL FILTER EFFICIENCY SHALL BE 99.97 = OR HIGHER FOR 1 MICRON PARTICLES. DO NOT POSITiVELY PRESSURIZE EXISTING DUCTWORK. USE THE NEGATIVE AIR MACHINE FOR SPOT FILTRATiON/EXHAUST SERVICE WHEN WORKING ABOVE THE CEILING OUTSIDE THE WALLS OF THE RENOVATED SPACE 18. STRONG ODORS ARE NOT EXPECTED DUE TO THE SCOPE OF WORK. 19. REFERENCE ARCHITECTURAL PLANS FOR LOCATION OF TEMPORARY CONSTRUCTION WALLS AND PHASING. 20. REFERENCE INFECTION CONTROL CONSTRUCTION PERMIT FOR ADDITIONAL REQUIREMENTS 21. REFERENCE CONSTRUCTION DOCUMENTS FOR ADDMONAL REQUIREMENTS. 22. PROVIDE A FIRE WATCH IN AREAS AREAS OF CONSTRUCTION DURING ENTIRE CONSTRUCTION PERIOD. v' r, COMPLY WiTH FBC 4114.2.10. COORDINATE REQUIREMENT OF FIRE EXTINGUISHERS WiTH GENERAL CONTRACTOR LEGEND NOTES OCONTRACTOR SHALL INSTALL NEGATIVE AIR MACHINE AND TEMPORARY ROUND FLEX DUCT FROM MACHINE AS INDICATED. REMOVE AT END OF CONSTRUCTION. OCONTRACTOR SHALL INSTALL MAGNETIC DRAFT GAUGE MAINTAIN 0.02' W.C. NEGATIVE PRESSURE IN THE CONSTRUCTION AREA OA CERTIFIED TEST AND BAALANCE FIRM SHALL PERFORM A PRE - CONSTRUCTION TEST AND BALANCE IN THE SCOPE OF WORK AREA TO DETERMINE ACTUAL FLOW RATES AT ALL SUPPLY, RETURN AND EXHAUST DEVICES. FOLLOWING T&B, CONTRACTOR SHALL CLOSE SUPPLY, RETURN AND EXHAUST DAMPERS THAT SERVE THE SCOPE OF WORK AREA AND REBALANCE THE AIR HANDLING UNIT AND FAN THAT SERVE THE AREA, REDUCING THE TOTAL AIRFLOW AMOUNT AT THE EQUIPMENT BY THE AMOUNT BEING REMOVED FROM THE SYSTEM. CONTRACTOR SHALL COVER ALL AIR MMCES WITHIN RENOVATED AREA WITH VISQUEEN PLASTIC. AT SUBSTANTIAL COMPLETION OF THE PROJECT, THE CONTRACTOR SHALL REMOVE VISQUEEN PLASTIC AND REBALANCE AIR HANDLING UNIT, FANS AND AIRFLOW DEVICES IN THE SPACE BACK TO THE PRE - CONSTRUCTION QUANTITIES. OTEMPORARILY CONNECT TO NEAREST EMERGENCY POWER CONTRACTOR SHALL PROVIDE ALL NECESSARY ELECTRICAL APPURENTECES AS REQUIRED FOR THIS CONNECTION. 5O TEMPORARY CONSTRUCTION WALL/ VISQUEEN PLASTIC. REFER TO ARCHITECTURAL PLANS OTEMPORARY ROUND FLEX DUCT SIZEID FOR 0.1' W.G. AT A MAXIMUM OF 1,200 FPM. 7OCONTRACTOR SHALL INSTALL NEGATIVE HEPA AIR MACHINE AS INDICATED. REMOVE AT END OF CONSTRUCTION. O8 PROVIDE DUCT COLLARS IN TEMPORARY PARTITION TO FIT TEMPORARY ROUND AIR DUCT AS INDICATED. AT THE END OF CONSTRUCTION CONTRACTOR SHALL PATCH, SEAL, RETNSULATE, PAINT, ETC.- WALL/WNDOW TO MATCH EXISTING. PROVIDE BIRD SCREEN AT OPENING. (i) f� 75 CFM TRANSFER 75 CFMI THROUGH LOUVER PROVIDE INTAKE LOUVER WITH BIRD SCREEN INSTALLED IN TEMPORARY PARTITION. PROVIDE THE FOLLOWING FILTERS WITH PORTABLE AIR SCRUBBER: STAGE 1 PRE - FILTER: ONE -INCH DEEP FIBER TRAPPER STAGE 2 PRE - FILTER: TWO--INCH MERV 7 STAGE 3 PRE - FILTER: TWO--INCH DEEP FIBER TRAPPER CARBON FILTER STAGE 4 FINAL - FILTER: METAL -FRAME 99.97% OR HIGHER HEPA FILTER INSTALL DUCTS AS INDICATED ON FLOOR PLANS AIRFLOW METAL FLEX MR) PORTABLE NR SCRUBBER WiTH HEPA & CARBON FILTER MANUFACTURER YODEL / PORTABLE NR SCRUBBER TO BE SIMILAR T0: ABATEMENT TECHNOLOGIES/ PAS2400 02 AIR SCRUBBER DETAIL SCALE.- NTS 7 8 6 4 3 2 Project #:411447.000 2121 Ponce de Lec-i Boulevard - ' i Suite 350 ' Coral Gables, FL 33134 phone: 305.569.1692 ' Professional Consult fax: 305.559:1693 ----- Austin . Dallas • Denver . Houstori . Kansas City-. -Miami Nashville . Phoenix . RichmonC • Wa�lhingtm_D.C. SET- EB00007658 DATES 323.12 niFOlffiTH FLOOR PLAN - M-ICRA V I SCALE 1/4' m T -0" • •8aa1, ,►�0 00 ; • I . . RL ru d kill 8 NP DESORPTION DATE I I I I malm" 111M 1 4 JOB 19 . 4t= MACRA-2 0 oopyr4ht UEA 6, ho.