Loading...
12-1353-030PLUMBING ABBREVIATIONS C.W COLD WATER N 0 T E OWNER FURNISHED CONTRACTOR INSTALLED H.W. HOT WATER R.D. NOTES: H.W.R. HOT WATER RECIRC F.D. FLOOR DRAIN 1. IF ANY PIPES ARE TO BE INSULATED, DO NOT RUN INSULATION THROUGH A RATED FIRE P.R.V. ELEVATE A/C UNIT SUFFICIENT DISTANCE A.V.T.R. BARRIER OR RATED SMOKE BARRIER. AFTER SEALING PENETRATIONS AROUND PIPE THROUGH REDUCED PRESSURE BACKFLOW PREVENTER ABOVE FLOOR OR ROOF TO ALLOW FOR WASTE (INTERIOR) THE WALL WITH "THROUGH - PENETRATION FIRESTOP SYSTEM ", FLARE INSULATION ONTO FACE ABOVE FINISHED FLOOR INSTALLATION OF TRAP WITH ADEQUATE RAIN WATER LEADER OF WALL AROUND PIPE ON BOTH SIDES OF WALL, AND SEAL TO FACE OF WALL WITH S.W. DIMENSIONS TO WITHSTAND SYSTEM A.W. INSULATION MASTIC. 2. COMBUSTIBLE CONDUIT AND /OR COMBUSTIBLE PIPE IS NOT ALLOWED. I.E. OPERATING PRESSURE. COORDINATE A.P. ACCESS PANEL C.O. CLEANOUT WITH DETAIL FOR A \C UNIT MOUNTING. PERFORATED VENT CAP 3 5/8" (MINIMUM) SEAL PENETRATIONS WITH APPROVED TESTED "THROUGH C.D. METAL STUDS AT - PENETRATION FIRESTOP SYSTEM" AS SANITARY SEWER 12' FROM BOTTOM OF 16" O.C. (MAXIMUM) INDICATED BELOW VALVE IN VERTICAL HIGHEST DRAIN PAN OR RISER AIR HANDLING UNIT NON- COMBUSTIBLE PIPE OR CONDUIT FAN COIL UNIT SEE SPECIFIATIONS DAMAGE TO THE FINISH OR FURNISHING OF THE BUILDING RESULTING FROM THE 4. FOR PIPING MATERIAL. METAL RUNNER B CLEAN -OUT DRAIN PAN PLUG CONNECTION �� �� A VERIFY REQUIRED NUMBER OF LAYERS AND TYPE OF 5/8 " , TYPE X " GYPSUM BOARD VACUUM BREAKERS, REDUCING VALVES, SPECIAL FITTINGS, SECTION SHALL BE KEPT TO A MINIMUM AND THE CONTRACTOR SHALL FURNISH ALL 12' TEE UNION 2' -0" MAXIMUM FOR FULL - HEIGHT 2' -0" MAXIMUM FOR FULL - HEIGHT MATERIALS AND LABOR REQUIRED WHENEVER TEMPORARY CONNECTIONS ARE 20 GAGE (MINIMUM) METAL STUDS 20 GAGE (MINIMUM) METAL STUDS NECESSARY TO MAINTAIN CONTINUITY OF SERVICE. INTERRUPTIONS OF THE WITH VENDOR SUPPLIER DRAWINGS. V -4" MAXIMUM "A' (TYPICAL) 5. = H TEE MINIMUM FULL METAL RUNNER BEHIND GYPSUM BOARD I 2" MAX LD = CONNECTION SIZE )UM I � f� IF ADDITIONAL OFFSETS ARE REQUIRED TO COORDINATE WITH OTHER TRADES. (SECURELY ATTACHED IF THE THE CONTRACTOR DESIRES TO CHANGE THE PLUMBING ROUTING FOR TO VERTICAL STUDS) I. THE DURATION OF EACH SHUTDOWN SHALL BE LIMITED TO NIGHTS AND /OR -j a X WEEKENDS WITH THE TIME FRAME FOR SHUTDOWNS AS SPECIFIED BY THE ~ ELBOW OWNER. THE CONTRACTOR SHALL NOTIFY THE OWNER IN WRITING FORTY -EIGHT UNI N "A" (48) HOURS IN ADVANCE OF EACH REQUIRED INTERRUPTION FLOOR SLAB A UM tD z BOTTOM (TYPICAL) FOR LABOR AND EQUIPMENT REQUIRED FOR ALL NIGHT AND WEEKEND 6, ALL MATERIALS, EQUIPMENT, AND APPARATUS SHALL BE NEW, EXCEPT THAT L PIPE SUPPORT vc CALLED FOR AS BEING RE -USED OR FURNISHED BY OTHERS. YU TURN PIPE DOWN AT NEAREST CONDENSATE SEAL PENETRATIONS AND IONS OF OF RAT OR LOOR IN A COR STOPE I ALL CONDENSATE PIPING SHALL BE INSULATED THROUGHOUT ENTIRE SYSTEM. DRAIN, WITH MIN OF I -INCH AIR GAP UNLESS SHOWN FIRE THROUGH P NON- COMBUSTIBLE OTHERWISE ON PLANS. SEE PLUMBING PLANS FOR CONTINUATION. „ „ A CONDUIT OR PIPING PROVIDE A MINIMUM OF 6 INCHES BETWEEN ALL PIPING AND FIRE RATED AND SMOKE TIGHT PARTITIONS FOR REQUIRED INSPECTIONS. ANY PIPING WITHIN THIS 6 INCHES I. CONDENSATE TRAPS SHALL BE MADE UP OF UNIONS IN EACH SIDE PIPING SHALL NOT BE RUN OVER ANY ELECTRICAL EQUIPMENT, PANELS AND PACK TIGHTLY WITH MINERAL FIBER SAFING INSULATION FOR SPACE SHALL BE REQUIRED TO BE MOVED AND REROUTED. ANY COST IMPACT TO OTHER TRADES WILL BE THE RESPONSIBILITY OF THE CONTRACTOR. OF TRAP, AND SHALL BE COMPLETELY REMOVABLE FOR CLEANING. V -4" MAXIMUM FULL DEPTH OF BARRIER, AND SEAL PENETRATIONS WITH 'THROUGH CONTRACTOR SHALL DEMONSTRATE TRAP REMOVAL PRIOR TO FINAL (TYPICAL) APPROVED TESTED - PENETRATION FIRESTOP SYSTEM INSULATION, FITTINGS COVERS AND ALL FINISHES AND MATERIALS SHALL HAVE A ACCEPTANCE. AS THE JOB PROGRESSES. NO MAJOR CHANGE SHALL BE MADE TO PLUMBING PER REQUIREMENTS OF: MAXIMUM FLAME SPREAD RATING OF 25 AND A MAXIMUM SMOKE DEVELOPED RATING ELEVATION 2009 NFPA 101, LIFE SAFETY CODE SECTION 8.3.5 OF 50. FOR APPROVAL. 2010 FBC SECTION 712.3 AND 2. INSTALL PER MANUFACTURER'S WRITTEN INSTRUCTIONS. 2010 FLORIDA EDITION OF NFPA 101, LIFE SAFETY CODE DRAWINGS ARE DIAGRAMMATIC. DO NOT SCALE FROM DRAWINGS. BUT FIT WORK TO 10. CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGES TO EXISTING PIPING SECTION 8.3.5. ACTUAL CONDITION AND SPACE REQUIREMENTS. AND FIXTURES DUE TO NEW CONSTRUCTION AND SHALL RESTORE EXISTING WORK DISTURBED TO IT'S ORIGINAL CONDITION AT NO COST TO THE OWNER. TYPICAL MULTIPLE NON- COMBUSTIBLE ALL WORK SHALL BE PERFORMED BY A LICENSED CONTRACTOR IN A FIRST CLASS CONDUIT OR PIPE PENETRATIONS II. TOTAL HEIGHT OF TRAP= X +H+ ( I%2 x PIPE DIAMETER ) DETAIL THROUGH RATED FIRE BARRIERS TO AVOID ANY PIPE ROUTING PROBLEMS. AND /OR RATED SMOKE BARRIERS 12. FOR DRAW THRU UNITS FOR BLOW THRU UNITS i/ NOT TO SCALE CONTRACTOR SHALL OBTAIN AND PAY FOR ALL PERMITS, FEES, INSPECTIONS X= MIN. H (PREFERRED X =H) X= FAN STATIC PRESSURE +I' AND TESTS. 13. H= NEGA&E STATIC PRESSURE +I' H= MIN. I- I HR PENETRATION DETAIL ALL REQUIRED INSURANCES SHALL BE PROVIDED AND MAINTAINED BY THE COOLING COIL CONDENSATE DRAIN PLUMBING ABBREVIATIONS C.W COLD WATER OFCI OWNER FURNISHED CONTRACTOR INSTALLED H.W. HOT WATER R.D. ROOF DRAIN H.W.R. HOT WATER RECIRC F.D. FLOOR DRAIN V.T.R. VENT THRU ROOF P.R.V. PRESSURE REDUCING VALVE A.V.T.R. ACID VENT THRU ROOF R.P.B.P. REDUCED PRESSURE BACKFLOW PREVENTER W. WASTE (INTERIOR) A.F.F. ABOVE FINISHED FLOOR R.W.L. RAIN WATER LEADER A.F.G. ABOVE FINISHED GRADE S.W. STORM WATER A.W. ACID WASTE I.E. INVERT ELEVATION A.P. ACCESS PANEL C.O. CLEANOUT W.C.O. WALL CLEANOUT C.D. CONDENSATE S.S. SANITARY SEWER C.F.C.I. CONTRACTOR FURNISHED CONTRACTOR INSTALLED V.I.V. VALVE IN VERTICAL A.H.0 AIR HANDLING UNIT F.C.0 FAN COIL UNIT NOTE:NOT ALL SYMBOLS USED. PLUMBING LEGEND SYMBOL DESCRIPTION SYMBOL DESCRIPTION - COLD WATER r BALL VALVE - -- HOT WATER %r - CHECK VALVE - - - -- HOT WATER RECIRCULATION REQUIREMENTS. UNION IN PIPE W WASTE LINE -►t- SECTIONAL CONTROL VALVE __V__ VENT PIPE (ABOVE OR BELOW GROUND) 19 EXTERIOR CLEANOUT -RWL RAIN WATER LEADER P -I,ETC FIXTURE INDENTIFICATION -71 CLEANOUT (ABOVE CEILING) CONTRACTOR SHALL COORDINATE EQUIPMENT CONNECTIONS & MOUNTING CONNECTION TO EXISTING FOR THE PERIOD OF ONE YEAR. BALANCING VALVE CIRCUIT SETTER WITH CHECK VALVE o CAP ON LINE 0 PIPE TURNED UP MAKE FINAL CONNECTIONS FURNISHING CUTOFF VALVES, P- TRAPS, FITTINGS, SHOCK ARRESTOR B. DEFECTS OF ANY KIND DUE TO FAULTY WORK OR MATERIALS, APPEARING PIPE TURNED DOWN AND PIPING AS REQUIRED. DURING THE ABOVE MENTIONED PERIOD, MUST BE IMMEDIATELY REPAIRED BY NOTE:NOT ALL SYMBOLS USED. PLUMBING NEW CONSTRUCTION NOTES I. PLUMBING INSTALLATION OF ALL FIXTURES, EQUIPMENT, AND PIPING 14. THE CONTRACTOR IS EXPECTED TO ORDER ALL MATERIALS IN SUFFICIENT TIME PLUMBING NOTES, LEGEND, DETAILS AND DRAWING INDEX SHOWN ON THESE DRAWINGS SHALL BE INSTALLED IN ACCORDANCE PLUMBING SPECIFICATIONS TO AVOID DELAYING THE COMPLETION OF THE PROJECT. DELAY IN DELIVERIES MAIN BUILDING FIRST FLOOR PLAN - PLUMBING WITH ALL APPLICABLE STATE, LOCAL AND HEALTH CODES NORTH TOWER FIRST FLOOR PLAN - PLUMBING WILL NOT BE CONSIDERED A JUSTIFIABLE REASON FOR SUBMISSION OF MAIN BUILDING SECOND FLOOR PLAN - PLUMBING REQUIREMENTS. SUBSTITUTE MATERIALS. 2. CONTRACTOR SHALL FIELD VERIFY EXISTING ELEVATIONS, SIZES AND 15, WARRANTY /GUARANTEE LOCATIONS OF EXISTING PLUMBING PRIOR TO BIDDING. IF DISCREPANCIES ARE FOUND, THEY ARE TO NOTIFY ENGINEER. A. THE CONTRACTOR SHALL WARRANTY /GUARANTEE AND MAINTAIN THE STABILITY OF WORK AND MATERIALS AND KEEP SAME IN PERFECT REPAIR AND CONDITION 3. CONTRACTOR SHALL COORDINATE EQUIPMENT CONNECTIONS & MOUNTING FOR THE PERIOD OF ONE YEAR. HEIGHTS WITH EQUIPMENT AND SUPPLIER. INSTALL EQUIPMENT AND MAKE FINAL CONNECTIONS FURNISHING CUTOFF VALVES, P- TRAPS, FITTINGS, B. DEFECTS OF ANY KIND DUE TO FAULTY WORK OR MATERIALS, APPEARING AND PIPING AS REQUIRED. DURING THE ABOVE MENTIONED PERIOD, MUST BE IMMEDIATELY REPAIRED BY CONTRACTOR SHALL OBTAIN A SET OF THE EQUIPMENT DRAWINGS PRIOR THE CONTRACTOR AT HIS OWN EXPENSE TO THE ENTIRE SATISFACTION OF THE TO BIDDING IN ORDER TO DETERMINE ALL REQUIRED CONNECTIONS. OWNER AND ENGINEER. SUCH RECONSTRUCTION AND REPAIRS SHALL INCLUDE DAMAGE TO THE FINISH OR FURNISHING OF THE BUILDING RESULTING FROM THE 4. CONTRACTOR SHALL PROVIDE ROUGH -INS AND MAKE FINAL CONNECTIONS ORIGINAL DEFECT OR REPAIR THERETO. FOR EACH PIECE OF EQUIPMENT REQUIRING PLUMBING CONNECTION, INCLUDING TAILPIECES, TRAPS, LINE STRAINERS, STOP VALVES, GAUGES, 16. CONTINUITY OF SERVICE: INTERRUPTIONS OF EXISTING SERVICES OR FACILITIES VACUUM BREAKERS, REDUCING VALVES, SPECIAL FITTINGS, SHALL BE KEPT TO A MINIMUM AND THE CONTRACTOR SHALL FURNISH ALL INSULATION, AND ALL NECESSARY DEVICES FOR A COMPLETE AND MATERIALS AND LABOR REQUIRED WHENEVER TEMPORARY CONNECTIONS ARE OPERATIVE SYSTEM. COORDINATE EXACT REQUIRED PLUMBING ROUGH -INS NECESSARY TO MAINTAIN CONTINUITY OF SERVICE. INTERRUPTIONS OF THE WITH VENDOR SUPPLIER DRAWINGS. EXISTING SERVICES, THE INSTALLATION OF TEMPORARY FACILITIES, AND THE WORK OF MAKING FINAL CONNECTIONS TO NEW WORK SHALL BE DONE ONLY AT SUCH 5. THE CONTRACTOR SHALL INSTALL PLUMBING PIPING IN LOCATIONS INDICATED TIMES AS PERMITTED AND SCHEDULED BY THE OWNER. ALL SUCH CONNECTIONS ON THE CONTRACT DOCUMENTS. THE ONLY DEVIATION FROM THIS WOULD BE AND TIE -INS SHALL BE COORDINATED THROUGH THE OWNERS PROJECT MANAGER. IF ADDITIONAL OFFSETS ARE REQUIRED TO COORDINATE WITH OTHER TRADES. IF THE THE CONTRACTOR DESIRES TO CHANGE THE PLUMBING ROUTING FOR I. THE DURATION OF EACH SHUTDOWN SHALL BE LIMITED TO NIGHTS AND /OR ANY OTHER REASON, HE SHALL COMPENSATE THE ENGINEER AT A RATE OF WEEKENDS WITH THE TIME FRAME FOR SHUTDOWNS AS SPECIFIED BY THE DPE x 2.75 TO REVISE THE PLUMBING DRAWINGS, RISER DIAGRAMS AND FOR OWNER. THE CONTRACTOR SHALL NOTIFY THE OWNER IN WRITING FORTY -EIGHT THE TIME INVOLVED IN REISSUING DRAWINGS TO THE AUTHORITY HAVING (48) HOURS IN ADVANCE OF EACH REQUIRED INTERRUPTION JURISDICTION. CONTRACTOR SHALL CONTACT ENGINEER FOR ESTIMATED TIME OF EXISTING SERVICE. REQUIRED AND SCHEDULE FOR PERFORMING WORK. 2. THE CONTRACTOR SHALL INCLUDE IN BID PRICE ALL PREMIUM TIME CHARGES FOR LABOR AND EQUIPMENT REQUIRED FOR ALL NIGHT AND WEEKEND 6, ALL MATERIALS, EQUIPMENT, AND APPARATUS SHALL BE NEW, EXCEPT THAT OVERTIME WORK, AS NECESSARY, TO COMPLETE THE SCOPE OF THE CONTRACT. CALLED FOR AS BEING RE -USED OR FURNISHED BY OTHERS. 7' SEAL PENETRATIONS AND IONS OF OF RAT OR LOOR IN A COR STOPE 17. ALL CONDENSATE PIPING SHALL BE INSULATED THROUGHOUT ENTIRE SYSTEM. FIRE THROUGH P SYSTEMS. COORDINATE REQUIREMENTS WITH ARCHITECTURAL PLANS AND SPECIFICATIONS. lg, PROVIDE A MINIMUM OF 6 INCHES BETWEEN ALL PIPING AND FIRE RATED AND SMOKE TIGHT PARTITIONS FOR REQUIRED INSPECTIONS. ANY PIPING WITHIN THIS 6 INCHES g, PIPING SHALL NOT BE RUN OVER ANY ELECTRICAL EQUIPMENT, PANELS AND SPACE SHALL BE REQUIRED TO BE MOVED AND REROUTED. ANY COST IMPACT TO OTHER TRADES WILL BE THE RESPONSIBILITY OF THE CONTRACTOR. PHONE PANELS. 9, THE PLUMBING CONTRACTOR SHALL KEEP A SET OF MARKED UP DRAWINGS 18. INSULATION, FITTINGS COVERS AND ALL FINISHES AND MATERIALS SHALL HAVE A AS THE JOB PROGRESSES. NO MAJOR CHANGE SHALL BE MADE TO PLUMBING MAXIMUM FLAME SPREAD RATING OF 25 AND A MAXIMUM SMOKE DEVELOPED RATING DESIGN ENGINEERING UNLESS IT HAS BEEN COORDINATED, DRAWN AND SUBMITTED OF 50. FOR APPROVAL. 20. DRAWINGS ARE DIAGRAMMATIC. DO NOT SCALE FROM DRAWINGS. BUT FIT WORK TO 10. CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGES TO EXISTING PIPING ACTUAL CONDITION AND SPACE REQUIREMENTS. AND FIXTURES DUE TO NEW CONSTRUCTION AND SHALL RESTORE EXISTING WORK DISTURBED TO IT'S ORIGINAL CONDITION AT NO COST TO THE OWNER. 21' ALL WORK SHALL BE PERFORMED BY A LICENSED CONTRACTOR IN A FIRST CLASS WORKMANLIKE MANNER. THE COMPLETE SYSTEM SHALL BE FULLY AND PROPERLY II. CONTRACTOR SHALL COORDINATE WITH ALL DISCIPLINES INVOLVED SO AS OPERATIVE, AND IN COMPLIANCE WITH APPLICABLE CODES AND GOVERNING TO AVOID ANY PIPE ROUTING PROBLEMS. AUTHORITIES AND SUBJECT TO ACCEPTANCE BY OWNER /ENGINEER. 12. PROVIDE OFFSETS AND FITTINGS AS REQUIRED. 22. CONTRACTOR SHALL OBTAIN AND PAY FOR ALL PERMITS, FEES, INSPECTIONS AND TESTS. 13. THIS CONTRACTOR SHALL BASE HIS PROPOSAL UPON THE MATERIALS AS 23, ALL REQUIRED INSURANCES SHALL BE PROVIDED AND MAINTAINED BY THE SPECIFIED, USING THE MANUFACTURERS AND MODEL NUMBERS CONTRACTOR FOR THE PROTECTION AGAINST PUBLIC LIABILITY AND PROPERTY AS CALLED FOR IN THE SPECIFICATIONS ON THE DRAWINGS. DAMAGE, AND OTHER INSURANCES REQUIRED BY THE OWNER, FOR THE DURATION OF IF MORE THAN ONE MANUFACTURER OF EQUIPMENT IS SPECIFIED, ANY ONE THE WORK. OF THE MANUFACTURERS OF EQUIPMENT MAY BE USED IN THIS CONTRACTOR'S PROPOSAL. IF THIS CONTRACTOR WISHES TO USE EQUIPMENT NOT SPECIFIED 24, CONTRACTOR SHALL OBTAIN FROM THE OWNER A COPY OF THE INFECTION CONTROL HE MUST, AT THE TIME OF BIDDING, SUBMIT SEPARATELY ON LETTERHEAD RISK ASSESSMENT (ICRA) PREPARED FOR THIS PROJECT. CONTRACTOR SHALL REVIEW STATIONARY OF THE BIDDER, THE EQUIPMENT HE WOULD SUBSTITUTE AND THE REQUIREMENTS IN THE REPORT AND PERFORM ALL WORK IN ACCORDANCE WITH THE COST TO BE ADDED OR TO BE DEDUCTED FROM HIS PROPOSAL. THOSE REQUIREMENTS. SEE MECHANICAL DRAWINGS FOR COORDINATION OF VENTILATION REQUIREMENTS REQUIRED BY ICRA. PHILLIPS CONCRETE FASTENER I.T.T. ANVIL (RED HEAD) ALL THREAD HANGER ROD PIPE HANGER RING I.T.T. ANVIL FIG.69 PIPES 2%2" & SMALLER NOTE: 1. PROVIDE COPPER PLATING ON HANGER BETWEEN STEEL AND COPPER WHERE UNINSULATED COPPER PIPING IS USED. 2. PROVIDE ADDITIONAL HANGERS ON EACH SIDE OF A WALL WHERE THE PIPING PENETRATES THE WALL. 3. ALL INTERIOR HANGERS SHALL BE GALVANIZED INCLUDING CLAMPS, THREADED RODS, NUTS AND BOLTS. 4. ALL PLUMBING TRADE ITEMS SHALL BE INDIVIDUALLY AND RIGIDLY SUPPORTED FROM STRUCTURE ABOVE INDEPENDENT OF ALL OTHER TRADES. (DO NOT HANG PLUMBING ITEMS FROM ANOTHER TRADE.) U.L. /F.M. APPROVED CONCRETE INSERT PIPING HANGER DETAIL 25. REFER TO DIVISION 22 SPECIFICATIONS FOR MORE INFORMATION. PLUMBING AS- BUILTS NOTE PLUMBING CONTRACTOR IS REQUIRED TO SUBMIT PLUMBING AS BUILT PLANS UPON COMPLETION OF THE PROJECT. COMPLETION IS DEFINED AS THE OWNER RECEIVING A 'CO' AND PLUMBING INSPECTOR HAS FINALIZED AND APPROVED THE INSTALLATION. AS BUILTS SHALL BE SUBMITTED IN ELECTRONIC FASHION IN EITHER AUTOCAD FORMAT OR SCANNED FILES IN PDF FORMAT. AS BUILTS SHALL BE LEGIBLE AND NEAT. AS BUILTS WILL BE RETAINED BY ARCHITECT AND ENGINEER FOR RECORDS OF CHANGES TO THE SYSTEM. AS BUILTS WILL BE SUBMITTED TO OWNER THROUGH ARCHITECT AND ENGINEER. DRAWING INDEX SHEET NUMBER SHEET TITLE PO.01 PLUMBING NOTES, LEGEND, DETAILS AND DRAWING INDEX PO.02 PLUMBING SPECIFICATIONS P2.01 MAIN BUILDING FIRST FLOOR PLAN - PLUMBING P2.02 NORTH TOWER FIRST FLOOR PLAN - PLUMBING P2.03 MAIN BUILDING SECOND FLOOR PLAN - PLUMBING SRmi h ei * ".. 600 West Hillsboro, Suite 300 Dcerfield Beach, FL 33441 0954) 421 -1260 7Ax: (954) 421 -1466 www.ssr- inc.com Firm Certification - EB- 0000857 John E. Moulder PE-33200 Michael A. Steward PE - 65701 SSR JOB # 1232030.0 ro"__ - LU U) T z �M Cn 0 W W M 0 ~ It 0 _ = W F-EE -�U 7o LL Q O -z� �Q W Cfj� _°6 Er °o= F- Zc) CD-) Q I-- O 0 Q vJ MDii,,��� xks No. 33 - = = i- -r ; Lu W L its 1110, DRAWN CHECKED DATE 11/12/12 REVISED SHEET NO. PLUMBING NOTES, LEGEND DETAILS AND DRAWING INDEX P0.01