Loading...
12-271-023PATH O hC_ 50 CFM UTILITY FAN WITH PEPA WWI" SPEED CONT120L (75 C�F� TO CLEAN AND RECIQCUL THE AIR - CYTOLOGY 1,xo 1, CID SCREENING - . 8X4 7 100 CFM X6 REG UTILITY FAN WITH PEPA FILTER AND SPEED CONT20L (100 CFM) TO CLEAN AND RECIRCULATE THE Al2 IN THE CONSTRUCTION AREA. N140 CFM SEC i 230 CF? ix I LOCATION OF N =L CHASE. ALL WOF INSIDE 1200M __ -` 5X10 | ) 15X11 ---- TT ----- :E,-- 1UX5 100 CFM B5A1 7-1/2 HP MOTOR, 230/46OV, 30 20/10 AMPS, 1760 RPM BLOWER PULLEY 8-1/2-0 MOTOR PULLEY 6-1/2-0 UTILITY FAN WITH HERA FILTER AND UTILITY FAN WITH HERA FILTER AND SPEED CONTROL (400 CFIVI) TO SPEED CONTROL (125 CFM) TO LOCATION OF NEW TOILET ABOVE. (TYP.X 2) SEE CLEAN AND RECIRCULATE THE AIR CLEAN AND PEC112CULATE THE AIR PLUMB. DWGS IN THE CONSTRUCTION AREA. IN THE CONSTRUCTION AREA. CONNECT 8'0 FLEX CONNECT 8'0 FLEX CONNECTION TEMP CONNECTION TEMP012ALY TO P/A GRILLE P/A GRILLE HE FILTER FI ER "t 1 18.0 CONNECT 12*0 FLEX/, IOOCFMi I UTILITY FAN WITH PEPA FILTER FIL OFFICE CONFJ LIBRARY LOUNGE PEI r Fr_ Elm 999 '-OFFICE S/A 11 6X611 '200CFM V\,i if 11 6X61 VN 26X4 VN so PATH OFFICE u ORAL 6X6 IXO CORRIDOR RILLE PEPA FILTER -7 7 STAFF TOILET,` 50 �A 10 E-1 6XIS M�_#L HEPA 80 CFM CF MB-STAIR 1 AP-TEMPOP -Y LOCATION OF NEW AFTER 80, CF I S/A 'OFFICE NTER SINK ABOVE. L'__JI cou 7. j RECIRCULATE THE Al2 T_ CLEAN AND /A 150CFM SPEED CONTROL (100 M) TO/" 8"0 FLEX CONNECTION CONNECT TO R/A DUCT, I AFTER CONST 10 cof CT 10 FINISH CAP AND/ INSULATE /CO OFFICE/"" TO R/A GRILLE 1171 1 FILTER 8-0 Q 6X6 REG r co 50 CFM CAP TEMPORAL LOCATION OF,' I ACTIVE IAI 'I H PA AHU—B6A1 11 STORAGE 1 "0 EPA .1 LTEP 7 FILTER 1001 Lv_L__4 80 CFM 6X12 nLIL 15X14 18X14 18X12 VAULT HEPA FILTER Z TAPl EMPOPAI[l C\- I J R 71� 100 CrM mr LOCATION OF NEW FLOOR DRAIN ABOVE /TfP. % 7\ SEE. PLUMBING DWGS. PROJ. No. 21053 CA 924 LOUIS J. AGUIRRE & ASSOCIATES P.A. CONSULTING ENGIINEEM� 9150 SOUTH DADELAND BLVD. -SUIT E 900� MIAMI, FLORIDA 33155- TELEPHONE: (305) 670-0141 FAX: (305) 670-0144 1 AREA Of CONSTRUCTION SHALL BE MAINTAINED UNDER NEGATIVE PRESSURE |N RELATION TO SURROUNDING AREAS. THE CONSTRUCTION AREAS TOBE TESTED WEEKLY TOASSURE A NEGATIVE PRESSURE OFO.O2 INCHES WATER GAUGE |SBEING MAINTAINED WHEN ALL DOORS AND WINDOWS ARE CLOSED. ALL AIR OUTLETS AND WALL PENETRATIONS SHALL BEBLOCKED OFF TO MAINTAIN NEGATIVE PRESSURE |NSPACE. CONTRACTOR WILL PROVIDE A TEMPORARY EXHAUST FAN TO MAINTAIN NEGATIVE PRESSURE |N THE SPACE. 2 SEE ARCHITECTURAL DRAWINGS FOR ADDITIONAL DEMOLITION WORK INFORMATION. 3 WORK SHALL BE SCHEDULED TO MINIMIZE IMPACT TUNORMAL OPERATION OF THE 3K4HUSPTAL- MAIN BUILDING, SEE A��H|�ECTURALDRAVV|NGPLAN. �OORD|NATEVV|THTHE AUTHORIZED BHM REPRESENTATIVE /\ MINIMUM DF72HOURS PRIOR TO ANY SHUTDOWN REQUIRED TOPERFORM WORK ON HVAC SYSTEMS. 4 PROVIDE VISUAL NEGATIVE PRESSURE GAUGE TQMONITOR THE PRESSURE RELATIONSHIP BETWEEN THE CONSTRUCTION AREA AND THE ADJACENT SPACE TO PROVIDE NEGATIVE | PRESSURE OF0.O2^VV.G. WITHIN THE SPACE. INFECUhJ����������x���F��� RISK ASSESSMENT: TION /��,~ ����^� " u^���_ ^^"��u�x�^����_^���wv�_'� " . 1 TO THE EXTEND THAT IT IS REQUIRED BY |CRA. THE CONTRACTOR SHALL MAINTAIN EXISTING LEVELS OF INDOOR AIR QUALITY IN SURROUNDING AND ADJACENT AREAS TDTHE CONSTRUCTION AREA, AND ELSEWHERE |N THE FACILITY. IT SHOULD BE ANTICIPATED THAT THE |CRA REPORT WILL REQUIRE ERECTION OF CONSTRUCTION ZONE BARRIERS AND PROVISION OF NEGATIVE PRESSURE IN CONSTRUCTION ZONE RELATIVE TO SURROUNDING AREAS. 2 IN ADDITION TO MEETING THE REQUIREMENTS OF THE |CRA REPORT, THE CONTRACTOR SHALL PROVIDE THE EQUIPMENT NECESSARY TO CREATE A NEGATIVE PRESSURE IN THE CONSTRUCTION AREA, RELATIVE TO THE ADJACENT AREA. EXISTING HVAC SYSTEM AND COMPONENTS SHALL NOT BE USED FOR THIS FUNCT|ON, UNLESS SPECIFICALLY APPROVED BY THE OWNERS INFECTION CONTROL OFFICER. THE CONCEPT AND ALL ASPECTS OF THIS WORK SHALL BE DONE IN ACCORDANCE WITH THE |CRA REQUIREMENTS AND ASMINIMUM THE FOLLOWING: A. VERIFY ALL EXISTING DUCTWORK WHICH PASSES THROUGH THE CONSTRUCTION ZONE. AND IS TO HEK4A|N. IS SEALED AND PROTECTED DURING CONSTRUCTION. B. AIR REMOVED FROM THE CONSTRUCTION ZONE SHALL BE FILTERED AND/OR DISCHARGED AS DIRECTED BY THE |CRA REPORT. C. PRESENT THE NEGATIVE AIR PRESSURE PLAN TO THE OWNER FOR APPROVAL BY THE INFECTION CONTROL OFFICER. O. PROVIDE MEANS TO MONITOR AND VERIFY NEGATIVE PRESSURE IS BEING MAINTAINED IN ACCORDANCE WITH THE |CBA REPORT, AND PROVIDE DOCUMENTS TO THE | OWNER ASREQUIRED. | CODED NOTES: 1 TEMPORARY FLEXIBLE DUCT. REMOVE FLEXIBLE DUCT AFTER DEMOLITION |SCOMPLETED. 2 INSTALL AGAINST AIR DEVICE TEMPORARY BLANKET TYPE, DISPOSABLE 1^THlCK SYNTHETIC MEDIA. REMOVE SYNTHETIC MEDIA AFTER DEMOLITION ISCOMPLETED. 3 FLOOR MOUNTED UTILITY FAN WITH HEPA FILTER AND SPEED CONTROL (31DCFM) EACH T0 CLEAN AND EXHAUST THE AIR |N THE CONSTRUCTION AREA, MAINTAINING NEGATIVE PRESSURE OFU.U2^VV.G. BETWEEN CONSTRUCTION AREA AND ADJACENT SPACES (SEE DEMOLITION NOTES ON THIS DRAWING) 4 INSTALL TEMPORARY CAP }N SUPPLY AND EXHAUST AIR DUCTS | AND SEAL AIRTIGHT. REMOVE AJ END OFCONSTRUCTION. RELATIVE PRESSURE (0) — EQUAL PRESSURE NEGATIVE PRESSURE POSITIVE PRESSURE PAVILION BUILDING DIALYSIS UNIT - ` . . tz � r 0 to 1 �� `� � � �� = LLI o PERMIT SET DRAWN, r=141s.,jj5,1jA. CHECKED: EZ. DATE: 02-15-12 ' � � ) / / LOCATION PLAN SIXTH FLOOR U KJOB # 201138 U