Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
12-521-007
L e I E I Le A 16 i 15 14 I 13 I 1� 11 1 In 1 IN 7 F 1 � 1 n 1 0 1 m Iti 0 Id I2 lu 1 9 Ii 7 C*1 5 4 I 3 2 ICRA ICRA SYMBOLS LEGEND = = -" - CONSTRUCTION . . • —� ICRA �_ . - _- -= DOCUMENT SET T,�-- ICRA SYMBOLS LEGEND _ _ _ DENOTES LIMIT OF WORK LINE FOR BID & _ DENOTES EXISTING WALLS : - - - e CONSTRUCTION l -- — —• —•— DENOTES LIMIT OF WORK LINE LE r - - - DATE: I EXISTING WALLS R DENOTES ICRA WORK 03/23/12 I _ J PRIVATE DOOM _ _ _ = DENOTES WORK TO BE DEMOLISHED e �� FILTER HEPA LTEt DENOTES ICRA WORK I I I ICRA AHCA i • 3 _ _ I — — — — GENERAL NOTES DURING CONTRUCTION g1EPR CODE ALE - 231100154 - DUST MAT � ICRA �_ p . I I I I I 1 REMOVE AND ISOLATE HVAC SYSTEM IN AREA WHERE WORK IS BEING DONE TO PREVENT CONTAMINATION OF DUCT SYSTEM. PROJECT ID -180 PROJECT SUBMISSION -001 ROBERT BROWN , ARCHITECT l,s ' I DUST MAT � 1 OCATI OCAII 1 GENERAL NOTES DURING CONTRUCTION I s:c > °> ° J I I I 2. COMPLETE ALL CRITICAL BARRIERS I.E. SHEETROCK, �` °" I � I I PLYWOOD, PLASTIC, TO SEAL AREA FROM NON WORK AREA I PRIVATE O a ,:.,. r,:,; "�A I REMOVE AND ISOLATE HVAC SYSTEM IN AREA WHERE WORK IS BEING DONE TO PREVENT CONTAMINATION OF DUCT A�� x I ( I I OR IMPLEMENT CONTROL CITE METHOD (CART WITH PLASTIC COVERING AND SEALED CO WORK SITE WITH HEPA VACUUM PRIOR TO EXIT) BEFORE CONSTRUCTION BEGINS. AR 9262 �1t, r , . • _ ._ PRIVATE t E OO � fi;: ANTE SYSTEM I I I ', ": F;ROp FLOCTAM AT Roots -"' / DUST MAT h€ 2. COMPLETE ALL CRITICAL BARRIERS I.E. SHEETROCK, PLYWOOD, PLASTIC, TO SEAL AREA FROM NON WORK AREA OR IMPLEMENT CONTROL CUBE METHOD (CART WITH PLASTIC COVERING AND SEALED CO WORK SITE WITH HEPA VACUUM PRIOR TO EXIT) BEFORE CONSTRUCTION BEGINS, . >` 1 7 a 4 I I I I I I I I I HEPA FILTER I I 3. MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORK SITE UTILIZING HEPA EQUIPPED AIR FILTRATION UNITS. 4. SEAL HOLES, PIPES, CONDUITS, AND PUNCTURES APPROPRIATELY. r �1; ;> N •. t;.:; A� '. 1r- : ' �• 0� �' .• TIr LOCA li` — a 3. MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORK SITE UTILIZING HEPA EQUIPPED AIR FILTRATION UNITS. "� I I L J I 5. CONSTRUCT ANTEROOM AND REQUIRE ALL PERSONNEL TO PASS THROUGH THIS ROOM SO THEY CAN BE VACUUMED •; •. ,- ► , _ - -- — — — — USING A HEPA VACUUM CLEANER BEFORE LEAVING WORK Archdecttre �--- - -� 4, SEAL HOLES, PIPES, CONDUITS, AND PUNCTURES APPROPRIATELY, I I SITE OR THEY CAN WEAR CLOTH OR PAPER OVERALLS THAT 2 ` I I ARE REMOVED EACH TIME THE LEAVE THE WORK SITE. z 5. CONSTRUCT ANTEROOM AND REQUIRE ALL PERSONNEL TO s I I 6. ALL PERSONNEL ENTERING WORK SITE ARE REQUIRED TO WEAR SHOE COVERS, SHOE COVERS MUST BE CHANGED Focky Asse=r nta p IN lntsrlor Daslyr b PASS THROUGH THIS ROOM SO THEY CAN BE VACUUMED USING A HEPA VACUUM CLEANER BEFORE LEAVING WORK h • ° L J — — EACH TIME THE WORKER EXITS THE WORK AREA. �,.� , • �. � -� a1 car ^��: •• .. "' �� 1 SITE OR THEY CAN WEAR CLOTH OR PAPER OVERALLS THAT ARE REMOVED EACH TIME THE LEAVE THE WORK SITES AUTOMATED "All e 1 7, CONTAIN CONSTRUCTION WASTE IN TIGHTLY COVERED CONTAINERS BEFORE TRANSPORTING. ;...,,: • s� ° 6. ALL PERSONNEL ENTERING WORK SITE ARE REQUIRED TO CHEMISTRY A I N• _ \ / WEAR SHOE COVERS. SHOE COVERS MUST BE CHANGED EACH TIME THE WORKER EXITS THE WORK AREA 5 a 8. COVER TRANSPORT RECEPTACLES OR CARTS. TAPES COVERING UNLESS SOLID LID. �e<a� �a . ""� FPA TRUC IANSP WASTE TIGHTLY COVERED L! ��' ,01% Ah " I ICRA M L I N E A 5 , I n C , • C' U CONTAINERS BOEF , — — — — — — — — KEYED NOTES -- — -- -- ..- ••.�.•.� 9 8, COVER TRANSPORT RECEPTACLES OR CARTS. TAPE COVERING UNLESS SOLID LID. I I ( 1� TYPICAL VISQUEEN ZIPWALL ASSEMBLY. 701 4th ST., SUITE 201 MIAMI BEACH, FLORIDA 33139 305- 673 -0004 FAx 305- 673 -0080 �� I I — — — C I — — — — I FOR MINOR ELECTRICAL WORK ONLY. :t ICRA I SEE DETAIL A16 /DO,I co — -- - `` "ANTE' ° ' >J I KEYED NOTES t L — — — 2❑ ZIPPED ENTRANCE .� ROOM � {{ DUST MAT DUST MAT .� s LOCATI LOCATI r �: 0 TEMPORARY BARRIER - PROVIDE VISQUEEN PARTITION $ a I I L 30 TEMPORARY BARRIER - CONSTRUCT BARRIER WALL SEE DETAIL A14 /DO,I O CO '- SEE DETAIL A16/DO,1 I — I I LL w # PROTECT OR REMOVE ALL FURNITURE DURING CONSTRUCTION. COAGULATION/ HEMATOLOGY 0 J ® DOOR MUST REMAIN CLOSED AND SEALED WITH k VISQUEEN DURING CONSTRUCTION.— M . � � � LV Co PROVIDE TEMPORARY VISQUEEN WALL PARTITION " Lk` =1 V O ® F— ICRA ", .. BEFORE AND DURING THE CONSTRUCTION OF THE `. 3. LL I— O Lo GENERAL NOTES AFTER CONTRUCTION I r— — — — — — — — — I TEMPORARY WALL AS PER DETAIL Alb /DO,I. REMOVE AFTER GYP. BD. TEMP, WALL IS COMPLETE. � J MC I DO NOT REMOVE BARRIERS FOR WORK AREA UNTIL I I TEMPORARY WALL AS PER DETAIL Alb /DOA REMOVE "I �. G LL ~ -- - - - - -�� I I COMPLETED PROJECT IS INSPECTED BY THE OWNER'S STAFF, 2, VACUUM WORK AREA WITH HEPA FILTERED VACUUMS. . I 8 4A REINSTALL VISQUEEN FOR REMOVAL OF TEMP. GYP. BD WALI R © TEMPORARY VISQUEEN WALL DURING FLOOR INSTALLATION. 'Y: ✓ c—c � G W �RRL I 3. WET MOP/ WIPE EXPOSED SURFACES WITH APPROPRIATELY LABELED AND BHSF APPROVED HOSPITAL DISINFECTANT. 2 I 3 >> 0 TEMPORARILY MOVE EQUIPMENT WHEN CONSTRUCTING cJ® VISQUEEN PARTITION ;" 1 "" O WASTE IN TIGHTLY COVERED TMA °CAn z I TEMPORARY 48 MIN. 3/4 HR RATED DOOR AND FRAME. ,, PROVIDE CLOSER, HARDWARE SET SCHLAGE ND 105S, �_ 0 N OFF. CONTAINERS BEFORE TRANSPORTING. `' ; UTILITY l� P . 5 COVER TRANSPORT RECEPTACLE S OR CARTS. TAPE 5 � � < sx m r 9 .s' a LATCHES, AND 3 HINGES. � 9� TEMPORARY 48 "" MIN. 3/4 HR RATED DOOR AND FRAME. >�S COVERING UNLESS SOLID LID. 6. REMOVE ISOLATION OF HVAC SYSTEM IN AREAS WHERE COIv1PUTER OM ROOM / 2 r� / PROVIDE CLOSER, HARDWARE SET SCHLAGE ND96LD. LA TCHES, AND 3 HINGES. lMEDECC? CYLINDER BY OWNER) x , ~>a: u .. ' a<3 �: "\ — -� WORK IS BEING PREFORMED. I __ _ : • <" r MLOCA $ ICRA GENERAL NOTES 'WrER CONTRUCTION O - - -- - - -- -t 7. REMOVE BARRIER MATERIALS CAREFULLY TO MNIMZE SPEARING OF DIRT AND DEBRIS ASSOCIATED WITH CONSTRUCTION. ° El ( l DO NOT REMOVE BARRIERS FOR WORK AREA UNTIL COMPLETED PROJECT IS INSPECTED BY THE OWNER'S — -- — — 8. FINAL CLEANING BY ENVIRONMENTAL SERVICES PRIOR TO STAFF. OCCUPANCY, 0 X �° �,� „.,,,;.;�o �«� .�o »,o moo..., 2. VACUUM WORK AREA WITH HEPA FILTERED VACUUMS. T. CORRIDOR rsa F. >x _�� -...�_ .� �� 3. WET MOP/ WIPE EXPOSED SURFACES WITH APPROPRIATELY LABELED AND BHSF APPROVED HOSPITAL DISINFECTANT.. z O CLINICAL LABORATORY >s•' L` 4. CONTAIN CONSTRUCTION WASTE IN TIGHTLY COVERED z U CONTAINERS BEFORE TRANSPORTING. W 5 COVER TRANSPORT RECEPTACLE S OR CARTS. TAPE COVERING UNLESS SOLID LID. ..__I Q L•� z ^ 6. REMOVE ISOLATION OF HVAC SYSTEM IN AREAS WHERE WORK IS BEING PREFORMED. 0 Q 7. REMOVE BARRIER MATERIALS CAREFULLY TO MINIMIZE SPEARING OF DIRT AND DEBRIS ASSOCIATED WITH z CONSTRUCTION. W 8. FINAL CLEANING BY ENVIRONMENTAL SERVICES PRIOR TO LL OCCUPANCY. 16 FOURTH FLOOR ICRA DRAWING D 08 FOURTH FLOOR ICRA PLAN SCALE 1/4• =1'-0' SCALE NTS SEAL W/ HEAVY EbSTiJG DECK y TEMP. FIRE RETAPDNT : z •<.. VSQUEEN WlfAE REQUIRED'' SEACW1 HEAV( EXISTING DECK `: FULL rF1( WALL TQ NO DESCRIPTION DATE SEAL W/ rEavY ourY TAPE fT � ww+RD PRE RETARDANT F NOT POSSIBLE IOUEE ,. PROVIDE RE RETARDANT VISQUEEN �' 1 T Y BuOF gp 1'�TA 1 ADDENDUM #1 4/13/12 GM Dec LD1�►G p r�l EP' 2 ADDENDUM #2 4/19/12 x .,° . <•,.: .< g FIE �am° h, AETARDNT'° VSOI.EENNWIfPE REQUIF'ET1 ", CEILING AS IT OCCLRS�` SE CBLNG PLAN 9 S/8' MTL. STUDS @I8 O.0 2 :� ;:? ka x • STRUCTU R� s�CTro(�J ��•c ➢f'r'�,VE' 3 4 5 2 PATENT AREA OR * 1 FIR RATED WALL CONSTRUCTION ` k Y v _ " ^ +: n. ti r.. J }• �f •/^ /� STAFF AREA n %8 8 CONSTRUCTION AMA IXTENSION POLES JOB NQ 41121.00 DRAWN BY CHECKED BY "TEMP. FM PETAPDNT ` ^ . TEW. STUDS BY GC ► r f REQUR�DISK 2 GRIP 5/9 "' WALLBOARD BY GC RG RB SEAL YW/ vY DATE SCALE 03/23/2012 AS NOTED SHEET N Q 1 VISQUEEN BARRIER TEMPORARY PARTITION INFECTION CONTROL PLAN A 16 A 1 A 12 A08 NOT IN USE A04 NOT IN USE s SCAM M, =1' -0• SCALE 112' =1' -0• 1 11 SCALE 1/4• =1' -0• NTS SCALE WS © co PY 9 ri ht LINEA 5, Inc. m Iti 0 Id I2 lu 1 9 Ii 7 C*1 5 4 I 3 2