12-1353-038FROM NEW ATS -2 -
REFER TO SHEET
E2.01 FOR
CONTINUATION
CONDUIT FOR
B8 /E8 FROM
1MCLD1
,EX PNL DP11-
F_x
jFF' #h
UP TO PHEO
-REFER TO
SHEET E1.04
I <1t/1
LEX PNL D
TAP 60X
' r
f
f
a�
2%
�X PNL E4
jl{
ff
rt�
T
f
:1
i7
{r; f
C� l
-i
fC:
F>
>
0.n
T
"I
"f
i�
t
0
E�
i
,r �
t f€
,I $
} L J
/f
("3 r } n
c:
L 6 4
E 1 ( 4 t 41 f
� j(t
A_
H_
} _�=
OVERALL FLOOR PLAN -
FOURTH FLOOR - ELECTRICAL
N
0' 1.5' 3' 6' 12' 18'
OVERALL FLOOR PLAN -
FIFTH FLOOR - ELECTRICAL �N
NEW PNL EX PNL r EX PNL
CL5D1 NL5 T ( NH5
NEW TRANSFORMER CL5DISTACKED
ABOVE EXISTING TRANSFORMER. REFER
TO DETAIL ON SHEET EO.01.
ENLARGED FIFTH FLOOR
ELECTRICAL ROOM
N
0' 2' 4' 8' 16' 24'
OVERALL FLOOR PLAN -
SIXTH FLOOR - ELECTRICAL (I N
"mlm� I
KEYED NOTES:
Oi RE -FEED EXISTING AHU B4A1 FROM PANEL D4 TO PANEL DPA. PROVIDE NEW NAMEPLATE
FOR AHU DISCONNECT /STARTERS.
O REMOVE PANEL D4 AFTER AHU B4A1 IS RE -FED. REMOVE ALL ASSOCIATED WIRING BACK TO
SOURCE OR LOAD. REMOVE CONDUIT TO THE FURTHEST EXTENT POSSIBLE.
O SUGGESTED PROPOSED ROUTE FOR NEW FEEDER CONDUITS FROM NEW DISTRIBUTION PANEL
CL5D1 TO EXISTING PANELS FED FROM EXISTING SWITCHBOARD MSBL3. ROUTES SHOWN FOR
NEW CONDUIT ARE APPROXIMATE AND DO NOT REFLECT ALL OFFSETS. BENDS AND PULL
BOXES THAT MAY BE NECESSARY. CONTRACTOR SHALL VERIFY EXACT ROUTING IN FIELD
PRIOR TO BID. PULL BOXES SHALL BE PROVIDED TO ENSURE THERE ARE NO MORE THAN
FOUR 90 DEGREE BENDS (360 DEGREE TOTAL) BETWEEN PULL POINT.
"em h
e1�a�an
l , nC.
EUO west Mi1166ro „Suite 300
DeeRfield Beach, Ft 33441
"r "(954)-42' -1,260
FAX: (954) 421 -1466
www.ssr - inc.com
Firm Certification - EB- 0000857
John E. Moulder PE - 33200
Michael A Steward PE - 65701
SSR JOB # 1232030.0
L
ZT
CV)
c� O W W M
0 ~2 CC
= =W U)Cc:
�o
MLL
QO
_Z� �Q
W
_ OZ5 1= C:)
I-ZC� w�
DQF u)
02 Q
W
06 0
i�
¢� • j
•F �cLO G
s
DRAWN
CHECKED
DATE 11/12/12
REVISED
SHEET N0.
OVERALL FLOOR PLAN
- FOURTH, FIFTH
& SIXTH FLOORS
- ELECTRICAL
El .a3
i
' r
f
f
a�
2%
�X PNL E4
jl{
ff
rt�
T
f
:1
i7
{r; f
C� l
-i
fC:
F>
>
0.n
T
"I
"f
i�
t
0
E�
i
,r �
t f€
,I $
} L J
/f
("3 r } n
c:
L 6 4
E 1 ( 4 t 41 f
� j(t
A_
H_
} _�=
OVERALL FLOOR PLAN -
FOURTH FLOOR - ELECTRICAL
N
0' 1.5' 3' 6' 12' 18'
OVERALL FLOOR PLAN -
FIFTH FLOOR - ELECTRICAL �N
NEW PNL EX PNL r EX PNL
CL5D1 NL5 T ( NH5
NEW TRANSFORMER CL5DISTACKED
ABOVE EXISTING TRANSFORMER. REFER
TO DETAIL ON SHEET EO.01.
ENLARGED FIFTH FLOOR
ELECTRICAL ROOM
N
0' 2' 4' 8' 16' 24'
OVERALL FLOOR PLAN -
SIXTH FLOOR - ELECTRICAL (I N
"mlm� I
KEYED NOTES:
Oi RE -FEED EXISTING AHU B4A1 FROM PANEL D4 TO PANEL DPA. PROVIDE NEW NAMEPLATE
FOR AHU DISCONNECT /STARTERS.
O REMOVE PANEL D4 AFTER AHU B4A1 IS RE -FED. REMOVE ALL ASSOCIATED WIRING BACK TO
SOURCE OR LOAD. REMOVE CONDUIT TO THE FURTHEST EXTENT POSSIBLE.
O SUGGESTED PROPOSED ROUTE FOR NEW FEEDER CONDUITS FROM NEW DISTRIBUTION PANEL
CL5D1 TO EXISTING PANELS FED FROM EXISTING SWITCHBOARD MSBL3. ROUTES SHOWN FOR
NEW CONDUIT ARE APPROXIMATE AND DO NOT REFLECT ALL OFFSETS. BENDS AND PULL
BOXES THAT MAY BE NECESSARY. CONTRACTOR SHALL VERIFY EXACT ROUTING IN FIELD
PRIOR TO BID. PULL BOXES SHALL BE PROVIDED TO ENSURE THERE ARE NO MORE THAN
FOUR 90 DEGREE BENDS (360 DEGREE TOTAL) BETWEEN PULL POINT.
"em h
e1�a�an
l , nC.
EUO west Mi1166ro „Suite 300
DeeRfield Beach, Ft 33441
"r "(954)-42' -1,260
FAX: (954) 421 -1466
www.ssr - inc.com
Firm Certification - EB- 0000857
John E. Moulder PE - 33200
Michael A Steward PE - 65701
SSR JOB # 1232030.0
L
ZT
CV)
c� O W W M
0 ~2 CC
= =W U)Cc:
�o
MLL
QO
_Z� �Q
W
_ OZ5 1= C:)
I-ZC� w�
DQF u)
02 Q
W
06 0
i�
¢� • j
•F �cLO G
s
DRAWN
CHECKED
DATE 11/12/12
REVISED
SHEET N0.
OVERALL FLOOR PLAN
- FOURTH, FIFTH
& SIXTH FLOORS
- ELECTRICAL
El .a3