GENERAL NOTES
INDEX OF DRAWINGS v� V u Baptl*st ealth
V U
U
V v V V V U
V
V U U V U U V
01. IN THE EVENT THAT DISCREPANCIES OR AMBIGUITIES AND /OR OMISSIONS FROM THE SPECIFICATIONS OR DRAWINGS COVER SHEET
ARE FOUND, OR SHOULD THERE BE DOUBT AS TO THEIR MEANING, THE ARCHITECT SHALL BE NOTIFIED IN ORDER TO `
V V
V `
PROVIDE A WRITTEN CLARIFICATION. ARCHITECTURAL DRAWINGS
� Flori'*
SOUTH � HOSPITAL
UVVV VVUVV
02. ABBREVIATIONS THROUGHOUT THE PLANS ARE THOSE IN COMMON USE. SEE ABBREVIATIONS ON THIS SHEET. LS -13 EXISTING FIRST FLOOR LIFE SAFETY PLAN
ARCHITECT WILL DEFINE INTENT OF ANY IN QUESTION.
(FOR REFERENCE ONLY)
03. THE CONTRACTOR SHALL PROVIDE ALL NECESSARY TEMPORARY BARRIERS, LIGHTING, COVERINGS, FIRE LS1.01 FIRST FLOOR LIFE SAFETY PLAN
PREVENTION AND OTHER EQUIPMENT TO PROTECT THE SAFETY OF ALL PERSONS AND THE PROPERTY A1,01 EAST TOWER - PARTIAL FIRST FLOOR
THROUGHOUT THE ENTIRE PERIOD OF THE CONSTRUCTION CONTRACT.
DEMOLITION PLAN 4g
04. THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFICATIONS AND COORDINATION WITH OTHER TRADES AND A2.01 TEMPORARY BARRIER DETAILS AND INFORMATION
THEIR WORK TO ENSURE COMPLIANCE WITH THE DRAWINGS AND SPECIFICATIONS. A3.01 EAST TOWER - PARTIAL FIRST FLOOR AND REFLECTED
05, THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND CONDITIONS IN THE FIELD BEFORE COMMENCING ANY CEILING PLANS
PORTION OF THE WORK AND SHALL NOTIFY THE ARCHITECT IMMEDIATELY IN WRITING, IF THERE ARE ANY 04 '
DISCREPANCIES AND /OR DEVIATIONS FROM THE THE DRAWINGS OR AS REQUIRED IN ORDER TO ACCOMMODATE RENOVATIONS FO R T H E A D M I N I RAT I OFFICES A4.01 FINISH AND DOOR SCHEDULES, NOTES AND PARTITION
EXISTING CONDITIONS. COMMENCEMENT OF WORK SHALL CONSTITUTE FULL ACCEPTANCE OF SITE CONDITIONS. TYPES
A5.01 SPECIFICATIONS SHEET
06. THE CONTRACTOR SHALL VERIFY SIZES AND LOCATIONS OF ALL OPENINGS FOR MECHANICAL, ELECTRICAL, AND �� THE CENTER
PLUMBING EQUIPMENT WITH SUBCONTRACTORS, AS WELL AS SHOP DRAWINGS AS APPROVED BY ARCHITECT, AND I
BEFORE PROCEEDING WITH THE WORK.
07. ALL ITEMS USED IN CONSTRUCTION, BUT NOT SPECIFICALLY MENTIONED HEREIN, SHALL CONFORM TO ALL LOCAL MECHANICAL DRAWING
CODES AND STATE ORDINANCES AS TO APPLICATION AND USE.
08, PROVIDE DIELECTRIC INSULATION BETWEEN ALL DISSIMILAR METALS AND ALSO BETWEEN CEMENT AND METAL. M0.00 GENERAL NOTES / SPECIFICATIONS
MD1,00 PARTIAL FIRST DEMOLITION PLAN - MECHANICAL
09. THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING ALL PERMITS TO COMPLETE THE PROJECT, M2.00 PARTIAL FIRST FLOOR PLAN - MECHANICAL
10. M.E.P. SUBCONTRACTOR IS RESPONSIBLE FOR REVIEWING ALL DRAWINGS INCLUDING ARCHITECTURAL EQUIPMENT
FLOOR PLANS AND SCHEDULES BEFORE SUBMITTING FINAL BID. GENERAL CONTRACTOR IS RESPONSIBLE FOR ALL
EQUIPMENT AND M.E.P. REQUIREMENTS REQUESTED ON THE DRAWINGS TO BE INSTALLED. M.E.P. -- - -• --
SUBCONTRACTORS' BID SHALL BE BASED ON ALL DRAWINGS. ' ``: i.. - -_ i `
lr r, FIRE PROTECTION DRAWINGS
11. GENERAL CONTRACTOR IS RESPONSIBLE FOR THE TOTAL SCOPE OF THE WORK INCLUDING COORDINATION OF ALL //
TRADES. IT IS THE CONTRACTOR'S RESPONSIBILITY THAT ALL MAJOR SUBCONTRACTORS REVIEW ALL DRAWINGS 'l FOAO GENERAL NOTES FIRE PROTECTION
BEFORE BIDDING THE WORK, IN LIEU OF ONLY REVIEWING DRAWINGS OF RESPECTIVE TRADE. f 150 A I f� a m b r a C I r C I e u i t e 7 0 0 O r a Cl Gables , Florida 33
13 4
F2.00 PARTIAL FIRST FLOOR PLAN
'/ FIRE PROTECTION
12. SECTIONS /DETAILS NOTED TYPICAL MAY NOT BE NOTED AT EACH APPLICABLE CONDITION, HOWEVER, THEY MAY BE s
USED MORE THAN ONCE.
13. DRAWINGS ARE SCHEMATIC SHOWING RELATIVE LOCATIONS AND CONNECTIONS AND SHALL NOT BE SCALED AT ANY G ''`':.., `" ' ., .:;' T. 3 0 5 � 4 4 4. 0 413 F. 3 0 5 4 41. 6 4 0 4 A A -F0001 21
TIME. ELECTRICAL DRAWINGS
14. ALL WOOD BLOCKING USED WITHIN BUILDING STRUCTURE, SHALL BE FIRE - RETARDANT TREATED AS PER E0.00 GENERAL INFORMATION - ELECTRICAL
SPECIFICATIONS.
ED1.00 PARTIAL FIRST FLOOR DEMOLITION PLAN -
15. GENERAL CONTRACTOR IS RESPONSIBLE FOR THE SAFETY AND SECURITY OF ALL AREAS AFFECTED BY ELECTRICAL
CONSTRUCTION. THIS RESPONSIBILITY EXTENDS FROM THE BEGINNING OF CONSTRUCTION (BUILDING PERMIT) TO E2.00 PARTIAL FIRST FLOOR PLAN - ELECTRICAL
COMPLETION OF CONSTRUCTION (FINAL PAYMENT TO CONTRACTOR), 24 HOURS A DAY /7 DAYS A WEEK. E3.00 PARTIAL ELECTRICAL RISER DIAGRAM
16, THE GENERAL CONTRACTOR IS RESPONSIBLE FOR THE COMPLETE SET OF CONSTRUCTION DOCUMENTS. DIVISION E4.00 ELECTRICAL STUDIES, DETAILS AND
OF DISCIPLINES IS INTENDED FOR THE DESIGNER'S BENEFIT WHILE PREPARING THE PLANS AND NOT FOR EITHER SCHEDULES
PRICING OR WORK PERFORMANCE. CONTRACTOR IS RESPONSIBLE FOR PROVIDING SERVICES REQUIRED TO
OPERATE ALL SYSTEMS AND EQUIPMENT. IF GAPS EXIST, GENERAL CONTRACTOR IS RESPONSIBLE FOR OW E5.00 ELECTRICAL SPECIFICATIONS
REQUESTING THE INFORMATION DURING THE BIDDING PHASE, IF INFORMATION IS NOT REQUESTED, CONTRACTOR
WILL PROVIDE WHAT IS (AS DIRECTED BY ARCHITECT /ENGINEER) AT HIS OWN EXPENSE. FOR THE PROTECTION OF
THIS CONCEPT ARCHITECT /ENGINEER RECOMMENDS THAT THE GENERAL CONTRACTOR MAKE COMPLETE SETS
AVAILABLE TO SUBCONTRACTORS FOR BIDDING PURPOSES.
E,ofessional Censwing Enginneis
17. ALL LOOSE DEBRIS ABOVE CEILINGS SHALL BE REMOVED.
18. FIREPROOF ALL EXPOSED STRUCTURAL STEEL MEMBERS (OF BUILDINGS AND AREAS WITHIN SCOPE OF WORK)
WITH SPRAYED -ON FIREPROOFING U.L. APPROVED AS SHOWN ON CONTRACT DOCUMENTS. CCRD � 19- DRAWINGS ARE DIAGRAMMATIC AND INDICATE GENERAL ARRANGEMENT OF SYSTEMS AND WORK INCLUDED IN
CONTRACT. SUBCONTRACTOR SHALL FOLLOW DRAWINGS IN LAYING OUT WORK, CHECK DRAWINGS OF ALL TRADES
TO VERIFY SPACES IN WHICH WORK WILL BE INSTALLED, AND MAINTAIN MAXIMUM HEADROOM AND SPACE
CONSULTING CONDITIONS AT ALL POINTS. WHERE HEADROOM OR SPACE CONDITIONS APPEAR INADEQUATE, ENGINEERS
ARCHITECT /ENGINEER SHALL BE NOTIFIED BEFORE PROCEEDING WITH FABRICATION AND INSTALLATION. IF �.
DIRECTED BY ARCHITECT /ENGINEER SUBCONTRACTOR SHALL, WITHOUT EXTRA CHARGE, MAKE REASONABLE 2121 j� � � I � � � � LEON � � i / D � SUITE
MODIFICATIONS IN LAYOUT AS NEEDED TO PREVENT CONFLICT WITH WORK OF VARIOUS TRADES OR FOR PROPER f I \J v
EXECUTION OF THE WORK WHERE VARIANCES OCCUR BETWEEN DRAWINGS AND SPECIFICATIONS, OR WITHIN
EITHER DOCUMENT ITSELF, THE ITEM OR ARRANGEMENT OF BETTER QUALITY, GREATER QUANTITY OR HIGHER CORAL � � � � � 9 FL.
COST SHALL BE INCLUDED IN PRICE. ARCHITECT /ENGINEER SHALL DECIDE ON ITEM AND MANNER IN WHICH THE
WORK SHALL BE INSTALLED.
20, VENDOR DRAWINGS ARE BEING INCLUDED FOR REFERENCE ONLY AND ARE TO PROVIDE THE CONSTRUCTION PHONE ( -1 2 FAX: (305)569-1693E B 00007658
MANAGER /CONTRACTOR WITH THE INFORMATION ESSENTIAL TO ACCURATELY BID AND PROVIDE THE NECESSARY
ITEMS FOR PROPER INSTALLATION OF ALL EQUIPMENT.
i" RUClUC-Al_
LOCATION MAP PROJECT SITE APPLICABLE CODES HOSPITAL PROTECTION REQUIREMENTS AND y 1.
°
THE FOLLOWING BUILDING CODES AND BUILDING CODE CLASSIFICATION CURRENT EDITIONS UNLESS OTHERWISE SPECIFIED WILL BE ADHERED TO'
iii •::
S
GENERAL FLORIDA BUILDING CODE
COPE YEAR /CODE LIFE SAFETY CODE FLOR A BUI
N.F.P.A. 101 2006 EDITION 2007 EDITION
?sw r f. BUILDING FLORIDA BUILDING CODE 2007 WITH 2009 SUPPLEMENTS}
:'` .. : yr� ,/r'„ % {;�:;:,�rz•,:�r;r•�.��r ,'<,,r',�::;::; <:�:.1� , /'�:_;�/ _ .� -_^_ -- - _- �- ^_,T� -_a _�_
OCCUPANCY CLASSIFICATION EXISTING HEALTH CARE FACILITY GROUP I - UNRESTRAINED cy
ACCESSIBILITY 2007 FLORIDA BUILDING CODE, CHAPTER 11 {FBC) _
-- - -- -------- -- - - - - -- - - - -- - -- - - - - -- -- -- - - - - -- -- - - - -- - -- - -- - -- -- - TYPE OF CONSTRUCTION TYPE II (2,2,2} TYPE IB
/
ACCESSIBILITY DEPARTMENT OF JUSTICE (ADA) FIRE SPRINKLERS (FULLY PROTECTED ) YES YES ' j
r
- -- - - --------- ... . .. .. ----------------------------------- --- ---- - - --- -- -- - - - --- `-- -- -- -- ---- - - -- - -- - -•- - -•-- ------------------ ---- ---- ----------
MAX. TRAVEL DISTANCE TO EXIT 200 FT. 200 FT.
LIFE SAFETY NFPA 101 LIFE SAFETY CODE 2006 EDITION -_- - -_
- F - - - -- - MAX. O
FLORIDA IRE PREVENTION CEDE 2007 EDITION AND MAX DEAD END CORRIDOR 20 FT. - NEW CONSTRUCTION 20 FT.
:,; /. :::;::: :.; .;:: ;:.:; >:< ;�; .. ,. ; :, • >� :,: >::::: FIRE PREVENTION - - - - -- - - - - - -- - - - .. ..... .. . .. .. .. - -- ` - -- • -- -- - - - - -- ` - -- - - -- - -- - -- - - - - - - -- - - `- - - - - --
s r , : /fir / /�:/ f /•:::;/: r ;/ :::;y� -� - -- STATE FIRE MARSHALL FLOOR CONSTRUCTION O
ER EDITIONS AS A -_ 2 HOURS 2 HOURS
2006 GUIDELINES FOR DESIGN AND CONSTRUCTION -- - -- - --- ---- -- -_ _�.- _� _
O-- HEALTH CARE FACILITIES ROOF CONSTRUCTION 2 HOURS 1 HOURS -�
s
BEAM CONSTRUCTION
2 HOURS
------ - -------------------------------- I -------------- - --------------------- - ---- - ------ - 2 H UR
., . O S
- -- . --------------------- -- -- - - -- PROJECT D E S C I P T I N ------------- - - - -- -------- ----------------- - -
- - -- - -- - ------- - - - - -- -- •------ - - - - -- - -------- - - -- -- •---- - ----------------- - -- - - - -- - - -- - -- -
.lrr :'r'i 2007 NATIONAL COLUMN CONSTRUCTION 2 HOURS --HOURS
,.:f:.r:�...:.:..::: : r1r! ,'�. �.y / /,/ ��s ��//���i.:•% ,....., .% i / / /..:.: rr, :::% � ' .:;..:: ELECTRIC N ELECTRIC CODE (NEC) - -- -------- -----
- - - - - - - - -` -- -- --------------------- - -- - - - - -- - - - -- - THE SCOPE OF THIS 472 S T.
2007 FLORIDA BUILDING CODE PLUMBING FBC
PLUMBING ( ) - Q F AREA RENOVATION WORK, INVOLVES THE DEMOLITION OF THREE (3} EXISTING CLOSETS AND HALLWAY
NOTES. DEAD SPACE TO CREATE TWO 2 E
O NEW LARGER OFFICES. ADDITIONALLY, ONE (1) LARGE OFFICE WILL BE DIVIDED INTO TWO (2) SMALLER
< ✓ ;,, / of ./
/
1
is %::: ;f':::r:� , f ' {.f . <.,..;:• 2007 FLORIDA BUILDING B 1 • THESE REQUIREMENTS A OFFICES.
MECHANICAL
CODE, MECHANICAL (FBC } AND CODE CLASSIFICATIONS WERE TAKEN FROM EXISTING STATEMENT OF
MEC
�. Jam:;: < /// :;;:;' :.:: ;r.:; .;,:,^: ":• ,,� :. %:% ,:.:..� / + „.,, %1,�. � rf � , r� :�., f - - ------------------------------------ --------------------------- - --- - -- - - -` - - - --------------- - -------- --- ------ - --------- ------------------- ---- CONDITION /LIFE SAFETY STUDY SHEET
L5 -13, AS PREPARED BY "HKS ARCHITECTS, 1NC-
f
OSHA GUIDELINES DATED APRIL 12, 2011. PROVIDED FOR REFERENCE ONLY WITHIN THIS SET OF CONSTRUCTION DOCUMENTS.
„ y: '1>s" f� THIS RENOVATION WORK DOES NOT ALTER, REMOVE, REPLACE OR ADD TO THE EXISTING BED CENSUS OF THE HOSPITAL.
1,/,: /,, � /f.�•
REVISIONS
.... ... ;
-% i -
I .J J
r
r
100% CONS TR 1� CTO I N DOCUMENT SUBMITTAL
f
OCTOBER 19,2011
Z� ----------- -- _. ------------------- ---- - - ----- - - - -__' ' _ - -----------------------------------------------------------