12-271-022GENERAL MECHANICAL NOTES
1. IT IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR TO COORDINATED THE RIGHT OF WAY FOR THE
INSTALLATION OF DUCTWORK, PIPING, ELECTRIC LIGHTING CONDUIT WITH ALL TRADES IN ORDER TO AVOID DELAY IN
THE PROJECT CONSTRUCTION TIMETABLE, ANY CONFLICT SHALL BE BROUGHT TOT HE ATTENTION OF THE A/E OF THE
PROJECT FOR ITS SOLUTION.
2. ALL SUPPLY, RETURN, EXHAUST AND OUTSIDE AIR SHALL BE CONSTRUCTED OF GALVANIZED SHEET METAL. DUCTS
SHALL BE FABRICATED IN COMPLIANCE WITH SMACNA "HVAC DUCT CONSTRUCTION STANDARDS METAL AND FLEXIBLE ".
REFER TO THE PROJECT SPECIFICATIONS FOR PRESSURE CLASSIFICATION AND SEALING REQUIREMENTS.
3. EXHAUST AIR DUCTWORK SHALL BE INSULATED.
4. ALL CONCEALED SUPPLY AIR DUCTS SHALL BE EXTERNALLY INSULATED WITH DUCT WRAP AS INDICATED IN
SPECIFICATIONS. RIGID INSULATION SHALL BE PROVIDED IN EXPOSED LOCATIONS.
5. RETURN DUCTS LOCATED IN CEILING SPACE SHALL BE INSULATED THE SAME AS THE SUPPLY AIR DUCTS.
6. EXACT LOCATION OF AIR DISTRIBUTION DEVICES SHALL BE COORDINATED WITH THE LIGHTS, SPRINKLER HEADS AND
WITH THE SUSPENDED CEILING TILES.
7. CHILLED WATER PIPING SHALL BE SCHEDULE 40 BLACK STEEL WITH DIELECTRIC FITTINGS AT DISSIMILAR METALS. AT
THE CONTRACTORS OPTION, ABOVE GROUND CHILLED WATER PIPING RUNOUTS TO THE INDIVIDUAL AIR HANDLING
UNITS, WHEN OF SIZE OF 2" AND SMALLER, MAY BE TYPE "L" COPPER NOT TO EXCEED 20 FEET IN LENGTH. VALVES AND
FITTINGS IN COPPER LINES SHALL HAVE BRAZED JOINTS. ALL UNDERGROUND CHILLED WATER LINES SHALL BE
WELDED STEEL. REFER TO SPECIFICATIONS FOR INSULATION REQUIREMENTS. ALL EXTERIOR PIPE NIPPLES SHALL BE
BRASS.
8. COORDINATE INSTALLATION WITH ALL OTHER INVOLVED TRADES. IN THE CASE OF CONFLICT BETWEEN DRAWINGS AND
SPECIFICATION, THE MORE STRINGENT REQUIREMENT AS DETERMINED BY THE ARCHITECT / ENGINEER SHALL TAKE
PRECEDENT.
9. REFER TO PLANS FOR ADDITIONAL NOTES.
10. FLEX DUCT: PROVIDE FACTORY ASSEMBLED CLASS 1 AIR DUCT (UL 181) WITH 1 -1/2" THICK 1 PCF FIBERGLASS
INSULATION R -6 AND REINFORCED OUTER PROTECTIVE COVERIVAPOR BARRIER. FLEX DUCT SHALL MEET NFPA 90A
WITH FLAME SPREAD UNDER 25, SMOKE DEVELOPED UNDER 50, AND SHALL BE RATED FOR 2" W.G. PRESSURE AND 0 TO
250 DEGREES FAHRENHEIT. PROVIDE METAL ADJUSTABLE CLAMPING DEVICES, SCREW OPERATED. USE TWIST -LOCK
CONICAL TAP COLLARS AT CONNECTIONS INTO SHEET METAL DUCTWORK. FLEXIBLE DUCTWORK MAY BE USED FOR
BRANCHES TO DIFFUSERS AS INDICATED ON DRAWINGS. DO NOT EXCEED EIGHT (8) FEET IN LENGTH FOR ANY FLEX
DUCT. ACCEPT MANUFACTURER FLEX MASTER 8M AND THERMOFLEX MKE, NO OTHER MANUFACTURER WILL BE
ACCEPTABLE.
11. SPIN COLLARS SHALL BE OF THE INTEGRAL DAMPER TYPE WITH LOCKING WING NUT AND 2 INCH TALL STAND OFF
BRACKET. ALL SPIN COLLARS SHALL BE ATTACHED TO THE SIDE OF DUCT WITH THE CONNECTION SEALED WITH
MASTIC; CONNECTION TO TOP OR BOTTOM OF DUCT SHALL NOT BE USED UNLESS SPECIFICALLY APPROVED BY THE
ENGINEER. SPRAY PAINT DAMPER HANDLES DAY -GLOW ORANGE AND INSTALL A 24 INCH LONG RED RIBBON ON THE
HANDLE FOR T.A.B. PURPOSES AFTER INSTALLATION.
12. ELEVATIONS GIVEN: BE = BOTTOM ELEVATION, CE = CENTERLINE ELEVATION, TE = TOP ELEVATION, ARE TAKEN FROM
THE CONCRETE FLOOR SLAB. THESE ELEVATIONS ARE APPROXIMATE AND MUST BE VERIFIED IN THE FIELD BY THE
CONTRACTOR PRIOR TO FABRICATION OF ANY DUCTWORK OR PIPING.
13. PROVIDE SINGLE THICKNESS METAL TURNING VANES IN ALL SQUARE ELBOWS INCLUDING SUPPLY, RETURN, EXHAUST
AND OUTSIDE AIR DUCTS. WHERE UNEQUAL SQUARE ELBOWS ARE SHOWN, TURNING VANES WITH TRAILING EDGE
EXTENSIONS SHALL BE USED.
14. PROVIDE MANUAL AIR VENTS AT ALL HIGH POINTS IN THE PIPING SYSTEM AND AT EACH AIR HANDLING UNIT.
15. PROVIDE ACCESS DOORS AT ALL FIRE DAMPERS, SMOKE DETECTORS, FIRE/SMOKE DAMPERS AND AUTOMATIC
TEMPERATURE CONTROL DEVICES WITH MAXIMUM ALLOWABLE STANDARD SIZE PERMITTED B DUCT DIMENSIONS.
DOOR SHALL BE REMOVABLE TYPE WITH SAFETY CHAIN AND SHALL HAVE CAM LATCHES AND BE FULLY GASKETED TO
THE PERIMETER. PROVIDE ACCESS PANELS IN CEILING WHERE REQUIRED PROVIDING ACCESS TO DAMPERS.
16. DOCUMENTS ARE SCHEMATIC IN NATURE AND DO NOT INDICATE EVERY BEND, ELBOW OR OFFSETS REQUIRED IN
DUCTWORK AND PIPING. FIELD VERIFY ALL SIZES AND ELEVATIONS PRIOR TO FABRICATION / INSTALLATION. PROVIDE
MODIFICATIONS WHERE REQUIRED FOR COORDINATION IN BASE CONTRACT PRICE AT NO ADDITIONAL COST.
17. COIL PIPING ON LARGE SCALE PLANS ONLY INDICATED MAJOR VALUING; REFER TO COIL PIPING SCHEMATIC FOR
DETAILED REQUIREMENTS.
18. ENDS OF DUCTWORK SHALL BE KEPT SEALED USING PLASTIC SHEETING AND DUCT TAPE DURING CONSTRUCTION.
19. LOCATIONS FOR TEMPERATURE AND HUMIDITY SENSOR ARE APPROXIMATE IN NATURE AND SHALL NOT BE SCALED
FROM THE DRAWINGS. COORDINATE EXACT LOCATIONS WITH ROOM FURNITURE LAYOUT AND CONFIRM PROPOSED
LOCATION WITH THE OWNERS REPRESENTATIVE PRIOR TO ROUGH -IN.
20. EQUIPMENT SHALL BE SUPPLIED AND INSTALLED WITH PROVISION FOR IN -PLACE CLEANING AND SIMILAR MAINTENANCE
TASKS IN ACCORDANCE WITH THE REQUIREMENTS OF ASHRAE 62.1 -2007.
21. PROVIDE MISCELLANEOUS STRUCTURAL STEEL TO SPAN ACROSS BEAMS AND JOIST WHERE REQUIRED FOR
INTERMEDIATE SUPPORT.
22. THE LOCATION OF FIRE DAMPERS IN DUCT PENETRATIONS IN RATED WALLS AND PARTITIONS IS BASED ON THE FLORIDA
BUILDING CODE -2007 (BUILDING AND MECHANICAL), WHERE EXCEPTIONS ARE ALLOWED BY CODE FOR OMISSION OF
DAMPERS. THESE EXCEPTIONS HAVE BEEN EMPLOYED FOR THIS PROJECT.
23. CONTRACTOR SHALL OBTAIN A COMPLETE SET OF CONSTRUCTION DRAWINGS AND SPECIFICATIONS, AND REVIEW TO
ENSURE ALL ITEMS INDICATED ON THE DRAWINGS ARE INCLUDED IN HIS BASE BID. ALL ITEMS REQUIRING A
MECHANICAL CONNECTION (DUCTWORK, PIPING, ETC.) SHALL BE HOOKED -UP TO PROVIDE A FULLY OPERATIONAL AND
FUNCTIONAL SYSTEM, AND INCLUDED IN THE BASE BID.
24. SUBMIT SHOP DRAWINGS OF ALL MATERIALS, DUCTWORK DUCT LAYOUT AND EQUIPMENT FOR REVIEW BY ENGINEER
PRIOR TO FABRICATION AND /OR INSTALLATION.
25. ANY MANUFACTURER LISTED IN THE SPECIFICATION IS THE PROVIDER OF FMCS EQUIPMENT TO CONTROL HVAC
SYSTEMS.
26. ALL ROOF - MOUNTED EQUIPMENT THAT REQUIRES SERVICE SUCH AS FANS, SHALL BE INSTALLED A MINIMUM OF 10' -0"
FORM ANY ROOF EDGE WHEN THE REQUIREMENT FOR A GUARD ON THE ROOF PARAPET IS NOT SPECIFIED ON THE
ROOF PLANS.
27. ALL MECHANICAL EQUIPMENT INSTALLED OUTDOORS AND THAT IS EXPOSED TO THE WIND SHALL BE BUILT AND
ANCHORED TO SUSTAIN HURRICANE FORCE WINDS AS OUTLINED IN SECTION 6 OF ASCE STANDARD 7. WIND VELOCITY
(3- SECOND GUST) USED IN STRUCTURAL CALCULATION SHALL BE 146 MILES PER HOUR IN MIAMI -DADE COUNTY.
28. EQUIPMENT AND APPLIANCES SHALL BE INSTALLED AS REQUIRED BY THE TERMS OF THEIR APPROVAL, IN ACCORDANCE
WITH THE CONDITIONS OF THE LISTING, THE MANUFACTURER'S INSTALLATION INSTRUCTIONS ON FBC -2007 CHAPTER 3
GENERAL REGULATIONS - SECTION 304 INSTALLATION #304.1 GENERAL. MANUFACTURER'S INSTALLATION
INSTRUCTIONS SHALL BE AVAILABLE ON THE JOB SITE AT THE TIME OF INSPECTION.
29. CONTRACTOR SHALL COORDINATE FINAL LOCATION OF ALL CEILING MOUNTED FIXTURES, OUTLETS, DEVICES AND /OR
EQUIPMENT SHOWN IN THESE ENGINEERING DRAWINGS WITH THE ARCHITECTURAL REFLECTED CEILING PLANS AND /OR
APPLICABLE DETAIL DRAWINGS. ANY DISCREPANCY AND /OR CONFLICT MUST BE BROUGHT TO THE ATTENTION OF THE
ARCHITECT /ENGINEER PRIOR TO PROCEEDING WITH ANY ROUGH -IN WORK.
30. ALL SERVICE INTERRUPTIONS AS WELL AS REMOVAL AND DISPOSAL WORK SHALL BE COORDINATED WITH
AUTHORIZED REPRESENTATIVE OF SOUTH MIAMI HOSPITAL IN ADVANCE.
31. THE CONTRACTOR SHALL COORDINATE WITH THE OWNERS REPRESENTATIVE THE PHASING OF THE DEMOLITION WORK
INCLUDED IN THE SCOPE OF WORK.
32. WORK SHALL BE SCHEDULED TO MINIMIZE IMPACT TO NORMAL OPERATION OF THE HOSPITAL. SEE ARCHITECTURAL
DRAWING FOR STAGING (PHASING) PLAN. COORDINATE WITH AUTHORIZED SOUTH MIAMI HOSPITAL REPRESENTATIVE
A MINIMUM OF 72 HOURS PRIOR TO ANY SHUTDOWN REQUIRED TO PERFORM WORK ON HVAC SYSTEMS.
GENERAL NOTES
1. UNLESS OTHERWISE NOTED, CAV UNITS SHALL BE FACTORY GALVANIZED DOUBLE WALL.
2. SCHEDULED ESP INCLUDES FILTER PRESSURE DROP.
3. BHP OF SUBMITTED UNITS SHALL NOT EXCEED 85% OF MOTOR HP.
4. ALL THREE PHASE MOTORS LARGER THAN 1 HP SHALL BE HIGH EFFICIENCY.
5. MOTOR STARTERS SHALL MEET THE REQUIREMENTS OF SPECIFICATION.
6. COIL FACE VELOCITY OF SUBMITTED UNITS SHALL NOT EXCEED 105% OF THIS SCHEDULE, BUT IN NO CASE
SHALL EXCEED 500 FPM.
7. SENSIBLE CAPACITY OF SUBMITTED UNITS SHALL NOT EXCEED 105% OF SCHEDULED CAPACITY AND SUM
OF ALL GPM SHALL NOT EXCEED THE SUM OF SCHEDULED GPM.
8. COIL PRESSURE DROP SHALL NOT EXCEED 133% OF THE SCHEDULED UNIT.
9. FAN DRIVE SHALL BE VARIABLE AND ADJUSTABLE PITCH TYPE WITH A SERVICE FACTOR OF 1.5.
10. FAN MOTOR SHALL BE LOCATED AT THE SAME SIDE AS COIL CONNECTION AND AS SHOWN ON THE PLANS
TO MINIMIZE THE SYSTEM EFFECT.
11. AHU SHALL BE PROVIDED SLOPPED DRAIN PAN.
12. PROVIDE ACCESS DOOR IN AHU'S FOR IN PLACE CLEANING OF COOLING COILS.
13. FILTER BOX SHALL BE FLAT AS REQUIRED TO AVOID EXCEEDING THE MAXIMUM FORCE VELOCITY OF THE
SPECIFIED TYPE OF FILTER. HOWEVER, WHEN DUCTED, RETURN TO VERTICAL AHU AS INDICATED ON THE
DRAWINGS. PROVIDE A FACTORY SUPPLIED MIXING BOX OR COMBINATION FILTER MIS BOX SECTION.
14. MANUFACTURER MUST PROVIDE A 4 INCH MINIMUM MAIN FULL PERIMETER HEAVY GAGE GALVANIZED
STEEL BASE RAIL CHANNEL ABOVE CONCRETE PAD.
15. THE AC EQUIPMENT SHALL BE PLACED ON 6 INCH CONCRETE PAD BY THE CONTRACTOR ACCORDING TO
MANUFACTURER'S SERVICE /MAINTENANCE RECOMMENDATIONS.
16. INSTALL DUCT AND PIPING AT AIR HANDLING UNIT ROOMS USING SPRING ISOLATORS PER SPECIFICATION.
17. AIR HANDLING UNITS MUST BE PROVIDED WITH AUXILIARY SECONDARY DRAIN PAN. AS ALTERNATE TO
SEPARATE DRAIN LINE, AN APPROVED WATER LEVEL DETECTOR OR FLOAT SWITCH DEVICE SHALL BE
USED TO CONTROL OVERFLOW BY AUTOMATICALLY SHUTTING DOWN THE EQUIPMENT OR APPLIANCE
THAT PRODUCES THE CONDENSATE. AUXILIARY DRAIN PANS SHALL HAVE A MINIMUM DEPTH OF 1 -1/2 INCH
ES (38MM), SHALL NOT BE LESS THAN 3 INCHES (76 MM) LARGER THAN THE UNIT OR COIL DIMENSIONS IN
WIDTH AND LENGTH, AND SHALL BE CONSTRUCTED OF AN APPROVED CORROSION - RESISTANT MATERIAL.
METALLIC PANS SHALL HAVE A MINIMUM THICKNESS OF NOT LESS THAN 0.0276 INCHES (0.7MM)
GALVANIZED SHEET METAL.
18. CONSTRUCTION FILTER: PROVIDE TWO SETS OF TEMPORARY 2 INCH THICK FIBERGLASS THROW AWAY
FILTERS DURING CONSTRUCTION AND START UP. CONSTRUCTION FILTERS TO BE 35% EFFICIENT.
CONSTRUCTION FILTERS PROVIDED FOR ALL FILTER APPLICATION. REPLACE FILTER REGULARLY BUT NOT
TO EXCEED 7 DAYS DURING CONSTRUCTION. FINAL FILTERS: SHALL CONSIST OF A SINGLE 2 INCH THICK,
DISPOSABLE, PLEATED PARTICULATE FILTER, ASHRAE 52.1 -92 RATED AT 40-45% PERCENT ATMOSPHERIC
DUST SPOT EFFICIENCY (ADS), LOCATED IN FILTER BOX OF EACH COIL. FINAL FILTER: SEE FILTER
SCHEDULE.
HVAC PROTECTION PLAN:
1. MEET OR EXCEED THE RECOMMENDED CONTROL MEASURES OF THE SMACNA IAQ CHAPTER 3,
NOVEMBER 2007.
2. CONSTRUCTION FILTER: PROVIDE TWO SETS OF TEMPORARY 2" THICK FIBER GLASS THROW AWAY
FILTER (MERV -8 OR BETTER) AT EACH RETURN AIR OPENINGS (ANUS AND DUCTWORK).
3. SEAL ALL DUCT AND EQUIPMENT OPENINGS WITH APPROVED PLASTIC COVER AND TAPE.
4. PROTECT STORED ON -SITE (EQUIPMENTS AND MATERIALS) OR INSTALLED ABSORPTIVE MATERIALS
FROM MOISTURE DAMAGE.
5. INSTITUTE CLEANING ACTIVITIES DESIGNED TO CONTROL CONTAMINANTS IN BUILDING SPACE DURING
CONSTRUCTION AND PRIOR TO OCCUPANCY,
COORDINATION DRAWINGS
1. THE CONTRACTOR SHALL SUBMIT COORDINATION DRAWINGS TO ARCH./ENG AND OWNER'S
PROJECT MANAGER FOR APPROVAL PRIOR TO ANY FABRICATION AND INSTALLATION.
2. CONTRACTOR SHALL COORDINATE THE LOCATION OF ALL NEW PIPING, DUCTWORK,
CONDUITS, ECT. WITH ARCHITECTURAL, STRUCTURAL, MECHANICAL AND ELECTRICAL
SYSTEMS OF THE BUILDING. VERIFY ALL SPACE CONDITIONS AND DIMENSIONS AT JOBSITE
PRIOR TO FABRICATION AND INSTALLATION OF EQUIPMENT AND MATERIALS. ANY CONFLICTS
SHALL BE REPORTED IMMEDIATELY TO THE ARCHITECT /ENGINEER PRIOR TO BEGINNING OF
CONSTRUCTION.
I COORDINATION NOTE I
AS PART OF THIS CONTRACT, THE SUB - CONTRACTOR AND THE CONTRACTOR ARE RESPONSIBLE FOR
COORDINATION AND VERIFICATION THAT ALL EQUIPMENT, SHOWN IN THE ARCHITECTURAL DRAWINGS
PARTICULARLY, BUT NOT LIMITED TO THE ARCHITECTURAL EQUIPMENT PLAN, INCLUDE ALL
SERVICE /UTILITY REQUIRED TO OPERATE THE EQUIPMENT SHOWN. ANY DISCREPANCIES ARE TO BE
POINTED OUT DURING THE BIDDING PROCESS.
DISCREPANCIES NOT POINTED OUT DURING THE BIDDING PROCESS WILL BE RESOLVED BY THE
CONTRACTOR AS PER THE ARCHITECT DETAILS AT NO ADDITIONAL COST TO THE OWNER.
AIR CONDITIONING LEGEND
SYMBOL
DESCRIPTION
AHU
AIR HANDLING UNIT
BD
BACKDRAFT DAMPER
COND.
CONDENSATE
CHWS
CHILLER WATER SUPPLY
CHWR
CHILLER WATER RETURN
CONC.
CONCRETE
CFM
CUBIC FEET PER MINUTE
EF
EXHAUST FAN
EA
EACH
E/A
EXHAUST AIR
FD
FIRE DAMPER
FF
FINAL FILTER
FLA
FULL LOAD AMPS
FPM
FEET PER MINUTE
FPS
FEET PER SECOND
H
HUMIDISTAT
HP
HORSEPOWER
HR
HOUR
HWC
HOT WATER COIL
HWS
HOT WATER SUPPLY
HWR
HOT WATER RETURN
IN.
INCH
LBS.
POUNDS
MAX.
MAXIMUM
NO.
NUMBER
O/A
OUTSIDE AIR
PF
PRE - FILTER
RPM.
REVOLUTIONS PER MINUTE
R/A
RETURN AIR
R/C
RE -HEAT COIL
S/A
SUPPLY AIR
TEMP.
TEMPERATURE
T
THERMOSTAT
VD
MANUAL VOLUME DAMPER (OPPOSED BLADE TYPE)
V
VELOCITY
APPLICABLE CODES / STANDARDS
THE SCOPE OF THE WORK SHALL INCLUDE THE FURNISHING AND INSTALLATION OF
THE NECESSARY MATERIAL AND LABOR TO ACCOMPLISH THE WORK INDICATED BY
THE DRAWINGS AND HEREIN SPECIFIED. ALL WORK BY CONTRACTOR SHALL
CONFORM TO ALL APPLICABLE FEDERAL, STATE AND LOCAL BUILDING CODES AND
STANDARDS INCLUDING BUT NOT LIMITED TO:
1. STATE OF FLORIDA
2. LIFE SAFETY CODE - NFPA 101 (2006)
3. UNDERWRITERS LABORATORIES, INC. PUBLICATIONS (UL)
4. NATIONAL FIRE PROTECTION ASSOCIATION. (NFPA)
5. AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI)
6. NATIONAL ELECTRICAL CODE - NFPA 70 (2008)
7. INSTITUTE OF ELECTRICAL AND ELECTRONICS ENGINEERS (IEEE)
8. NATIONAL ELECTRICAL MANUFACTURER'S ASSOCIATION (NEMA)
9. INTERNATIONAL POWER CABLE ENGINEER'S ASSOCIATION (IPCEA)
10. NATIONAL ELECTRICAL SAFETY CODE
11. REQUIREMENTS OF LOCAL UTILITY COMPANY
12. NATIONAL FIRE PROTECTION ASSOCIATION 72 (2002)
13. NATIONAL FIRE PROTECTION ASSOCIATION 99 (2005)
14. THE STATE FIRE PREVENTION CODE, 4A60 (2001)
15. BUILDING CODE: FLORIDA BUILDING CODE (2007)
WITH 2008 AND 2009 REVISIONS
16. AIA GUIDELINES (2006)
17. NFPA 110 (2005)
18. ASHRAE 62 (2007)
19. SMACNA (2005)
f I
INFECTION CONTROL •
CONTRACTOR SHALL OBTAIN A COPY OF THE INFECTION CONTROL RISK ASSESMENT
FOR THIS PROJECT. ALL WORK SHALL BE IN COMPLIANCE WITH THE REPORT. ALL WORK
OUTSIDE THE SCOPE OF WORK AREA REQUIRED FOR THIS PROJECT, SHALL BE
COORDINATED WITH OWNER AND BE IN COMPLIANCE WITH THE ICRA REPORT AND BE
SUPERVISED BY THE OWNER'S REPRESENTATIVE.
THE DRAWINGS DO NOT INDICATE EXISTING INSTALLATIONS OTHER THAN TO IDENTIFY
MODIFICATIONS OR EXTENSIONS THERETO. VISIT THE SITE AND ASCERTAIN THE
EXISTING CONDITIONS. REVIEW CONSTRUCTION DETAILS OF THE EXISTING PORTION OF
THE BUILDING DURING THE SITE INSPECTION. INCLUDE ALL WORK REQUIRED TO
REMOVE OR MODIFY PORTIONS OF THE EXISTING INSTALLATION IN ORDER TO
ACCOMMODATE THE NEW WORK . FAILURE TO COMPLY WITH THIS WILL NOT BE
CONSIDERED GROUNDS FOR ADDITIONAL PAYMENT IN CONNECTION WITH REMOVING OR
MODIFYING ANY PART OF THE EXISTING INSTALLATION OR INSTALLING ANY NEW OR
TEMPORARY WORK.
PROJ. No. 21053
L -'-I-
CA 904
LOUIS J. AGUIRRE & ASSOCIATES P.A. Po
CONSULTING ENGINEERS -
9150 SOUTH DADELAND BLVD. - SU'TEf'J00
MIAMI, FLORIDA 3 156 M
TELEPHONE: (305) 670 - 0141
FAX: (305) 670 -0144
www.ljoopoxom
AIR DISTRIBUTION LEGEND
DUCT: FIRST FIGURE IS SIDE
- --
24X12
DUCT MTD. SMOKE DETECTOR
-°
AD
SHOWN
FIRE DAMPERS)
W /REMOTE & TEST SWITCH
SMOKE DAMPER(S)
(PROVIDE ACCESS DOOR. 12x12 min)
sp
FC
DUCT SECTION: SUPPLY &
FLEXIBLE DUCT; FLEXIBLE
RETURN OR EXHAUST
® E
CONNECTION (FC)
U.C. '
ALL ELBOW MUST BE PROVIDED
WITH TURNING VANES WHETHER
UNDERCUT DOOR
OR SHOWN ON DWGS.
THERMOSTAT (SEE NOTE 3)
iT
TYP. 45° TAP -OFF WITH
VOLUME DAMPER
jk:V:D�
HUMIDISTAT (SEE NOTE 3)
G
---- Clews - - --
NEW HOT WATER COIL
EXISTING CHILLER WATER PIPES
- - -- CNw[2 - - --
SPLITTER DAMPER
EXISTING HOT WATER PIPES
-- -- Pwws - - --
EXISTING EQUIPMENT OR DUCT
TRANSITION RECTANGULAR
TO BE REMOVED,
�f
=AD
TO ROUND
CHws
FIRE DAMPER WITH ACCESS DOOR
NEW CHWS PIPES
(12X12 ACCESS DOOR MIN.)
GI fWR
N
PRE FILTER (PF) AND HIGH
EFFICIENCY FINAL FILTER (FF)
HOT
lI I I
NEW WATER PIPES
IN BOX
u LJ
PF FF
NEUTRAL PRESSURE
61
(0)
W
CAP
POSSITIVE PRESSURE
NEUTRAL PRESSURE
t ->
POINT OF CONNECTION
BETWEEN NEW WORK AND
EXISTING
NOTES
1. 45' TAP -OFFS, SPLITTERS AT EACH TAP -OFF AND TEE, AND ACCESS DOORS SHALL BEE
USED WHERE REQUIRED, WHETHER OR NOT INDICATED IN THE DRAWINGS.
2. IN AREAS WHERE NON - REMOVABLE CIELINGS ARE USED, PROVIDE 45 TAP -OFFS OF THE
FIXED TYPE, WITH WIDTH PROPORTION TO BRANCH CFM.
3. THERMOSTAT AND HUMIDISTAT MUST BE INSTALLED BETWEEN 48 " -54" MAX. HIGH ABOVE
FINISHED FLOOR (FBC 2007 CHAPTER 11)
--TYPE OF DIFFUSER
A 1W ---- DIRECTION OF FLOW
:6x6 -�
1 cJ Q SIZE OF DIFFUSER
AMOUNT OF CFM
AIR OUTLET TAG
N.T.S.
HVAC DESIGN REQUIRES:
YES
NO
DUCT SMOKE DETECTOR
X
FIRE DAMPERS)
X
SMOKE DAMPER(S)
X
FIRE RATED ENCLOSURE
X
FIRE RATED ROOF /FLOOR
CEILING ASSEMBLY
X
FIRE STOPPING
X
SMOKE CONTROL
X
Revisions:
a
zF
w o
WO
Z V)
�x
a�
4�
A
Ew
c
• pm"M
c0
oa x
q
a
O w1
`a V
4
FAIN
o k
cn
W
H
O
z
W
z
W
U
A V
zQ
Q
z
W
V
W
...al
O
V)
1. 4°7`1
DRAWN: E14.slim.,J.N.
CHECKED: E,5.
DATE: 02 -15 -12