12-487-005CI ITI FR HAMMFR (EXISTING) uAw n( ic- 00�7A ►Ji n
m ARL
VOLTAGE 120/208V, 3 PH, 4W PANEL "2MCU .SECT.2» A I C 1OKAIC
MOUNTING SURFACE FED FROM: "2MCH1" (CRITICAL BRANCH) THRU 150A BKR. LOCATION 2ND FL. ELEC, ROOM
VOLT
AMP
POLE
TRIP
CON
DUI
WIRE
REMARKS
CKT"
NO.
Q
CKT.
N0.
REMARKS
WIRE
CON
DUI
TRIP
POLE
VOLT
AMP
2MCL1
1
20
10000
PBX UPS
EXISTING PBX RECEPTACLE
43
10000
CDPA
42
EXISTING PBX RECEPTACLE
35000
LSDPA
20
1
65000
* * * * * * * * * * * * * * * * * * * * * **
1
20
* * * * * * * * * * * * * * * * * * * * * **
NOTE: FAULT CURRENT ANALYSIS
EXISTING PBX RECEPTACLE
45
46
EXISTING PBX RECEPTACLE
�
ELEV. 1
20
1
LLJ
1
20
EXISTING PBX RECEPTACLE
47
48
EXISTING PBX RECEPTACLE
�a
20
1
-1002
�
1
20
PLOT SIZE:
V)
EXISTING PBX RECEPTACLE
49
50
EXISTING PBX RECEPTACLE
SHEET No.:
20
1
-3
1
20
EXISTING PBX RECEPTACLE
51
52
EXISTING PBX RECEPTACLE
g
£$
20
1
1
20
EXISTING PBX RECEPTACLE
53
54
EXISTING PBX RECEPTACLE
20
1
. !..
1
20
EXISTING PBX RECEPTACLE
55
56
EXISTING PBX RECEPTACLE
20
1
1
20
EXISTING PBX RECEPTACLE
57
58
EXISTING PBX RECEPTACLE
20
1
1
20
EXISTING PBX RECEPTACLE
59
60
EXISTING PBX RECEPTACLE
20
1
1
20
EXISTING PBX RECEPTACLE
61
62
EXISTING PBX RECEPTACLE
20
1
i DO
I
2000
2
30
1/2 "3f10
TEMPORARY UPS RECEPTACLE
63
65
64
66
TEMPORARY UPS RECEPTACLE
31101/2"
30
2
2000
2000
2
30
1/2 "3f10
TEMPORARY UPS RECEPTACLE
6g 67
68
SPACE
70
SPACE
2000
2
30
1/2 "3f10
TEMPORARY UPS RECEPTACLE
71
3
74
SPACE
2000
2
30
1/2 "3#10
TEMPORARY UPS RECEPTACLE
77 75
6
SPACE
7
SPACE
1080
1
20
1/2:3#12
TEMPORARY PBX1 CKT.1
79
80
SPACE
_
1080
1
20
1/2
12
TEMPORARY PBX1 CKT.7
81
82
SPACE
1080
1
20
1 2'
12
TEMPORARY PBX CKT.8
83
84
SPACE
TOTAL DEMAND LOAD: 37.87KVA + 11.24KVA(LOAD TEMPORARILY ADDED) = 49.11 KVA
I = 49.11 KVA = 136.4A @ 208V
0.360V
NOTES:
0 CONTRACTOR SHALL PROVIDE /INSTALL NEW 1 -POLE, 20A CIRCUIT BREAKER AND RUN TEMPORARY WIRES &
CONDUIT AS PER PANEL SCHEDULE. ONCE TEMPORARY WORK IS REMOVED LABEL THIS CIRCUIT AS SPARE.
0 CONTRACTOR SHALL PROVIDE /INSTALL NEW 2 -POLE, 30A CIRCUIT BREAKER AND RUN WIRES &
CONDUIT AS PER PANEL SCHEDULE. LOAD SHOWN IN THIS CIRCUIT WAS CONSIDERED AS DEMAND LOAD.
CONTRACTOR SHALL PROVIDE /INSTALL NEW 2 -POLE, 30A CIRCUIT BREAKER AND RUN TEMPORARY WIRES &
CONDUIT AS PER PANEL SCHEDULE. LOAD SHOWN IN THIS CIRCUIT WAS CONSIDERED AS DEMAND LOAD.
ONCE TEMPORARY WORK IS REMOVED LABEL THIS CIRCUIT AS SPARE.
3. CONNECTED LOAD TAKEN FROM DRAWINGS DATED 05 -05 -10 PROVIDED BY SMH.
TILT PAT. TILT
ROOM
M.I.C. U. ❑ �o :Ell
ROOM ROOM
❑
MEDICINE ELECTRICAL
NUTRITION ROOM
CORR
El
❑ EXISTING PANEL "2LSL1"
O av,30,4W,50A .C.B.).
PREP/
ROOM WAITING RECOV. #1
EQUIPMENT FAMILY
ROOM EXIST. MECH,
M.I.C. U.
PACS
DMS
ROOM
M.I.C. U.
I
NT -STAIR 1
* * * * * * * * * * * * * * * ** F A U
L T A N A
L Y S I S S U
M M A R Y * * * * * * * * * * * * * **
--____..-__.--------------------------
BUS NAME
VOLTAGE
- - -
AVAILABLE
- -- _.-----------------------------
FAULT CURRENT ,FUTURE
Q
L -L
AFC (AMPS) **
AIC (AMPS)* ,ELEV. 14
2LSL1
208.
1200
10000
2MCL1
208.
3237
10000
PBX UPS
208.
1829
10000
CDPA
480.
26033
35000
LSDPA
480.
24174
65000
* * * * * * * * * * * * * * * * * * * * * **
FAULT ANALYSIS
REPORT COMPLETED
* * * * * * * * * * * * * * * * * * * * * **
NOTE: FAULT CURRENT ANALYSIS
WAS TAKEN FROM ORIGINAL COORDINATION &
SHORT CIRCUIT STUDY DATED 11/30/2011 PROVIDED BY SMH.
�
J
�
ELEV. 1
m
m
(
C'.1
Z,
r7;s
COORDINATION: 2MCL1 (M.C.B.- LARGEST BREAKER
ELEV. 2
UP
P -STAIR 3
F
JANITOR ELECTRICAL
ROOM
REFRESHMENT
AREA TREATMENT WATER
ROOM
EXISTING CIRCUITS #1, 3 & 5 CURRENTLY
SERVING FIRE ALARM CIRCUITS SHALL BE
REMOVED FROM THIS PANEL &
RE- CONNECTED TO PANEL "2LSL1 ".
EXISTING PANEL "PBX1" (v,30,4W,100A) FED FROM "LS2 -PBX"-
SHALL BE REMOVED & ALL ASSOCIATED BRANCH CIRCUITS WILL
BE TRANSFERRED TO NEW PANELS IN NEW PDU.
CORR
PREP/ PREP/ PREP/
RECOV. RECOV. RECOV.
#3 4 #5
TILT
EXISTING PANEL "LS2 -PBX" (Egv,30,4W,100A) FED
FROM EXISTING UPS SHALL BE REMOVED & ALL
ASSOCIATED BRANCH CIRCUITS WILL BE TRANSFERRED
TO NEW PANELS IN NEW PDU.
EXISTING TO REMAIN 3 -POLE, 100A SAFETY
SWITCH FOR EXISTING TO BE REMOVED UPS.
EXISTING 40KVA LIEBERT UPS SHALL BE REMOVED &
REPLACED WITH A NEW UPS (SAME CAPACITY).
CONTRACTOR SHALL REMOVE EXISTING SECONDARY
CONDUIT & WIRES FROM UPS TO PANEL "LS2 -PBX" AND
ALSO PRIMARY CONDUIT & WIRES FROM EXISTING 100A,
\
1600V SAFETY SWITCH TO UPS.
NURSES
STATION
PREP/ PREP/
RECOV. RECOV.
F#6 I #T I
FUTURE
ELEV. 15 TOILET MECHANICAL D
ROOM A &T D MARKI
4 ROO OPERATORS SEC, MD. SUPPORT EXAM PHYSICIAN OFFICE PHYSICIAN OFFICE CLINICIAN OFFICE
M
I FIBE
ROOM
EXISTING PUBLIC ADDRESS �63,G5 EXISTING PANEL "LS1' (v,30,4W,100A)
RELOCATED. SEE NEW
SYSTEM RACK SHALL BE FED FROM "LS2 -PBX' SHALL BE R D
WORK FOR NEW LOCATION. & ALL ASSOCIATED B NCH CIRCU S
TRANSFERRED Na4 IN °
III
JAN. N.I.- ADMINISTRATION
CLO. 1 CORR
0
El
a _
I I LOUNGE
ELEV. 13 M 1 WORKRM.
o TL ">'
EXISTING PBX
TOILET
EQUIPMENT RM.
EXISTING POW TRIP TO
BE REMOVED AN CORR
71,7
5 REPLACED WITH 0 NEW
QUADRUPLEX RE PTAC
=��5r77 SEE NEW WORK.
EXIST. MECH. RM. CLERICAL
AHU ��wcl
P OFFICE
ELECTRICAL
EXISTING PANEL "PBX -8" av,30,4W,100A) ROOM
FED FROM 8TH FLOOR SHALL BE REMOVED CORR
ALONG WITH ASSOCIATED CONDUIT & WIRES
BACK TO POWER SOURCE. EXISTING PANEL "2MCL1 -II" (v,30,4W,225A) SHALL BE
CORRIDOR
it �I i
ELEV. USED TO PROVIDE POWER TO TEMPORARY UPS's &
CIRCUITS, CONTRACTOR SHALL PROVIDE INSTALL NEW
CIRCUIT BREAKERS AS REQUIRED. SEE PANEL SCHEDULE ELECT. El I IN THIS SHEET.
NIVL ARTERIAL EXIST. ELEV.
EAK RM. WCH LOBBY
o _
0
E V 9 EV 1 °
TLT
.................. ............... .._ .................................... , _ N I V I
TEMPORARY WORK NOTES:
0 TEMPORARY NEMA L6 -30P RECEPTACLE TO BE PROVIDED & INSTALLED BY CONTRACTOR AND MOUNTED ON EXISTING RACK. ONCE NEW UPS -PDU
IS 100% OPERATIONAL AND ALL LOADS ARE TRANSFERRED TO NEW PDU PANELS, TEMPORARY RECEPTACLE SHALL REMAIN CONNECTED TO
CRITICAL PANEL "2MCL1 -11 ". CONTRACTOR SHALL PROVIDE /INSTALL PHENOLIC LABEL TO READ "NOT UPS POWER ".
Q TEMPORARY WALL MOUNTED NEMA L6 -30P RECEPTACLE TO BE PROVIDED & INSTALLED BY CONTRACTOR. FIELD COORDINATE EXACT LOCATION.
ONCE NEW UPS -PDU IS 100% OPERATIONAL AND ALL LOADS ARE TRANSFERRED TO NEW PDU PANELS, TEMPORARY RECEPTACLE SHALL REMAIN
CONNECTED TO CRITICAL PANEL "2MCL1 -11 ". CONTRACTOR SHALL PROVIDE /INSTALL PHENOLIC LABEL TO READ "NOT UPS POWER ".
3Q TEMPORARY APC 6000VA UPS TO BE SUPPLIED BY OWNER & INSTALLED BY CONTRACTOR. TYPICAL. ALL PBX LOADS SHALL BE CONNECTED TO
TEMPORARY UPS's BY PLUGGING THEM IN THE UPS BUILT -IN RECEPTACLES.
® CONTRACTOR SHALL TEMPORARILY FEED CIRCUITS 1, 7 & 8 FROM PANEL "2MCL1 -II" BY PROVIDING /INSTALLING NEW 1 -POLE, 20A CIRCUIT
BREAKERS IN "2MCL1 -11 "(SEE PANEL SCHEDULE IN THIS SHEET) & RUNNING TEMPORARY CONDUIT & WIRES DIRECTLY TO EXISTING 1 -POLE, 20A
CIRCUIT BREAKERS FOR SAID CIRCUITS IN PANEL PBX1. ONCE THESE CIRCUITS ARE TRANSFERRED TO PDU PANELS THEN CONTRACTOR SHALL
PROCEED TO REMOVE TEMPORARY CONDUITS & WIRES FEEDING CIRCUITS 1,7 & 8.
Q TEMPORARY NEMA L6 -30P RECEPTACLE TO BE PROVIDED & INSTALLED BY CONTRACTOR AND MOUNTED ON EXISTING RACK. ONCE NEW UPS -PDU
IS 100% OPERATIONAL AND ALL CIRCUITS ARE TRANSFERRED TO NEW PDU PANELS CONTRACTOR SHALL REMOVE TEMPORARY RECEPTACLE AND
ASSOCIATED WIRES BACK TO POWER SOURCE AND LEAVE THE CONDUIT FOR FUTURE USE.
6. PANEL SCHEDULE OF "2MCL1 -11" SHALL BE UPDATED TO READ "SPARE" IN ALL CIRCUITS USED TO FEED LOADS DURING TEMPORARY WORK ONCE
NEW WORK IS COMPLETE.
PARTIAL SECOND FLOOR PLAN
DEMOLITION &TEMPORARY WORK
O ° 3l) i l� D l i�.� i 8 s l-I^AL. L Comm
1 IIL I "JVi �i {3�a 1 x' F LrfIS TI G OCOU r'�NU�ILS
B +�
y
6
y ., .J:I
DATE. Cy
.�.�..
PREP/
RECOV.
PREP
RECOV.
#11
T L_T
PREP
R-770-
#10
PREP/
RECOV.
COORD- OFFIC
CAROL
ADMIN. SUPPORT OFFI'
N.I.- ECHO
HOLDING
CORR
RESEARCH OFFICE
OFFICE',
PHYSICIAN
ECHO ROOM;
ECHO
ECHO
4
Y
i
cn
v
a
a
0
U knO 4) kn
.o
P4 com �®
Wry ti
F I v
� � o 40,
F a w.a
m��! -.drn
ao ko w d
6ac�
G'],04 44
o--r W �•' U
�o
N
rX, a
� o
I
W
0
0
U
fY
Z
0
U
0 0
0
a V)
w w
o
Of o
()
CURRENT IN AMPERES
'V
.)000
O
o'd
Q
Of
.; �
1 c
O
0
...........
V /
O
■ . .
CL
Z
M
M
_
O
W
M
Q
m
Q
Z
M
�
J
�
w �
LLJ
1
°
s
FILE:
�a
ff
212
-1002
�
....
pm
PLOT SIZE:
V)
N
DESIGNED /DRAWN BY: A.V.
CHECKED BY: F,A.
SHEET No.:
E
-3
SHEEP
4 OF 9
g
£$
>
f
f;
. !..
.: . ....
h '. .
,
sol
0,0
10
i DO
I
PBX,t c Ref. .
5'1. cAta,f 208V
Cw'v -nt if , Arel 1 :rte:,{
m
m
(
C'.1
Z,
r7;s
COORDINATION: 2MCL1 (M.C.B.- LARGEST BREAKER
ELEV. 2
UP
P -STAIR 3
F
JANITOR ELECTRICAL
ROOM
REFRESHMENT
AREA TREATMENT WATER
ROOM
EXISTING CIRCUITS #1, 3 & 5 CURRENTLY
SERVING FIRE ALARM CIRCUITS SHALL BE
REMOVED FROM THIS PANEL &
RE- CONNECTED TO PANEL "2LSL1 ".
EXISTING PANEL "PBX1" (v,30,4W,100A) FED FROM "LS2 -PBX"-
SHALL BE REMOVED & ALL ASSOCIATED BRANCH CIRCUITS WILL
BE TRANSFERRED TO NEW PANELS IN NEW PDU.
CORR
PREP/ PREP/ PREP/
RECOV. RECOV. RECOV.
#3 4 #5
TILT
EXISTING PANEL "LS2 -PBX" (Egv,30,4W,100A) FED
FROM EXISTING UPS SHALL BE REMOVED & ALL
ASSOCIATED BRANCH CIRCUITS WILL BE TRANSFERRED
TO NEW PANELS IN NEW PDU.
EXISTING TO REMAIN 3 -POLE, 100A SAFETY
SWITCH FOR EXISTING TO BE REMOVED UPS.
EXISTING 40KVA LIEBERT UPS SHALL BE REMOVED &
REPLACED WITH A NEW UPS (SAME CAPACITY).
CONTRACTOR SHALL REMOVE EXISTING SECONDARY
CONDUIT & WIRES FROM UPS TO PANEL "LS2 -PBX" AND
ALSO PRIMARY CONDUIT & WIRES FROM EXISTING 100A,
\
1600V SAFETY SWITCH TO UPS.
NURSES
STATION
PREP/ PREP/
RECOV. RECOV.
F#6 I #T I
FUTURE
ELEV. 15 TOILET MECHANICAL D
ROOM A &T D MARKI
4 ROO OPERATORS SEC, MD. SUPPORT EXAM PHYSICIAN OFFICE PHYSICIAN OFFICE CLINICIAN OFFICE
M
I FIBE
ROOM
EXISTING PUBLIC ADDRESS �63,G5 EXISTING PANEL "LS1' (v,30,4W,100A)
RELOCATED. SEE NEW
SYSTEM RACK SHALL BE FED FROM "LS2 -PBX' SHALL BE R D
WORK FOR NEW LOCATION. & ALL ASSOCIATED B NCH CIRCU S
TRANSFERRED Na4 IN °
III
JAN. N.I.- ADMINISTRATION
CLO. 1 CORR
0
El
a _
I I LOUNGE
ELEV. 13 M 1 WORKRM.
o TL ">'
EXISTING PBX
TOILET
EQUIPMENT RM.
EXISTING POW TRIP TO
BE REMOVED AN CORR
71,7
5 REPLACED WITH 0 NEW
QUADRUPLEX RE PTAC
=��5r77 SEE NEW WORK.
EXIST. MECH. RM. CLERICAL
AHU ��wcl
P OFFICE
ELECTRICAL
EXISTING PANEL "PBX -8" av,30,4W,100A) ROOM
FED FROM 8TH FLOOR SHALL BE REMOVED CORR
ALONG WITH ASSOCIATED CONDUIT & WIRES
BACK TO POWER SOURCE. EXISTING PANEL "2MCL1 -II" (v,30,4W,225A) SHALL BE
CORRIDOR
it �I i
ELEV. USED TO PROVIDE POWER TO TEMPORARY UPS's &
CIRCUITS, CONTRACTOR SHALL PROVIDE INSTALL NEW
CIRCUIT BREAKERS AS REQUIRED. SEE PANEL SCHEDULE ELECT. El I IN THIS SHEET.
NIVL ARTERIAL EXIST. ELEV.
EAK RM. WCH LOBBY
o _
0
E V 9 EV 1 °
TLT
.................. ............... .._ .................................... , _ N I V I
TEMPORARY WORK NOTES:
0 TEMPORARY NEMA L6 -30P RECEPTACLE TO BE PROVIDED & INSTALLED BY CONTRACTOR AND MOUNTED ON EXISTING RACK. ONCE NEW UPS -PDU
IS 100% OPERATIONAL AND ALL LOADS ARE TRANSFERRED TO NEW PDU PANELS, TEMPORARY RECEPTACLE SHALL REMAIN CONNECTED TO
CRITICAL PANEL "2MCL1 -11 ". CONTRACTOR SHALL PROVIDE /INSTALL PHENOLIC LABEL TO READ "NOT UPS POWER ".
Q TEMPORARY WALL MOUNTED NEMA L6 -30P RECEPTACLE TO BE PROVIDED & INSTALLED BY CONTRACTOR. FIELD COORDINATE EXACT LOCATION.
ONCE NEW UPS -PDU IS 100% OPERATIONAL AND ALL LOADS ARE TRANSFERRED TO NEW PDU PANELS, TEMPORARY RECEPTACLE SHALL REMAIN
CONNECTED TO CRITICAL PANEL "2MCL1 -11 ". CONTRACTOR SHALL PROVIDE /INSTALL PHENOLIC LABEL TO READ "NOT UPS POWER ".
3Q TEMPORARY APC 6000VA UPS TO BE SUPPLIED BY OWNER & INSTALLED BY CONTRACTOR. TYPICAL. ALL PBX LOADS SHALL BE CONNECTED TO
TEMPORARY UPS's BY PLUGGING THEM IN THE UPS BUILT -IN RECEPTACLES.
® CONTRACTOR SHALL TEMPORARILY FEED CIRCUITS 1, 7 & 8 FROM PANEL "2MCL1 -II" BY PROVIDING /INSTALLING NEW 1 -POLE, 20A CIRCUIT
BREAKERS IN "2MCL1 -11 "(SEE PANEL SCHEDULE IN THIS SHEET) & RUNNING TEMPORARY CONDUIT & WIRES DIRECTLY TO EXISTING 1 -POLE, 20A
CIRCUIT BREAKERS FOR SAID CIRCUITS IN PANEL PBX1. ONCE THESE CIRCUITS ARE TRANSFERRED TO PDU PANELS THEN CONTRACTOR SHALL
PROCEED TO REMOVE TEMPORARY CONDUITS & WIRES FEEDING CIRCUITS 1,7 & 8.
Q TEMPORARY NEMA L6 -30P RECEPTACLE TO BE PROVIDED & INSTALLED BY CONTRACTOR AND MOUNTED ON EXISTING RACK. ONCE NEW UPS -PDU
IS 100% OPERATIONAL AND ALL CIRCUITS ARE TRANSFERRED TO NEW PDU PANELS CONTRACTOR SHALL REMOVE TEMPORARY RECEPTACLE AND
ASSOCIATED WIRES BACK TO POWER SOURCE AND LEAVE THE CONDUIT FOR FUTURE USE.
6. PANEL SCHEDULE OF "2MCL1 -11" SHALL BE UPDATED TO READ "SPARE" IN ALL CIRCUITS USED TO FEED LOADS DURING TEMPORARY WORK ONCE
NEW WORK IS COMPLETE.
PARTIAL SECOND FLOOR PLAN
DEMOLITION &TEMPORARY WORK
O ° 3l) i l� D l i�.� i 8 s l-I^AL. L Comm
1 IIL I "JVi �i {3�a 1 x' F LrfIS TI G OCOU r'�NU�ILS
B +�
y
6
y ., .J:I
DATE. Cy
.�.�..
PREP/
RECOV.
PREP
RECOV.
#11
T L_T
PREP
R-770-
#10
PREP/
RECOV.
COORD- OFFIC
CAROL
ADMIN. SUPPORT OFFI'
N.I.- ECHO
HOLDING
CORR
RESEARCH OFFICE
OFFICE',
PHYSICIAN
ECHO ROOM;
ECHO
ECHO
4
Y
i
cn
v
a
a
0
U knO 4) kn
.o
P4 com �®
Wry ti
F I v
� � o 40,
F a w.a
m��! -.drn
ao ko w d
6ac�
G'],04 44
o--r W �•' U
�o
N
rX, a
� o
I
W
0
0
U
fY
Z
0
U
0 0
0
a V)
w w
o
Of o
()
'V
O
o'd
Q
Of
O
0
O
F
V /
O
■ . .
CL
Z
M
M
_
O
W
M
Q
m
Q
Z
M
�
J
�
w �
LLJ
1
°
FILE:
�a
U
212
-1002
0
Lj
-19 -12
PLOT SIZE:
V)
N
DESIGNED /DRAWN BY: A.V.
CHECKED BY: F,A.
'V
O
o'd
L
Of
O
0
O
0
J
�
U
O
W
m
Q
Z
M
�
J
�
w �
z
°
FILE:
JOB NO.:
212
-1002
DATE :
03-
-19 -12
PLOT SIZE:
AS
NOTED
DESIGNED /DRAWN BY: A.V.
CHECKED BY: F,A.
SHEET No.:
E
-3
SHEEP
4 OF 9