12-271-023PATH O hC_
50 CFM UTILITY FAN WITH PEPA WWI"
SPEED CONT120L (75 C�F� TO
CLEAN AND RECIQCUL THE AIR
-
CYTOLOGY 1,xo 1,
CID
SCREENING
- .
8X4 7
100 CFM X6 REG
UTILITY FAN WITH PEPA FILTER AND
SPEED CONT20L (100 CFM) TO
CLEAN AND RECIRCULATE THE Al2
IN THE CONSTRUCTION AREA.
N140 CFM
SEC i 230 CF?
ix
I LOCATION OF N =L
CHASE. ALL WOF
INSIDE 1200M
__
-` 5X10 | ) 15X11 ---- TT ----- :E,--
1UX5 100 CFM
B5A1
7-1/2 HP MOTOR, 230/46OV, 30
20/10 AMPS, 1760 RPM
BLOWER PULLEY 8-1/2-0
MOTOR PULLEY 6-1/2-0
UTILITY FAN WITH HERA FILTER AND UTILITY FAN WITH HERA FILTER AND
SPEED CONTROL (400 CFIVI) TO SPEED CONTROL (125 CFM) TO LOCATION OF NEW TOILET ABOVE. (TYP.X 2) SEE
CLEAN AND RECIRCULATE THE AIR CLEAN AND PEC112CULATE THE AIR PLUMB. DWGS
IN THE CONSTRUCTION AREA. IN THE CONSTRUCTION AREA. CONNECT 8'0 FLEX CONNECT 8'0 FLEX
CONNECTION TEMP CONNECTION TEMP012ALY
TO P/A GRILLE P/A GRILLE
HE
FILTER FI ER "t 1 18.0
CONNECT 12*0 FLEX/, IOOCFMi I UTILITY FAN WITH PEPA FILTER
FIL
OFFICE CONFJ
LIBRARY
LOUNGE
PEI r Fr_
Elm 999
'-OFFICE S/A
11 6X611 '200CFM
V\,i if 11 6X61 VN 26X4 VN
so
PATH OFFICE u
ORAL 6X6
IXO CORRIDOR
RILLE
PEPA
FILTER -7 7
STAFF
TOILET,` 50 �A 10
E-1 6XIS M�_#L
HEPA
80 CFM CF
MB-STAIR 1
AP-TEMPOP -Y
LOCATION OF NEW
AFTER 80, CF I S/A 'OFFICE
NTER SINK ABOVE. L'__JI
cou
7. j RECIRCULATE THE Al2
T_ CLEAN AND /A 150CFM
SPEED CONTROL (100 M) TO/"
8"0 FLEX CONNECTION
CONNECT TO R/A DUCT,
I AFTER CONST 10 cof CT 10
FINISH CAP AND/ INSULATE /CO OFFICE/""
TO R/A GRILLE
1171 1 FILTER
8-0 Q 6X6 REG
r co 50 CFM
CAP TEMPORAL LOCATION OF,' I ACTIVE IAI 'I
H PA AHU—B6A1 11 STORAGE 1 "0
EPA
.1 LTEP
7 FILTER
1001 Lv_L__4
80 CFM
6X12 nLIL
15X14 18X14 18X12
VAULT
HEPA
FILTER
Z TAPl EMPOPAI[l C\-
I J R 71�
100 CrM
mr
LOCATION OF NEW FLOOR DRAIN ABOVE
/TfP. % 7\ SEE. PLUMBING DWGS.
PROJ. No. 21053 CA 924
LOUIS J. AGUIRRE & ASSOCIATES P.A.
CONSULTING ENGIINEEM�
9150 SOUTH DADELAND BLVD. -SUIT E 900�
MIAMI, FLORIDA 33155-
TELEPHONE: (305) 670-0141
FAX: (305) 670-0144
1 AREA Of CONSTRUCTION SHALL BE MAINTAINED UNDER
NEGATIVE PRESSURE |N RELATION TO SURROUNDING AREAS.
THE CONSTRUCTION AREAS TOBE TESTED WEEKLY TOASSURE
A NEGATIVE PRESSURE OFO.O2 INCHES WATER GAUGE |SBEING
MAINTAINED WHEN ALL DOORS AND WINDOWS ARE CLOSED.
ALL AIR OUTLETS AND WALL PENETRATIONS SHALL BEBLOCKED
OFF TO MAINTAIN NEGATIVE PRESSURE |NSPACE.
CONTRACTOR WILL PROVIDE A TEMPORARY EXHAUST FAN TO
MAINTAIN NEGATIVE PRESSURE |N THE SPACE.
2 SEE ARCHITECTURAL DRAWINGS FOR ADDITIONAL DEMOLITION
WORK INFORMATION.
3 WORK SHALL BE SCHEDULED TO MINIMIZE IMPACT TUNORMAL
OPERATION OF THE 3K4HUSPTAL- MAIN BUILDING, SEE
A��H|�ECTURALDRAVV|NGPLAN. �OORD|NATEVV|THTHE
AUTHORIZED BHM REPRESENTATIVE /\ MINIMUM DF72HOURS
PRIOR TO ANY SHUTDOWN REQUIRED TOPERFORM WORK ON
HVAC SYSTEMS.
4 PROVIDE VISUAL NEGATIVE PRESSURE GAUGE TQMONITOR
THE PRESSURE RELATIONSHIP BETWEEN THE CONSTRUCTION
AREA AND THE ADJACENT SPACE TO PROVIDE NEGATIVE
|
PRESSURE OF0.O2^VV.G. WITHIN THE SPACE.
INFECUhJ����������x���F��� RISK ASSESSMENT:
TION /��,~ ����^� " u^���_ ^^"��u�x�^����_^���wv�_'� " .
1 TO THE EXTEND THAT IT IS REQUIRED BY |CRA. THE
CONTRACTOR SHALL MAINTAIN EXISTING LEVELS OF INDOOR
AIR QUALITY IN SURROUNDING AND ADJACENT AREAS TDTHE
CONSTRUCTION AREA, AND ELSEWHERE |N THE FACILITY. IT
SHOULD BE ANTICIPATED THAT THE |CRA REPORT WILL
REQUIRE ERECTION OF CONSTRUCTION ZONE BARRIERS AND
PROVISION OF NEGATIVE PRESSURE IN CONSTRUCTION ZONE
RELATIVE TO SURROUNDING AREAS.
2 IN ADDITION TO MEETING THE REQUIREMENTS OF THE |CRA
REPORT, THE CONTRACTOR SHALL PROVIDE THE EQUIPMENT
NECESSARY TO CREATE A NEGATIVE PRESSURE IN THE
CONSTRUCTION AREA, RELATIVE TO THE ADJACENT AREA.
EXISTING HVAC SYSTEM AND COMPONENTS SHALL NOT BE
USED FOR THIS FUNCT|ON, UNLESS SPECIFICALLY APPROVED
BY THE OWNERS INFECTION CONTROL OFFICER. THE CONCEPT
AND ALL ASPECTS OF THIS WORK SHALL BE DONE IN
ACCORDANCE WITH THE |CRA REQUIREMENTS AND ASMINIMUM
THE FOLLOWING:
A. VERIFY ALL EXISTING DUCTWORK WHICH PASSES THROUGH
THE CONSTRUCTION ZONE. AND IS TO HEK4A|N. IS SEALED
AND PROTECTED DURING CONSTRUCTION.
B. AIR REMOVED FROM THE CONSTRUCTION ZONE SHALL BE
FILTERED AND/OR DISCHARGED AS DIRECTED BY THE |CRA
REPORT.
C. PRESENT THE NEGATIVE AIR PRESSURE PLAN TO THE
OWNER FOR APPROVAL BY THE INFECTION CONTROL
OFFICER.
O. PROVIDE MEANS TO MONITOR AND VERIFY NEGATIVE
PRESSURE IS BEING MAINTAINED IN ACCORDANCE WITH
THE |CBA REPORT, AND PROVIDE DOCUMENTS TO THE
|
OWNER ASREQUIRED. |
CODED NOTES:
1 TEMPORARY FLEXIBLE DUCT. REMOVE FLEXIBLE DUCT AFTER
DEMOLITION |SCOMPLETED.
2 INSTALL AGAINST AIR DEVICE TEMPORARY BLANKET TYPE,
DISPOSABLE 1^THlCK SYNTHETIC MEDIA. REMOVE SYNTHETIC
MEDIA AFTER DEMOLITION ISCOMPLETED.
3 FLOOR MOUNTED UTILITY FAN WITH HEPA FILTER AND SPEED
CONTROL (31DCFM) EACH T0 CLEAN AND EXHAUST THE AIR |N
THE CONSTRUCTION AREA, MAINTAINING NEGATIVE PRESSURE
OFU.U2^VV.G. BETWEEN CONSTRUCTION AREA AND ADJACENT
SPACES (SEE DEMOLITION NOTES ON THIS DRAWING)
4 INSTALL TEMPORARY CAP }N SUPPLY AND EXHAUST AIR DUCTS
|
AND SEAL AIRTIGHT. REMOVE AJ END OFCONSTRUCTION.
RELATIVE PRESSURE
(0) — EQUAL PRESSURE
NEGATIVE PRESSURE
POSITIVE PRESSURE
PAVILION
BUILDING
DIALYSIS
UNIT
- `
. .
tz
�
r
0 to 1
��
`�
�
�
��
=
LLI
o
PERMIT SET
DRAWN, r=141s.,jj5,1jA.
CHECKED: EZ.
DATE: 02-15-12
'
�
� )
/
/
LOCATION PLAN
SIXTH FLOOR
U KJOB # 201138 U