12-509-00613
�To I
�i
a
o
N
NOTES K
cn
z
KEYNOTES (CONT.) L
LEGEND K
KEYPLAN
co
m�v � a
ca o c�i
'2 '2 0
o ° ea �a
j
Z
J�uc��c°>
E 1
1. A
ALL AR OF CONSTRUCTION SHALL MAINTAIN NEGATIVE AIR 7
7. CONTRACTOR SHALL COORDINATE ANY /ALL DISRUPTIONS WITH 1
13
�To I
�i
a
GENERAL N
NOTES K
KEYNOTES K
KEYNOTES (CONT.) L
LEGEND K
KEYPLAN
E 1
1. A
ALL AR OF CONSTRUCTION SHALL MAINTAIN NEGATIVE AIR 7
7. CONTRACTOR SHALL COORDINATE ANY /ALL DISRUPTIONS WITH 1
1. 1
1 HOUR RATED TEMPORARY CONSTRUCTION BARRIER SHALL M
MAY INVOLVE WEEKEND AND /OR AFTER HOURS WORK. ®
®® ®® AREA LIMITS LINE
® P
PRESSURE RELATIVE TO ADJACENT SPACES FOR THE DURATION O
OWNER OF THE FLOORS ABOVE OR BELOW TO COMPLETE THE R
REMAIN IN PLACE THROUGHOUT CONSTRUCTION.
x O
OF CONSTRUCTION ACTIVITIES. REFER TO THE MECHANICAL PLAN R
RENOVATION OF THE 2ND FLOOR IN A TIMELY MANNER. IF 1
10. TEMPORARY PARTITION TO BE CONSTRUCTED AND REMAIN IN
" " " " " "' TEMPORARY CONSTRUCTION BARRIER A
AREA
c F
FOR ADDITIONAL INFORMATION. T
THERE ARE ANY CONFLICTS CONTRACTOR SHALL CONTACT THE 2
2. D
DOOR IN TEMPORARY CONSTRUCTION BARRIER. MUST BE 45 MIN. P
PLACE UNTIL EXISTING CORRIDOR WALL AND DOOR IS "