Loading...
12-487-005CI ITI FR HAMMFR (EXISTING) uAw n( ic- 00�7A ►Ji n m ARL VOLTAGE 120/208V, 3 PH, 4W PANEL "2MCU .SECT.2» A I C 1OKAIC MOUNTING SURFACE FED FROM: "2MCH1" (CRITICAL BRANCH) THRU 150A BKR. LOCATION 2ND FL. ELEC, ROOM VOLT AMP POLE TRIP CON DUI WIRE REMARKS CKT" NO. Q CKT. N0. REMARKS WIRE CON DUI TRIP POLE VOLT AMP 2MCL1 1 20 10000 PBX UPS EXISTING PBX RECEPTACLE 43 10000 CDPA 42 EXISTING PBX RECEPTACLE 35000 LSDPA 20 1 65000 * * * * * * * * * * * * * * * * * * * * * ** 1 20 * * * * * * * * * * * * * * * * * * * * * ** NOTE: FAULT CURRENT ANALYSIS EXISTING PBX RECEPTACLE 45 46 EXISTING PBX RECEPTACLE � ELEV. 1 20 1 LLJ 1 20 EXISTING PBX RECEPTACLE 47 48 EXISTING PBX RECEPTACLE �a 20 1 -1002 � 1 20 PLOT SIZE: V) EXISTING PBX RECEPTACLE 49 50 EXISTING PBX RECEPTACLE SHEET No.: 20 1 -3 1 20 EXISTING PBX RECEPTACLE 51 52 EXISTING PBX RECEPTACLE g £$ 20 1 1 20 EXISTING PBX RECEPTACLE 53 54 EXISTING PBX RECEPTACLE 20 1 . !.. 1 20 EXISTING PBX RECEPTACLE 55 56 EXISTING PBX RECEPTACLE 20 1 1 20 EXISTING PBX RECEPTACLE 57 58 EXISTING PBX RECEPTACLE 20 1 1 20 EXISTING PBX RECEPTACLE 59 60 EXISTING PBX RECEPTACLE 20 1 1 20 EXISTING PBX RECEPTACLE 61 62 EXISTING PBX RECEPTACLE 20 1 i DO I 2000 2 30 1/2 "3f10 TEMPORARY UPS RECEPTACLE 63 65 64 66 TEMPORARY UPS RECEPTACLE 31101/2" 30 2 2000 2000 2 30 1/2 "3f10 TEMPORARY UPS RECEPTACLE 6g 67 68 SPACE 70 SPACE 2000 2 30 1/2 "3f10 TEMPORARY UPS RECEPTACLE 71 3 74 SPACE 2000 2 30 1/2 "3#10 TEMPORARY UPS RECEPTACLE 77 75 6 SPACE 7 SPACE 1080 1 20 1/2:3#12 TEMPORARY PBX1 CKT.1 79 80 SPACE _ 1080 1 20 1/2 12 TEMPORARY PBX1 CKT.7 81 82 SPACE 1080 1 20 1 2' 12 TEMPORARY PBX CKT.8 83 84 SPACE TOTAL DEMAND LOAD: 37.87KVA + 11.24KVA(LOAD TEMPORARILY ADDED) = 49.11 KVA I = 49.11 KVA = 136.4A @ 208V 0.360V NOTES: 0 CONTRACTOR SHALL PROVIDE /INSTALL NEW 1 -POLE, 20A CIRCUIT BREAKER AND RUN TEMPORARY WIRES & CONDUIT AS PER PANEL SCHEDULE. ONCE TEMPORARY WORK IS REMOVED LABEL THIS CIRCUIT AS SPARE. 0 CONTRACTOR SHALL PROVIDE /INSTALL NEW 2 -POLE, 30A CIRCUIT BREAKER AND RUN WIRES & CONDUIT AS PER PANEL SCHEDULE. LOAD SHOWN IN THIS CIRCUIT WAS CONSIDERED AS DEMAND LOAD. CONTRACTOR SHALL PROVIDE /INSTALL NEW 2 -POLE, 30A CIRCUIT BREAKER AND RUN TEMPORARY WIRES & CONDUIT AS PER PANEL SCHEDULE. LOAD SHOWN IN THIS CIRCUIT WAS CONSIDERED AS DEMAND LOAD. ONCE TEMPORARY WORK IS REMOVED LABEL THIS CIRCUIT AS SPARE. 3. CONNECTED LOAD TAKEN FROM DRAWINGS DATED 05 -05 -10 PROVIDED BY SMH. TILT PAT. TILT ROOM M.I.C. U. ❑ �o :Ell ROOM ROOM ❑ MEDICINE ELECTRICAL NUTRITION ROOM CORR El ❑ EXISTING PANEL "2LSL1" O av,30,4W,50A .C.B.). PREP/ ROOM WAITING RECOV. #1 EQUIPMENT FAMILY ROOM EXIST. MECH, M.I.C. U. PACS DMS ROOM M.I.C. U. I NT -STAIR 1 * * * * * * * * * * * * * * * ** F A U L T A N A L Y S I S S U M M A R Y * * * * * * * * * * * * * ** --____..-__.-------------------------- BUS NAME VOLTAGE - - - AVAILABLE - -- _.----------------------------- FAULT CURRENT ,FUTURE Q L -L AFC (AMPS) ** AIC (AMPS)* ,ELEV. 14 2LSL1 208. 1200 10000 2MCL1 208. 3237 10000 PBX UPS 208. 1829 10000 CDPA 480. 26033 35000 LSDPA 480. 24174 65000 * * * * * * * * * * * * * * * * * * * * * ** FAULT ANALYSIS REPORT COMPLETED * * * * * * * * * * * * * * * * * * * * * ** NOTE: FAULT CURRENT ANALYSIS WAS TAKEN FROM ORIGINAL COORDINATION & SHORT CIRCUIT STUDY DATED 11/30/2011 PROVIDED BY SMH. � J � ELEV. 1 m m ( C'.1 Z, r7;s COORDINATION: 2MCL1 (M.C.B.- LARGEST BREAKER ELEV. 2 UP P -STAIR 3 F JANITOR ELECTRICAL ROOM REFRESHMENT AREA TREATMENT WATER ROOM EXISTING CIRCUITS #1, 3 & 5 CURRENTLY SERVING FIRE ALARM CIRCUITS SHALL BE REMOVED FROM THIS PANEL & RE- CONNECTED TO PANEL "2LSL1 ". EXISTING PANEL "PBX1" (v,30,4W,100A) FED FROM "LS2 -PBX"- SHALL BE REMOVED & ALL ASSOCIATED BRANCH CIRCUITS WILL BE TRANSFERRED TO NEW PANELS IN NEW PDU. CORR PREP/ PREP/ PREP/ RECOV. RECOV. RECOV. #3 4 #5 TILT EXISTING PANEL "LS2 -PBX" (Egv,30,4W,100A) FED FROM EXISTING UPS SHALL BE REMOVED & ALL ASSOCIATED BRANCH CIRCUITS WILL BE TRANSFERRED TO NEW PANELS IN NEW PDU. EXISTING TO REMAIN 3 -POLE, 100A SAFETY SWITCH FOR EXISTING TO BE REMOVED UPS. EXISTING 40KVA LIEBERT UPS SHALL BE REMOVED & REPLACED WITH A NEW UPS (SAME CAPACITY). CONTRACTOR SHALL REMOVE EXISTING SECONDARY CONDUIT & WIRES FROM UPS TO PANEL "LS2 -PBX" AND ALSO PRIMARY CONDUIT & WIRES FROM EXISTING 100A, \ 1600V SAFETY SWITCH TO UPS. NURSES STATION PREP/ PREP/ RECOV. RECOV. F#6 I #T I FUTURE ELEV. 15 TOILET MECHANICAL D ROOM A &T D MARKI 4 ROO OPERATORS SEC, MD. SUPPORT EXAM PHYSICIAN OFFICE PHYSICIAN OFFICE CLINICIAN OFFICE M I FIBE ROOM EXISTING PUBLIC ADDRESS �63,G5 EXISTING PANEL "LS1' (v,30,4W,100A) RELOCATED. SEE NEW SYSTEM RACK SHALL BE FED FROM "LS2 -PBX' SHALL BE R D WORK FOR NEW LOCATION. & ALL ASSOCIATED B NCH CIRCU S TRANSFERRED Na4 IN ° III JAN. N.I.- ADMINISTRATION CLO. 1 CORR 0 El a _ I I LOUNGE ELEV. 13 M 1 WORKRM. o TL ">' EXISTING PBX TOILET EQUIPMENT RM. EXISTING POW TRIP TO BE REMOVED AN CORR 71,7 5 REPLACED WITH 0 NEW QUADRUPLEX RE PTAC =��5r77 SEE NEW WORK. EXIST. MECH. RM. CLERICAL AHU ��wcl P OFFICE ELECTRICAL EXISTING PANEL "PBX -8" av,30,4W,100A) ROOM FED FROM 8TH FLOOR SHALL BE REMOVED CORR ALONG WITH ASSOCIATED CONDUIT & WIRES BACK TO POWER SOURCE. EXISTING PANEL "2MCL1 -II" (v,30,4W,225A) SHALL BE CORRIDOR it �I i ELEV. USED TO PROVIDE POWER TO TEMPORARY UPS's & CIRCUITS, CONTRACTOR SHALL PROVIDE INSTALL NEW CIRCUIT BREAKERS AS REQUIRED. SEE PANEL SCHEDULE ELECT. El I IN THIS SHEET. NIVL ARTERIAL EXIST. ELEV. EAK RM. WCH LOBBY o _ 0 E V 9 EV 1 ° TLT .................. ............... .._ .................................... , _ N I V I TEMPORARY WORK NOTES: 0 TEMPORARY NEMA L6 -30P RECEPTACLE TO BE PROVIDED & INSTALLED BY CONTRACTOR AND MOUNTED ON EXISTING RACK. ONCE NEW UPS -PDU IS 100% OPERATIONAL AND ALL LOADS ARE TRANSFERRED TO NEW PDU PANELS, TEMPORARY RECEPTACLE SHALL REMAIN CONNECTED TO CRITICAL PANEL "2MCL1 -11 ". CONTRACTOR SHALL PROVIDE /INSTALL PHENOLIC LABEL TO READ "NOT UPS POWER ". Q TEMPORARY WALL MOUNTED NEMA L6 -30P RECEPTACLE TO BE PROVIDED & INSTALLED BY CONTRACTOR. FIELD COORDINATE EXACT LOCATION. ONCE NEW UPS -PDU IS 100% OPERATIONAL AND ALL LOADS ARE TRANSFERRED TO NEW PDU PANELS, TEMPORARY RECEPTACLE SHALL REMAIN CONNECTED TO CRITICAL PANEL "2MCL1 -11 ". CONTRACTOR SHALL PROVIDE /INSTALL PHENOLIC LABEL TO READ "NOT UPS POWER ". 3Q TEMPORARY APC 6000VA UPS TO BE SUPPLIED BY OWNER & INSTALLED BY CONTRACTOR. TYPICAL. ALL PBX LOADS SHALL BE CONNECTED TO TEMPORARY UPS's BY PLUGGING THEM IN THE UPS BUILT -IN RECEPTACLES. ® CONTRACTOR SHALL TEMPORARILY FEED CIRCUITS 1, 7 & 8 FROM PANEL "2MCL1 -II" BY PROVIDING /INSTALLING NEW 1 -POLE, 20A CIRCUIT BREAKERS IN "2MCL1 -11 "(SEE PANEL SCHEDULE IN THIS SHEET) & RUNNING TEMPORARY CONDUIT & WIRES DIRECTLY TO EXISTING 1 -POLE, 20A CIRCUIT BREAKERS FOR SAID CIRCUITS IN PANEL PBX1. ONCE THESE CIRCUITS ARE TRANSFERRED TO PDU PANELS THEN CONTRACTOR SHALL PROCEED TO REMOVE TEMPORARY CONDUITS & WIRES FEEDING CIRCUITS 1,7 & 8. Q TEMPORARY NEMA L6 -30P RECEPTACLE TO BE PROVIDED & INSTALLED BY CONTRACTOR AND MOUNTED ON EXISTING RACK. ONCE NEW UPS -PDU IS 100% OPERATIONAL AND ALL CIRCUITS ARE TRANSFERRED TO NEW PDU PANELS CONTRACTOR SHALL REMOVE TEMPORARY RECEPTACLE AND ASSOCIATED WIRES BACK TO POWER SOURCE AND LEAVE THE CONDUIT FOR FUTURE USE. 6. PANEL SCHEDULE OF "2MCL1 -11" SHALL BE UPDATED TO READ "SPARE" IN ALL CIRCUITS USED TO FEED LOADS DURING TEMPORARY WORK ONCE NEW WORK IS COMPLETE. PARTIAL SECOND FLOOR PLAN DEMOLITION &TEMPORARY WORK O ° 3l) i l� D l i�.� i 8 s l-I^AL. L Comm 1 IIL I "JVi �i {3�a 1 x' F LrfIS TI G OCOU r'�NU�ILS B +� y 6 y ., .J:I DATE. Cy .�.�.. PREP/ RECOV. PREP RECOV. #11 T L_T PREP R-770- #10 PREP/ RECOV. COORD- OFFIC CAROL ADMIN. SUPPORT OFFI' N.I.- ECHO HOLDING CORR RESEARCH OFFICE OFFICE', PHYSICIAN ECHO ROOM; ECHO ECHO 4 Y i cn v a a 0 U knO 4) kn .o P4 com �® Wry ti F I v � � o 40, F a w.a m��! -.drn ao ko w d 6ac� G'],04 44 o--r W �•' U �o N rX, a � o I W 0 0 U fY Z 0 U 0 0 0 a V) w w o Of o () CURRENT IN AMPERES 'V .)000 O o'd Q Of .; � 1 c O 0 ........... V / O ■ . . CL Z M M _ O W M Q m Q Z M � J � w � LLJ 1 ° s FILE: �a ff 212 -1002 � .... pm PLOT SIZE: V) N DESIGNED /DRAWN BY: A.V. CHECKED BY: F,A. SHEET No.: E -3 SHEEP 4 OF 9 g £$ > f f; . !.. .: . .... h '. . , sol 0,0 10 i DO I PBX,t c Ref. . 5'1. cAta,f 208V Cw'v -nt if , Arel 1 :rte:,{ m m ( C'.1 Z, r7;s COORDINATION: 2MCL1 (M.C.B.- LARGEST BREAKER ELEV. 2 UP P -STAIR 3 F JANITOR ELECTRICAL ROOM REFRESHMENT AREA TREATMENT WATER ROOM EXISTING CIRCUITS #1, 3 & 5 CURRENTLY SERVING FIRE ALARM CIRCUITS SHALL BE REMOVED FROM THIS PANEL & RE- CONNECTED TO PANEL "2LSL1 ". EXISTING PANEL "PBX1" (v,30,4W,100A) FED FROM "LS2 -PBX"- SHALL BE REMOVED & ALL ASSOCIATED BRANCH CIRCUITS WILL BE TRANSFERRED TO NEW PANELS IN NEW PDU. CORR PREP/ PREP/ PREP/ RECOV. RECOV. RECOV. #3 4 #5 TILT EXISTING PANEL "LS2 -PBX" (Egv,30,4W,100A) FED FROM EXISTING UPS SHALL BE REMOVED & ALL ASSOCIATED BRANCH CIRCUITS WILL BE TRANSFERRED TO NEW PANELS IN NEW PDU. EXISTING TO REMAIN 3 -POLE, 100A SAFETY SWITCH FOR EXISTING TO BE REMOVED UPS. EXISTING 40KVA LIEBERT UPS SHALL BE REMOVED & REPLACED WITH A NEW UPS (SAME CAPACITY). CONTRACTOR SHALL REMOVE EXISTING SECONDARY CONDUIT & WIRES FROM UPS TO PANEL "LS2 -PBX" AND ALSO PRIMARY CONDUIT & WIRES FROM EXISTING 100A, \ 1600V SAFETY SWITCH TO UPS. NURSES STATION PREP/ PREP/ RECOV. RECOV. F#6 I #T I FUTURE ELEV. 15 TOILET MECHANICAL D ROOM A &T D MARKI 4 ROO OPERATORS SEC, MD. SUPPORT EXAM PHYSICIAN OFFICE PHYSICIAN OFFICE CLINICIAN OFFICE M I FIBE ROOM EXISTING PUBLIC ADDRESS �63,G5 EXISTING PANEL "LS1' (v,30,4W,100A) RELOCATED. SEE NEW SYSTEM RACK SHALL BE FED FROM "LS2 -PBX' SHALL BE R D WORK FOR NEW LOCATION. & ALL ASSOCIATED B NCH CIRCU S TRANSFERRED Na4 IN ° III JAN. N.I.- ADMINISTRATION CLO. 1 CORR 0 El a _ I I LOUNGE ELEV. 13 M 1 WORKRM. o TL ">' EXISTING PBX TOILET EQUIPMENT RM. EXISTING POW TRIP TO BE REMOVED AN CORR 71,7 5 REPLACED WITH 0 NEW QUADRUPLEX RE PTAC =��5r77 SEE NEW WORK. EXIST. MECH. RM. CLERICAL AHU ��wcl P OFFICE ELECTRICAL EXISTING PANEL "PBX -8" av,30,4W,100A) ROOM FED FROM 8TH FLOOR SHALL BE REMOVED CORR ALONG WITH ASSOCIATED CONDUIT & WIRES BACK TO POWER SOURCE. EXISTING PANEL "2MCL1 -II" (v,30,4W,225A) SHALL BE CORRIDOR it �I i ELEV. USED TO PROVIDE POWER TO TEMPORARY UPS's & CIRCUITS, CONTRACTOR SHALL PROVIDE INSTALL NEW CIRCUIT BREAKERS AS REQUIRED. SEE PANEL SCHEDULE ELECT. El I IN THIS SHEET. NIVL ARTERIAL EXIST. ELEV. EAK RM. WCH LOBBY o _ 0 E V 9 EV 1 ° TLT .................. ............... .._ .................................... , _ N I V I TEMPORARY WORK NOTES: 0 TEMPORARY NEMA L6 -30P RECEPTACLE TO BE PROVIDED & INSTALLED BY CONTRACTOR AND MOUNTED ON EXISTING RACK. ONCE NEW UPS -PDU IS 100% OPERATIONAL AND ALL LOADS ARE TRANSFERRED TO NEW PDU PANELS, TEMPORARY RECEPTACLE SHALL REMAIN CONNECTED TO CRITICAL PANEL "2MCL1 -11 ". CONTRACTOR SHALL PROVIDE /INSTALL PHENOLIC LABEL TO READ "NOT UPS POWER ". Q TEMPORARY WALL MOUNTED NEMA L6 -30P RECEPTACLE TO BE PROVIDED & INSTALLED BY CONTRACTOR. FIELD COORDINATE EXACT LOCATION. ONCE NEW UPS -PDU IS 100% OPERATIONAL AND ALL LOADS ARE TRANSFERRED TO NEW PDU PANELS, TEMPORARY RECEPTACLE SHALL REMAIN CONNECTED TO CRITICAL PANEL "2MCL1 -11 ". CONTRACTOR SHALL PROVIDE /INSTALL PHENOLIC LABEL TO READ "NOT UPS POWER ". 3Q TEMPORARY APC 6000VA UPS TO BE SUPPLIED BY OWNER & INSTALLED BY CONTRACTOR. TYPICAL. ALL PBX LOADS SHALL BE CONNECTED TO TEMPORARY UPS's BY PLUGGING THEM IN THE UPS BUILT -IN RECEPTACLES. ® CONTRACTOR SHALL TEMPORARILY FEED CIRCUITS 1, 7 & 8 FROM PANEL "2MCL1 -II" BY PROVIDING /INSTALLING NEW 1 -POLE, 20A CIRCUIT BREAKERS IN "2MCL1 -11 "(SEE PANEL SCHEDULE IN THIS SHEET) & RUNNING TEMPORARY CONDUIT & WIRES DIRECTLY TO EXISTING 1 -POLE, 20A CIRCUIT BREAKERS FOR SAID CIRCUITS IN PANEL PBX1. ONCE THESE CIRCUITS ARE TRANSFERRED TO PDU PANELS THEN CONTRACTOR SHALL PROCEED TO REMOVE TEMPORARY CONDUITS & WIRES FEEDING CIRCUITS 1,7 & 8. Q TEMPORARY NEMA L6 -30P RECEPTACLE TO BE PROVIDED & INSTALLED BY CONTRACTOR AND MOUNTED ON EXISTING RACK. ONCE NEW UPS -PDU IS 100% OPERATIONAL AND ALL CIRCUITS ARE TRANSFERRED TO NEW PDU PANELS CONTRACTOR SHALL REMOVE TEMPORARY RECEPTACLE AND ASSOCIATED WIRES BACK TO POWER SOURCE AND LEAVE THE CONDUIT FOR FUTURE USE. 6. PANEL SCHEDULE OF "2MCL1 -11" SHALL BE UPDATED TO READ "SPARE" IN ALL CIRCUITS USED TO FEED LOADS DURING TEMPORARY WORK ONCE NEW WORK IS COMPLETE. PARTIAL SECOND FLOOR PLAN DEMOLITION &TEMPORARY WORK O ° 3l) i l� D l i�.� i 8 s l-I^AL. L Comm 1 IIL I "JVi �i {3�a 1 x' F LrfIS TI G OCOU r'�NU�ILS B +� y 6 y ., .J:I DATE. Cy .�.�.. PREP/ RECOV. PREP RECOV. #11 T L_T PREP R-770- #10 PREP/ RECOV. COORD- OFFIC CAROL ADMIN. SUPPORT OFFI' N.I.- ECHO HOLDING CORR RESEARCH OFFICE OFFICE', PHYSICIAN ECHO ROOM; ECHO ECHO 4 Y i cn v a a 0 U knO 4) kn .o P4 com �® Wry ti F I v � � o 40, F a w.a m��! -.drn ao ko w d 6ac� G'],04 44 o--r W �•' U �o N rX, a � o I W 0 0 U fY Z 0 U 0 0 0 a V) w w o Of o () 'V O o'd Q Of O 0 O F V / O ■ . . CL Z M M _ O W M Q m Q Z M � J � w � LLJ 1 ° FILE: �a U 212 -1002 0 Lj -19 -12 PLOT SIZE: V) N DESIGNED /DRAWN BY: A.V. CHECKED BY: F,A. 'V O o'd L Of O 0 O 0 J � U O W m Q Z M � J � w � z ° FILE: JOB NO.: 212 -1002 DATE : 03- -19 -12 PLOT SIZE: AS NOTED DESIGNED /DRAWN BY: A.V. CHECKED BY: F,A. SHEET No.: E -3 SHEEP 4 OF 9