12-487-003ELECTRICAL GENERAL NOTES
The work shall comply with the latest applicable requirements of O.S.H.A., Florida Building Code
2010 Edition), National Fire Protection Association (NFPA) Life Safety Code 101(2009 edition),
FGI Guidelines for Design & Construction of Health Care Facilities (2010 edition), National Electrical Code (2008 edition),
Standards for Health Care Facilities NFPA -99 (2005 edition) & other applicable Codes, Statues & Regulations governing
this installation, as a minimum standard, unless specifications listed herein or shown on plans require a higher standard.
2. A ma erials shat be new and bear underwriters lobe s w ere applicable.
3. The work included consists of all supervision, labor, materials, equipment facilities, and installation required for the
complete satisfactory and approved electrical and communication systems as indicated on the drawings and called
for in this specification, or as may be reasonably implied by either.
4. Conductors shall consist of 987. conductivity copper, type THNN /THWN. sizes are AWG.
5. All conductors shall be stranded copper.
6. Contractor shall verify all equipment nameplate data for wiring and overcurrent protection requirements before
performing rough -in work.
7. All equipment shall be mounted on galvanized steel unistrut.
8. All EMT fittings shall be steel compression type.
9. All lugs shall be for copper conductors.
10. Label all equipment (disconnect switches, circuit breakers, controls, etc.) with engraved laminated plastic name
plates -screw attached to equipment.
11. Label all electrical outlets and light switches using engraved laminated plastic labels.
12. Contractor shall pay for all permits, fees, inspections and testing. Contractor to obtain permit and approved
submittals prior to beginning work or ordering equipment.
13. Electrical Contractor shall visit job site and familiarize himself with all conditions affecting electrical and
communications installation and make provisions as to the cost thereof. Existing conditions of electrical equipment,
light fixtures, etc... that are part of the final system shall be verified by the Contractor prior to submitting his bid.
14. Outlet boxes shall be pressed steel in dry locations. Cost alloy with threaded hubs in wet or damp locations
and special enclosures for other classified areas.
15. Electrical system shall be complete and effectively grounded as required by the latest edition of the N.E.C. or
local codes.
16. All required insurance shall be provided for protection against public liability and property damage for the
duration of the work.
17. Contractor shall submit shop drawings or cut sheets of lighting fixtures, switches and other electrical items for
approval by Engineer /Architect.
18. Contractor shall be responsible for all cutting and patching required of his work.
19. Label all panels w /typewritten directories (hand written is not acceptable).
20. Panelboards: Update panel directory showing any modification done in the panel for all existing electrical panels.
21. The term "Provide" used in the construction documents and specifications indicates the Contractor shall furnish
and install.
22. The minimum bend radius for grounding installation, shall be 8 inches for #6 wire and smaller, 12 inches for
wire larger than #6.
24. Panelboards: All current carrying buss shall be copper. All ground bus bars shall be copper. A.I.C. ratings shall
be as indicated on panelboard schedules.
25. Once construction is completed, as -built drawings shall be provided to the Engineer duly signed by the Electrical
Contractor.
Flortrinnl system at the fnriI4 during rnnstFu Gtinn
28. Contractor shall coordinate any power interruption of the building with Owner and submit a Request of Power Shutdown.
29. Prior to any power interruption, Contractor shall submit MOP for Owner approval.
30. The temperature rating associated with the ampacity of a conductor shall be so selected and coordinated as to
not exceed the lowest temperature rating of connected termination, conductor or device.
31. It shall not be the intent of these plans and /or specifications to show every minor detail of construction. The
Electrical Contractor shall be expected to furnish and install items for a complete electrical system and provide all
requirements necessary for equipment to be placed in proper working order.
32. The electrical Contractor shall keep all areas in which work is being performed free from debris at all items and
areas shall be left broom clean of the end of each working day.
33. The Electrical Contractor shall be responsible to repair to original conditions any and all damages to building
surfaces, equipment and furnishings caused during performance of work.
34. Where core drilling of floor /walls is required, Contractor shall seal openings watertight after utilities have been
installed. Location of cored holes shall be coordinated with location of equipment in a manner to be clean and
functional. The Contractor shall install only one conduit per hole and seal the opening around the conduit as
specified. Coordinate this with Owner representative.
35. Provide fire retardant U.L. approved sealant on all penetrations of fire rated partitions, walls and structural slabs.
It shall be the responsibility of the Electrical Contractor to verify, prior to submitting bid, locations of all such fire
rated partitions, wall and structural slabs.
36. Phase arrangement shall be pFeperly deterpRiRed in GGGA_.Fd_G_.AG_A_ �.A.gifh AFt. 430.97 (8) of N.E.G. use of phase
- o- R-o-^LI of theee -phase
37. Electrical Contractor shall demolish all remaining conduit, outlets, lighting fixtures, any electrical device and their
associated wiring that will not be re -used in this project and that is in the project area. Remove wiring back to
power source. If conduit part cannot be removed, abandon it in place duly capped at both ends.
38. Commission the electrical system free from grounds, tested for insulation integrity, voltage drop, and circuit
balanced as indicated on plan prior to final acceptance.
39. It shall be understood that all work performed shall be done by a licensed Electrical Contractor and in a first
class workmanlike manner. Said Contractor shall meet all requirements set forth by any local ordinance and /or
governing authorities.
40. Unless noted as existing, all equipment, wiring, devices, etc. shall be new and as specified. Equipment is to be
listed.
41. Contractor shall guarantee all materials and workmanship free from defects for a period of not less than (1)
year from date of acceptance, unless indicated or specified otherwise.
42. It shall be the responsibility of the Electrical Contractor for the advanced ordering of long lead items so as not
to interfere with the production of other trades resulting in any down or lag time.
43. All electrical equipment, devices, wire, etc., shall be listed for the intended use, with Underwriter's Laboratories,
Inc. (UL) where standards have been established by UL. As a minimum, all equipment shall meet applicable
standards for the type of equipment and intended use of the following:
A. American National Standards Institute (ANSI).
B. Illuminating Engineers Society (IES).
C. America Society Testing and Materials (ASTM).
D. National Electrical Manufacturer's Association (NEMA).
NOTE: These standards are subordinate to code and standards set by UL.
DEMOLITION LEGEND
EXISTING EQUIPMENT TO REMAIN
EXISTING EQUIPMENT TO BE RELOCATED
EXISTING EQUIPMENT TO BE REMOVED
NEW EQUIPMENT
COLOR CODE
YELLOW LIFE SAFETY
ORANGE - CRITICAL
GREEN EQUIPMENT
RED FIRE ALARM
44. The Electrical Contractor shall furnish a complete set of as -built drawings, showing all changes and deviations to
the Architect /Engineer prior to completion of the project.
45. Prepare and affix a type written directory to the inside cover of each new and or existing (revised) panelboard
indicating loads controlled by each circuit.
46. Provide temporary electrical service for use by all trades during construction and remove some at completion of
project. Temporary power is to be done per code.
48. Electrical contractor shall verify circuit protective devices rating for equipment prior to construction.
49. Contractor shall coordinate all work under his or her supervision and between work which is not under his
supervisionl, but affects his work.
52. Provide one year guarantee for all material and workmanship.
53. Contractor shall use 3M Fire Barrier CP -25WB+ Caulk, for any metal conduit penetration trhough a fire wall.
56. Only metallic conduit shall be used for all above ground applications (exposed or concealed) in this project.
57. Contactor shall investigate and trace carefully any existing conduit before removing or disconnecting it in
order to Make sure no existing equipment or system will be left without power. Contractor shall notify owner and
engineer if the removal of any existing conduit will leave any existing equipment without power.
58. Contractor shall prepare and submit to engineer 1/4" or 1/2" scale shop drawings of any electrical equipment
room (closet), UPS room, Engine /Generator Room, House Service Panel Room, etc, showing in detail actual room layout,
equipment) actual dimensions and actual conduit runs and sizes.
59. All conductors which are not terminated and have the potential to become energized during this project shall
have their) ends insulated. Conductors up to #6 shall be protected by screwing on a wire nut, sized for that conductor,
on the ends of the conductors. Conductors #4 and larger shall require a heat shrink rubber boot type fitting.
Electrical tape will not be an acceptable form of insulating the ends of conductors.
60. Contractor shall run 3/4" conduit with pullwire from data outlet to ceiling space (if there is ceiling) or to
10' A.F.F. if there is no ceiling. Provide plastic bushing at stub -up conduit.
Telephone data wiring by Telephone Contractor. Coordinate this work with Telephone Contractor before submitting bid.
61. Drawings are diagrammatic and shall not be scaled. Refer to architectural plans and elevations for exact
location of all equipment. Electrical Contractor shall furnish and install all items required for a complete and acceptable
working installation.
(
62. The 'electrical system shall be completely and effectively grounded as required in Article 250 of the National
Electrical Code.
i
63. The )electrical, telephone and cable television installations shall meet all requirements by the local utility companies.
64. Location of electrical equipment shown is approx, contractor shall field verify exact dimensions and field conditions
before installing equipment to make sure installation comply with NEC.
65. Documentation for Equipotential Grounding in all patient care areas shall be provided. This documentation and an
approved meter for testing shall be readily available at final survey. (NFPA 99 4.3.3).
ALL ABBREVIATIONS LISTED ABOVE ARE NOT NECESSARILY USED IN THIS PROJECT
SCOPE OF WORK NARRATIVE:
SOUTH MIAMI HOSPITAL
REPLACE EXISTING LIEBIERT UPS THAT SERVES THE TELECOM SYSTEM FOR SOUTH MIAMI HOSPITAL IN PBX ROOM WITH A NEW 40KVA
UPS /PDU.
RE- CONNECT NEW UPS /PDU FROM CENTRAL ENERGY PLANT CRITICAL POWER PANEL "CDPA ".
REMOVE (3) NON -CODE COMPLIANT, EXISTING RV PANELS "LS2- PBX ", "PBX1" & "LS1" AND TRANSFER THEIR ASSOCIATED LOADS
TO NEW PDU PANELS. PANEL "PBX -8" (WHICH IS COMPLETELY EMPTY) WILL ALSO BE REMOVED.
RELOCATE EXISTING PUBLIC ADDRESS SYSTEM RACK TO MAKE ROOM TO REPLACE UPS.
WORK SEQUENCE:
PRIOR TO REMOVING THE EXISTING PBX UPS, CONTRACTOR SHALL INSTALL TEMPORARY FEEDERS & RECEPTACLES FOR TEMPORARY
UPS's AND CIRCUITS CURRENTLY BEING FED FROM EXISTING TO BE REMOVED PBX UPS. THESE LOADS WILL BE TEMPORARILY FED
FROM CRITICAL POWER PANEL "2MCL1 ".
ONCE ALL PBX LOADS ARE RUNNING THRU TEMPORARY CIRCUITS, THEN CONTRACTOR SHALL PROCEED WITH THE DEMOLITION WORK.
EXISTING PBX8 PANEL LOCATED IN PBX ROOM SHALL BE REMOVED. EXISTING PUBLIC ADDRESS SYSTEM RACK SHALL BE RELOCATED
INSIDE PBX ROOM TO MAKE ROOM TO REPLACE EXISTING UPS. AT THE SAME TIME CONTRACTOR SHALL PROVIDE /INSTALL NEW
3 -POLE, 80A CIRCUIT BREAKER IN PANEL "CDPA" LOCATED IN FIRST FLOOR ELECTRICAL ROOM AND RUN NEW CONDUIT & WIRES TO
MAKE SPLICES TO THE EXISTING PBX UPS FEEDER THAT WAS ORIGINALLY CONNECTED TO PANEL "LSDPA" LOCATED IN SAME ROOM,
CONTRACTOR SHALL INSTALL NEW UPS /PDU WHICH INCLUDES TWO 42 CIRCUIT DISTRIBUTION PANELBOARDS. NEW UPS /PDU WILL BE
CONNECTED TO PANEL °'CDPA" THRU EXISTING TO REMAIN 100A DISCONNECT SWITCH PRESENT IN PBX ROOM. ONCE NEW UPS /PDU
IS INSTALLED, CONTRACTOR SHALL PROCEED TO TRANSFER ALL EXISTING LOADS IN PANELS "LS2 PBX ", "LS1" AND "PBX1" TO NEW
PDU PANELS.
ONCE NEW UPS /PDU IS 100% OPERATIONAL THEN CONTRACTOR SHALL PROCEED TO RE- CONNECT ALL LOADS SERVED BY
TEMPORARY CIRCUITS TO EXISTING OUTLETS NOW BEING FED FROM NEW UPS.
ELECTRICAL SYMBOL
LEGEND
SYMBOL
DESCRIPTION
JB
Cp ELA -3
SINGLE RECEPTACLE. "ELA -3" INDICATES RECEPTACLE IS FED
FROM CIRCUIT #3 IN PANEL ELA.
tt ELA -3
DUPLEX RECEPTACLE. "ELA -3" INDICATES RECEPTACLE IS FED
FROM CIRCUIT #3 IN PANEL ELA.
ELA -3
QUADRUPLEX RECEPTACLE. "ELA -3" INDICATES RECEPTACLE IS
FED FROM CIRCUIT #3 IN PANEL ELA.
O [J 13]
JUNCTION BOX
MH
MOUNTING HEIGHT
DATA OUTLET.
AUTOMATIC TRANSFER SWITCH
®
VISICU AUDIO- VISUAL SERVER
B'BD
OQ
VISICU CAMERA W /MICROPHONE
MAIN LUGS ONLY
SP
CEILING MOUNTED SPEAKER FOR VISICU SYSTEM.
MOP
M
VISICU MONITOR.
BUILDING
E❑
VISICU ELERT CALL BUTTON.
BSC
D
ELECTRIC PANELBOARD.
NOT FUSIBLE
E
CONDUIT SLEEVE.
NEC
�
CONCEALED CONDUIT.
CIRCUIT BREAKER
- - - - --
COMMUNICATION CABLES.
CCM
CIRCUIT CAPACITY MANAGER
ALL ELECTRICAL SYMBOLS ARE NOT NECESSARILY USED IN THIS PROJECT
ALL ABBREVIATIONS LISTED ABOVE ARE NOT NECESSARILY USED IN THIS PROJECT
SCOPE OF WORK NARRATIVE:
SOUTH MIAMI HOSPITAL
REPLACE EXISTING LIEBIERT UPS THAT SERVES THE TELECOM SYSTEM FOR SOUTH MIAMI HOSPITAL IN PBX ROOM WITH A NEW 40KVA
UPS /PDU.
RE- CONNECT NEW UPS /PDU FROM CENTRAL ENERGY PLANT CRITICAL POWER PANEL "CDPA ".
REMOVE (3) NON -CODE COMPLIANT, EXISTING RV PANELS "LS2- PBX ", "PBX1" & "LS1" AND TRANSFER THEIR ASSOCIATED LOADS
TO NEW PDU PANELS. PANEL "PBX -8" (WHICH IS COMPLETELY EMPTY) WILL ALSO BE REMOVED.
RELOCATE EXISTING PUBLIC ADDRESS SYSTEM RACK TO MAKE ROOM TO REPLACE UPS.
WORK SEQUENCE:
PRIOR TO REMOVING THE EXISTING PBX UPS, CONTRACTOR SHALL INSTALL TEMPORARY FEEDERS & RECEPTACLES FOR TEMPORARY
UPS's AND CIRCUITS CURRENTLY BEING FED FROM EXISTING TO BE REMOVED PBX UPS. THESE LOADS WILL BE TEMPORARILY FED
FROM CRITICAL POWER PANEL "2MCL1 ".
ONCE ALL PBX LOADS ARE RUNNING THRU TEMPORARY CIRCUITS, THEN CONTRACTOR SHALL PROCEED WITH THE DEMOLITION WORK.
EXISTING PBX8 PANEL LOCATED IN PBX ROOM SHALL BE REMOVED. EXISTING PUBLIC ADDRESS SYSTEM RACK SHALL BE RELOCATED
INSIDE PBX ROOM TO MAKE ROOM TO REPLACE EXISTING UPS. AT THE SAME TIME CONTRACTOR SHALL PROVIDE /INSTALL NEW
3 -POLE, 80A CIRCUIT BREAKER IN PANEL "CDPA" LOCATED IN FIRST FLOOR ELECTRICAL ROOM AND RUN NEW CONDUIT & WIRES TO
MAKE SPLICES TO THE EXISTING PBX UPS FEEDER THAT WAS ORIGINALLY CONNECTED TO PANEL "LSDPA" LOCATED IN SAME ROOM,
CONTRACTOR SHALL INSTALL NEW UPS /PDU WHICH INCLUDES TWO 42 CIRCUIT DISTRIBUTION PANELBOARDS. NEW UPS /PDU WILL BE
CONNECTED TO PANEL °'CDPA" THRU EXISTING TO REMAIN 100A DISCONNECT SWITCH PRESENT IN PBX ROOM. ONCE NEW UPS /PDU
IS INSTALLED, CONTRACTOR SHALL PROCEED TO TRANSFER ALL EXISTING LOADS IN PANELS "LS2 PBX ", "LS1" AND "PBX1" TO NEW
PDU PANELS.
ONCE NEW UPS /PDU IS 100% OPERATIONAL THEN CONTRACTOR SHALL PROCEED TO RE- CONNECT ALL LOADS SERVED BY
TEMPORARY CIRCUITS TO EXISTING OUTLETS NOW BEING FED FROM NEW UPS.
ABBREVIATIONS
O
A. F.
AMP FRAME
JB
JUNCTION BOX
A.T.
AMP TRIP
LMS
LIGHT MOTION SWITCH
A.F.F.
ABOVE FINISHED FLOOR
L &S
LANDIS AND STAEFA
AL
ALUMINUM
MH
MOUNTING HEIGHT
ATS
AUTOMATIC TRANSFER SWITCH
MCB
MAIN CIRCUIT BREAKER
B'BD
BACKBOARD
MLO
MAIN LUGS ONLY
BKR
BREAKER
MOP
METHOD OF PROCEDURE
BLDG
BUILDING
NESS
NETWORK EQUIPMENT BUILDING SYSTEM
BSC
BUILDING SERVICE CENTER
NF
NOT FUSIBLE
C
CONDUIT
NEC
NATIONAL ELECTRICAL CODE
CB
CIRCUIT BREAKER
NIC
NOT IN CONTRACT
CCM
CIRCUIT CAPACITY MANAGER
NL
NEW LOCATION
CH
CHILLER
OL
OVERLOAD
CKT
CIRCUIT
PB
PULL BOX
CLG
CEILING
PNL
PANEL
CT
COOLING TOWER
PVC
POLYVINYL CHLORIDE CONDUIT
COMM, CTR.
COMMUNICATION CENTER
RACCC
REMOTE ALARM CROSS CONNECT CABINET
DWG
DRAWING
RCPT
RECEPTACLE
EC
EMPTY CONDUIT
RE
EXISTING TO BE REMOVED
EF
EXHAUST FAN
ELECT
ELECTRICAL
RF
FREQUENCY
EMT
ELECTRIC METALLIC TUBING
RL
EXISTING TO BE RELOCATED
EMS
ENERGY MANAGEMENT SYSTEM
RGS
RIGID GALVANIZED STEEL CONDUIT
EX /EXIST.
EXISTING
RM
ROOM
FACP
FIRE ALARM CONTROL PANEL
SOD
SMOKE DUCT DETECTOR
FE
FIRE EXTINGUISHER
SW
SWITCH
FHC
FIRE HOSE CABINET
T
TRACK
FLUOR /F
FLUORESCENT
TEL
TELEPHONE
FPL
FLORIDA POWER & LIGHT
U01
UNLESS OTHERWISE INDICATED
GFI
GROUND FAULT CIRCUIT INTERRUPTER
VFD
VARIABLE FREQUENCY DRIVE
GRID
GROUND
WP
WEATHER PROOF
WT
WATER TIGHT
H -O -A
HAND - OFF - AUTOMATIC
XFMR
TRANSFORMER
HP
HORSE POWER
ALL ABBREVIATIONS LISTED ABOVE ARE NOT NECESSARILY USED IN THIS PROJECT
SCOPE OF WORK NARRATIVE:
SOUTH MIAMI HOSPITAL
REPLACE EXISTING LIEBIERT UPS THAT SERVES THE TELECOM SYSTEM FOR SOUTH MIAMI HOSPITAL IN PBX ROOM WITH A NEW 40KVA
UPS /PDU.
RE- CONNECT NEW UPS /PDU FROM CENTRAL ENERGY PLANT CRITICAL POWER PANEL "CDPA ".
REMOVE (3) NON -CODE COMPLIANT, EXISTING RV PANELS "LS2- PBX ", "PBX1" & "LS1" AND TRANSFER THEIR ASSOCIATED LOADS
TO NEW PDU PANELS. PANEL "PBX -8" (WHICH IS COMPLETELY EMPTY) WILL ALSO BE REMOVED.
RELOCATE EXISTING PUBLIC ADDRESS SYSTEM RACK TO MAKE ROOM TO REPLACE UPS.
WORK SEQUENCE:
PRIOR TO REMOVING THE EXISTING PBX UPS, CONTRACTOR SHALL INSTALL TEMPORARY FEEDERS & RECEPTACLES FOR TEMPORARY
UPS's AND CIRCUITS CURRENTLY BEING FED FROM EXISTING TO BE REMOVED PBX UPS. THESE LOADS WILL BE TEMPORARILY FED
FROM CRITICAL POWER PANEL "2MCL1 ".
ONCE ALL PBX LOADS ARE RUNNING THRU TEMPORARY CIRCUITS, THEN CONTRACTOR SHALL PROCEED WITH THE DEMOLITION WORK.
EXISTING PBX8 PANEL LOCATED IN PBX ROOM SHALL BE REMOVED. EXISTING PUBLIC ADDRESS SYSTEM RACK SHALL BE RELOCATED
INSIDE PBX ROOM TO MAKE ROOM TO REPLACE EXISTING UPS. AT THE SAME TIME CONTRACTOR SHALL PROVIDE /INSTALL NEW
3 -POLE, 80A CIRCUIT BREAKER IN PANEL "CDPA" LOCATED IN FIRST FLOOR ELECTRICAL ROOM AND RUN NEW CONDUIT & WIRES TO
MAKE SPLICES TO THE EXISTING PBX UPS FEEDER THAT WAS ORIGINALLY CONNECTED TO PANEL "LSDPA" LOCATED IN SAME ROOM,
CONTRACTOR SHALL INSTALL NEW UPS /PDU WHICH INCLUDES TWO 42 CIRCUIT DISTRIBUTION PANELBOARDS. NEW UPS /PDU WILL BE
CONNECTED TO PANEL °'CDPA" THRU EXISTING TO REMAIN 100A DISCONNECT SWITCH PRESENT IN PBX ROOM. ONCE NEW UPS /PDU
IS INSTALLED, CONTRACTOR SHALL PROCEED TO TRANSFER ALL EXISTING LOADS IN PANELS "LS2 PBX ", "LS1" AND "PBX1" TO NEW
PDU PANELS.
ONCE NEW UPS /PDU IS 100% OPERATIONAL THEN CONTRACTOR SHALL PROCEED TO RE- CONNECT ALL LOADS SERVED BY
TEMPORARY CIRCUITS TO EXISTING OUTLETS NOW BEING FED FROM NEW UPS.
N I N
� i N
CD CD
0 0
4J
as
O
a
M
u f•."
, 'gip � ,
�.
0
ko CO
w� C
to
c
P',
W c7 1
H Get
2
x ACQ
I �
0�rC,
O
m
coo�q��
Z
m
Ott
�w
�
� a
°
wa
�w
®
CD
Li1 r. LJ
J
�a
r
CD
Z w
I
w
M
�-
a-
z
FILE:
W
=
DATE :
03 -19 -12
C)
AS NOTED
DESIGNED /DRAWN BY: A.V.
O
SHEET No.:
E -1
N I N
� i N
CD CD
0 0
4J
as
O
a
M
O
M
�.
0
ko CO
w� C
to
c
P',
W c7 1
H Get
2
x ACQ
I �
0�rC,
O
m
coo�q��
Z
m
Ott
�w
�
� a
°
wa
�w
®
CD
Li1 r. LJ
J
�a
H
H
CD
Z w
I
w
N I N
� i N
CD CD
0 0
J
0
O
z
M
O
M
�.
1--
Qv.
X
W
m
O
m
O
Z
w
Ott
J
w
Q
�
CD
Li1 r. LJ
J
W
H
H
CD
Z w
1 . 1
■ •�•
M
�-
a-
z
FILE:
W
=
DATE :
03 -19 -12
C)
AS NOTED
DESIGNED /DRAWN BY: A.V.
O
SHEET No.:
E -1
U
U
O
W
V)
U
Z
°
�
0
o
fl-
uj
u)
of
w
w
o
_
Of
o
a
J
()
O
z
M
O
M
�.
1--
Qv.
X
W
m
O
m
O
Z
w
Ott
J
Q
Q
�
CD
Li1 r. LJ
J
W
H
H
CD
Z w
1 . 1
■ •�•
M
�-
a-
FILE:
W
=
DATE :
03 -19 -12
PLOT SIZE:
AS NOTED
DESIGNED /DRAWN BY: A.V.
O
SHEET No.:
E -1
U
OF 9
O
W
V)
Ln
J
()
O
z
M
O
M
�.
V
W
m
F-
m
O
Z
86
J
Q
Q
�
Z
Li1 r. LJ
J
W
H
H
CD
Z w
1 . 1
■ •�•
V
0
FILE:
JOB NO.:
212 -1002
DATE :
03 -19 -12
PLOT SIZE:
AS NOTED
DESIGNED /DRAWN BY: A.V.
CHECKED BY: F.A.
SHEET No.:
E -1
SHEEr 2
OF 9