12-509-046SPRINKLER
NOTES
1. ALL FIRE PROTECTION SYSTEMS SHALL BE IN COMPLIANCE WITH THE STATE AND
33.
IMMEDIATELY NOTIFY THE ARCHITECT /ENGINEER OF ANY DISCREPANCIES FOUND
LOCAL FIRE CODES AND ORDINANCES AND AS PER NFPA 13 - 2002. NFPA 14 -2003,
AUTOMATIC SPRINKLER MAW
BETWEEN THESE PLANS, OTHER ENGINEERING PLANS. THE ARCHITECTURAL PLANS
NFPA 20 - 2003 & NFPA 24 - 2002 EDITION REQUIREMENTS.
0
AND /OR FIELD CONDITIONS PRIOR TO FINAL BID PRICE OR FINAL PERMITTING.
2. MAKE ALL OFFSETS REQUIRED AS PER JOB CONTIONS.
34.
IN CASE OF DISPUTE OR DOUBT AS TO INTENT OF DRAWINGS OR SPECIFICATIONS.
3. CONTRACTOR TO PROVIDE AND TURN OVER TO THE OWNER AT LEAST (12) SPARE
CONNECTION TO EXISTING
OBTAIN ARCHITECT /ENGINEER'S DECISION BEFORE PROCEEDING WITH WORK OR BID
INVOLVED. FAILURE TO FOLLOW THIS INSTRUCTION SHALL CONSTITUTE LIABILITY
SPRINKLERS OF SAME TYPE AND TEMPERATURE RATING BEING INSTALLED.
POST INDICATOR VALVE
FOR DAMAGE TO OTHER WORK AND FOR REMOVING AND REPAIRING DEFECTIVE OR
4. PROVIDE SPRINKLER GUARDS ON HEADS IN ELECTRICAL ROOMS, IT ROOMS, MECHANICAL
BALL VALVE
MISLOCATED WORK IN PROPER MANNER.
ROOMS. AND ALL EXPOSED CEILINGS.
35.
BEFORE SUBMITTING PROPOSAL OR BID, EXAMINE ALL DRAWINGS AND SPECIFICATIONS
5. ALL SPRINKLER HEADS SHALL BE CENTERED AND PRESENT A NEAT AND BALANCED
CAP ON LINE
RELATING TO THIS PROJECT, THE AMOUNT OF SPACE AVAILABLE FOR PIPING,
PATTERN UNLESS SHOWN OTHERWISE.
■
EQUIPMENT AND CONNECTING SERVICES, THE SITE OF THE WORK. THE REQUIREMENTS
-H-
SECTIONAL CONTROL VALVE
TO CORRELATE THE FIRE PROTECTION WORK WITH THAT OF OTHER TRADES AND
6. PROVIDE AND MAINTAIN A MINIMUM CLEARANCE OF 18' BETWEEN THE BOTTOM
THE TIME SCHEDULE NECESSARY TO PERFORM THAT WORK.
OF THE SPRINKLER DEFLECTOR AND THE TOP OF STORAGE. FILE, SHELVING, ETC.
36.
ALL SPRINKLER HEADS MOUNTED IN CEILING SHALL BE LOCATED A MINIMUM OF 4'
7. SPRINKLER HEADS SHALL BE A MINIMUM OF 12' FROM ANY DIFFUSER PER NFPA 13.
AWAY FROM ANY WALLS. CEILING HEIGHT CHANGES OR ANY OTHER VERTICAL
-- -o- - - -+
SPRINKLER & PIPING BELOW DUCTWORK
INTERSECTING STRUCTURAL SURFACE.
8. ATE WITH STRUCTURE AND OTHER TRADES BEFORE
0)
INSTALL NG SPRINKLER WORK.
37.
PIPE SHALL BE REAMED AND CLEANED BEFORE ASSEMBLY, AND AFTER ASSEMBLY.
IM
0
CV)
r
THE ENTIRE PIPING SYSTEM SHALL BE FLUSHED CLEAN.
9. SPRINKLER HEAD 1/2 ORIFICE WITH 5.6 K- FACTOR, QUICK RESPONSE.
38.
PROVIDE SYSTEM(S) WITH FLUSHING CONNECTION(S).
10. INSTALL PIPING TIGHT TO STRUCTURE WHERE POSSIBLE.
39.
INDICATE THE TOTAL SQUARE FOOT AREA PROTECTED BY FIRE PROTECTION
11. SPRINKLER SYSTEM TO BE INSTALLED BY A STATE CERTIFIED FIRE PROTECTION
SYSTEM.
CONTRACTOR.
40.
CONTRACTOR SHALL COORDINATE EXACT LOCATION OF FIRE EXTINGUISHERS
12. SPRINKLER PIPING SHALL BE UL LISTED THREADABLE THINWALL AND /OR ALLIED XL
WITH THE ARCHITECTURAL LIFE SAFETY DRAWINGS, PRIOR TO INSTALLATION.
I' THROUGH 3' AND SCHEDULE 10 BLACK STEEL ASTM /A.135. UL LISTED FOR PIPING
4' AND LARGER. SEE SPECIFICATIONS FOR MORE INFORMATION.
41.
ALL PENETRATIONS OR OPENINGS FROM REMOVED PIPES THROUGH EXISTING
0
BUILDING WALLS AND FLOORS SHALL BE SLEEVED AND /OR PATCHED TO MATCH
13. SYSTEM DESIGNED FOR LIGHT HAZARD OCCUPANCY EXCEPT FOR ORDINARY HAZARD
co
ORIGINAL. SEE ARCHITECTURAL DRAWINGS FOR FINAL FINISHES.
GROUP 1 OCCUPANCY IN ELECTRICAL. MECHANICAL. AND STORAGE ROOMS. SYSTEM
=
W
CALCULATED TO THE STREET MAIN UTILIZING A FLOW TEST TAKEN NO MORE
42.
CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGE TO EXISTING PIPING
THAN 180 DAYS BEFORE INSTALLATION.
OR EQUIPMENT DUE TO NEW CONSTRUCTION AND HE SHALL RESTORE EXISTING
W
Q
WORK TO ITS ORIGINAL CONDITION AT NO COST TO THE OWNER.
14. PAINT RED ALL EXPOSED FIRE RISERS, INSPECTORS TESTS ASSEMBLIES &DRAIN
("�
RISERS.
43.
PROVIDE HANGERS ON ALL ARMOVERS OF 12' OR MORE IN LENGTH AND PER
15. CONTRACTOR SHALL COORDINATE WITH ALL DISCIPLINES INVOLVED SO AS TO AVOID
NFPA 13.
ANY PIPE ROUTING PROBLEMS.
44.
WARRANTY /GUARANTEE
16. CONTINUITY OF SERVICE: INTERRUPTIONS OF EXISTING SERVICES
Q
A. THE CONTRACTOR SHALL WARRANTY /GUARANTEE AND MAINTAIN THE STABILITY
OR FACILITIES SHALL BE KEPT TO A MINIMUM AND THE
0
OF WORK AND MATERIALS AND KEEP SAME IN PERFECT REPAIR AND CONDITION
CONTRACTOR SHALL FURNISH ALL MATERIALS AND LABOR
CM
c0
FOR THE PERIOD OF ONE YEAR.
REQUIRED WHENEVER TEMPORARY CONNECTIONS ARE NECESSARY
TO MAINTAIN CONTINUITY OF SERVICE. INTERRUPTIONS OF THE
B. DEFECTS OF ANY KIND DUE TO FAULTY WORK OR MATERIALS, APPEARING
EXISTING SERVICES. THE INSTALLATION OF TEMPORARY FACILITIES.
DURING THE ABOVE MENTIONED PERIOD. MUST BE IMMEDIATELY REPAIRED BY
AND THE WORK OF MAKING FINAL CONNECTIONS TO NEW WORK
THE CONTRACTOR AT HIS OWN EXPENSE TO THE ENTIRE SATISFACTION OF THE
SHALL BE DONE ONLY AT SUCH TIMES AS PERMITTED AND SCHEDULED
OWNER AND ENGINEER. SUCH RECONSTRUCTION AND REPAIRS SHALL INCLUDE
BY THE OWNER. ALL SUCH CONNECTIONS AND TIE -INS SHALL BE
DAMAGE TO THE FINISH OR FURNISHING OF THE BUILDING RESULTING FROM THE
COORDINATED THROUGH THE OWNERS PROJECT MANAGER.
ORIGINAL DEFECT OR REPAIR THERETO.
I. THE DURATION OF EACH SHUTDOWN SHALL BE LIMITED TO NIGHTS AND /OR
45.
PIPING SHALL NOT BE RUN OVER ANY ELECTRICAL PANELS. ELECTRICAL EQUIPMENT
WEEKENDS WITH THE TIME FRAME FOR SHUTDOWNS AS SPECIFIED BY THE
AND PHONE PANELS.
OWNER. THE CONTRACTOR SHALL NOTIFY THE OWNER IN WRITING FORTY -EIGHT
(48) HOURS IN ADVANCE OF EACH REQUIRED INTERRUPTION
46.
THE FIRE PROTECTION CONTRACTOR SHALL KEEP A SET OF MARKED UP DRAWINGS
OF EXISTING SERVICE.
AS THE JOB PROGRESSES. NO MAJOR CHANGE SHALL BE MADE TO FIRE PROTECTION
DESIGN ENGINEERING UNLESS IT HAS BEEN COORDINATED. DRAWN AND SUBMITTED
2. THE CONTRACTOR SHALL INCLUDE IN BID PRICE ALL PREMIUM TIME
FOR APPROVAL.
CHARGES FOR LABOR AND EQUIPMENT REQUIRED FOR ALL NIGHT AND
WEEKEND OVERTIME WORK, AS NECESSARY. TO COMPLETE THE SCOPE
47.
SPRINKLERS IN AREAS WITH EXPOSED STRUCTURE (OBSTRUCTED CONSTRUCTION)
OF THE CONTRACT.
SHALL BE INSTALLED WITH DEFLECTOR 1' BELOW BOTTOM OF THE BEAM (MAXIMUM
22' BELOW ROOF DECK) PER NFPA 13.
17. SEAL PENETRATIONS OF FIRE RATED WALLS, CEILINGS AND FLOORS IN
48.
ACCORDANCE WITH U.L. FIRE RESISTANCE INDEX FOR THROUGH PENETRATION
CONTRACTOR SHALL PROVIDE PROVISIONS FOR FLUSHING SPRINKLER PIPING PER
FIRE STOP SYSTEMS. COORDINATE REQUIREMENTS WITH ARCHITECTURAL
NFPA 13, 8.14.16. SHOW LOCATIONS OF FLUSHING CONNECTIONS ON SPRINKLER SHOP
PLANS AND SPECIFICATIONS.
DRAWINGS.
18. FIRE PROTECTION CONTRACTOR SHALL PREPARE A SET OF COORDINATION SHOP
49•
SSR IS CONTRACTED BY THE HOSPITAL /OWNER TO BE THE ENGINEER OF RECORD
DRAWINGS BASED ON PIPE SIZES SHOWN FOR ALL LEVELS COORDINATED WITH
FOR THIS PROJECT. CONTRACTOR SHALL PRODUCE SHOP DRAWINGS WHICH MATCH
ALL THE ENGINEERING DISCIPLINES AND FIRE PROTECTION PIPING. THESE SHOP
THESE DRAWINGS IN DESIGN INTENT (PIPE ROUTING. PIPE SIZING. SPRINKLER HEAD
DRAWINGS SHALL BE SUBMITTED TO SSR ENGINEER FOR APPROVAL PRIOR TO
LAYOUT, ETC.). CONTRACTOR SHALL COORDINATE FIRE PROTECTION INSTALLATION
FABRICATION, INSTALLATION OR SUBMITTAL TO BUILDING DEPARTMENT.
WITH SITE CONDITIONS (STRUCTURE. CEILING. DUCTWORK. PIPING CONDUIT, ETC.). AND
PROVIDE OFFSETS TO PIPE ROUTING OR DEVIATIONS FROM DESIGN INTENT ONLY
19. ALL GROOVED AND SCREWED FITTING SHALL BE APPROVED BY AN ENGINEER WHO
WHERE REQUIRED BY SITE CONDITIONS OR APPLICABLE CODES.
RESERVES THE RIGHT TO DISAPPROVE ANY FITTING. ALL FITTING TYPES SHALL BE
FROM THE SAME MANUFACTURER.
50.
REFER TO ARCHITECTURAL REFLECTED CEILING PLANS FOR SOFFIT LOCATIONS
AND CEILING HEIGHTS.
20. PRESSURE TEST PIPING AT 300 AND 200 PSIG FOR A MINIMUM OF TWO HOURS.
IF LEAKS ARE FOUND THEN CONTRACTOR SHALL FIX LEAKS AND TEST AGAIN.
51.
ENGINEERING SERVICES TO BE REMOVED SHALL BE CAPPED AND PLUGGED.
CONTRACTOR SHALL ALSO PROVIDE ALLOWANCE IN BID FOR PRESSURE TESTING
OF EXISTING PIPING SHOWN TO REMAIN AT 300 AND 200 PSIG FOR A MINIMUM
52.
REFER TO DIVISION 15 SPECIFICATIONS FOR MORE INFORMATION.
OF 2 HOURS. ALLOWANCE SHALL INCLUDE FIXING LEAKS AND RETESTING.
21. ANY SYSTEM OR PORTION OF SYSTEM, THAT IS SHUTDOWN, SHALL REQUIRE A
53.
CONTRACTOR SHALL REMOVE EXISTING SPRINKLER HEADS AS SHOWN AND
ADJUST PIPING TO NEW CEILING PATERN.
FIRE WATCH. COORDINATE WITH HOSPITAL REPRESENTATIVE BEFORE DEACTIVATING
ANY SYSTEM.
54.
EXISTING SERVICES INDICATED ON THESE DRAWINGS WERE DERIVED
22. PROVIDE SPRINKLERS ABOVE AND BELOW DUCTWORK, CONDUIT. PIPING, ETC. 48' IN
FROM EXISTING DRAWINGS AND LIMITED FIELD OBSERVATIONS. THESE
DRAWINGS MAY NOT BE ALL INCLUSIVE OF SERVICES THAT EXIST IN THE
WIDTH AND LARGER. THIS INCLUDES SYSTEMS LOCATED ADJACENT TO EACH OTHER
PROJECT AREA. CONTRACTOR SHALL VERIFY SERVICES, LOCATION, TYPE
WHICH THEIR COMBINED WIDTH IS 48' OR LARGER.
AND SIZE PRIOR TO ANY CONSTRUCTION. ANY DEVIATIONS IMPACTING WORK
SHOWN ON THESE DOCUMENTS SHALL BE REPORTED TO THE ARCHITECT FOR
23. SCHEDULE 5 PIPING AND FLEXIBLE SPRINKLER HEAD DROPS ARE NOT APPROVED
COORDINATION PRIOR TO CONSTRUCTION.
OR ACCEPTED PRODUCTS.
24. VISIT THE SITE TO CHECK AND VERIFY ALL EXISTING CONDITIONS PRIOR TO BIDDING
55.
CONTRACTOR IS RESPONSIBLE FOR RELOCATING ALL EXISTING FIRE MAINS AND
SPRINKLER PIPING TO FACILITATE THE INSTALLATION OF NEW ELECTRICAL.
TO INSURE THE COORDINATION OF THE FIRE SERVICES WITH EXISTING CONDITIONS.
HIS INC
MECHANICAL AND PLUMBING SYSTEMS. THIS INCLUDES ALL CEILING SPACES,
25. CUTTING OF STRUCTURAL AND /OR ARCHITECTURAL MEMBERS TO BE DONE ONLY
SHAFTS.WALLS.ETC.
WITH THE WRITTEN APPROVAL OF THE ARCHITECT AND STRUCTURAL ENGINEER.
56.
CONTRACTOR SHALL RAISE ALL EXISTING SPRINKLER PIPING WITHIN SCOPE TIGHT TO
26. SPRINKLER HEADS ARE TO BE COORDINATED WITH ALL LIGHTING FIXTURES AND
STRUCTURE AND PROVIDE NEW FITTINGS THROUGHOUT.
STRUCTURAL SYSTEM.
57.
CONTRACTOR SHALL FIELD VERIFY ALL EXISTING PIPING INCLUDING FITTINGS &
27. INDICATE CENTER TO CENTER DIMENSIONS AND /OR PIPE CUT LENGTHS AND
SPRINKLERS ARE RATED FOR 175 PSI PRIOR TO BIDDING. IF DISCREPANCIES ARE
NOMINAL PIPE DIAMETERS OF ALL PIPING ON SHOP DRAWINGS.
FOUND THEY ARE TO BE BROUGHT TO THE ENGINEERS ATTENTION.
28. INDICATE PIPE TYPE, SCHEDULE OF WALL THICKNESS AND METHOD OF JOINING ON
58.
ALL PENETRATIONS OR OPENINGS FROM REMOVED PIPES THROUGH EXISTING
SHOP DRAWING.
BUILDING WALLS AND FLOORS SHALL BE SLEEVED AND /OR PATCHED TO MATCH
ORIGINAL. SEE ARCHITECTURAL DRAWINGS FOR FINAL FINISHES.
29. CAUTION: MATERIAL SUBMITTALS AND SHOP DRAWINGS SHALL BE SUBMITTED TO
ARCHITECT /ENGINEER FOR APPROVAL AND SHALL BE APPROVED BEFORE ANY
59.
ENGINEERING SERVICES TO BE REMOVED SHALL BE CAPPED AND PLUGGED.
INSTALLATION.
60.
CONTRACTOR SHALL OBTAIN FROM THE OWNER A COPY OF THE INFECTION CONTROL
30. CONTRACTOR SHALL PROVIDE ALLOWANCE IN BID FOR AN ADDITIONAL 10 CONCEALED
RISK ASSESSMENT (ICRA) PREPARED FOR THIS PROJECT. CONTRACTOR SHALL REVIEW
HEADS WITH 10 FOOT 1' ARMOVER, 1 TEE AND 2 ELBOWS TO EACH HEAD. PROVIDE
THE REQUIREMENTS IN THE REPORT AND PERFORM ALL WORK IN ACCORDANCE WITH
LINE ITEM COST PER HEAD WITH ASSOCIATED ARMOVER. FITTINGS AND HANGERS.
THOSE REQUIREMENTS. SEE MECHANICAL DRAWINGS FOR COORDINATION OF
INSTALL HEADS WHERE REQUIRED BY TEMPORARY WALLS, LOCAL AHJ, UNFORSEEN
VENTILATION REQUIREMENTS REQUIRED BY ICRA.
CONDITIONS. ETC.
31. PROVIDE A MINIMUM OF 6 INCHES IN BETWEEN ALL PIPING AND FIRE RATED AND SMOKE
61.
CONTRACTOR SHALL PROVIDE 24/7 FIRE WATCH FOR ALL AREAS OF THE HOSPITAL
THAT HAVE THE FIRE PROTECTION SYSTEM SHUTDOWN FOR 4 HOURS OR MORE AS
TIGHT PARTITIONS FOR REQUIRED INSPECTIONS. ANY PIPING WITHIN THIS 6 INCHES SPACE
REQUIRED PER THE FLORIDA FIRE PREVENTION CODE 2007. COORDINATE
SHALL BE REQUIRED TO BE MOVED AND REROUTED. ANY COST IMPACT TO OTHER
REQUIREMENTS WITH OWNER.
TRADES WILL BE THE RESPONSIBILITY OF THE CONTRACTOR.
32. PROVIDE A PERMANENTLY ATTACHED NAME TAG STATING THE REQUIRED DESIGN
CRITERIA FOR EACH HYDRAULICALLY DESIGNED SYSTEM.
,t
FIRE PROTECTION LEG _ ND__
SYMBOL DESCRIPTION
SYMBOL DESCRIPTION
= FIRE DEPARTMENT W6 E- CABINET
F
FIRE LINE OR MAIN
-A /S-
AUTOMATIC SPRINKLER MAW
FP -19 ETC
FIXTURE IND NTIFICAT,'ON_ n rt
RISER INDE TIFICATION
0
DRAIN LINE
F.H.
o
PIPE TURNED UP
FIRE STANDPIPE
CONNECTION TO EXISTING
9
PIPE TURNED DOWN
POST INDICATOR VALVE
FIRE EXTINGUISHER
ABOVE FINISHED FLOOR
BALL VALVE
*
FLOW SWITCH
tit
CHECK VALVE
FLOW SWITCH
CAP ON LINE
Ff F
UNION IN PIPE
■
HYDRAULIC CALCULATION SPRINKLER AND PIPE NODE
-H-
SECTIONAL CONTROL VALVE
•
SPRINKLER HEAD
O.S. &Y. GATE VLV W /TAMPER SW
•
SIDE WALL SPRINKLER HEAD
0*
VALVE IN VERTICAL W /TAMPER SW
-- -o- - - -+
SPRINKLER & PIPING BELOW DUCTWORK
0)
Q
IM
0
CV)
r
FIRE PROTECTION ABBREVIATIONS
F.H.C.
FIRE HOSE CABINET
O.S. & Y.
OUTSIDE STEM AND YOKE
F.E.
FIRE EXTINGUISHER
S.C.V.
SECTIONAL CONTROL VALVE
A/S
AUTOMATIC SPRINKLER
F.H.
FIRE HYDRANT
F.SP.
FIRE STANDPIPE
R.P.B.P.
REDUCED PRESSURE BACKFLOW PREVENTER
P.I.V.
POST INDICATOR VALVE
A.F.F.
ABOVE FINISHED FLOOR
T.S.
TAMPER SWITCH
V.I.V.
VALVE IN VERTICAL
F.S.
FLOW SWITCH
B.V.
BUTTERFLY VALVE
R.C.V.
RISER CONTROL VALVE
SPRINKLER
HEAD LEGEND
TYPE
K -FACT
TEMP
LOCATION
I. CONCEALED - ORS (WITH WHITE COVER PLATE)
5.6
1550
ALL SPACES UNLESS OTHERWISE NOTED
2. UPRIGHT GENERAL - ORS
5.6
155'
ELEC & MECH. ROOMS. STAIRS AND ROOMS W /NO CEILINGS
FLOOR PLAN - DEMOLITION - FIRE PROTECTION
FP2.1
THIRD
FLOOR PLAN - NEW CONSTRUCTION - FIRE PROTECTION
FP2.2
THIRD
FLOOR PLAN - NEW CONSTRUCTION - FIRE PROTECTION
FP5.1
* SEE SPECIFICATIONS FOR MODEL NUMBERS.
FIRE COMPONENT SCHEDULE
IDENTITY
COMPONENT
FP -1
FIRE EXTINGUISHER (ABC - 10 LB.- RECESSED CABINET)
FP -2
FIRE EXTINGUISHER (ABC - 10 LB. - WALL HUNG)
FIRE
PROTECTION SCHEDULES. LEGENDS AND DRAWING INDEX
N DFR
IN_ i - Tip
DD NT IN_ 1 ;111`
PY41R 'I'nds f)I'Et l pit I'1 +s� iir 1-1
CONTRACTOR
" Y AtkpTI31O
SllCii 1TTEIJ 1eXR
A(,11 1)ADE COUNTY T FIRE 1 Vii- ll OR RJENI(3U�"D 4
Intl A10 SYSTEt+,1S IN
J
J
Q
Q
W
a
rn
0
UCV)
M
u_
W
WW
a
0
W
0
+ N
U�
a
U
o:
W
s
(
A + i
g$E i
L
if e N11-11 I
SS11 RSmith
eckman
Reid, Inc.
600 West Hillsboro, Suite 300
Deerfield Beach, FL 33441
(954) 421 -1260
FAX: (954) 421 -1466
www.ssr- inc.com
Firm certification - EB- 00000857
DkDni. PE-58M
Johnmbf -ma, PE -3=0
Irwhaa lL PE -86701
B3R JOB # 11=0.0
cc
DRAWING INDEX
SHEET
NUMBER
SHEET TITLE
FPO.1
FIRE
PROTECTION SCHEDULES. LEGENDS AND DRAWING INDEX
FPi.i
THIRD
FLOOR PLAN - DEMOLITION - FIRE PROTECTION
FP1.2
THIRD
FLOOR PLAN - DEMOLITION - FIRE PROTECTION
FP2.1
THIRD
FLOOR PLAN - NEW CONSTRUCTION - FIRE PROTECTION
FP2.2
THIRD
FLOOR PLAN - NEW CONSTRUCTION - FIRE PROTECTION
FP5.1
FIRE PROTECTION DETAILS
N DFR
IN_ i - Tip
DD NT IN_ 1 ;111`
PY41R 'I'nds f)I'Et l pit I'1 +s� iir 1-1
CONTRACTOR
" Y AtkpTI31O
SllCii 1TTEIJ 1eXR
A(,11 1)ADE COUNTY T FIRE 1 Vii- ll OR RJENI(3U�"D 4
Intl A10 SYSTEt+,1S IN
J
J
Q
Q
W
a
rn
0
UCV)
M
u_
W
WW
a
0
W
0
+ N
U�
a
U
o:
W
s
(
A + i
g$E i
L
if e N11-11 I
SS11 RSmith
eckman
Reid, Inc.
600 West Hillsboro, Suite 300
Deerfield Beach, FL 33441
(954) 421 -1260
FAX: (954) 421 -1466
www.ssr- inc.com
Firm certification - EB- 00000857
DkDni. PE-58M
Johnmbf -ma, PE -3=0
Irwhaa lL PE -86701
B3R JOB # 11=0.0
Comm. No: 11087.00
Date: 01/18/12
Drawn:
Revised:
V'
No. 33 •
I
FP0.1
cc
0
U
Z
....J
Q
U_
W
0)
Q
IM
0
CV)
r
CC
M
J
J
I-
Q
W
0���
co
a.O
0
co
0
I-
=
W
Z
0
W
W
Q
C
("�
C11)
n'
laaa
co
CO
0
II...
�-
U
Q
0
0
0
IM
0)
CM
c0
O
Comm. No: 11087.00
Date: 01/18/12
Drawn:
Revised:
V'
No. 33 •
I
FP0.1