12-1353-030PLUMBING ABBREVIATIONS
C.W
COLD WATER
N 0 T E
OWNER FURNISHED CONTRACTOR INSTALLED
H.W.
HOT WATER
R.D.
NOTES:
H.W.R.
HOT WATER RECIRC
F.D.
FLOOR DRAIN
1. IF ANY PIPES ARE TO BE
INSULATED, DO NOT RUN INSULATION THROUGH A RATED FIRE
P.R.V.
ELEVATE A/C UNIT SUFFICIENT DISTANCE
A.V.T.R.
BARRIER OR RATED SMOKE
BARRIER. AFTER SEALING PENETRATIONS AROUND PIPE THROUGH
REDUCED PRESSURE BACKFLOW PREVENTER
ABOVE FLOOR OR ROOF TO ALLOW FOR
WASTE (INTERIOR)
THE WALL WITH "THROUGH - PENETRATION FIRESTOP SYSTEM ", FLARE INSULATION ONTO FACE
ABOVE FINISHED FLOOR
INSTALLATION OF TRAP WITH ADEQUATE
RAIN WATER LEADER
OF WALL AROUND PIPE ON
BOTH SIDES OF WALL, AND SEAL TO FACE OF WALL WITH
S.W.
DIMENSIONS TO WITHSTAND SYSTEM
A.W.
INSULATION MASTIC.
2. COMBUSTIBLE CONDUIT AND /OR COMBUSTIBLE PIPE IS NOT ALLOWED.
I.E.
OPERATING PRESSURE. COORDINATE
A.P.
ACCESS PANEL
C.O.
CLEANOUT
WITH DETAIL FOR A \C UNIT MOUNTING.
PERFORATED VENT CAP
3 5/8" (MINIMUM) SEAL PENETRATIONS WITH APPROVED TESTED
"THROUGH
C.D.
METAL STUDS AT
- PENETRATION FIRESTOP SYSTEM" AS
SANITARY SEWER
12' FROM BOTTOM OF
16" O.C. (MAXIMUM)
INDICATED BELOW
VALVE IN VERTICAL
HIGHEST DRAIN PAN OR RISER
AIR HANDLING UNIT
NON- COMBUSTIBLE PIPE OR CONDUIT
FAN COIL UNIT
SEE SPECIFIATIONS
DAMAGE TO THE FINISH OR FURNISHING OF THE BUILDING RESULTING FROM THE
4.
FOR PIPING MATERIAL.
METAL RUNNER
B
CLEAN -OUT DRAIN PAN
PLUG CONNECTION
�� ��
A
VERIFY REQUIRED NUMBER OF LAYERS AND TYPE
OF 5/8 " ,
TYPE X " GYPSUM BOARD
VACUUM BREAKERS, REDUCING VALVES, SPECIAL FITTINGS,
SECTION
SHALL BE KEPT TO A MINIMUM AND THE CONTRACTOR SHALL FURNISH ALL
12' TEE UNION
2' -0" MAXIMUM FOR FULL - HEIGHT 2' -0" MAXIMUM FOR FULL - HEIGHT
MATERIALS AND LABOR REQUIRED WHENEVER TEMPORARY CONNECTIONS ARE
20 GAGE (MINIMUM) METAL STUDS 20 GAGE (MINIMUM) METAL STUDS
NECESSARY TO MAINTAIN CONTINUITY OF SERVICE. INTERRUPTIONS OF THE
WITH VENDOR SUPPLIER DRAWINGS.
V -4" MAXIMUM
"A' (TYPICAL)
5.
= H TEE MINIMUM FULL
METAL RUNNER BEHIND
GYPSUM BOARD
I 2" MAX
LD
= CONNECTION SIZE
)UM
I � f�
IF ADDITIONAL OFFSETS ARE REQUIRED TO COORDINATE WITH OTHER TRADES.
(SECURELY ATTACHED
IF THE THE CONTRACTOR DESIRES TO CHANGE THE PLUMBING ROUTING FOR
TO VERTICAL STUDS)
I. THE DURATION OF EACH SHUTDOWN SHALL BE LIMITED TO NIGHTS AND /OR
-j
a X
WEEKENDS WITH THE TIME FRAME FOR SHUTDOWNS AS SPECIFIED BY THE
~ ELBOW
OWNER. THE CONTRACTOR SHALL NOTIFY THE OWNER IN WRITING FORTY -EIGHT
UNI N
"A"
(48) HOURS IN ADVANCE OF EACH REQUIRED INTERRUPTION
FLOOR SLAB
A UM tD z
BOTTOM
(TYPICAL)
FOR LABOR AND EQUIPMENT REQUIRED FOR ALL NIGHT AND WEEKEND
6,
ALL MATERIALS, EQUIPMENT, AND APPARATUS SHALL BE NEW, EXCEPT THAT
L PIPE SUPPORT
vc
CALLED FOR AS BEING RE -USED OR FURNISHED BY OTHERS.
YU
TURN PIPE DOWN AT NEAREST CONDENSATE
SEAL PENETRATIONS AND
IONS OF OF RAT OR
LOOR IN A COR STOPE
I
ALL CONDENSATE PIPING SHALL BE INSULATED THROUGHOUT ENTIRE SYSTEM.
DRAIN, WITH MIN OF I -INCH AIR GAP UNLESS SHOWN
FIRE THROUGH P
NON- COMBUSTIBLE
OTHERWISE ON PLANS. SEE PLUMBING PLANS FOR CONTINUATION.
„ „
A
CONDUIT OR PIPING
PROVIDE A MINIMUM OF 6 INCHES BETWEEN ALL PIPING AND FIRE RATED AND SMOKE
TIGHT PARTITIONS FOR REQUIRED INSPECTIONS. ANY PIPING WITHIN THIS 6 INCHES
I. CONDENSATE TRAPS SHALL BE MADE UP OF UNIONS IN EACH SIDE
PIPING SHALL NOT BE RUN OVER ANY ELECTRICAL EQUIPMENT, PANELS AND
PACK TIGHTLY WITH MINERAL FIBER SAFING INSULATION FOR
SPACE SHALL BE REQUIRED TO BE MOVED AND REROUTED. ANY COST IMPACT TO
OTHER TRADES WILL BE THE RESPONSIBILITY OF THE CONTRACTOR.
OF TRAP, AND SHALL BE COMPLETELY REMOVABLE FOR CLEANING.
V -4" MAXIMUM
FULL DEPTH OF BARRIER, AND SEAL PENETRATIONS WITH
'THROUGH
CONTRACTOR SHALL DEMONSTRATE TRAP REMOVAL PRIOR TO FINAL
(TYPICAL)
APPROVED TESTED - PENETRATION FIRESTOP SYSTEM
INSULATION, FITTINGS COVERS AND ALL FINISHES AND MATERIALS SHALL HAVE A
ACCEPTANCE.
AS THE JOB PROGRESSES. NO MAJOR CHANGE SHALL BE MADE TO PLUMBING
PER REQUIREMENTS OF:
MAXIMUM FLAME SPREAD RATING OF 25 AND A MAXIMUM SMOKE DEVELOPED RATING
ELEVATION
2009 NFPA 101, LIFE SAFETY CODE SECTION 8.3.5
OF 50.
FOR APPROVAL.
2010 FBC SECTION 712.3 AND
2. INSTALL PER MANUFACTURER'S WRITTEN INSTRUCTIONS.
2010 FLORIDA EDITION OF NFPA 101, LIFE SAFETY CODE
DRAWINGS ARE DIAGRAMMATIC. DO NOT SCALE FROM DRAWINGS. BUT FIT WORK TO
10.
CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGES TO EXISTING PIPING
SECTION 8.3.5.
ACTUAL CONDITION AND SPACE REQUIREMENTS.
AND FIXTURES DUE TO NEW CONSTRUCTION AND SHALL RESTORE EXISTING
WORK DISTURBED TO IT'S ORIGINAL CONDITION AT NO COST TO THE OWNER.
TYPICAL MULTIPLE NON- COMBUSTIBLE
ALL WORK SHALL BE PERFORMED BY A LICENSED CONTRACTOR IN A FIRST CLASS
CONDUIT OR PIPE PENETRATIONS
II.
TOTAL HEIGHT OF TRAP= X +H+ ( I%2 x PIPE DIAMETER )
DETAIL
THROUGH RATED FIRE BARRIERS
TO AVOID ANY PIPE ROUTING PROBLEMS.
AND /OR RATED SMOKE BARRIERS
12.
FOR DRAW THRU UNITS FOR BLOW THRU UNITS
i/
NOT TO SCALE
CONTRACTOR SHALL OBTAIN AND PAY FOR ALL PERMITS, FEES, INSPECTIONS
X= MIN. H (PREFERRED X =H) X= FAN STATIC PRESSURE +I'
AND TESTS.
13.
H= NEGA&E STATIC PRESSURE +I' H= MIN. I-
I HR PENETRATION DETAIL
ALL REQUIRED INSURANCES SHALL BE PROVIDED AND MAINTAINED BY THE
COOLING COIL CONDENSATE DRAIN
PLUMBING ABBREVIATIONS
C.W
COLD WATER
OFCI
OWNER FURNISHED CONTRACTOR INSTALLED
H.W.
HOT WATER
R.D.
ROOF DRAIN
H.W.R.
HOT WATER RECIRC
F.D.
FLOOR DRAIN
V.T.R.
VENT THRU ROOF
P.R.V.
PRESSURE REDUCING VALVE
A.V.T.R.
ACID VENT THRU ROOF
R.P.B.P.
REDUCED PRESSURE BACKFLOW PREVENTER
W.
WASTE (INTERIOR)
A.F.F.
ABOVE FINISHED FLOOR
R.W.L.
RAIN WATER LEADER
A.F.G.
ABOVE FINISHED GRADE
S.W.
STORM WATER
A.W.
ACID WASTE
I.E.
INVERT ELEVATION
A.P.
ACCESS PANEL
C.O.
CLEANOUT
W.C.O.
WALL CLEANOUT
C.D.
CONDENSATE
S.S.
SANITARY SEWER
C.F.C.I.
CONTRACTOR FURNISHED CONTRACTOR INSTALLED
V.I.V.
VALVE IN VERTICAL
A.H.0
AIR HANDLING UNIT
F.C.0
FAN COIL UNIT
NOTE:NOT ALL SYMBOLS USED.
PLUMBING LEGEND
SYMBOL DESCRIPTION
SYMBOL DESCRIPTION
-
COLD WATER
r
BALL VALVE
- --
HOT WATER
%r -
CHECK VALVE
- - - --
HOT WATER RECIRCULATION
REQUIREMENTS.
UNION IN PIPE
W
WASTE LINE
-►t-
SECTIONAL CONTROL VALVE
__V__
VENT PIPE (ABOVE OR BELOW GROUND)
19
EXTERIOR CLEANOUT
-RWL
RAIN WATER LEADER
P -I,ETC
FIXTURE INDENTIFICATION
-71
CLEANOUT (ABOVE CEILING)
CONTRACTOR SHALL COORDINATE EQUIPMENT CONNECTIONS & MOUNTING
CONNECTION TO EXISTING
FOR THE PERIOD OF ONE YEAR.
BALANCING VALVE CIRCUIT SETTER
WITH CHECK VALVE
o
CAP ON LINE
0
PIPE TURNED UP
MAKE FINAL CONNECTIONS FURNISHING CUTOFF VALVES, P- TRAPS, FITTINGS,
SHOCK ARRESTOR
B. DEFECTS OF ANY KIND DUE TO FAULTY WORK OR MATERIALS, APPEARING
PIPE TURNED DOWN
AND PIPING AS REQUIRED.
DURING THE ABOVE MENTIONED PERIOD, MUST BE IMMEDIATELY REPAIRED BY
NOTE:NOT ALL SYMBOLS USED.
PLUMBING NEW CONSTRUCTION NOTES
I.
PLUMBING INSTALLATION OF ALL FIXTURES, EQUIPMENT, AND PIPING
14.
THE CONTRACTOR IS EXPECTED TO ORDER ALL MATERIALS IN SUFFICIENT TIME
PLUMBING NOTES, LEGEND, DETAILS AND DRAWING INDEX
SHOWN ON THESE DRAWINGS SHALL BE INSTALLED IN ACCORDANCE
PLUMBING SPECIFICATIONS
TO AVOID DELAYING THE COMPLETION OF THE PROJECT. DELAY IN DELIVERIES
MAIN BUILDING FIRST FLOOR PLAN - PLUMBING
WITH ALL APPLICABLE STATE, LOCAL AND HEALTH CODES
NORTH TOWER FIRST FLOOR PLAN - PLUMBING
WILL NOT BE CONSIDERED A JUSTIFIABLE REASON FOR SUBMISSION OF
MAIN BUILDING SECOND FLOOR PLAN - PLUMBING
REQUIREMENTS.
SUBSTITUTE MATERIALS.
2.
CONTRACTOR SHALL FIELD VERIFY EXISTING ELEVATIONS, SIZES AND
15,
WARRANTY /GUARANTEE
LOCATIONS OF EXISTING PLUMBING PRIOR TO BIDDING. IF DISCREPANCIES ARE
FOUND, THEY ARE TO NOTIFY ENGINEER.
A. THE CONTRACTOR SHALL WARRANTY /GUARANTEE AND MAINTAIN THE STABILITY
OF WORK AND MATERIALS AND KEEP SAME IN PERFECT REPAIR AND CONDITION
3.
CONTRACTOR SHALL COORDINATE EQUIPMENT CONNECTIONS & MOUNTING
FOR THE PERIOD OF ONE YEAR.
HEIGHTS WITH EQUIPMENT AND SUPPLIER. INSTALL EQUIPMENT AND
MAKE FINAL CONNECTIONS FURNISHING CUTOFF VALVES, P- TRAPS, FITTINGS,
B. DEFECTS OF ANY KIND DUE TO FAULTY WORK OR MATERIALS, APPEARING
AND PIPING AS REQUIRED.
DURING THE ABOVE MENTIONED PERIOD, MUST BE IMMEDIATELY REPAIRED BY
CONTRACTOR SHALL OBTAIN A SET OF THE EQUIPMENT DRAWINGS PRIOR
THE CONTRACTOR AT HIS OWN EXPENSE TO THE ENTIRE SATISFACTION OF THE
TO BIDDING IN ORDER TO DETERMINE ALL REQUIRED CONNECTIONS.
OWNER AND ENGINEER. SUCH RECONSTRUCTION AND REPAIRS SHALL INCLUDE
DAMAGE TO THE FINISH OR FURNISHING OF THE BUILDING RESULTING FROM THE
4.
CONTRACTOR SHALL PROVIDE ROUGH -INS AND MAKE FINAL CONNECTIONS
ORIGINAL DEFECT OR REPAIR THERETO.
FOR EACH PIECE OF EQUIPMENT REQUIRING PLUMBING CONNECTION,
INCLUDING TAILPIECES, TRAPS, LINE STRAINERS, STOP VALVES, GAUGES,
16.
CONTINUITY OF SERVICE: INTERRUPTIONS OF EXISTING SERVICES OR FACILITIES
VACUUM BREAKERS, REDUCING VALVES, SPECIAL FITTINGS,
SHALL BE KEPT TO A MINIMUM AND THE CONTRACTOR SHALL FURNISH ALL
INSULATION, AND ALL NECESSARY DEVICES FOR A COMPLETE AND
MATERIALS AND LABOR REQUIRED WHENEVER TEMPORARY CONNECTIONS ARE
OPERATIVE SYSTEM. COORDINATE EXACT REQUIRED PLUMBING ROUGH -INS
NECESSARY TO MAINTAIN CONTINUITY OF SERVICE. INTERRUPTIONS OF THE
WITH VENDOR SUPPLIER DRAWINGS.
EXISTING SERVICES, THE INSTALLATION OF TEMPORARY FACILITIES, AND THE WORK
OF MAKING FINAL CONNECTIONS TO NEW WORK SHALL BE DONE ONLY AT SUCH
5.
THE CONTRACTOR SHALL INSTALL PLUMBING PIPING IN LOCATIONS INDICATED
TIMES AS PERMITTED AND SCHEDULED BY THE OWNER. ALL SUCH CONNECTIONS
ON THE CONTRACT DOCUMENTS. THE ONLY DEVIATION FROM THIS WOULD BE
AND TIE -INS SHALL BE COORDINATED THROUGH THE OWNERS PROJECT MANAGER.
IF ADDITIONAL OFFSETS ARE REQUIRED TO COORDINATE WITH OTHER TRADES.
IF THE THE CONTRACTOR DESIRES TO CHANGE THE PLUMBING ROUTING FOR
I. THE DURATION OF EACH SHUTDOWN SHALL BE LIMITED TO NIGHTS AND /OR
ANY OTHER REASON, HE SHALL COMPENSATE THE ENGINEER AT A RATE OF
WEEKENDS WITH THE TIME FRAME FOR SHUTDOWNS AS SPECIFIED BY THE
DPE x 2.75 TO REVISE THE PLUMBING DRAWINGS, RISER DIAGRAMS AND FOR
OWNER. THE CONTRACTOR SHALL NOTIFY THE OWNER IN WRITING FORTY -EIGHT
THE TIME INVOLVED IN REISSUING DRAWINGS TO THE AUTHORITY HAVING
(48) HOURS IN ADVANCE OF EACH REQUIRED INTERRUPTION
JURISDICTION. CONTRACTOR SHALL CONTACT ENGINEER FOR ESTIMATED TIME
OF EXISTING SERVICE.
REQUIRED AND SCHEDULE FOR PERFORMING WORK.
2. THE CONTRACTOR SHALL INCLUDE IN BID PRICE ALL PREMIUM TIME CHARGES
FOR LABOR AND EQUIPMENT REQUIRED FOR ALL NIGHT AND WEEKEND
6,
ALL MATERIALS, EQUIPMENT, AND APPARATUS SHALL BE NEW, EXCEPT THAT
OVERTIME WORK, AS NECESSARY, TO COMPLETE THE SCOPE OF THE CONTRACT.
CALLED FOR AS BEING RE -USED OR FURNISHED BY OTHERS.
7'
SEAL PENETRATIONS AND
IONS OF OF RAT OR
LOOR IN A COR STOPE
17.
ALL CONDENSATE PIPING SHALL BE INSULATED THROUGHOUT ENTIRE SYSTEM.
FIRE THROUGH P
SYSTEMS. COORDINATE REQUIREMENTS WITH ARCHITECTURAL PLANS AND
SPECIFICATIONS.
lg,
PROVIDE A MINIMUM OF 6 INCHES BETWEEN ALL PIPING AND FIRE RATED AND SMOKE
TIGHT PARTITIONS FOR REQUIRED INSPECTIONS. ANY PIPING WITHIN THIS 6 INCHES
g,
PIPING SHALL NOT BE RUN OVER ANY ELECTRICAL EQUIPMENT, PANELS AND
SPACE SHALL BE REQUIRED TO BE MOVED AND REROUTED. ANY COST IMPACT TO
OTHER TRADES WILL BE THE RESPONSIBILITY OF THE CONTRACTOR.
PHONE PANELS.
9,
THE PLUMBING CONTRACTOR SHALL KEEP A SET OF MARKED UP DRAWINGS
18.
INSULATION, FITTINGS COVERS AND ALL FINISHES AND MATERIALS SHALL HAVE A
AS THE JOB PROGRESSES. NO MAJOR CHANGE SHALL BE MADE TO PLUMBING
MAXIMUM FLAME SPREAD RATING OF 25 AND A MAXIMUM SMOKE DEVELOPED RATING
DESIGN ENGINEERING UNLESS IT HAS BEEN COORDINATED, DRAWN AND SUBMITTED
OF 50.
FOR APPROVAL.
20.
DRAWINGS ARE DIAGRAMMATIC. DO NOT SCALE FROM DRAWINGS. BUT FIT WORK TO
10.
CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGES TO EXISTING PIPING
ACTUAL CONDITION AND SPACE REQUIREMENTS.
AND FIXTURES DUE TO NEW CONSTRUCTION AND SHALL RESTORE EXISTING
WORK DISTURBED TO IT'S ORIGINAL CONDITION AT NO COST TO THE OWNER.
21'
ALL WORK SHALL BE PERFORMED BY A LICENSED CONTRACTOR IN A FIRST CLASS
WORKMANLIKE MANNER. THE COMPLETE SYSTEM SHALL BE FULLY AND PROPERLY
II.
CONTRACTOR SHALL COORDINATE WITH ALL DISCIPLINES INVOLVED SO AS
OPERATIVE, AND IN COMPLIANCE WITH APPLICABLE CODES AND GOVERNING
TO AVOID ANY PIPE ROUTING PROBLEMS.
AUTHORITIES AND SUBJECT TO ACCEPTANCE BY OWNER /ENGINEER.
12.
PROVIDE OFFSETS AND FITTINGS AS REQUIRED.
22.
CONTRACTOR SHALL OBTAIN AND PAY FOR ALL PERMITS, FEES, INSPECTIONS
AND TESTS.
13.
THIS CONTRACTOR SHALL BASE HIS PROPOSAL UPON THE MATERIALS AS
23,
ALL REQUIRED INSURANCES SHALL BE PROVIDED AND MAINTAINED BY THE
SPECIFIED, USING THE MANUFACTURERS AND MODEL NUMBERS
CONTRACTOR FOR THE PROTECTION AGAINST PUBLIC LIABILITY AND PROPERTY
AS CALLED FOR IN THE SPECIFICATIONS ON THE DRAWINGS.
DAMAGE, AND OTHER INSURANCES REQUIRED BY THE OWNER, FOR THE DURATION OF
IF MORE THAN ONE MANUFACTURER OF EQUIPMENT IS SPECIFIED, ANY ONE
THE WORK.
OF THE MANUFACTURERS OF EQUIPMENT MAY BE USED IN THIS CONTRACTOR'S
PROPOSAL. IF THIS CONTRACTOR WISHES TO USE EQUIPMENT NOT SPECIFIED
24,
CONTRACTOR SHALL OBTAIN FROM THE OWNER A COPY OF THE INFECTION CONTROL
HE MUST, AT THE TIME OF BIDDING, SUBMIT SEPARATELY ON LETTERHEAD
RISK ASSESSMENT (ICRA) PREPARED FOR THIS PROJECT. CONTRACTOR SHALL REVIEW
STATIONARY OF THE BIDDER, THE EQUIPMENT HE WOULD SUBSTITUTE AND
THE REQUIREMENTS IN THE REPORT AND PERFORM ALL WORK IN ACCORDANCE WITH
THE COST TO BE ADDED OR TO BE DEDUCTED FROM HIS PROPOSAL.
THOSE REQUIREMENTS. SEE MECHANICAL DRAWINGS FOR COORDINATION OF
VENTILATION REQUIREMENTS REQUIRED BY ICRA.
PHILLIPS CONCRETE FASTENER
I.T.T. ANVIL (RED HEAD)
ALL THREAD
HANGER ROD
PIPE HANGER RING
I.T.T. ANVIL FIG.69
PIPES 2%2" & SMALLER
NOTE: 1. PROVIDE COPPER PLATING ON HANGER BETWEEN
STEEL AND COPPER WHERE UNINSULATED COPPER
PIPING IS USED.
2. PROVIDE ADDITIONAL HANGERS ON EACH SIDE OF A
WALL WHERE THE PIPING PENETRATES THE WALL.
3. ALL INTERIOR HANGERS SHALL BE GALVANIZED
INCLUDING CLAMPS, THREADED RODS, NUTS AND BOLTS.
4. ALL PLUMBING TRADE ITEMS SHALL BE INDIVIDUALLY
AND RIGIDLY SUPPORTED FROM STRUCTURE ABOVE
INDEPENDENT OF ALL OTHER TRADES. (DO NOT HANG
PLUMBING ITEMS FROM ANOTHER TRADE.)
U.L. /F.M. APPROVED CONCRETE
INSERT PIPING HANGER DETAIL
25. REFER TO DIVISION 22 SPECIFICATIONS FOR MORE INFORMATION.
PLUMBING AS- BUILTS NOTE
PLUMBING CONTRACTOR IS REQUIRED TO SUBMIT PLUMBING AS BUILT PLANS
UPON COMPLETION OF THE PROJECT. COMPLETION IS DEFINED AS THE OWNER
RECEIVING A 'CO' AND PLUMBING INSPECTOR HAS FINALIZED AND APPROVED THE
INSTALLATION.
AS BUILTS SHALL BE SUBMITTED IN ELECTRONIC FASHION IN EITHER AUTOCAD
FORMAT OR SCANNED FILES IN PDF FORMAT.
AS BUILTS SHALL BE LEGIBLE AND NEAT. AS BUILTS WILL BE RETAINED BY
ARCHITECT AND ENGINEER FOR RECORDS OF CHANGES TO THE SYSTEM. AS BUILTS
WILL BE SUBMITTED TO OWNER THROUGH ARCHITECT AND ENGINEER.
DRAWING INDEX
SHEET
NUMBER
SHEET TITLE
PO.01
PLUMBING NOTES, LEGEND, DETAILS AND DRAWING INDEX
PO.02
PLUMBING SPECIFICATIONS
P2.01
MAIN BUILDING FIRST FLOOR PLAN - PLUMBING
P2.02
NORTH TOWER FIRST FLOOR PLAN - PLUMBING
P2.03
MAIN BUILDING SECOND FLOOR PLAN - PLUMBING
SRmi h
ei * "..
600 West Hillsboro, Suite 300
Dcerfield Beach, FL 33441
0954) 421 -1260
7Ax: (954) 421 -1466
www.ssr- inc.com
Firm Certification - EB- 0000857
John E. Moulder PE-33200
Michael A. Steward PE - 65701
SSR JOB # 1232030.0
ro"__ -
LU U)
T
z �M
Cn 0 W W M
0 ~ It 0
_ = W F-EE
-�U 7o
LL
Q O
-z� �Q
W Cfj�
_°6 Er °o=
F- Zc) CD-)
Q I-- O
0 Q
vJ
MDii,,���
xks
No. 33
-
= = i-
-r ; Lu W
L its 1110,
DRAWN
CHECKED
DATE 11/12/12
REVISED
SHEET NO.
PLUMBING NOTES,
LEGEND
DETAILS AND
DRAWING INDEX
P0.01