Loading...
12-509-0404'W UP & DN — I�EW COISTR -�CTION LEGEND SYMBOLS ORI f ION 1 I 3� -5LX' G 1 i Ck REMAIN 1 ...._._..... I --------------------- i I EEJW—C 'iRUCT10N 1? CONNECT T EXIST. AT THIS POINT I C 3333jiljiljj 2 I � '4 t € o ,..r € P-3 1 € >,.: ;, i.:,:: RED LINE' GENERAL NOTES: 1. CONTRACTOR SHALL PATCH WALLS, FLOORS AND CEILINGS TO MATCH " n EXISTING FINISHES FOR DEMOLITION AND INSTALLATION OF PIPING, FIXT�JRi S-, " EOUIPMENT, ETC UNLESS NOTED OTHERWISE ON ARCH. DRAWINGS. 2. THE HOSPITAL IS OPEN 24 HOURS A DAY, 7 DAYS A WEEK. THE COMZRACTO----- --- -- SHALL HAVE TO PERFORM WORK WITHIN ACTIVE PATIENT CARE AREAS. ° CONTRACTOR SHALL: A. COORDINATE SHUTDOWN OF EXISTING SYSTEMS WELL IN ADVANCE -WITH OWNER. B. PERFORM WORK AT SUCH TIMES AND UNDER SUCH CONDITIONS AS PRESCRIBED BY OWNER. C. PERFORM WORK WITHIN THE GUIDELINES OF THE ICRA REPORT PREPARED FOR THIS PROJECT BY THE OWNER. D. SEOUENCE DEMOLITION AND NEW CONSTRUCTION TO MINIMIZE NUMBER & DURATION OF SHUTDOWNS REOUIRED. 3. CONTRACTOR SHALL COORDINATE WORK WITH EXISTING CONDITIONS (STRUCTURE DUCTWORK. PIPING, CONDUIT, ETC.). PROVIDE OFFSETS AS REOUIRE6 TO INSTALL NEW WORK. 4. CONTRACTOR SHALL LOCATE ALL NEW VALVES AT ACCESSIBLE LOCATIONS. PROVIDE ACCESS PANELS,AS REQUIRED,FOR VALVES LOCATED ABOVE HARD CEILINGS. 5. ALI, WASTE. STORM AND CONDENSATE PIPING 2- & LESS TO BE SLOPED o I /4 /FT. ALL WASTE, STORM AND CONDENSATE PIPING 21/2 & LARGER TO BE SLOPED Q 1 /e /FT• 6. WORK MAY NOT BE LIMITED TO SCOPE OF WORK OR PHASING AREAS INDICATED, BUT ALSO MAY INCLUDE WORK OUTSIDE OF THE SCOPE OF WORK OR PHASING AREAS AS INDICATED BY CONTRACT DOCUMENTS. 7• CONTRACTOR SHALL FIELD VERIFY WITH HOSPITAL LOCATION OF EXISTING SERVICE VALVES FOR SHUTDOWN OF CW AND HW COORDINATE TIMING. DURATION AND AREA AFFECTED BY SHUTDOWN WITH HOSPITAL. 8. CONTRACTOR SHALL LABEL EXISTING PIPING SHOWN TO REMAIN WITHIN AREA OF WORK PER SPECIFICATIONS. 9. PIPING SHOWN IS ROUTED AT THIRD FLOOR CEILING UNLESS NOTED OTHERWISE. 10. CONTRACTOR SHALL OFFSET NEW WASTE PIPING DROPS AS REQUIRED TO AVOID STRUCTURAL JOISTS. 11. CONTRACTOR TO REMOVE EXISTING STACKS AND RISERS LOCATED IN EXISTING WALLS TO BE DEMOLISHED, AND PROVIDE NEW OFFSETS AT CEILING ABOVE AND SLAB BELOW TO NEW STACK OR RISER LOCATION COORDINATED WITH FLOOR PLAN LAYOUT AND EXISTING CONDITIONS. 12. CONTRACTOR SHALL PROVIDE ADD ALTERNATE TO REPLACE EXISTING INSULATION ON EXISTING DOMESTIC HW & HWR PIPING, SHOWN ON THIS DRAWING AS EXISTING TO REMAIN, IN AREAS OF WORK EXPOSED BY CONSTRUCTION. REVIEW INSULATION CONDITIONS WITH OWNER'S REPRESENTATIVE, AND REPLACE EXISTING INSULATION AS DIRECTED. 6 - -# 4 -W ON I i` id :f( i . ............. .........f ......: :::::::..::- - - 3 ..... ....._......................... :: 1'CD DOWN TO FLOOR BELOW. SEE COOLING COIL CONDENSATE DRAIN DETAIL. . FAN COIL UNIT (FCU -1). SEE MECH DRAWINGS. _I I £ NON MEDICAL AIR COMPRESSOR ` I •FD-2 id- P- - ......... _ � _ ....._ ...a _ 2-1 ............. 58 P 626 ii. - 3 VTR +4'W CAPPED -; OBELOW SLAB 'I_ 1/ CW. SEE I 3RD FLOOR PLAN =r THIS DRAWING. PARTIAL THIRD FLOOR PLAN NEW CONSTRUCTION - PLUMBING 0' 1' 2' 4' 8' 12' " " " " "' ° " " "' O EXISTING 4' WASTE DOWN TO 2ND FLOOR TO BE OFFSET AS REOUIRED TO ACCOMMODATE .... NEW FLOOR LAN LAYOUT P-5 1 _ ............ . --- --- - . --- - £ xi � 4w w..E.3 €"i * ' I .,.y..., } i f i , `t 'f. t^ <: >?::: ?:}i• ^ «k ,,.,..,.......,.,... 1 ....................................... • ' ; ,I.....�,.. 2 EXISTING 1 ACID VENT UP FROM 2ND FLOOR TO BE OFFSET AS REQUIRED TO ACCOMMODATE b _ w_ _ <. tIa 2 "' i "" NEW FLOOR PLAN LAYOUT. PROVIDE POLYPROPYLENE SCHEDULE 40 PIPING AND FITTINGS MEETING - � "'_..`....� I w- •-• -`' I , ASTM D635 /ASTM D2843. JOIN PIPING WITH MECHANICAL COUPLINGS. CALL /'Z S � : I € t .::° :`s r 3 INSTALL NEW HW MAIN ADJACENT TO EXISTING HW MAIN PRIOR TO ITS REMOVAL. SEE ' i i `•. ;; s; € DEMOLITION DRAWINGS. CONTRACTOR SHALL COORDINATE ANY SHUTDOWNS REQUIRED WELL FD -1 1€ }• I i r -, . ; x , -, . , IN ADVANCE WITH HOSPITAL, AND SEOUENCE WORK TO MINIMIZE NUMBER AND DURATION < •- I �2• ( r -+3WL € P -3 OF SHUTDOWNS REQUIRED. is . r f • s. P 206 <;;; Fr. ...�:::::::::::::<•; .. ° �... . i 00.86. , . € - .: ..,.«.: iii r-- -•--.,:.... 3 • =, : i i x:..... °• ';--- — i m > „ „; i 4 INSTALL VALVES AND PIPING PRIOR TO COMENCING DEMOLITION WORK TO MINIMIZE DOWNTIME P13A ...... OF EX TIN SY TE 006 t # °-006 -_. 0086 P i 3 :i s E � ''... ; i .: '?.... ,,.� s: i :-.._E �c i ( i I E •::::.W --:._' .,.;..,..; .. : - .....F :----: }... `..... .... �Z:...: � I - # i .: ............. SUPPORT ABOVE ROOF MINIMUM UTILIZING MAXIMUM - I , r ( 1 10 FT. ON CENTER. SUPPORTS SHALL BE MIRO INDUSTRIES MODEL 20 -BASE STRUT -12. ADJUSTABLE. 2' 3'VTR 4'W DN � - -_ POLYCARBONATE BASE. AND GALVANIZED STEEL STRUT CONNECTED WITH STAINLESS STEEL ALL THREAD � 1 / — ( 2 TO BASE. CLAMP PIPE TO UNISTRUT WITH PHD 82401 - 2461 STRUT CLAMP WITH GALVANIZED FINISH (VERIFY CLAMP MODEL - WITH PIPE MATERIAL). ATTACH BASE AND FLASH TO ROOF (SEAL WATERTIGHT) i/ € ( WITH MIN. ' EXPANSION BOLTS AT EACH CORNER. VERIFY ATTACHMENT TO ROOF AND FLASHING WITH ARCH. DRAWINGS. LABEL PIPING A MINIMUM OF ONCE EVERY 20 FT. ON CENTER. THIRD FLOOR PLAN - NEW CONSTRUCTION — PLUMBING ” O TURN UP AND TERMINATE 3' VENT A MINIMUM OF 25 FEET FROM ANY OUTSIDE AIR INTAKE OPENING, OPERABLE WINDOW, ETC. (D OFFSET EXISTING 3' VTR ABOVE ROOF AS REQUIRED TO ACHIEVE A MINIMUM OF 25 FEET SEPARATION I'I'I'I'I I FROM THE NEW COMPRESSED AIR INTAKE SHOWN ON DRAWING P3.1 AND ANY OTHER EXISTING OUTSIDE 0' i' 2' 4' 8' 12' AIR INTAKES. A w w w A A A A A Jk A A A J\ KEYPLAN H AF N �� 3rd Floor Level J 0 �1 Q oC Q W L.LCo ° v, 0) a o; UM J LL WW 0 W 0 g T L + N U� J U C W M S z � o a U J U 0 0 W SSA Smith Beckman Reid, Inc. 600 West Hillsboro, Suite 300 Deerfield Beach, FL 33441 (954) 421 -1260 FAX: (954) 421 -1466 www.ssr- inc.com i¢m CerUfkation -E - 0000e67 D..bDi. PE -68688 Ah.Lmo- w PE -66200 1r.h•d.i8te.nd PE -66701 886 JOB # 1182009.0 Ix O M U_ Z J Q U_ W v! M a0 M m J J �, LL U. � a � J W M Q S 0 a U �o Qo H = W z J Cr W O W Q z co 0 a O Q 0 N O m 0) (ID Or- Comm. No: 11087.00 Date: 01/18/12 Drawn: Revised: AHCA COMMENTS/ COORDINATION 2/6/12 I< • v ' 3 ' 0. = OF - �rlllitti P2.2