12-487-010ROOM
M.LC.U.
----------------------------------------------------------- ... .. - ... - -_.._
SOILED
UTILITY
CORRIDOR
❑ ❑ I 0
I _
I
ELECTRICAL
ROOM
GTO -m
NUTRITION II MEDICINE
M
ROOM
M.I.C.U.
NT -STAIR 1
FUTURE FUTURE
ELEV. 14 ELEV. 15
COMM.
CLOSET
ELEV. 1 I I ELEV. 2 11 ELEV. 13
UP
P -STAIR 3
CORRIDOR
.................1.1. P i \ .- __ _..._..
WAITING
\ FAMILY J
❑
IQ
CONTRACTOR SHALL
❑
Ld
USE HEPA VACUUM
c�
CLEANER WHEN
I�
b_
DRILLING. MAKE SURE
ROOM
JANITO
VACUUM CLEANER
I�
ROOM
ry
INTAKE NOZZLE IS AS
O
M.I.C.U.
100
�`
ROOM
CLOSE TO SOURCE OF
Fy Fy
TREATMENT
WATER I
I
EQUIPMENT
DUST AS POSSIBLE.
'mm
I
I
I
TOILET
I
IMECHANICAL
W
IROOM
I JAN.
.o
M
ROOM
M.I.C.U.
NT -STAIR 1
FUTURE FUTURE
ELEV. 14 ELEV. 15
COMM.
CLOSET
ELEV. 1 I I ELEV. 2 11 ELEV. 13
UP
P -STAIR 3
CORRIDOR
.................1.1. P i \ .- __ _..._..
WAITING
\ FAMILY J
�I
1
I ELEV.
I
1
CONSTRUCTION MATERIALS & DEBRIS ROUTING
FILM/ PAPER STO. PREP/ RECOVERY #22
PROVIDE /INSTALL A RECIRCULATING
AIR SCRUBBER MACHINE WITH CORR
WPPA RII TPR ni IRIt\If 1A /Al I
PROVIDE /INSTALL A RECIRCULATING AIR
SCRUBBER MACHINE WITH HEPA FILTER
DURING WALL DRILLING.
CONTRACTOR SHALL USE HEPA
VACUUM CLEANER WHEN DRILLING.
MAKE SURE VACUUM CLEANER INTAKE
NOZZLE IS AS CLOSE TO SOURCE OF
DUST AS POSSIBLE.
EXIST. ELEV. LOBBY
N
PARTIAL SECOND FLOOR ICRA PLAN.
SCAM vr
-- CORR___.
- - --1
HOLDING C O R R
.............. .
/ ECHO
ICRA NOTES:
1.) CONTRACTOR SHALL INSTALL A PLASTIC WALL WITH ZIPPER INSIDE PBX & ELECTRICAL
ROOMS DOOR LEAVING BETWEEN THE ROOM DOOR AND PLASTIC WALL JUST ENOUGH
SPACE FOR THE CONTRACTOR TO CLOSE THE DOOR OF THE ROOM PRIOR TO OPENING
THE ZIPPER OF THE PLASTIC WALL. A STICKY MAT SHALL BE PLACED INSIDE PBX ROOM.
2.) CONTRACTOR SHALL USE A MOBILE CONTAINMENT CUBE FOR ALL CONSTRUCTION
WORK TAKING PLACE IN CORRIDORS. SEE EQUIPMENT SPECIFICATION "A" BELOW.
3.) CONSTRUCTION MATERIALS AND DEBRIS CAN ONLY COME OUT DURING WEEKENDS OR
NIGHTS AND SAID CONSTRUCTION MATERIALS AND DEBRIS SHALL BE TRANSPORTED IN
AHCA /SMH APPROVED CLEAN AND COVERED CARTS FOLLOWING THE ROUTING SHOWN IN
THIS DRAWING.
4.) CONTRACTOR SHALL REPLACE PBX ROOM AIR HANDLING UNIT FILTERS IMMEDIATELY
AFTER DRILLING ALL REQUIRED HOLES FOR CONDUIT PENETRATION.
5.) VERIFY THAT ALL EXISTING DUCTWORK WHICH PASSES THOUGH THE WORK AREA AND
REMAIN ARE SEALED AND PROTECTED DURING THE CONSTRUCTION WORK. COVER OR
BLANK OFF ALL SUPPLY, RETURN /EXHAUST OPENINGS IN ELECTRICAL ROOMS.
CONSTRUCTION, WORK AREA VENTILATION NOTES
TYPE B. LOW RISK. CLASS II. // ( )
1 PREPARED OBYSOWNER FOR THIS MPROJ CT.HOCONTRACTORESHALL PERFORM BALL WORKS IN ACCOIRDANCE
WITH SAID REQUIREMENTS. CONTRACTOR SHALL ADHERE TO THE LIMITS OF THE CONSTRUCTION AREA.
WHERE PHASING IS SHOWN, CONTRACTOR SHALL ADHERE TO THE PHASING DRAWINGS.
2. AS MAY BE REQUIRED BY THE ICRA, THE CONTRACTOR SHALL MAKE EVERY EFFORT TO MAINTAIN
EXIST. LEVELS OF INDOOR AIR QUALITY IN AREAS SURROUNDING CONSTRUCTION AREA. CONTRACTOR
SHALL ERECT ALL CONSTRUCTION BARRIERS AND PROVISIONS IN THE CONSTRUCTION AREA AS
REQUIRED.
3. ANY REQUIRED EQUIP. SHUTDOWN SHALL BE COORDINATED W /THE OWNER, IN ADVANCE TO ASSURE
THAT SHUTDOWN WILL NOT ADVERSALLY AFFECT AIR PRESSURE RELATIONSHIPS.
4. VISQUEEN CUBE CONSTRUCTION ISOLATION SHALL BE CREATED WHERE WORK IS PERMITTED IN THE
CORRIDORS. H.E.P.A. VACUUM SHALL BE USED TO CLEAN WITHIN THE CUBE AFTER THE WORK HAS
BEEN COMPLETED.
EQUIPMENT SPECIFICATIONS:
A. PORTABLE CONTAINMENT CUBE - ABATEMENT TECHNOLOGIES MODEL #AG3000MCCK WITH I.C.R.A.
PACKAGE (1- 888 - 634 -9091) U.L. OR E.T.L. LISTED OR EQUIVALENT.
Ica 1
a a co
mS
me
o.
I
PSI
o c)
CD
0
z
0
z
0
0
z °
0
0- Lj
wW
o
a
IQ
J
Ld
I�
b_
ROOM
JANITO
ELECTRICAL
W
a
ry
LLJ
O
I-
100
�`
.<
AREA
REFRESHMENT ROOM
I
TREATMENT
WATER I
I
I
CONSTRUCTION MATERIALS & DEBRIS ROUTING
I
I
I
I
TOILET
I
IMECHANICAL
W
IROOM
I JAN.
I CLO.
�
I
I
I
ITOILET
�I
1
I ELEV.
I
1
CONSTRUCTION MATERIALS & DEBRIS ROUTING
FILM/ PAPER STO. PREP/ RECOVERY #22
PROVIDE /INSTALL A RECIRCULATING
AIR SCRUBBER MACHINE WITH CORR
WPPA RII TPR ni IRIt\If 1A /Al I
PROVIDE /INSTALL A RECIRCULATING AIR
SCRUBBER MACHINE WITH HEPA FILTER
DURING WALL DRILLING.
CONTRACTOR SHALL USE HEPA
VACUUM CLEANER WHEN DRILLING.
MAKE SURE VACUUM CLEANER INTAKE
NOZZLE IS AS CLOSE TO SOURCE OF
DUST AS POSSIBLE.
EXIST. ELEV. LOBBY
N
PARTIAL SECOND FLOOR ICRA PLAN.
SCAM vr
-- CORR___.
- - --1
HOLDING C O R R
.............. .
/ ECHO
ICRA NOTES:
1.) CONTRACTOR SHALL INSTALL A PLASTIC WALL WITH ZIPPER INSIDE PBX & ELECTRICAL
ROOMS DOOR LEAVING BETWEEN THE ROOM DOOR AND PLASTIC WALL JUST ENOUGH
SPACE FOR THE CONTRACTOR TO CLOSE THE DOOR OF THE ROOM PRIOR TO OPENING
THE ZIPPER OF THE PLASTIC WALL. A STICKY MAT SHALL BE PLACED INSIDE PBX ROOM.
2.) CONTRACTOR SHALL USE A MOBILE CONTAINMENT CUBE FOR ALL CONSTRUCTION
WORK TAKING PLACE IN CORRIDORS. SEE EQUIPMENT SPECIFICATION "A" BELOW.
3.) CONSTRUCTION MATERIALS AND DEBRIS CAN ONLY COME OUT DURING WEEKENDS OR
NIGHTS AND SAID CONSTRUCTION MATERIALS AND DEBRIS SHALL BE TRANSPORTED IN
AHCA /SMH APPROVED CLEAN AND COVERED CARTS FOLLOWING THE ROUTING SHOWN IN
THIS DRAWING.
4.) CONTRACTOR SHALL REPLACE PBX ROOM AIR HANDLING UNIT FILTERS IMMEDIATELY
AFTER DRILLING ALL REQUIRED HOLES FOR CONDUIT PENETRATION.
5.) VERIFY THAT ALL EXISTING DUCTWORK WHICH PASSES THOUGH THE WORK AREA AND
REMAIN ARE SEALED AND PROTECTED DURING THE CONSTRUCTION WORK. COVER OR
BLANK OFF ALL SUPPLY, RETURN /EXHAUST OPENINGS IN ELECTRICAL ROOMS.
CONSTRUCTION, WORK AREA VENTILATION NOTES
TYPE B. LOW RISK. CLASS II. // ( )
1 PREPARED OBYSOWNER FOR THIS MPROJ CT.HOCONTRACTORESHALL PERFORM BALL WORKS IN ACCOIRDANCE
WITH SAID REQUIREMENTS. CONTRACTOR SHALL ADHERE TO THE LIMITS OF THE CONSTRUCTION AREA.
WHERE PHASING IS SHOWN, CONTRACTOR SHALL ADHERE TO THE PHASING DRAWINGS.
2. AS MAY BE REQUIRED BY THE ICRA, THE CONTRACTOR SHALL MAKE EVERY EFFORT TO MAINTAIN
EXIST. LEVELS OF INDOOR AIR QUALITY IN AREAS SURROUNDING CONSTRUCTION AREA. CONTRACTOR
SHALL ERECT ALL CONSTRUCTION BARRIERS AND PROVISIONS IN THE CONSTRUCTION AREA AS
REQUIRED.
3. ANY REQUIRED EQUIP. SHUTDOWN SHALL BE COORDINATED W /THE OWNER, IN ADVANCE TO ASSURE
THAT SHUTDOWN WILL NOT ADVERSALLY AFFECT AIR PRESSURE RELATIONSHIPS.
4. VISQUEEN CUBE CONSTRUCTION ISOLATION SHALL BE CREATED WHERE WORK IS PERMITTED IN THE
CORRIDORS. H.E.P.A. VACUUM SHALL BE USED TO CLEAN WITHIN THE CUBE AFTER THE WORK HAS
BEEN COMPLETED.
EQUIPMENT SPECIFICATIONS:
A. PORTABLE CONTAINMENT CUBE - ABATEMENT TECHNOLOGIES MODEL #AG3000MCCK WITH I.C.R.A.
PACKAGE (1- 888 - 634 -9091) U.L. OR E.T.L. LISTED OR EQUIVALENT.
Ica 1
a a co
mS
me
o.
I
PSI
o c)
CD
0
z
0
z
0
0
z °
0
0- Lj
wW
o
a
cy-
^
�+ )
C)
Lt_
Z
0
rO
Lj
v) ' 1
N�N
F
CD
C
z
0
FILE:
JOB NO.: 212 -1002
DATE : 03 -19 -12
PLOT SIZE: AS NOTED
DESIGNED /DRAWN BY: A.V.
CHECKED BY: F.A.
SHEET No.:
ICRA -1
SHEET 9 OF 9
J
=
W
a
Q
LLJ
O
CC
.�G
.<
�
Q
+.
W
O
O
U
C:)
V)
tW
cy-
^
�+ )
C)
Lt_
Z
0
rO
Lj
v) ' 1
N�N
F
CD
C
z
0
FILE:
JOB NO.: 212 -1002
DATE : 03 -19 -12
PLOT SIZE: AS NOTED
DESIGNED /DRAWN BY: A.V.
CHECKED BY: F.A.
SHEET No.:
ICRA -1
SHEET 9 OF 9