12-271-022GENERAL MECHANICAL NOTES 1. IT IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR TO COORDINATED THE RIGHT OF WAY FOR THE INSTALLATION OF DUCTWORK, PIPING, ELECTRIC LIGHTING CONDUIT WITH ALL TRADES IN ORDER TO AVOID DELAY IN THE PROJECT CONSTRUCTION TIMETABLE, ANY CONFLICT SHALL BE BROUGHT TOT HE ATTENTION OF THE A/E OF THE PROJECT FOR ITS SOLUTION. 2. ALL SUPPLY, RETURN, EXHAUST AND OUTSIDE AIR SHALL BE CONSTRUCTED OF GALVANIZED SHEET METAL. DUCTS SHALL BE FABRICATED IN COMPLIANCE WITH SMACNA "HVAC DUCT CONSTRUCTION STANDARDS METAL AND FLEXIBLE ". REFER TO THE PROJECT SPECIFICATIONS FOR PRESSURE CLASSIFICATION AND SEALING REQUIREMENTS. 3. EXHAUST AIR DUCTWORK SHALL BE INSULATED. 4. ALL CONCEALED SUPPLY AIR DUCTS SHALL BE EXTERNALLY INSULATED WITH DUCT WRAP AS INDICATED IN SPECIFICATIONS. RIGID INSULATION SHALL BE PROVIDED IN EXPOSED LOCATIONS. 5. RETURN DUCTS LOCATED IN CEILING SPACE SHALL BE INSULATED THE SAME AS THE SUPPLY AIR DUCTS. 6. EXACT LOCATION OF AIR DISTRIBUTION DEVICES SHALL BE COORDINATED WITH THE LIGHTS, SPRINKLER HEADS AND WITH THE SUSPENDED CEILING TILES. 7. CHILLED WATER PIPING SHALL BE SCHEDULE 40 BLACK STEEL WITH DIELECTRIC FITTINGS AT DISSIMILAR METALS. AT THE CONTRACTORS OPTION, ABOVE GROUND CHILLED WATER PIPING RUNOUTS TO THE INDIVIDUAL AIR HANDLING UNITS, WHEN OF SIZE OF 2" AND SMALLER, MAY BE TYPE "L" COPPER NOT TO EXCEED 20 FEET IN LENGTH. VALVES AND FITTINGS IN COPPER LINES SHALL HAVE BRAZED JOINTS. ALL UNDERGROUND CHILLED WATER LINES SHALL BE WELDED STEEL. REFER TO SPECIFICATIONS FOR INSULATION REQUIREMENTS. ALL EXTERIOR PIPE NIPPLES SHALL BE BRASS. 8. COORDINATE INSTALLATION WITH ALL OTHER INVOLVED TRADES. IN THE CASE OF CONFLICT BETWEEN DRAWINGS AND SPECIFICATION, THE MORE STRINGENT REQUIREMENT AS DETERMINED BY THE ARCHITECT / ENGINEER SHALL TAKE PRECEDENT. 9. REFER TO PLANS FOR ADDITIONAL NOTES. 10. FLEX DUCT: PROVIDE FACTORY ASSEMBLED CLASS 1 AIR DUCT (UL 181) WITH 1 -1/2" THICK 1 PCF FIBERGLASS INSULATION R -6 AND REINFORCED OUTER PROTECTIVE COVERIVAPOR BARRIER. FLEX DUCT SHALL MEET NFPA 90A WITH FLAME SPREAD UNDER 25, SMOKE DEVELOPED UNDER 50, AND SHALL BE RATED FOR 2" W.G. PRESSURE AND 0 TO 250 DEGREES FAHRENHEIT. PROVIDE METAL ADJUSTABLE CLAMPING DEVICES, SCREW OPERATED. USE TWIST -LOCK CONICAL TAP COLLARS AT CONNECTIONS INTO SHEET METAL DUCTWORK. FLEXIBLE DUCTWORK MAY BE USED FOR BRANCHES TO DIFFUSERS AS INDICATED ON DRAWINGS. DO NOT EXCEED EIGHT (8) FEET IN LENGTH FOR ANY FLEX DUCT. ACCEPT MANUFACTURER FLEX MASTER 8M AND THERMOFLEX MKE, NO OTHER MANUFACTURER WILL BE ACCEPTABLE. 11. SPIN COLLARS SHALL BE OF THE INTEGRAL DAMPER TYPE WITH LOCKING WING NUT AND 2 INCH TALL STAND OFF BRACKET. ALL SPIN COLLARS SHALL BE ATTACHED TO THE SIDE OF DUCT WITH THE CONNECTION SEALED WITH MASTIC; CONNECTION TO TOP OR BOTTOM OF DUCT SHALL NOT BE USED UNLESS SPECIFICALLY APPROVED BY THE ENGINEER. SPRAY PAINT DAMPER HANDLES DAY -GLOW ORANGE AND INSTALL A 24 INCH LONG RED RIBBON ON THE HANDLE FOR T.A.B. PURPOSES AFTER INSTALLATION. 12. ELEVATIONS GIVEN: BE = BOTTOM ELEVATION, CE = CENTERLINE ELEVATION, TE = TOP ELEVATION, ARE TAKEN FROM THE CONCRETE FLOOR SLAB. THESE ELEVATIONS ARE APPROXIMATE AND MUST BE VERIFIED IN THE FIELD BY THE CONTRACTOR PRIOR TO FABRICATION OF ANY DUCTWORK OR PIPING. 13. PROVIDE SINGLE THICKNESS METAL TURNING VANES IN ALL SQUARE ELBOWS INCLUDING SUPPLY, RETURN, EXHAUST AND OUTSIDE AIR DUCTS. WHERE UNEQUAL SQUARE ELBOWS ARE SHOWN, TURNING VANES WITH TRAILING EDGE EXTENSIONS SHALL BE USED. 14. PROVIDE MANUAL AIR VENTS AT ALL HIGH POINTS IN THE PIPING SYSTEM AND AT EACH AIR HANDLING UNIT. 15. PROVIDE ACCESS DOORS AT ALL FIRE DAMPERS, SMOKE DETECTORS, FIRE/SMOKE DAMPERS AND AUTOMATIC TEMPERATURE CONTROL DEVICES WITH MAXIMUM ALLOWABLE STANDARD SIZE PERMITTED B DUCT DIMENSIONS. DOOR SHALL BE REMOVABLE TYPE WITH SAFETY CHAIN AND SHALL HAVE CAM LATCHES AND BE FULLY GASKETED TO THE PERIMETER. PROVIDE ACCESS PANELS IN CEILING WHERE REQUIRED PROVIDING ACCESS TO DAMPERS. 16. DOCUMENTS ARE SCHEMATIC IN NATURE AND DO NOT INDICATE EVERY BEND, ELBOW OR OFFSETS REQUIRED IN DUCTWORK AND PIPING. FIELD VERIFY ALL SIZES AND ELEVATIONS PRIOR TO FABRICATION / INSTALLATION. PROVIDE MODIFICATIONS WHERE REQUIRED FOR COORDINATION IN BASE CONTRACT PRICE AT NO ADDITIONAL COST. 17. COIL PIPING ON LARGE SCALE PLANS ONLY INDICATED MAJOR VALUING; REFER TO COIL PIPING SCHEMATIC FOR DETAILED REQUIREMENTS. 18. ENDS OF DUCTWORK SHALL BE KEPT SEALED USING PLASTIC SHEETING AND DUCT TAPE DURING CONSTRUCTION. 19. LOCATIONS FOR TEMPERATURE AND HUMIDITY SENSOR ARE APPROXIMATE IN NATURE AND SHALL NOT BE SCALED FROM THE DRAWINGS. COORDINATE EXACT LOCATIONS WITH ROOM FURNITURE LAYOUT AND CONFIRM PROPOSED LOCATION WITH THE OWNERS REPRESENTATIVE PRIOR TO ROUGH -IN. 20. EQUIPMENT SHALL BE SUPPLIED AND INSTALLED WITH PROVISION FOR IN -PLACE CLEANING AND SIMILAR MAINTENANCE TASKS IN ACCORDANCE WITH THE REQUIREMENTS OF ASHRAE 62.1 -2007. 21. PROVIDE MISCELLANEOUS STRUCTURAL STEEL TO SPAN ACROSS BEAMS AND JOIST WHERE REQUIRED FOR INTERMEDIATE SUPPORT. 22. THE LOCATION OF FIRE DAMPERS IN DUCT PENETRATIONS IN RATED WALLS AND PARTITIONS IS BASED ON THE FLORIDA BUILDING CODE -2007 (BUILDING AND MECHANICAL), WHERE EXCEPTIONS ARE ALLOWED BY CODE FOR OMISSION OF DAMPERS. THESE EXCEPTIONS HAVE BEEN EMPLOYED FOR THIS PROJECT. 23. CONTRACTOR SHALL OBTAIN A COMPLETE SET OF CONSTRUCTION DRAWINGS AND SPECIFICATIONS, AND REVIEW TO ENSURE ALL ITEMS INDICATED ON THE DRAWINGS ARE INCLUDED IN HIS BASE BID. ALL ITEMS REQUIRING A MECHANICAL CONNECTION (DUCTWORK, PIPING, ETC.) SHALL BE HOOKED -UP TO PROVIDE A FULLY OPERATIONAL AND FUNCTIONAL SYSTEM, AND INCLUDED IN THE BASE BID. 24. SUBMIT SHOP DRAWINGS OF ALL MATERIALS, DUCTWORK DUCT LAYOUT AND EQUIPMENT FOR REVIEW BY ENGINEER PRIOR TO FABRICATION AND /OR INSTALLATION. 25. ANY MANUFACTURER LISTED IN THE SPECIFICATION IS THE PROVIDER OF FMCS EQUIPMENT TO CONTROL HVAC SYSTEMS. 26. ALL ROOF - MOUNTED EQUIPMENT THAT REQUIRES SERVICE SUCH AS FANS, SHALL BE INSTALLED A MINIMUM OF 10' -0" FORM ANY ROOF EDGE WHEN THE REQUIREMENT FOR A GUARD ON THE ROOF PARAPET IS NOT SPECIFIED ON THE ROOF PLANS. 27. ALL MECHANICAL EQUIPMENT INSTALLED OUTDOORS AND THAT IS EXPOSED TO THE WIND SHALL BE BUILT AND ANCHORED TO SUSTAIN HURRICANE FORCE WINDS AS OUTLINED IN SECTION 6 OF ASCE STANDARD 7. WIND VELOCITY (3- SECOND GUST) USED IN STRUCTURAL CALCULATION SHALL BE 146 MILES PER HOUR IN MIAMI -DADE COUNTY. 28. EQUIPMENT AND APPLIANCES SHALL BE INSTALLED AS REQUIRED BY THE TERMS OF THEIR APPROVAL, IN ACCORDANCE WITH THE CONDITIONS OF THE LISTING, THE MANUFACTURER'S INSTALLATION INSTRUCTIONS ON FBC -2007 CHAPTER 3 GENERAL REGULATIONS - SECTION 304 INSTALLATION #304.1 GENERAL. MANUFACTURER'S INSTALLATION INSTRUCTIONS SHALL BE AVAILABLE ON THE JOB SITE AT THE TIME OF INSPECTION. 29. CONTRACTOR SHALL COORDINATE FINAL LOCATION OF ALL CEILING MOUNTED FIXTURES, OUTLETS, DEVICES AND /OR EQUIPMENT SHOWN IN THESE ENGINEERING DRAWINGS WITH THE ARCHITECTURAL REFLECTED CEILING PLANS AND /OR APPLICABLE DETAIL DRAWINGS. ANY DISCREPANCY AND /OR CONFLICT MUST BE BROUGHT TO THE ATTENTION OF THE ARCHITECT /ENGINEER PRIOR TO PROCEEDING WITH ANY ROUGH -IN WORK. 30. ALL SERVICE INTERRUPTIONS AS WELL AS REMOVAL AND DISPOSAL WORK SHALL BE COORDINATED WITH AUTHORIZED REPRESENTATIVE OF SOUTH MIAMI HOSPITAL IN ADVANCE. 31. THE CONTRACTOR SHALL COORDINATE WITH THE OWNERS REPRESENTATIVE THE PHASING OF THE DEMOLITION WORK INCLUDED IN THE SCOPE OF WORK. 32. WORK SHALL BE SCHEDULED TO MINIMIZE IMPACT TO NORMAL OPERATION OF THE HOSPITAL. SEE ARCHITECTURAL DRAWING FOR STAGING (PHASING) PLAN. COORDINATE WITH AUTHORIZED SOUTH MIAMI HOSPITAL REPRESENTATIVE A MINIMUM OF 72 HOURS PRIOR TO ANY SHUTDOWN REQUIRED TO PERFORM WORK ON HVAC SYSTEMS. GENERAL NOTES 1. UNLESS OTHERWISE NOTED, CAV UNITS SHALL BE FACTORY GALVANIZED DOUBLE WALL. 2. SCHEDULED ESP INCLUDES FILTER PRESSURE DROP. 3. BHP OF SUBMITTED UNITS SHALL NOT EXCEED 85% OF MOTOR HP. 4. ALL THREE PHASE MOTORS LARGER THAN 1 HP SHALL BE HIGH EFFICIENCY. 5. MOTOR STARTERS SHALL MEET THE REQUIREMENTS OF SPECIFICATION. 6. COIL FACE VELOCITY OF SUBMITTED UNITS SHALL NOT EXCEED 105% OF THIS SCHEDULE, BUT IN NO CASE SHALL EXCEED 500 FPM. 7. SENSIBLE CAPACITY OF SUBMITTED UNITS SHALL NOT EXCEED 105% OF SCHEDULED CAPACITY AND SUM OF ALL GPM SHALL NOT EXCEED THE SUM OF SCHEDULED GPM. 8. COIL PRESSURE DROP SHALL NOT EXCEED 133% OF THE SCHEDULED UNIT. 9. FAN DRIVE SHALL BE VARIABLE AND ADJUSTABLE PITCH TYPE WITH A SERVICE FACTOR OF 1.5. 10. FAN MOTOR SHALL BE LOCATED AT THE SAME SIDE AS COIL CONNECTION AND AS SHOWN ON THE PLANS TO MINIMIZE THE SYSTEM EFFECT. 11. AHU SHALL BE PROVIDED SLOPPED DRAIN PAN. 12. PROVIDE ACCESS DOOR IN AHU'S FOR IN PLACE CLEANING OF COOLING COILS. 13. FILTER BOX SHALL BE FLAT AS REQUIRED TO AVOID EXCEEDING THE MAXIMUM FORCE VELOCITY OF THE SPECIFIED TYPE OF FILTER. HOWEVER, WHEN DUCTED, RETURN TO VERTICAL AHU AS INDICATED ON THE DRAWINGS. PROVIDE A FACTORY SUPPLIED MIXING BOX OR COMBINATION FILTER MIS BOX SECTION. 14. MANUFACTURER MUST PROVIDE A 4 INCH MINIMUM MAIN FULL PERIMETER HEAVY GAGE GALVANIZED STEEL BASE RAIL CHANNEL ABOVE CONCRETE PAD. 15. THE AC EQUIPMENT SHALL BE PLACED ON 6 INCH CONCRETE PAD BY THE CONTRACTOR ACCORDING TO MANUFACTURER'S SERVICE /MAINTENANCE RECOMMENDATIONS. 16. INSTALL DUCT AND PIPING AT AIR HANDLING UNIT ROOMS USING SPRING ISOLATORS PER SPECIFICATION. 17. AIR HANDLING UNITS MUST BE PROVIDED WITH AUXILIARY SECONDARY DRAIN PAN. AS ALTERNATE TO SEPARATE DRAIN LINE, AN APPROVED WATER LEVEL DETECTOR OR FLOAT SWITCH DEVICE SHALL BE USED TO CONTROL OVERFLOW BY AUTOMATICALLY SHUTTING DOWN THE EQUIPMENT OR APPLIANCE THAT PRODUCES THE CONDENSATE. AUXILIARY DRAIN PANS SHALL HAVE A MINIMUM DEPTH OF 1 -1/2 INCH ES (38MM), SHALL NOT BE LESS THAN 3 INCHES (76 MM) LARGER THAN THE UNIT OR COIL DIMENSIONS IN WIDTH AND LENGTH, AND SHALL BE CONSTRUCTED OF AN APPROVED CORROSION - RESISTANT MATERIAL. METALLIC PANS SHALL HAVE A MINIMUM THICKNESS OF NOT LESS THAN 0.0276 INCHES (0.7MM) GALVANIZED SHEET METAL. 18. CONSTRUCTION FILTER: PROVIDE TWO SETS OF TEMPORARY 2 INCH THICK FIBERGLASS THROW AWAY FILTERS DURING CONSTRUCTION AND START UP. CONSTRUCTION FILTERS TO BE 35% EFFICIENT. CONSTRUCTION FILTERS PROVIDED FOR ALL FILTER APPLICATION. REPLACE FILTER REGULARLY BUT NOT TO EXCEED 7 DAYS DURING CONSTRUCTION. FINAL FILTERS: SHALL CONSIST OF A SINGLE 2 INCH THICK, DISPOSABLE, PLEATED PARTICULATE FILTER, ASHRAE 52.1 -92 RATED AT 40-45% PERCENT ATMOSPHERIC DUST SPOT EFFICIENCY (ADS), LOCATED IN FILTER BOX OF EACH COIL. FINAL FILTER: SEE FILTER SCHEDULE. HVAC PROTECTION PLAN: 1. MEET OR EXCEED THE RECOMMENDED CONTROL MEASURES OF THE SMACNA IAQ CHAPTER 3, NOVEMBER 2007. 2. CONSTRUCTION FILTER: PROVIDE TWO SETS OF TEMPORARY 2" THICK FIBER GLASS THROW AWAY FILTER (MERV -8 OR BETTER) AT EACH RETURN AIR OPENINGS (ANUS AND DUCTWORK). 3. SEAL ALL DUCT AND EQUIPMENT OPENINGS WITH APPROVED PLASTIC COVER AND TAPE. 4. PROTECT STORED ON -SITE (EQUIPMENTS AND MATERIALS) OR INSTALLED ABSORPTIVE MATERIALS FROM MOISTURE DAMAGE. 5. INSTITUTE CLEANING ACTIVITIES DESIGNED TO CONTROL CONTAMINANTS IN BUILDING SPACE DURING CONSTRUCTION AND PRIOR TO OCCUPANCY, COORDINATION DRAWINGS 1. THE CONTRACTOR SHALL SUBMIT COORDINATION DRAWINGS TO ARCH./ENG AND OWNER'S PROJECT MANAGER FOR APPROVAL PRIOR TO ANY FABRICATION AND INSTALLATION. 2. CONTRACTOR SHALL COORDINATE THE LOCATION OF ALL NEW PIPING, DUCTWORK, CONDUITS, ECT. WITH ARCHITECTURAL, STRUCTURAL, MECHANICAL AND ELECTRICAL SYSTEMS OF THE BUILDING. VERIFY ALL SPACE CONDITIONS AND DIMENSIONS AT JOBSITE PRIOR TO FABRICATION AND INSTALLATION OF EQUIPMENT AND MATERIALS. ANY CONFLICTS SHALL BE REPORTED IMMEDIATELY TO THE ARCHITECT /ENGINEER PRIOR TO BEGINNING OF CONSTRUCTION. I COORDINATION NOTE I AS PART OF THIS CONTRACT, THE SUB - CONTRACTOR AND THE CONTRACTOR ARE RESPONSIBLE FOR COORDINATION AND VERIFICATION THAT ALL EQUIPMENT, SHOWN IN THE ARCHITECTURAL DRAWINGS PARTICULARLY, BUT NOT LIMITED TO THE ARCHITECTURAL EQUIPMENT PLAN, INCLUDE ALL SERVICE /UTILITY REQUIRED TO OPERATE THE EQUIPMENT SHOWN. ANY DISCREPANCIES ARE TO BE POINTED OUT DURING THE BIDDING PROCESS. DISCREPANCIES NOT POINTED OUT DURING THE BIDDING PROCESS WILL BE RESOLVED BY THE CONTRACTOR AS PER THE ARCHITECT DETAILS AT NO ADDITIONAL COST TO THE OWNER. AIR CONDITIONING LEGEND SYMBOL DESCRIPTION AHU AIR HANDLING UNIT BD BACKDRAFT DAMPER COND. CONDENSATE CHWS CHILLER WATER SUPPLY CHWR CHILLER WATER RETURN CONC. CONCRETE CFM CUBIC FEET PER MINUTE EF EXHAUST FAN EA EACH E/A EXHAUST AIR FD FIRE DAMPER FF FINAL FILTER FLA FULL LOAD AMPS FPM FEET PER MINUTE FPS FEET PER SECOND H HUMIDISTAT HP HORSEPOWER HR HOUR HWC HOT WATER COIL HWS HOT WATER SUPPLY HWR HOT WATER RETURN IN. INCH LBS. POUNDS MAX. MAXIMUM NO. NUMBER O/A OUTSIDE AIR PF PRE - FILTER RPM. REVOLUTIONS PER MINUTE R/A RETURN AIR R/C RE -HEAT COIL S/A SUPPLY AIR TEMP. TEMPERATURE T THERMOSTAT VD MANUAL VOLUME DAMPER (OPPOSED BLADE TYPE) V VELOCITY APPLICABLE CODES / STANDARDS THE SCOPE OF THE WORK SHALL INCLUDE THE FURNISHING AND INSTALLATION OF THE NECESSARY MATERIAL AND LABOR TO ACCOMPLISH THE WORK INDICATED BY THE DRAWINGS AND HEREIN SPECIFIED. ALL WORK BY CONTRACTOR SHALL CONFORM TO ALL APPLICABLE FEDERAL, STATE AND LOCAL BUILDING CODES AND STANDARDS INCLUDING BUT NOT LIMITED TO: 1. STATE OF FLORIDA 2. LIFE SAFETY CODE - NFPA 101 (2006) 3. UNDERWRITERS LABORATORIES, INC. PUBLICATIONS (UL) 4. NATIONAL FIRE PROTECTION ASSOCIATION. (NFPA) 5. AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI) 6. NATIONAL ELECTRICAL CODE - NFPA 70 (2008) 7. INSTITUTE OF ELECTRICAL AND ELECTRONICS ENGINEERS (IEEE) 8. NATIONAL ELECTRICAL MANUFACTURER'S ASSOCIATION (NEMA) 9. INTERNATIONAL POWER CABLE ENGINEER'S ASSOCIATION (IPCEA) 10. NATIONAL ELECTRICAL SAFETY CODE 11. REQUIREMENTS OF LOCAL UTILITY COMPANY 12. NATIONAL FIRE PROTECTION ASSOCIATION 72 (2002) 13. NATIONAL FIRE PROTECTION ASSOCIATION 99 (2005) 14. THE STATE FIRE PREVENTION CODE, 4A60 (2001) 15. BUILDING CODE: FLORIDA BUILDING CODE (2007) WITH 2008 AND 2009 REVISIONS 16. AIA GUIDELINES (2006) 17. NFPA 110 (2005) 18. ASHRAE 62 (2007) 19. SMACNA (2005) f I INFECTION CONTROL • CONTRACTOR SHALL OBTAIN A COPY OF THE INFECTION CONTROL RISK ASSESMENT FOR THIS PROJECT. ALL WORK SHALL BE IN COMPLIANCE WITH THE REPORT. ALL WORK OUTSIDE THE SCOPE OF WORK AREA REQUIRED FOR THIS PROJECT, SHALL BE COORDINATED WITH OWNER AND BE IN COMPLIANCE WITH THE ICRA REPORT AND BE SUPERVISED BY THE OWNER'S REPRESENTATIVE. THE DRAWINGS DO NOT INDICATE EXISTING INSTALLATIONS OTHER THAN TO IDENTIFY MODIFICATIONS OR EXTENSIONS THERETO. VISIT THE SITE AND ASCERTAIN THE EXISTING CONDITIONS. REVIEW CONSTRUCTION DETAILS OF THE EXISTING PORTION OF THE BUILDING DURING THE SITE INSPECTION. INCLUDE ALL WORK REQUIRED TO REMOVE OR MODIFY PORTIONS OF THE EXISTING INSTALLATION IN ORDER TO ACCOMMODATE THE NEW WORK . FAILURE TO COMPLY WITH THIS WILL NOT BE CONSIDERED GROUNDS FOR ADDITIONAL PAYMENT IN CONNECTION WITH REMOVING OR MODIFYING ANY PART OF THE EXISTING INSTALLATION OR INSTALLING ANY NEW OR TEMPORARY WORK. PROJ. No. 21053 L -'-I- CA 904 LOUIS J. AGUIRRE & ASSOCIATES P.A. Po CONSULTING ENGINEERS - 9150 SOUTH DADELAND BLVD. - SU'TEf'J00 MIAMI, FLORIDA 3 156 M TELEPHONE: (305) 670 - 0141 FAX: (305) 670 -0144 www.ljoopoxom AIR DISTRIBUTION LEGEND DUCT: FIRST FIGURE IS SIDE - -- 24X12 DUCT MTD. SMOKE DETECTOR -° AD SHOWN FIRE DAMPERS) W /REMOTE & TEST SWITCH SMOKE DAMPER(S) (PROVIDE ACCESS DOOR. 12x12 min) sp FC DUCT SECTION: SUPPLY & FLEXIBLE DUCT; FLEXIBLE RETURN OR EXHAUST ® E CONNECTION (FC) U.C. ' ALL ELBOW MUST BE PROVIDED WITH TURNING VANES WHETHER UNDERCUT DOOR OR SHOWN ON DWGS. THERMOSTAT (SEE NOTE 3) iT TYP. 45° TAP -OFF WITH VOLUME DAMPER jk:V:D� HUMIDISTAT (SEE NOTE 3) G ---- Clews - - -- NEW HOT WATER COIL EXISTING CHILLER WATER PIPES - - -- CNw[2 - - -- SPLITTER DAMPER EXISTING HOT WATER PIPES -- -- Pwws - - -- EXISTING EQUIPMENT OR DUCT TRANSITION RECTANGULAR TO BE REMOVED, �f =AD TO ROUND CHws FIRE DAMPER WITH ACCESS DOOR NEW CHWS PIPES (12X12 ACCESS DOOR MIN.) GI fWR N PRE FILTER (PF) AND HIGH EFFICIENCY FINAL FILTER (FF) HOT lI I I NEW WATER PIPES IN BOX u LJ PF FF NEUTRAL PRESSURE 61 (0) W CAP POSSITIVE PRESSURE NEUTRAL PRESSURE t -> POINT OF CONNECTION BETWEEN NEW WORK AND EXISTING NOTES 1. 45' TAP -OFFS, SPLITTERS AT EACH TAP -OFF AND TEE, AND ACCESS DOORS SHALL BEE USED WHERE REQUIRED, WHETHER OR NOT INDICATED IN THE DRAWINGS. 2. IN AREAS WHERE NON - REMOVABLE CIELINGS ARE USED, PROVIDE 45 TAP -OFFS OF THE FIXED TYPE, WITH WIDTH PROPORTION TO BRANCH CFM. 3. THERMOSTAT AND HUMIDISTAT MUST BE INSTALLED BETWEEN 48 " -54" MAX. HIGH ABOVE FINISHED FLOOR (FBC 2007 CHAPTER 11) --TYPE OF DIFFUSER A 1W ---- DIRECTION OF FLOW :6x6 -� 1 cJ Q SIZE OF DIFFUSER AMOUNT OF CFM AIR OUTLET TAG N.T.S. HVAC DESIGN REQUIRES: YES NO DUCT SMOKE DETECTOR X FIRE DAMPERS) X SMOKE DAMPER(S) X FIRE RATED ENCLOSURE X FIRE RATED ROOF /FLOOR CEILING ASSEMBLY X FIRE STOPPING X SMOKE CONTROL X Revisions: a zF w o WO Z V) �x a� 4� A Ew c • pm"M c0 oa x q a O w1 `a V 4 FAIN o k cn W H O z W z W U A V zQ Q z W V W ...al O V) 1. 4°7`1 DRAWN: E14.slim.,J.N. CHECKED: E,5. DATE: 02 -15 -12 SCALFw °"- � °SHOUJ�t I lle-Owl. NP �A+! Ila �, spa