Loading...
12-42-014ELECTRICAL GENERAL NOTES: TAL GENERAL. CONDITIONS Al THE DRAWINGS ARE GENERALLY DIAGRAMMATIC AND IT IS THE INTENT AND MEANING OF THE CONTRACT DOCUMENTS THAT THE CONTRACTOR SHALL PROVIDE AN ELECTRICAL INSTALLATION THAT IS COMPLETE WITH ALL ITEMS AND APPURTENANCES NECESSARY, REASONABLE INCIDENTAL, OR CUSTOMARILY INCLUDED, EVEN THOUGH EACH AND EVERY ITEM IS NOT SPECIFICALLY CALLED OUT OR SHOWN, THE CONTRACTOR MALL PROVIDE ALL EQUIPMENT, MATERIALS, LABOR, SUPERVISION AND SERVICE NECESSARY SO AS TO PROVIDE A COMPLETE, FUNCTIONING ELECTRICAL SYSTEM IN SAFE WORKING ORDER. A2 SYMBOLS FOR VARIOUS ELEMENTS AND SYSTEMS ARE SHOWN ON THE DRAWINGS, SHOULD THERE BE ANY DOUBT REGARDING THE MEANING OR INTENT OF THE SYMBOLS USED, AN INTERPRETATION SHALL BE OBTAINED FROM THE ARCHITECT IN WRITING. THE DECISION OF THE ARCHITECT SHALL BE FINAL A3 IT SHALL BE THE RESPONSIBILITY OF EACH CONTRACTOR TO EXAMINE THE CONTRACT DOCUMENTS CAREFULLY BEFORE SUBMITTING THEIR BID, WITH PARTICULAR ATTENTION TO ERRORS, OMISSIONS, CONFLICTS WITH PROVISIONS OF LAWS AND CODES HAVING JURISDICTION, CONFLICTS BETWEEN DRAWINGS OR DRAWINGS AND SPECIFICATIONS, AND AMBIGUOUS DEFINITION OF THE EXTENT OF COVERAGE BETWEEN CONTRACTS, ANY SUCH DISCREPANCY SHALL BE BROUGHT IMMEDIATELY TO THE ATTENTION OF THE ARCHITECT FOR CORRECTION. SHOULD ANY OF THESE ERRORS, OMISSIONS, CONFLICTS, OR AMBIGUITIES EXIST, THE CONTRACTOR SHALL HAVE THEM EXPLAINED AND ADJUSTED IN WRITING BEFORE SIGNING THE CONTRACT OR PROCEEDING WITH THE WORK; OTHERWISE, THE CONTRACTOR SHALL, AT THEIR OWN EXPENSE, SUPPLY THE PROPER MATERIALS AND LABOR TO MAKE GOOD ANY DAMAGE OR DEFECTS IN THEIR WORK OR THE RESULTS OBTAINED THEREFROM, CAUSED BY SUCH DISCREPANCY. A4 WHEREVER CONFLICTS OCCUR BETWEEN DIFFERENT PARTS OF THE CONTRACT DOCUMENTS, THE GREATER QUANTITY, THE BETTER QUALITY, OR LARGER SIZE SHALL PREVAIL UNLESS THE ARCHITECT INFORMS THE CONTRACTOR OTHERWISE IN WRITING. A5 THE SCALE OF EACH DRAWING IS RELATIVELY ACCURATE; ANY DIMENSIONS SHOWN ARE APPROXIMATE TO CENTERLINE FROM ASSUMED BUILDING PERIMETER THE CONTRACTOR SHALL OBTAIN THE NECESSARY DIMENSIONS FOR ANY EXACT TAKEOFFS FROM THE ARCHITECT, NO ADDITIONAL COST TO THE OWNER WILL BE CONSIDERED FOR FAILURE TO OBTAIN EXACT DIMENSIONS WHERE NOT CLEAR OR IN ERROR ON THE DRAWINGS, ANY DEVICE OR FIXTURE ROUGHED IN IMPROPERLY AND NOT POSITIONED ON IMPLIED CENTER —LINES OR AS REQUIRED BY GOOD PRACTICE MUST BE REPOSITIONED AT NO COST TO THE OWNER A6 THE CONTRACTOR IS RESPONSIBLE FOR FILING AND PAYING ALL FEES AND OBTAINING NECESSARY PERMITS AND CERTIFICATES OF INSPECTION. THE CONTRACTOR SHALL DELIVER ALL CERTIFICATES OF INSPECTION TO OWNER /CONSTRUCTION MANAGER INCLUDING COPIES WITH MAINTENANCE MANUALS. A7 ONLY EXPERIENCED CRAFTSMEN KNOWLEDGEABLE IN THEIR RESPECTIVE TRADE SHALL PERFORM THE WORK DESCRIBED IN THE CONSTRUCTION DOCUMENTS. A8 ALL WORK SHALL BE DONE IN ACCORDANCE WITH THE LATEST ADDITION OF NFPA STANDARD 70 (NATIONAL ELECTRICAL CODE). CONTRACTOR SHALL ALSO CONFORM TO ALL APPLICABLE LOCAL CODES AND AMENDMENTS, A9 UNLESS OTHERWISE INDICATED, ALL EQUIPMENT AND MATERIALS SHALL BE NEW AND SHALL MEET NEMA AND ANSI STANDARDS. THEY SHALL ALSO BE LISTED/LABELED BY AN NATIONALLY RECOGNIZED LABORATORY IN ACCORDANCE WITH NFPA 70, EQUIPMENT AND MATERIALS SHALL BE INSTALLED IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS, AND WITHIN THEIR LISTING/LABELING REQUIREMENTS AND RESTRICTIONS, A10 PROVIDE SHOP DRAWING FOR ENGINEER'S REVIEW FOR ALL ELECTRICAL EQUIPMENT, DEVICES, AND MATERIALS PROPOSED TO BE PROVIDED UNDER THIS CONTRACT. ANY DEVIATIONS FROM ITEMS SPECIFIED SHALL BE CLEARLY IDENTIFIED AND SEPARATELY SUBMITTED WITH A FORMAL SUBSTITUTION REQUEST. REFER TO SPECIFICATIONS (PROJECT MANUAL) FOR REQUIREMENTS. All CONTRACTOR SHALL CONNECT ALL PIV VALVES, BACKFLOW PREVENTERS, AND FLOW AND TAMPER SWITCHES TO THE NEW FIRE ALARM SYSTEM, CONTRACTOR SHALL PROVIDE AN AUDIBLE AND VISUAL ALARM RIGHT OUTSIDE THE FIRE PUMP ROOM AND INTERCONNECT WITH FIRE ALARM SYSTEM. REFER TO FIRE PROTECTION AND CIVIL DRAWING FOR QUANTITY AND LOCATION OF DEVICES. ELECTRICAL EQUIPMENT B1 PROVIDE AN IDENTIFICATION NAMEPLATE FOR EACH ELECTRICAL EQUIPMENT, APPURTENANCE DEPICTING THE DESIGNATION INDICATED ON THE DRAWINGS. REFER TO SPECIFICATIONS FOR FURTHER REQUIREMENTS. B2 WEATHERPROOF ENCLOSURES SHALL BE PROVIDED FOR ALL ELECTRICAL EQUIPMENT, DEVICES AND APPURTENANCES (ALL SYSTEMS) INSTALLED OUTDOORS, 63 COORDINATE AND SCHEDULE ALL POWER OUTAGES WITH OWNER REFER TO SPECIFICATIONS FOR FURTHER REQUIREMENTS. 04 SPACE ALLOCATIONS FOR MATERIALS, EQUIPMENT AND DEVICES HAVE BEEN MADE ON THE BASIS OF PRESENT AND KNOWN FUTURE REQUIREMENTS AND THE DIMENSIONS OF ITEMS OF EQUIPMENT OR DEVICES OF A PARTICULAR MANUFACTURER THE CONTRACTOR SHALL VERIFY THAT ALL MATERIALS, EQUIPMENT AND DEVICES PROPOSED FOR USE ON THIS PROJECT ARE WITHIN THE CONSTRAINTS OF THE ALLOCATED SPACE. B5 DO NOT USE PERMANENT INK WHEN MAKING FIELD MARKING OR TEMPORARY CIRCUIT LABELS ON PANELS. CONTRACTOR SHALL USE REMOVABLE TAPE/TAGS FOR ALL TEMPORARY MARKING AND SHALL REMOVE THESE TEMPORARY MARKING AT THE CONCLUSION OF THIS PROJECT. SIE WORK Cl COORDINATE WITH THE SITE WORK FOR THE LOCATION, DIMENSIONS AND ELEVATION OF ALL DUCTBANKS/SERVICE CONDUITS EXTERNAL TO THE BUILDING PRIOR TO INSTALLATION OF ALL DUCTBANKS/SERVICE CONDUITS INTERNAL TO THE BUILDING, C2 COORDINATE ALL ELECTRICAL UTILITY SERVICE REQUIREMENTS WITH UTILITIES REPRESENTATIVE PRIOR TO COMMENCING ANY ELECTRICAL SITE WORK. CONTRACTOR SHALL SCHEDULE ALL NECESSARY MEETING BETWEEN UTILITY COMPANIES CONSTRUCTION FOREMAN, ELECTRICAL SUBCONTRACTORS, AND VARIOUS SUBCONTRACTORS RESPONSIBLE FOR SITE CONSTRICTION PRIOR TO ELECTRICAL ROUGH —IN. CONDUIT 14 RACEWAY D1 ALL WORK SHALL BE COORDINATED SO THAT INTERFERENCES ARE AVOIDED. PROVIDE ALL NECESSARY OFFSETS IN CONDUITS, RACEWAYS, ETC., REQUIRED TO PROPERLY INSTALL THE WORK, EXPOSED WORK MUST BE KEPT AS CLOSE AS POSSIBLE TO WALLS, CEILINGS, COLUMNS, ETC., SO AS TO TAKE UP MINIMUM AMOUNT OF SPACE; ALL OFFSETS, FITTINGS, ETC., REQUIRED SHALL BE PROVIDED WITHOUT ADDITIONAL EXPENSE TO THE OWNER. WORK SHALL BE COORDINATED WITH OTHER TRADES. D2 CONDUIT RUNS ARE DIAGRAMMATIC IN NATURE CONTRACTOR IS RESPONSIBLE FOR SIZING AND LOCATING PULL BOXES PER NFPA 70 AND FOR COORDINATION WITH OTHER DISCIPLINES. D3 PENETRATIONS OF WALLS, FLOORS, AND ROOFS FOR THE PASSAGE OF ELECTRICAL RACEWAYS SHALL BE APPROVED BY THE STRUCTURAL ENGINEER OF RECORD PRIOR TO THE COMMENCEMENT OF WORK. ALL SUCH PENETRATIONS SHALL BE PROPERLY SEALED OFF AFTER INSTALLATION OF RACEWAY SO AS TO MAINTAIN THE STRUCTURAL, WATER PROOF, AND FIRE PROOF INTEGRITY OF THE WALL, FLOOR, OR ROOF SYSTEM PENETRATED. D4 SEAL ALL CONDUITS THAT PENETRATE THE BASEMENT FLOOR SLAB TO MAKE THEM WATER TIGHT. THE CONDUITS SHALL BE DRIED PRIOR TO INSTALLATION OF WIRE /CABLE AND SHALL BE SEALED AT TERMINATIONS. 05 ALL PENETRATIONS THROUGH FIRE RATED WALLS OR PARTITIONS SHALL BE MADE IN ACCORDANCE WITH U.L 'FIRE RESISTANCE DIRECTORY. PENETRATIONS SHALL BE SLEEVED AND SEALED WITH A UL APPROVED FIRE RATED SEALANT. REFER TO ARCHITECTURAL PLANS FOR FIRE RATED WALLS. D6 ALL EMPTY CONDUIT SYSTEMS SHALL CONTAIN A PULL WIRE FOR FUTURE PULLING OF CONDUCTORS, BRANCH CIRCUITS AND FEEDERS E1 CIRCUITING IS SHOWN DIAGRAMMATICALLY. HOMERUNS SHALL BE COMBINED WHERE POSSIBLE IN ACCORDING TO NFPA 70. E2 UNLESS OTHERWISE INDICATED, ALL CIRCUITS 100' OR LEG SHALL BE MINIMUM #12 AWG WIRE SIZE. CIRCUITS OVER 100 BUT LESS THAN 200' SHALL BE MINIMUM #10 AWG WIRE SIZE, CIRCUITS OVER 200' BUT LESS THAN 300' SHALL BE MINIMUM #8 AWG WIRE SIZE E2 UNLESS OTHERWISE INDICATED, ALL CONDUCTORS SHALL BE COPPER. 98X CONDUCTIVITY CONTINUOUS FROM OUTLET TO OUTLET. E3 UNLESS OTHERWISE INDICATED, CONDUCTOR SIZES #12 AN AND #10 AWG SHALL BE SOLID. CONDUCTOR SIZES #8 AWG AND LARGER MAY BE STRANDED. E4 A SEPARATE INSULATED EQUIPMENT GROUNDING CONDUCTOR SHALL BE PULLED WITH THE CIRCUIT CONDUCTORS FOR GROUNDING WHETHER OR NOT INDICATED ON THE DRAWINGS. METAL RACEWAY, OR A CABLE ARMOR OR SHEATH SHALL NOT BE USED AS THE ONLY EQUIPMENT GROUNDING CONDUCTOR. E5 HOMERUN CIRCUITS FOR ISOLATED GROUND RECEPTACLES SHALL BE SEPARATED FROM OTHER CIRCUITS. EACH CIRCUIT SHALL HAVE ITS OWN NEUTRAL CONDUCTOR AND EACH HOMERUN SHALL CONTAIN AN ISOLATE? AND EQUIPMENT GROUND CONDUCTOR. WIRING DEVICES F1 REFER TO ARCHITECTURAL DRAWINGS AND SPECIFICATIONS FOR LOCATION AND MOUNTING HEIGHT OF ALL WALL AND FLOOR MOUNTED ELEMENTS (OUTLETS, LIGHT SWITCHES, CONTROLLERS. POKE —THRU, ETC). ALL WALIAOOR MOUNTED ITEMS SHALL BE INSTALLED IN ACCORDANCE WITH THE ARCHITECTURAL DIMENSIONED DRAWINGS, IF LOCATION FOR AN ITEM IS NOT SHOWN ON THE ARCHITECTURAL DRAWINGS, VERIFY THE EXACT LOCATION OF THE ITEM WITH THE ARCHITECT PRIOR TO INSTALLATION. THESE REQUIREMENTS APPLY TO ALL WALL/FLOOR TYPES IN ALL AREAS. 00 NOT SCALE OR DIMENSION LOCATIONS FROM THESE DRAWINGS. F2 COORDINATE THE LOCATION AND INSTALLATION DETAIL OF OUTLETS IN MILLWORK WITH ARCHITECTURAL DRAWINGS (WALL ELEVATIONS, MILLWORK DETAILS, ETC,) AND WITH MILLWORK MANUFACTURER PRIOR TO ELECTRICAL ROUGH —IN, F3 WALL AND FLOOR MOUNTED POWER RECEPTACLES SHOWN NEAR DATA OUTLETS SHALL BE LOCATED WITHIN SIX (6) INCHES OF THE DATA OUTLET. LOCATE AT SAME MOUNTING HEIGHT UNLESS NOTED OTHERWISE F4 VERIFY THE EXACT POWER CONNECTION TYPE AND NEMA CONFIGURATION OF RECEPTACLES FOR EQUIPMENT FURNISHED BY THE OWNER, OTHER TRADES, OR UNDER A SEPARATE SECTION OF THIS CONTRACT PRIOR TO ELECTRICAL ROUGH —IN. F5 ALL RECEPTACLES LOCATED OUTSIDE THE BUILDING ENVELOPE SHALL BE HOUSED IN ENCLOSURES THAT ARE RATED 'WEATHER — PROOF— WHILE —IN —USE' AND SHALL BE EQUIPPED WITH GFCI FOR PERSONNEL PROTECTION. F6 ALL GFCI RECEPTACLES SHALL BE CONNECTED SO THAT ALL DEVICES ON THE SAME CIRCUIT AS THE GFCI RECEPTACLE DO NOT DE— ENERGIZE UPON TRIPPING. ALL GFCI RECEPTACLES SHALL INCLUDE A LOCK —OUT FUNCTION TO PROTECT AGAINST THE USE OF MISWIRED DEVICES OR DEVICES THAT HAVE BEEN DAMAGED DUE TO DISABLING SURGES. F7 ALL RECEPTACLES WITHIN 6 FT OF ANY WATER SOURCE (IL SINKS, ETC) MALL BE OF THE GFCl TYPE LIGHTING SYSTEM G1 REFER TO ARCHITECTURAL DRAWINGS AND SPECIFICATIONS FOR LOCATION OF ALL CEILING ELEMENTS (LIGHTS, SPRINKLERS, DIFFUSERS, ETC). ALL CEILING MOUNTED ITEMS SHALL BE INSTALLED IN ACCORDANCE WITH THE ARCHITECTURAL DIMENSIONED DRAWINGS. IF LOCATION FOR AN ITEM IS NOT SHOWN ON THE ARCHITECTURAL DRAWINGS, VERIFY THE EXACT LOCATION OF THE ITEM WITH THE ARCHITECT PRIOR TO INSTALLATION, THESE REQUIREMENTS APPLY TO ALL CEILING TYPES IN ALL AREAS. DO NOT SCALE OR DIMENSION LOCATIONS FROM THESE DRAWINGS. G2 PROVIDE AND INSTALL ALL SUPPORTS FOR LIGHT FIXTURES. SUPPORTS SHALL BE INDEPENDENT OF THE CEILING GRID SUPPORT SYSTEM. G3 LIGHT SWITCHES / OCCUPANCY SENSORS LOCATED IN A ROOM SHALL CONTROL ALL THE LIGHT FIXTURES IN THAT ROOM UNLESS NOTED OTHERWISE CONTRACTOR SHALL GANG TOGETHER ALL SWITCHES/bIMMERS UNDER A SINGLE COVER PLATE IN ALL AREAS THAT REQUIRE MORE THAN ONE SWITCH TO CONTROL ELECTRICAL DEVICES. G4 IN INSTANCES WHERE A TRACK LIGHTING SYSTEM, DIMMING SYSTEM, AND /OR LIGHTING CONTROL SYSTEM IS SPECIFIED, THE CONTRACTOR SHALL COORDINATE ALL NECESSARY COMPONENTS OF SUCH SYSTEM(S) WITH THE MANUFACTURER PRIOR TO BID AND INCLUDE ALL NECESSARY ACCESSORIES TO INSTALL A COMPLETE AND FUNCTIONING SYSTEM. G5 FOLLOW —UP SERVICE (EXTERIOR AND INTERIOR LIGHTING) FINAL AIMING AND ADJUSTING: PERFORM ADJUSTMENTS TO ALL AIMABLE AND TRACK MOUNTED LUMINAIRES AS DIRECTED BY THE ARCHITECT TO PROVIDE REQUIRED LIGHT INTENSITIES AND DISTRIBUTIONS. 1) SCHEDULING: AFTER SUBSTANTIAL COMPLETION, BUT NOT MORE THAN THREE MONTHS AFTER FINAL ACCEPTANCE; AFTER DELIVERY AND PLACEMENT OF AMENITIES INCLUDING BUT NOT LIMITED TO FURNITURE, ARTWORK, PLANTING, AND SIGNAGE /GRAPHICS; DURING A PERIOD MUTUALLY AGREEABLE TO THE ARCHITECT AND OWNER. 2) REQUIRED EQUIPMENT: PROVIDE SCAFFOLDING, LADDERS, MOTORIZED MAN —LIFTS OR HOISTS AS REQUIRED TO REACH LUMINAIRES. 3) RE —LAMP: UTILIZING THE EXTRA MATERIALS FURNISHED UNDER SECTION 265100 AND 265600, RE —LAMP FIXTURES WITH NEW LAMPS HAVING DIFFERING BEAM — SPREADS AS DIRECTED BY THE ARCHITECT, RETURN ALL UNUSED OR MINIMALLY —USED LAMPS TO THE FACILITIES STOCK AT THE COMPLETION OF THE AIMING AND ADJUSTMENT AS DIRECTED BY THE OWNER H1 REFERENCE THE MECHANICAL AND PLUMBING DRAWING FOR ALL EQUIPMENT NEEDING ELECTRICAL CONNECTIONS, MAKE ALL CONNECTIONS AND PROVIDE APPROPRIATE WIRE, CONDUIT, AND OVERCURRENT PROTECTION FOR ALL EQUIPMENT. H2 VERIFY 17= LOCATION OF ALL POWER CONNECTIONS AND CONTROL DEVICES WITH OTHER TRADES AND MANUFACTURERS SHOP DRAWING BEFORE CONSTRUCTION. COORDINATE ALL REQUIRED ENERGY MANAGEMENT SYSTEM POINTS AND CONTACT CONNECTIONS TO ENSURE THE COMPLETE AND PROPER OPERATION OF ALL SYSTEMS. H3 ALL FUSED SWITCH AND /OR CIRCUIT BREAKERS SERVING EQUIPMENT SHALL HAVE PROVISIONS FOR HANDLE LOCKS. H4 ALL CIRCUIT BREAKERS SERVING MECHANICAL EQUIPMENT SHALL BEAR AN 'HACR' RATING. H5 ALL DISCONNECTS DOWN STREAM OF VFD9 SHALL BE PROVIDED WITH AUXILIARY CONTACTS TO SHUT DOWN UPSTREAM VIED WHEN SWITCH IS OPENED. H6 COORDINATE BETWEEN TRADES AND PROVIDE CONTROL POWER FOR ALL VAV BOXES/DAMPERS/ETC, AS REQUIRED TO ENSURE A COMPLETE, FULLY FUNCTIONAL HVAC SYSTEM. SHOULD AN EXACT CRCUIT NUMBER NOT BE INDICATED ON ELECTRICAL DRAWING, CONTRACTOR SHALL UTILIZE AVAILABLE 2OA/1P SPACE FROM THE NEAREST 208V/120V PANEL OR FROM BUILDING CONTROL POWER DISTRIBUTION SYSTEM. 02 PARTIAL FIRST FLOOR PLAN - LIGHTING �J'k scnLE: w• • rro" FIRST FLOOR PLAN -POWER AND SYSTEMS � olPARTIAL 3CALE ,,," . ,b" GENERAL NOTES: A. CONTRACTOR SHALL ENSURE THE FIRE ALARM SYSTEM REMAINS FULLY OPERATIONAL DURING AND AFTER CONSTRUCTION. KEYED NOTES: OEXISTING CIRCUIT PREVIOUSLY SERVING AREA. EXTEND CONDUIT AND WIRE AS REQUIRED TO ENSURE A FULLY FUNCTIONAL AND OPERATIONAL SYSTEM. NOTIFY ENGINEER IF THERE ARE ANY DISCREPENCIES. THERE IS NO LOAD INCREASE. PROVIDE NEW 1P-20 AMP CIRCUIT BREAKER TO MATCH EXISTING TYPE. FINAL LOCATION OF EXISTING LIGHT FIXTURES TO BE RELOCATED. EXTEND CONDUIT AND WIRE AS REQUIRED TO ENSURE A FULLY FUNCTIONAL AND OPERATIONAL SYSTEM. FINAL LOCATION OF EXISTING LIGHT SWITCH TO BE RELOCATED. EXTEND CONDUIT AND WIRE AS REQUIRED TO ENSURE A FULLY FUNCTIONAL AND OPERATIONAL SYSTEM. LEGEND D IM L1lATYM NEW CONSTRUCTION u EXISTING TO REMAIN J U ik IAPAI -DARE COMM FRE PROMEN1 W"T IVI IN F ;tTI l�1 ► IV DATE KEY PLAN I V4U'vu u u u u u o y u u u u U U f i V V V J u V J U V V U V V V TV, u V V J V V MGEARCHITECTS 160 Alhambra Circle, Suite 700 Coral Gables, Florida 33134 7.306.444.0413 F.306.441.0404 www.mgearchitecte.com AA- F000121 in a5'waieon wio WI LM OT SAN Z A R C H I T E C T U R E P L A N N I N G 1031 20111M 301 - 500 -niN (F 301- 660 -11150 2121 Ponce de Leon Blvd., Suite 350 Carat Gables, FL 33134 onafConsullingEngineers phone' 305.569.1692 tax; 305.569.1693 Dallas . Houston . Nashville . Miami - Richmond Austin - Denver . Phoenix . Washington D.C. ccrd project number: 411442.000 EB00007658 SOUTH HOSPITAL- EAST FLOOR RENOVATIONS R: OFFICES AT THE CENTER FOR WOMEN AND INFANTS SEAL: i � •%,%J11111117t!/ j77o ye c Tip R ' X61 T CTRICAL ENO] EER NOV � fl19 DRAVVING PARTIAL FIRST FL%^..F^WR PLAN ELECTRICAL DMNWNO - E2001 C= ,i. j .