Loading...
12-1353-032ED GAS == O M TO RAG E PUMP ROOM 1" CD MAIN BUILDING FIRST FLOOR PL 1'1'111'1 1 0' 1' 2' 4' W 12' GENERAL NOTES: I. CONTRACTOR SHALL PATCH WALLS, FLOORS AND CEILINGS TO MATCH EXISTING FINISHES FOR DEMOLITION AND INSTALLATION OF PIPING. 2. THE HOSPITAL IS OPEN 24 HOURS A DAY, 7 DAYS A WEEK. THE CONTRACTOR SHALL HAVE TO PERFORM WORK WITHIN ACTIVE PATIENT CARE AREAS. CONTRACTOR SHALL: A. COORDINATE SHUTDOWN OF EXISTING SYSTEMS WELL IN ADVANCE WITH OWNER. B. PERFORM WORK AT SUCH TIMES AND UNDER SUCH CONDITIONS AS PRESCRIBED BY OWNER. C. PERFORM WORK WITHIN THE GUIDELINES OF THE ICRA REPORT PREPARED FOR THIS PROJECT BY THE OWNER. D. SEQUENCE DEMOLITION AND NEW CONSTRUCTION TO MINIMIZE NUMBER & DURATION OF SHUTDOWNS REQUIRED. 3. CONTRACTOR SHALL COORDINATE WORK WITH EXISTING CONDITIONS (STRUCTURE, DUCTWORK, PIPING, CONDUIT, ETC.). PROVIDE OFFSETS AS REQUIRED TO INSTALL NEW WORK. 4. ALL CONDENSATE PIPING 2Y/2' & LESS T BE SLOPED a 1 /4' /FT. ALL CONDENSATE V8 PIPING 3' & LARGER TO BE SLOPED a ' /FT. 5. WORK MAY NOT BE LIMITED TO SCOPE OF WORK OR PHASING AREAS INDICATED, BUT ALSO MAY INCLUDE WORK OUTSIDE OF THE SCOPE OF WORK OR PHASING AREAS AS INDICATED BY CONTRACT DOCUMENTS. 6. PIPING SHOWN IS ROUTED AT FIRST FLOOR CEILING UNLESS NOTED OTHERWISE. KEYED NOTES: PLUMBING O I' CONDENSATE LINE (3.0 TONS) TO CONNECT TO ", EXISTING IV2' CONDENSATE LINE ABOVE CEILING. 2O REFER TO MECHANICAL PLANS FOR SECONDARY DRAIN PAN WITH FLOAT SWITCH SHUT DOWN. O 1' CONDENSATE LINE (0.5 TONS) UP TO 2ND FLOOR. SEE DRAWING P2.03 FOR CONTINUATION. COORDINATE ALL WORK INCLUDING PHASING AND SEQUENCING WITH DIV 26. 119 p W LEGEND DESCRIPTION EXISTING TO REMAIN rCONSTRUCTION - EXISTING TO BE REMOVED NEW CONSTRUCTION CONNECT TO EXIST. AT THIS POINT KEY PLA SCALE N.T.S. AREA OF WORK 3F WORK -T j mi h _per-an elY,Tnc. 6001(Vest Hilipboro, Suite 300 Q�erfiQld Eeach, FL 33441 1954; 42t -1260 FAX: (3) 42 : -1466 www.ssr- inc.com Finn Certffication - EB- 0000857 John E. Moulder PE - 33200 Michael A. Steward PE - 65M SSR JOB # 1232030.0 w T z �.._. c10 U0 O w W M O ~2 =o _ = W C0 I= �o OC c1r) U- Q O _z� �Q _°?5� °oz I— Z U) (0 � �Q�- O O Q CO CD S. MOVE N. ' 0• • . S ' �...R..•• C; 0NAL�E�J��. DRAWN CHECKED DATE 11/12/12 REVISED SHEET N0. MAIN BUILDING FIRST FLOOR PLAN - PLUMBING P2001