12-1353-029MAIN BUILDING SECOND FLOOR PLAN - DEMOLITION - EIRE PROTECTION N 0' 1' 2' 4' 8' 12' GENERAL NOTES: L WORK INCLUDING PHASING UENCING WITH DIV 26. I. CONTRACTOR SHALL PHASE WORK AS DIRECTED BY OWNER. 2. CONTRACTOR SHALL PATCH WALLS, FLOORS, AND CEILINGS TO MATCH EXISTING FINISHES FOR DEMOLITION AND INSTALLATION OF FIRE PROTECTION SYSTEMS. COORDINATE WITH ARCHITECTURAL DRAWINGS. 3. THE HOSPITAL IS OPEN 24 HOURS A DAY, 7 DAYS A WEEK. THE CONTRACTOR SHALL HAVE TO PERFORM WORK WITHIN ACTIVE PATIENT CARE AREAS. CONTRACTOR SHALL: A. COORDINATE SHUTDOWN OF EXISTING SYSTEMS WELL IN ADVANCE WITH OWNER. B. PERFORM WORK AT SUCH TIMES AND UNDER SUCH CONDITIONS AS PRESCRIBED BY OWNER. C. PERFORM WORK WITHIN THE GUIDELINES OF THE ICRA REPORT PREPARED FOR THIS PROJECT BY THE OWNER. D. SEQUENCE DEMOLITION AND NEW CONSTRUCTION TO MINIMIZE NUMBER & DURATION OF SHUTDOWNS REQUIRED. WHERE FEASIBLE INSTALL NEW MAINS PRIOR TO DEMOLITION OF EXISTING. 4. CONTRACTOR SHALL COORDINATE WORK WITH EXISTING CONDITIONS (STRUCTURE, DUCTWORK, PIPING, CONDUIT, ETC.). PROVIDE OFFSETS AS REQUIRED TO INSTALL NEW WORK. 5. PIPING SHOWN TO BE REMOVED IS NOT TO BE CAPPED AND ABANDONED. 6. CONTRACTOR SHALL COORDINATE TIMING, DURATION AND AREAS AFFECTED BY SHUTDOWNS WITH HOSPITAL IN ORDER TO FACILITATE REQUIRED FIRE WATCH. 7. CONTRACTOR SHALL COORDINATE NEW SPRINKLER HEAD LOCATIONS WITH CEILING MOUNTED DEVICES (LIGHTS, DIFFUSERS, SMOKE DETECTORS, ETC.) AND OBSTRUCTIONS TO SPRINKLER THROW (SOFFITS, PRIVACY CURTAINS, ETC.) PER NFPA 13. MAIN BUILDING SECOND FLOOR PLAN - NEW CONSTRUCTION - FIRE PRDTE"CT lON 1'1'1'1'1 1 0' 1' 2' 4' 8' 12' KEYED NOTES: O REMOVE EXISTING SPRINKLER HEAD AND EXTEND EXISTING I' BRANCH PIPING TO NEW SPRINKLER HEAD. SEE NEW CONSTRUCTION PLAN. DEMOLITION LEGEND SYMBOL DESCRIPTION EXISTING TO REMAIN EXISTING TO BE REMOVED �---� REMOVE EXISTING TO THIS POINT SPRINKLER SCHEDULE 2 SPRINKLER HEAD REMOVED. 2 SPRINKLERS HEADS ADDED. 1--o—SPRINKLER HEAD ADDED NEW CONSTRUCTION LEGEND SYMBOL DESCRIPTION EXISTING TO REMAIN NEW CONSTRUCTION �'-- -� CONNECT TO EXIST. AT THIS POINT "Aghk ,0 KEY PLA SCALE N.T.S. AREA OF WORK )F WORK n �N \1/ mi h �1 : " ' ' � - eih an 600 West Hillsboro, Suite 300 Deerfield Beach, FL 33441 ;954) 421 -1260 TAX: k'954) 421 -1466 www.ssr- inc.com Firm Certfticatlon - EB- 0000857 John E. Moulder PE - 33200 Michael A. Steward PE - 65701 SSR JOB # 1232030.0 a W U C T Z �, �, U O W w M OF-� Xo _ =W CI= 00 Cv) LL Q 0 -� —Z� �a =HOC o= F-ZC/) �� �Q� o O Q CO M V 0 No. ; r fast$&" DRAWN CHECKED DATE 11/12/12 REVISED SHEET NO. MAIN BUILDING - SECONE FLOOR PLAN - DEMO & NEW CONSTRUCTION FIRE PROTECTION FP2,03