Loading...
12-1353-038FROM NEW ATS -2 - REFER TO SHEET E2.01 FOR CONTINUATION CONDUIT FOR B8 /E8 FROM 1MCLD1 ,EX PNL DP11- F_x jFF' #h UP TO PHEO -REFER TO SHEET E1.04 I <1t/1 LEX PNL D TAP 60X ' r f f a� 2% �X PNL E4 jl{ ff rt� T f :1 i7 {r; f C� l -i fC: F> > 0.n T "I "f i� t 0 E� i ,r � t f€ ,I $ } L J /f ("3 r } n c: L 6 4 E 1 ( 4 t 41 f � j(t A_ H_ } _�= OVERALL FLOOR PLAN - FOURTH FLOOR - ELECTRICAL N 0' 1.5' 3' 6' 12' 18' OVERALL FLOOR PLAN - FIFTH FLOOR - ELECTRICAL �N NEW PNL EX PNL r EX PNL CL5D1 NL5 T ( NH5 NEW TRANSFORMER CL5DISTACKED ABOVE EXISTING TRANSFORMER. REFER TO DETAIL ON SHEET EO.01. ENLARGED FIFTH FLOOR ELECTRICAL ROOM N 0' 2' 4' 8' 16' 24' OVERALL FLOOR PLAN - SIXTH FLOOR - ELECTRICAL (I N "mlm� I KEYED NOTES: Oi RE -FEED EXISTING AHU B4A1 FROM PANEL D4 TO PANEL DPA. PROVIDE NEW NAMEPLATE FOR AHU DISCONNECT /STARTERS. O REMOVE PANEL D4 AFTER AHU B4A1 IS RE -FED. REMOVE ALL ASSOCIATED WIRING BACK TO SOURCE OR LOAD. REMOVE CONDUIT TO THE FURTHEST EXTENT POSSIBLE. O SUGGESTED PROPOSED ROUTE FOR NEW FEEDER CONDUITS FROM NEW DISTRIBUTION PANEL CL5D1 TO EXISTING PANELS FED FROM EXISTING SWITCHBOARD MSBL3. ROUTES SHOWN FOR NEW CONDUIT ARE APPROXIMATE AND DO NOT REFLECT ALL OFFSETS. BENDS AND PULL BOXES THAT MAY BE NECESSARY. CONTRACTOR SHALL VERIFY EXACT ROUTING IN FIELD PRIOR TO BID. PULL BOXES SHALL BE PROVIDED TO ENSURE THERE ARE NO MORE THAN FOUR 90 DEGREE BENDS (360 DEGREE TOTAL) BETWEEN PULL POINT. "em h e1�a�an l , nC. EUO west Mi1166ro „Suite 300 DeeRfield Beach, Ft 33441 "r "(954)-42' -1,260 FAX: (954) 421 -1466 www.ssr - inc.com Firm Certification - EB- 0000857 John E. Moulder PE - 33200 Michael A Steward PE - 65701 SSR JOB # 1232030.0 L ZT CV) c� O W W M 0 ~2 CC = =W U)Cc: �o MLL QO _Z� �Q W _ OZ5 1= C:) I-ZC� w� DQF u) 02 Q W 06 0 i� ¢� • j •F �cLO G s DRAWN CHECKED DATE 11/12/12 REVISED SHEET N0. OVERALL FLOOR PLAN - FOURTH, FIFTH & SIXTH FLOORS - ELECTRICAL El .a3 i ' r f f a� 2% �X PNL E4 jl{ ff rt� T f :1 i7 {r; f C� l -i fC: F> > 0.n T "I "f i� t 0 E� i ,r � t f€ ,I $ } L J /f ("3 r } n c: L 6 4 E 1 ( 4 t 41 f � j(t A_ H_ } _�= OVERALL FLOOR PLAN - FOURTH FLOOR - ELECTRICAL N 0' 1.5' 3' 6' 12' 18' OVERALL FLOOR PLAN - FIFTH FLOOR - ELECTRICAL �N NEW PNL EX PNL r EX PNL CL5D1 NL5 T ( NH5 NEW TRANSFORMER CL5DISTACKED ABOVE EXISTING TRANSFORMER. REFER TO DETAIL ON SHEET EO.01. ENLARGED FIFTH FLOOR ELECTRICAL ROOM N 0' 2' 4' 8' 16' 24' OVERALL FLOOR PLAN - SIXTH FLOOR - ELECTRICAL (I N "mlm� I KEYED NOTES: Oi RE -FEED EXISTING AHU B4A1 FROM PANEL D4 TO PANEL DPA. PROVIDE NEW NAMEPLATE FOR AHU DISCONNECT /STARTERS. O REMOVE PANEL D4 AFTER AHU B4A1 IS RE -FED. REMOVE ALL ASSOCIATED WIRING BACK TO SOURCE OR LOAD. REMOVE CONDUIT TO THE FURTHEST EXTENT POSSIBLE. O SUGGESTED PROPOSED ROUTE FOR NEW FEEDER CONDUITS FROM NEW DISTRIBUTION PANEL CL5D1 TO EXISTING PANELS FED FROM EXISTING SWITCHBOARD MSBL3. ROUTES SHOWN FOR NEW CONDUIT ARE APPROXIMATE AND DO NOT REFLECT ALL OFFSETS. BENDS AND PULL BOXES THAT MAY BE NECESSARY. CONTRACTOR SHALL VERIFY EXACT ROUTING IN FIELD PRIOR TO BID. PULL BOXES SHALL BE PROVIDED TO ENSURE THERE ARE NO MORE THAN FOUR 90 DEGREE BENDS (360 DEGREE TOTAL) BETWEEN PULL POINT. "em h e1�a�an l , nC. EUO west Mi1166ro „Suite 300 DeeRfield Beach, Ft 33441 "r "(954)-42' -1,260 FAX: (954) 421 -1466 www.ssr - inc.com Firm Certification - EB- 0000857 John E. Moulder PE - 33200 Michael A Steward PE - 65701 SSR JOB # 1232030.0 L ZT CV) c� O W W M 0 ~2 CC = =W U)Cc: �o MLL QO _Z� �Q W _ OZ5 1= C:) I-ZC� w� DQF u) 02 Q W 06 0 i� ¢� • j •F �cLO G s DRAWN CHECKED DATE 11/12/12 REVISED SHEET N0. OVERALL FLOOR PLAN - FOURTH, FIFTH & SIXTH FLOORS - ELECTRICAL El .a3