12-1353-034GENERAL NOTES:
I. CONTRACTOR SHALL PATCH WALLS, FLOORS AND CEILINGS TO MATCH EXISTING FINISHES FOR
DEMOLITION AND INSTALLATION OF PIPING.
2. THE HOSPITAL IS OPEN 24 HOURS A DAY, 7 DAYS A WEEK. THE CONTRACTOR SHALL HAVE
TO PERFORM WORK WITHIN ACTIVE PATIENT CARE AREAS. CONTRACTOR SHALL:
A. COORDINATE SHUTDOWN OF EXISTING SYSTEMS WELL IN ADVANCE WITH OWNER.
B. PERFORM WORK AT SUCH TIMES AND UNDER SUCH CONDITIONS AS PRESCRIBED BY OWNER.
C. PERFORM WORK WITHIN THE GUIDELINES OF THE ICRA REPORT PREPARED FOR THIS PROJECT
BY THE.OWNER.
D. SEQUENCE DEMOLITION AND NEW CONSTRUCTION TO MINIMIZE NUMBER & DURATION OF
SHUTDOWNS REQUIRED.
3. CONTRACTOR SHALL COORDINATE WORK WITH EXISTING CONDITIONS (STRUCTURE, DUCTWORK.
PIPING, CONDUIT, ETC.). PROVIDE OFFSETS AS REQUIRED TO INSTALL NEW WORK.
4. ALL CONDENSATE PIPING 2V /2' & LESS BE SLOPED a 1 /4' /FT. ALL CONDENSATE
PIPING 3' & LARGER TO BE SLOPED a ve' /FT.
5. WORK MAY NOT BE LIMITED TO SCOPE OF WORK OR PHASING AREAS INDICATED, BUT ALSO MAY
INCLUDE WORK OUTSIDE OF THE SCOPE OF WORK OR PHASING AREAS AS INDICATED BY
CONTRACT DOCUMENTS.
6. PIPING SHOWN IS ROUTED AT SECOND FLOOR CEILING UNLESS NOTED OTHERWISE.
UMB / NG
01 1' 29 C 8$ 12'
KEYED NOTES:
0 I CONDENSATE LINE (0.5 TONS) TO DROP DOWN TO FIRST FLOOR CEILING.
SEE DRAWING P2.01 FOR CONTINUATION.
2\J REFER TO MECHANICAL PLANS FOR SECONDARY DRAIN PAN WITH FLOAT SWITCH SHUT DOWN.
COORDINATE ALL WORK INCLUDING PHASING
AND SEQUENCING WITH DIV 26.
NEW CONSTRUCTION LEGEND
SYMBOL
DESCRIPTION
EXISTING TO REMAIN
NEW CONSTRUCTION
----�
CONNECT TO EXIST. AT THIS POINT
KEY PLA
SCALE N.T.S.
I
AREA OF WORK
Y WORK
r� J
f
1
h
IN,
an
m
�nc.
600,'Yest Wi xbQro, Suite 300
Ceer6eld Beach, FL 33441
ti -(954 42* -1260
rAX: (954) 421 -1466
www.ssr- inc.com
Finn Certification - EB- 0000857
John E. (Moulder PE - 33200
(Michael A. Steward PE - 65701
SSR JOB # 1232030.0
Q W U)
1 F
ZT
C0
C/) C/) O W W CO
O F- W Q
_
S W o�
v,
U 0
_�..
CV) LL
Q O -�
_Z� �Q
W U�
_ °� Cr o =
lZU) com
—
0 < < C0
cn 2
oyi
�� ��• ♦DENS
. � F
No. 33 0
>ar: •
fez
-t u— w
E` 1 •
`
�� i lAi i i����``
DRAWN
CHECKED
DATE 11/12/12
REVISED
SHEET NO.
MAIN BUILDING
SECOND FLOOR PLAN -
PLUMBING
P2.03