Loading...
12-1353-014HVAC GENERAL NOTES 1. HVAC DRAWINGS ARE DIAGRAMMATICAL IN NATURE AND REPRESENT EXISTING CONDITIONS BASED ON DRAWINGS AND SITE OBSERVATIONS. CONTRACTOR IS RESPONSIBLE FOR FIELD VERIFICATION OF ALL ACTUAL CONDITIONS INCLUDING PIPING LOCATIONS AND SIZES. 2. DUE TO DRAWINGS BEING DIAGRAMMATICAL IN NATURE RISERS AND DROPS ARE NOT SHOWN - CONTRACTOR SHALL INCLUDE THESE IN THE BID - WHERE POSSIBLE ALL RISERS AND DROPS SHALL BE CONSTRUCTED USING 45 DEGREE OR LONG RADIUS ELBOWS. 3. PROVIDE AND INSTALL NECESSARY PIPING INCREASERS /REDUCERS AS REQUIRED FOR EQUIPMENT CONNECTIONS. CONSULT MANUFACTURER'S DATA FOR ACTUAL PIPING CONNECTIONS SIZES, INCLUDING, BUT NOT LIMITED TO THOSE SHOWN. 4. SCHEDULE NEW CONSTRUCTION WORK WITH THE OWNER WELL IN ADVANCE. 5. ALL FINISHES AND SURFACES TO REMAIN WHICH ARE DAMAGED DURING CONSTRUCTION WORK SHALL BE REPAIRED OR REPLACED TO THE SATISFACTION OF THE OWNER AT NO ADDITIONAL COST TO THE OWNER. 6. NO PIPING OR CONDUIT SHALL BE INSTALLED UNTIL IT IS COORDINATED WITH ALL OTHER TRADES AFFECTED. PROVIDE ALL OFFSETS REQUIRED TO AVOID INTERFERENCE WITH OTHER TRADES: EXISTING CONDITIONS AND WITH THE STRUCTURE, INCLUDING, BUT NOT LIMITED TO, THOSE SHOWN. 7. REFER TO DETAIL SHEETS AND SPECIFICATIONS FOR ADDITIONAL INSTALLATION REQUIREMENTS. 8. CONTRACTOR SHALL SUBMIT A COMPLETE LIST OF EQUIPMENT AND ITEMS TO BE REMOVED TO THE OWNER. ALL ITEMS THAT THE OWNER WISHES TO RETAIN SHALL BE TURNED OVER TO OWNER AND THE REMAINDER SHALL BE REMOVED FROM THE SITE AND DISPOSED OF IN A PROPER MANNER BY CONTRACTOR. 9. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO PERFORM ALL WORK NECESSARY TO PREPARE THE STRUCTURE FOR THE INSTALLATION AND /OR DEMOLITION WORK OF THE MECHANICAL SYSTEMS. ALL HOLES, OPENINGS AND ANY DAMAGED MATERIALS OR SURFACES SHALL BE REPAIRED AND FINISHED TO MATCH EXISTING. 10. ALL DEMOLITION WORK SHALL COMPLY WITH NFPA 241 AND THE REQUIREMENTS OF THE OWNER. 11. EXISTING SYSTEMS SHOWN ON THE DRAWINGS ARE BASED ON AVAILABLE RECORD DRAWINGS. THIS INFORMATION IS ONLY PARTIALLY VERIFIED. THE CONTRACTOR IS RESPONSIBLE TO FIELD VERIFY AND INVESTIGATE ALL CONDITIONS THAT AFFECTS THE WORK PRIOR TO SUBMITTING THE BID. 12. PROVIDE CLEAR ACCESS TO VALVES. 13. ALL PIPING MATERIALS SHALL BE PROTECTED WHILE BEING SHIPPED TO THE SITE, STORED ON SITE AND AS INSTALLATION PROGRESSES. PIPING STORED ON SITE PRIOR TO INSTALLATION SHALL BE OFF THE FLOOR. PIPING SHALL BE END CAPPED. 14. PROVIDE MAINTENANCE MANUALS FOR ALL PIECES OF EQUIPMENT FOR OWNERS USE FOR PREVENTATIVE MAINTENANCE AND GENERAL RECORDS. IDENTIFY EACH PIECE OF EQUIPMENT IN A TABBED, 3 RING BINDER THAT MATCHES THE LABELS ON THE EQUIPMENT. SCOPE OF WORK 1. INSTALL 4 FAN COIL UNITS IN EXISTING ELECTRICAL ROOMS. 2. INSTALL CHILLED WATER LINES TO FAN COIL UNITS. 230100 - BASIC MECHANICAL REQUIREMENTS A. CODES & REFERENCES 1. FLORIDA STATE BUILDING CODES 2010. 2. NFPA 101 (2009) 3. NFPA 90A (2009) 4. NFPA 99 (2005) 5. FACILITIES GUIDELINE INSTITUTE GUIDELINES FOR DESIGN & CONSTRUCTION OF HEALTHCARE FACILITIES, 2010. FAN COIL UNIT SCHEDULE 1. SEE PLANS FOR R/L HAND PIPING CONNECTIONS. 4. PROVIDE VIBRATION ISOLATION. 2. PROVIDE STAINLESS STEEL DRAIN PAN. 5. PROVIDE OPEN PROTOCAL INTERFACE FOR BUILDING AUTOMATION CONTROLS. 3. PROVIDE OVERFLOW PROTECTION. WATERGUARD OR EQUAL. 6. PROVIDE CONDENSATE PUMP. (DENT. TYPE MANUFACTURER & MODEL NO. FAN MINIMUM OUTSIDE AIR FILTERS COOLING COIL FAN WEIGHT (LBS) CFM EXT. GPM E.W.T. E.A.D.B. E.A.W.B. SENSIBLE TOTAL COIL /ROWS PIPE CONN MAX WTR H.P. FLA ELEC. MAIN BUILDING SECOND FLOOR PLAN - DEMOLITION - HVAC M2.01 S.P. BUILDING FIRST FLOOR PLAN - NEW CONSTRUCTION - HVAC M2.02 NORTH TOWER FIRST FLOOR PLAN - NEW CONSTRUCTION - HVAC M2.03 CAPACITY CAPACITY - HVAC SIZE PR. DROP DETAILS & CONTROLS FCU -M -1 COMPACT CONCEALED TRANE FC -P -020 245 _ - 1' THROW AWAY 1.2 45 80 67 4.4 5.9 2 5/8 8.0 1 3.1 120/1/60 81 FCU -M -2 COMPACT CONCEALED TRANE FC -P -080 675 - - 1' THROW AWAY 4.6 45 80 67 15.3 22.6 q 5/e 10.6 1 3.1 120/1/60 147 FCU -M -3 COMPACT CONCEALED TRANE FC -P -020 245 - - 1' THROW AWAY 1.2 45 80 67 4.4 5.9 2 5/8 8.0 1 3.1 120/1/60 81 FCU -N -1 COMPACT CONCEALED TRANE FC -P -020 245 - - 1' THROW AWAY 1.2 45 80 67 4.4 5.9 2 5 ' /e 8.0 1 3.1 120/1/60 81 FCU -N -2 COMPACT CONCEALED TRANE FC -P -030 310 - - 1' THROW AWAY 1.6 45 80 67 5.9 7.9 3 5 ' /e 3.8 1 3.1 120/1/60 81 HVAC LEGEND PIPING - CHS CHILLED WATER SUPPLY - CHR CHILLED WATER RETURN �(51 SHUT -OFF VALVE O THERMOSTAT (ADJUST.) MECHANICAL EXISTING FIELD CONDITIONS MECHANICAL CONTRACTOR IS REQUIRED PRIOR TO FINAL INSPECTIONS TO LABEL ALL NEW AND EXISTING PIPES, VALVES, BOXES, AHU'S, FAN COILS, ETC. WITH PROPER TAGS AND LABELS. (SEE BOOK SPECIFICATIONS FOR LABELING). CONTRACTOR SHALL WORK WITH OWNER /FACILITIES STAFF TO DETERMINE ALL EXISTING SERVICES FUNCTIONS, SOURCES, NAMES, ETC FOR PROPER IDENTIFICATION. ALL IDENTIFICATIONS SHALL BE CLEARLY NOTED ON AS BUILT CONDITIONS AND SHALL BE TURNED OVER TO OWNER AND DESIGN TEAM FOR FINAL RECORDS. CONTRACTOR IS REQUIRED TO HAVE LABELING AND IDENTIFICATION COMPLETED PRIOR TO 757. INSPECTIONS AND /OR COMPLETION OF CONSTRUCTION. B. SCOPE OF WORK 1. PROVIDE ALL REQUIRED PERMITS, LABOR, MATERIAL AND EQUIPMENT REQUIRED TO COMPLETE THE SCOPE OF THE PROJECT SHOWN ON THE DRAWINGS COMPLETE AND READY FOR OCCUPANCY AND USE BY OWNER. THE WORK SHALL INCLUDE BUT IS NOT LIMITED TO: a. REMOVAL, RELOCATION AND RE- INSTALLATION OF EXISTING EQUIPMENT AND SYSTEM. b. CONNECTIONS TO EXISTING OR NEW EQUIPMENT AND SYSTEMS. C. MODIFICATION OF EXISTING CHILLED OR HOT WATER SYSTEMS, STEAM SYSTEMS, CONDENSATE DRAINAGE, DUCTWORK, TEMPERATURE CONTROLS AND LIFE - SAFETY SYSTEMS. d. CUTTING AND PATCHING TO REMOVE EXISTING OR INSTALL NEW WORK. e. CLEANING AND TESTING. f. INSTRUCTION TO OWNER'S PERSONNEL. 2. PROVIDE ALL BUILDING PENETRATIONS REQUIRED TO COMPLETE PROJECT. ALL PENETRATIONS SHALL BE PATCHED AND SEALED WATERTIGHT. MAINTAIN FIRE RATINGS OF EXISTING STRUCTURE. 3. PROVIDE ALL NECESSARY EQUIPMENT, PIPE SUPPORTS AND MATERIALS REQUIRED FOR INSTALLATION PER THE REQUIREMENTS OF LOCAL, STATE OR FEDERAL CODES. C. REQUIRED SHOP DRAWINGS 1. INSULATION. 2. FAN COIL UNITS. 3. VALVES. 4. PIPES. D. MAINTENANCE MANUALS 1. PROVIDE MAINTENANCE MANUALS FOR ALL NEW EQUIPMENT CONTAINING ALL OPERATING AND MAINTENANCE DATA, SUBMITTALS, WARRANTEES, DIAGRAMS, INSPECTION REPORTS AND VALVE LISTS IN A 3 RING BINDER WITH POCKETS FOR DRAWINGS. PROVIDE OWNER WITH MINIMUM OF 2 COPIES. E. RECORD DRAWINGS 1. THE CONTRACTOR SHALL MAINTAIN AN ACCURATE RECORD OF ALL CHANGES MADE TO THE CONTRACT DOCUMENTS. 2.THE CONTRACTOR SHALL PROVIDE THE ENGINEER 2 SETS OF COMPLETED RECORD 'DRAWINGS. 3.THE PROJECT WILL NOT BE CONSIDERED COMPLETE UNTIL ACCURATE RECORD DRAWINGS ARE DELIVERED. HAZARDOUS MATERIAL NOTES 1. PORTIONS OF THE EXISTING SYSTEM MAY CONTAIN HAZARDOUS MATERIAL (ASBESTOS). COORDINATE WITH THE OWNER TO DETERMINE THE LOCATION AND TYPES OF HAZARDOUS MATERIALS. 2. THE OWNER IS RESPONSIBLE FOR THE IDENTIFICATION, REMOVAL AND DISPOSAL OF HAZARDOUS MATERIAL AND IS NOT TO BE INCLUDED AS PART OF THE WORK OF THIS CONTRACT UNLESS SPECIFICALLY IDENTIFIED AS SUCH. 3. IF ANY MATERIAL APPEARS TO CONTAIN HAZARDOUS MATERIAL AND WAS NOT PREVIOUSLY IDENTIFIED. THE CONTRACTOR IS TO INFORM THE OWNER TO RECEIVE INSTRUCTIONS ON HOW TO PROCEED. TEST & BALANCE NOTES 1. FINAL CONSTRUCTION: UPON COMPLETION OF THE HVAC RENOVATION WORK, THE TEST AND BALANCE CONTRACTOR SHALL BALANCE EQUIPMENT TO PROVIDE INDICATED AIR QUANTITIES TO THE SPACE. ANY ADDITION ADJUSTMENTS REQUIRED FOR THIS SHALL BE INCLUDED IN THIS CONTRACTORS PROPOSAL. 2. FINAL REPORT: SUBMIT FINAL TEST AND BALANCE REPORT TO ENGINEER FOR REVIEW AND ACCEPTANCE ONE WEEK PRIOR TO FINAL AHCA INSPECTION FOR EACH PHASE. HVAC SPECIFICATIONS F. SUBSTITUTIONS 230523 - VALVES 1. EQUIPMENT AND DESIGN OF SYSTEMS INDICATED ON THE DESIGN DRAWINGS AND WITHIN THESE SPECIFICATIONS SHALL BE CONSIDERED AS 'SPECIFIED STANDARD' OF QUALITY. NO SUBSTITUTIONS SHALL BE MADE WITHOUT PRIOR WRITTEN APPROVAL OF THE ENGINEER 10 DAYS PRIOR TO BID DATE. 2. ANY DEVIATION FROM SPECIFIED EQUIPMENT THAT AFFECTS THE ELECTRICAL REQUIREMENTS SHALL BE COORDINATED BY THE MECHANICAL CONTRACTOR AND EQUIPMENT VENDOR WITH THE ELECTRICAL CONTRACTOR PRIOR TO SUBMITTING BIDS. 230500 - BASIC MATERIALS AND METHODS A. LABELING 1. PROVIDE RIGID PLASTIC EMBOSSED EQUIPMENT NAME TAGS FOR ALL NEW EQUIPMENT AND DISCONNECTS. SETON NAMEPLATE CORPORATION. 2. PROVIDE VALVE TAGS ON ALL NEW AND RELOCATED VALVES. VALVE TAGS SHALL MATCH TAGS USED AT THE EXISTING FACILITY. TAGS SHALL BE SECURED TO VALVES WITH BRASS CHAINS. PROVIDE UPDATED INFORMATION ON ALL NEW VALVES TO THE EXISTING VALVE CHART. 3. PROVIDE SETON SNAP ON PIPE LABELS ON ALL NEW PIPING. PIPE LABELS TO MATCH SIZE AND TYPE USED AT THE EXISTING FACILITY AND COMPLY WITH ANSI Al 3.1. LABELS SHALL BE APPLIED CLOSE TO VALVES, CHANGES IN PIPE DIRECTIONS, BRANCHES, PIPES PASSING THROUGH WALLS OR FLOORS AND EVERY 20 FEET IN STRAIGHT RUNS OF PIPING AND AT LEAST ONE TIME PER ROOM. B. HANGERS AND SUPPORTS 1. PROVIDE ALL NECESSARY PIPE SUPPORTS, HANGERS, RODS, CLAMPS AND ATTACHMENTS TO PROPERLY INSTALL AND SUPPORT PIPING AND EQUIPMENT FROM THE BUILDING STRUCTURE. 2. PROVIDE ANY ANGLE IRON OR UNISTRUT AND SUSPENSION RODS REQUIRED TO INSTALL EQUIPMENT AND PIPING. 3. THE USE OF BAILING WIRE OR PERFORATED METAL STRAPPING IS NOT PERMITTED FOR SUPPORTS. C. WARRANTY /GUARANTEE 1. THE CONTRACTOR SHALL WARRANTY /GUARANTEE AND MAINTAIN THE STABILITY OF WORK AND MATERIALS AND KEEP SAME IN PERFECT REPAIR AND CONDITION OF THE PERIOD OF ONE YEAR. 2. DEFECTS OF ANY KIND DUE TO THE FAULTY WORK OR MATERIALS APPEARING DURING THE ABOVE MENTIONED PERIOD MUST BE IMMEDIATELY MADE GOOD BY THE CONTRACTOR AT HIS OWN EXPENSE TO THE ENTIRE SATISFACTION OF THE OWNER AND ENGINEER. SUCH RECONSTRUCTION AND REPAIRS SHALL INCLUDE DAMAGE TO THE FINISH OR FURNISHING OF THE BUILDING RESULTING FROM THE ORIGINAL DEFECT OR REPAIR THERETO. 230600 - PIPING A. DO NOT USE MECHANICALLY COUPLED JOINTS OR T- DRILLED TEES ON HVAC SYSTEMS. B. SCHEDULE 40 ASTM A53 GRADE B SEAMLESS BLACK STEEL PIPE WITH CLASS 150 MALLEABLE IRON FITTINGS USED FOR: 1. CHILLED WATER 2' BELOW, THREADED JOINTS, ABOVE 21/j WELDED JOINTS. C. TYPE L HARD COPPER PIPE WITH WROUGHT COPPER FITTINGS AND SOLDERED JOINTS OR VIEGA PRO. PRESS. I. HVAC CHILLED WATER UP TO 11/j OPTION UP TO 21/j. D. PVC PIPE IS NOT TO BE USED ON MECHANICAL SYSTEMS. A. NIBCO, STOCKHAM, CRANE, MILWAUKEE, APPOLLO OR KITZ. B. HVAC WATER VALVES (NIBCO NUMBERS INDICATED BELOW). 1. SHUT OFF BELOW 3' FIGURE T585 -70 OR S585 -70, 2 PIECE, FULLY PORTED 600 psi, BALL VALVE. PROVIDE RAISED STEM HANDLE FOR INSULATION. 230501 - SLEEVES A. SLEEVES TO BE 18 GAUGE SHEET METAL OR SCHEDULE 40 PIPE. SLEEVE THE FOLLOWING: 1. MASONRY WALLS SLEEVE ALL PIPE PENETRATIONS. 2. FIRE RATED DRY WALL PARTITIONS SLEEVE STEAM SUPPLY AND RETURN AND HEATING WATER. 3. NON -FIRE RATED PARTITIONS NO SLEEVES REQUIRED. SEAL WALL TO INSULATION. 4. USE U.L. LISTED ASSEMBLY FOR ALL PENETRATIONS THROUGH RATED CONSTRUCTION. 230548 - VIBRATION ISOLATION A. ACCEPTABLE MANUFACTURERS: 1. MASON INDUSTRIES. 2. KINETICS NOISE CONTROL. 3. KORFUND. 4. AMBER BOOTH. B. MASON TYPE HS CEILING FOR SUSPENDED FAN COIL UNIT. 230700 - INSULATION A. INSULATION, ADHESIVES, COATINGS, SEALERS, TAPES, ETC. SHALL HAVE A FLAME SPREAD OF 25 OR LESS AND SMOKE DEVELOPMENT OF 50 OR LESS IN ACCORDANCE WITH ASTM E -84, NFPA 225, UL 723 AND MEET THE REQUIREMENTS OF NFPA 90A. ALL INSULATING R- VALUES TO MEET THE REQUIREMENTS OF THE FLORIDA ENERGY CODE. B. CELLULAR GLASS PIPE INSULATION, PITTSBURGH CORNING 'FOAMGLASS' WITH ASJ. 1. CHILLED WATER PIPING 2' AND UNDER - 11/1 THICK. 230923 - TEMPERATURE CONTROLS A. EXTEND EXISTING CONTROL SYSTEM TO NEW EQUIPMENT AND PROVIDE ALL MODIFICATIONS NECESSARY FOR A FULLY FUNCTIONING SYSTEM. B. FAN COIL UNIT 1. THE EXISTING CONTROL SYSTEM IS TO BE MODIFIED BY THE OWNERS EXISTING CONTROL VENDOR. 2. AUTOMATIC CONTROL VALVES SHALL BE FULLY PROPORTIONING WITH MODULATING PLUG OR V -PORT INNER GUIDES OR LINEAR CHARACTERISTIC BALL TYPE. THE VALVE SHALL BE QUIET IN OPERATION AND FAIL -SAFE IN THE NORMALLY 'COOLING' POSITION IN THE CONTROL EVENT OF CONTROL FAILURE. CONTROL VALVES SHALL BE SIZED BY THE CONTROL MANUFACTURER AND SHALL BE WARRANTED TO MEET THE HEATING AND COOLING LOADS AS SPECIFIED. CONTROL VALVES SHALL BE SUITABLE FOR THE PRESSURE CONDITIONS AND SHALL CLOSE AGAINST THE DIFFERENTIAL PRESSURE INVOLVED. VALVE OPERATORS SHALL BE OF THE PNEUMATIC OR ELECTRIC 24 VOLT MECHANICAL DEMOLITION NOTES 1. FOR EQUIPMENT AND SYSTEMS TO REMAIN IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO VERIFY THE CONDITION OF, EXACT SIZES AND LOCATION OF EXISTING DUCT AND PIPING ETC. BEFORE DEMOLITION WORK IS BEGUN. REPORT ANY DISCREPANCIES BETWEEN PLANS AND ACTUAL FIELD CONDITIONS TO THE OWNER AND ENGINEER PRIOR TO THE COMMENCEMENT OF DEMOLITION WORK. 2. REMOVE THE INDICATED HVAC ITEMS AS SHOWN ON PLANS, THIS INCLUDES ALL HANGERS, STRAPS AND RELATED MATERIAL. AS DIRECTED THIS MATERIAL SHALL BE REMOVED FROM THE SITE OR TURNED OVER TO THE OWNER (AS DIRECTED BY THE OWNER). 3. CAP AND SEAL AIR TIGHT ALL POINTS AT WHICH DUCTWORK IS REMOVED FROM DUCTWORK THAT WILL REMAIN. 4. PATCH AND MATCH OPENINGS IN WALLS TO MAINTAIN THE INTEGRITY OF THE WALL WHERE AIR DEVICES, DUCTS, PIPING, ETC. HAVE BEEN REMOVED. (MAINTAIN THE EXISTING RATINGS). 5. CONTRACTOR SHALL VERIFY CLEARANCE REQUIREMENTS AND INDICATE ROUTING OF NEW PIPES AS RISES AND DROPS MAY BE NECESSARY DUE TO EXISTING FIELD CONDITIONS. 6. ALL DEMOLITION WORK SHALL COMPLY WITH NFPA 241 AND THE REQUIREMENTS OF THE OWNER. DUCT AND PIPE INSULATION PIPING 1. CHILLED WATER PIPING: (FOAM GLASS MIN. K =.27) -PIPES 2' OR LESS = 1 i/j THICK TYPE. BODY PRESSURE RATING AND CONNECTION TYPE (SCREWED FLANGED OR FLANGED) SHALL CONFORM TO PIPE SCHEDULE ELSEWHERE IN THIS SPECIFICATION. 3. CONTROL CONTRACTOR SHALL PROVIDE ALL WIRING REQUIRED FOR THE CONTROL SYSTEM TO OPERATE. IF THE JOB CONTAINS SMOKE DAMPERS THEY SHALL ALSO BE WIRED BY T.C.C. 4. MOUNT THERMOSTATS 48' A.F.F. ALIGN WITH LIGHT SWITCHES, DOOR SWINGS AND OTHER WALL MOUNTED DEVICES. 5. COORDINATE FINAL LOCATION OF THERMOSTATS WITH THE OWNER PRIOR TO INSTALLATION. 230593 - TEST AND BALANCE A. PROVIDE COMPLETE TEST AND BALANCE OF ALL WATER AND AIR SYSTEMS IN ACCORDANCE WITH NEBB (NATIONAL ENVIRONMENTAL BALANCING BUREAU) OR AABC (ASSOCIATED AIR BALANCE COUNCIL) STANDARDS. B. TEST AND BALANCE FIRM SHALL BE: 1 • EARL HAYGOOD, INC. - (305) 266 -7070. 2. GFS CONSULTING - (305) 992 -4348. C. CONTRACTOR SHALL: 1. VISIT SITE AT START OF PROJECT AND COORDINATE REQUIRED BALANCING EQUIPMENT AND DAMPERS WITH MECHANICAL CONTRACTOR. 2. AIR SYSTEMS: a. MAKE CHANGES TO BELTS, PULLEYS, DAMPERS, VOLUME BOXES, ETC. TO OBTAIN DESIGN CONDITIONS AS REQUIRED BY TAB PROCEDURES. b. BALANCE SUPPLY, RETURN AND EXHAUST AIR OUTLETS WITHIN 10% OF DESIGN WHILE MAINTAINING REQUIRED PRESSURE RELATIONSHIPS. RECORD DESIGN AND ACTUAL TOTALS. c. MEASURE AND REPORT FAN RPM, FAN SUCTION PRESSURE, FAN DISCHARGE PRESSURE, FAN TOTAL PRESSURE AND PRESSURE DROP ACROSS COMPONENTS. DESIGN AND ACTUAL SUPPLY, RETURN, OUTSIDE AND EXHAUST AIR. d. ACTUAL AND DESIGN NAMEPLATE AMPERAGE ON FAN MOTORS. e. PRESSURE DIFFERENTIAL ACROSS DUCT SMOKE DETECTORS. f. ADJUST FANS FOR LOWEST STATIC PRESSURE REQUIRED TO DELIVER TO OUTLETS AS NOTED IN NEBB OR AABC PROCEDURES. 3. WATER SYSTEMS: a. ADJUST AND RECORD ACTUAL GPM AND SYSTEM SUCTION AND DISCHARGE PRESSURES (STATIC AND OPERATING). B. MOTOR DESIGN AND ACTUAL AMPERAGE AT PUMPS. c. DESIGN AND ACTUAL GPM AND TEMPERATURE DIFFERENCE ACROSS COILS, CONVERTERS, CHILLER AND TOWERS. d. ADJUST AND RECORD SYSTEM MAKEUP PRESSURE, RELIEF PRESSURE SETTING AND EXPANSION TANK PRESSURE. 4. CONFIRM OPERATION OF ALL CONTROLS, MANOMETERS AND SENSING DEVICES. 5. ON AHCA REVIEWABLE PROJECTS PROVIDE WRITTEN REPORT AT LEAST ONE WEEK BEFORE FINAL INSPECTION AND PROVIDE A TECHNICIAN DURING FINAL INSPECTION OF PROJECT. 6. CONTRACTOR SHALL PROVIDE FINAL SHEAVE CHANGE OUT AND ADJUSTMENT FOR MAXIMUM AMPRAGE TO INCLUDE DIRTY FILTER ALLOWANCE LOADING ALLOWING THE VFD TO RAMP UP IN RESPONSE TO FILTER LOADING. mi h er an el , nc. 699 -West Hillsboro, Suite 300 OeerYield Beach, FL 33441 (954) 421 -1260 - - - r AX: (954) 421 -1466 www.ssr- inc.com Firm Certification - EB- 0000857 John E. Moulder PE - 33200 Michael A Steward PE - 65701 SSR JOB # 1232030.0 W vJ CY) �: 1-- T Z �M cry O w W M O lZ Q Z = W CF/-)-CE -F- U -0o Cr) LJL Q O Z W =HOC o= I- Z U) (0 Z) - I. O Q Q C/) 02 W MOV 41fi/ ' No. Off, IL \ �� rfill%,� DRAWN CHECKED DATE 11/12/12 REVISED SHEET N0. HVAC SCHEDULE, NOTES, SPECIFICATIONS,LEGEND AND DRAWING INDEX M0.01 DRAWING INDEX SHEET NUMBER SHEET TITLE MO.01 HVAC SCHEDULE, NOTES, SPECIFICATIONS, LEGEND AND DRAWING INDEX MO.02 HVAC CONSTRUCTION ZONE VENTILATION SCHEDULE, NOTES & DETAIL M1.00 HVAC CONSTRUCTION ZONE VENTILATION PLANS M1.01 MAIN BUILDING FIRST FLOOR PLAN - DEMOLITION - HVAC M1.02 NORTH TOWER FIRST FLOOR PLAN - DEMOLITION - HVAC M1.03 MAIN BUILDING SECOND FLOOR PLAN - DEMOLITION - HVAC M2.01 MAIN BUILDING FIRST FLOOR PLAN - NEW CONSTRUCTION - HVAC M2.02 NORTH TOWER FIRST FLOOR PLAN - NEW CONSTRUCTION - HVAC M2.03 MAIN BUILDING SECOND FLOOR PLAN - NEW CONSTRUCTION - HVAC M3.01 HVAC DETAILS & CONTROLS TYPE. BODY PRESSURE RATING AND CONNECTION TYPE (SCREWED FLANGED OR FLANGED) SHALL CONFORM TO PIPE SCHEDULE ELSEWHERE IN THIS SPECIFICATION. 3. CONTROL CONTRACTOR SHALL PROVIDE ALL WIRING REQUIRED FOR THE CONTROL SYSTEM TO OPERATE. IF THE JOB CONTAINS SMOKE DAMPERS THEY SHALL ALSO BE WIRED BY T.C.C. 4. MOUNT THERMOSTATS 48' A.F.F. ALIGN WITH LIGHT SWITCHES, DOOR SWINGS AND OTHER WALL MOUNTED DEVICES. 5. COORDINATE FINAL LOCATION OF THERMOSTATS WITH THE OWNER PRIOR TO INSTALLATION. 230593 - TEST AND BALANCE A. PROVIDE COMPLETE TEST AND BALANCE OF ALL WATER AND AIR SYSTEMS IN ACCORDANCE WITH NEBB (NATIONAL ENVIRONMENTAL BALANCING BUREAU) OR AABC (ASSOCIATED AIR BALANCE COUNCIL) STANDARDS. B. TEST AND BALANCE FIRM SHALL BE: 1 • EARL HAYGOOD, INC. - (305) 266 -7070. 2. GFS CONSULTING - (305) 992 -4348. C. CONTRACTOR SHALL: 1. VISIT SITE AT START OF PROJECT AND COORDINATE REQUIRED BALANCING EQUIPMENT AND DAMPERS WITH MECHANICAL CONTRACTOR. 2. AIR SYSTEMS: a. MAKE CHANGES TO BELTS, PULLEYS, DAMPERS, VOLUME BOXES, ETC. TO OBTAIN DESIGN CONDITIONS AS REQUIRED BY TAB PROCEDURES. b. BALANCE SUPPLY, RETURN AND EXHAUST AIR OUTLETS WITHIN 10% OF DESIGN WHILE MAINTAINING REQUIRED PRESSURE RELATIONSHIPS. RECORD DESIGN AND ACTUAL TOTALS. c. MEASURE AND REPORT FAN RPM, FAN SUCTION PRESSURE, FAN DISCHARGE PRESSURE, FAN TOTAL PRESSURE AND PRESSURE DROP ACROSS COMPONENTS. DESIGN AND ACTUAL SUPPLY, RETURN, OUTSIDE AND EXHAUST AIR. d. ACTUAL AND DESIGN NAMEPLATE AMPERAGE ON FAN MOTORS. e. PRESSURE DIFFERENTIAL ACROSS DUCT SMOKE DETECTORS. f. ADJUST FANS FOR LOWEST STATIC PRESSURE REQUIRED TO DELIVER TO OUTLETS AS NOTED IN NEBB OR AABC PROCEDURES. 3. WATER SYSTEMS: a. ADJUST AND RECORD ACTUAL GPM AND SYSTEM SUCTION AND DISCHARGE PRESSURES (STATIC AND OPERATING). B. MOTOR DESIGN AND ACTUAL AMPERAGE AT PUMPS. c. DESIGN AND ACTUAL GPM AND TEMPERATURE DIFFERENCE ACROSS COILS, CONVERTERS, CHILLER AND TOWERS. d. ADJUST AND RECORD SYSTEM MAKEUP PRESSURE, RELIEF PRESSURE SETTING AND EXPANSION TANK PRESSURE. 4. CONFIRM OPERATION OF ALL CONTROLS, MANOMETERS AND SENSING DEVICES. 5. ON AHCA REVIEWABLE PROJECTS PROVIDE WRITTEN REPORT AT LEAST ONE WEEK BEFORE FINAL INSPECTION AND PROVIDE A TECHNICIAN DURING FINAL INSPECTION OF PROJECT. 6. CONTRACTOR SHALL PROVIDE FINAL SHEAVE CHANGE OUT AND ADJUSTMENT FOR MAXIMUM AMPRAGE TO INCLUDE DIRTY FILTER ALLOWANCE LOADING ALLOWING THE VFD TO RAMP UP IN RESPONSE TO FILTER LOADING. mi h er an el , nc. 699 -West Hillsboro, Suite 300 OeerYield Beach, FL 33441 (954) 421 -1260 - - - r AX: (954) 421 -1466 www.ssr- inc.com Firm Certification - EB- 0000857 John E. Moulder PE - 33200 Michael A Steward PE - 65701 SSR JOB # 1232030.0 W vJ CY) �: 1-- T Z �M cry O w W M O lZ Q Z = W CF/-)-CE -F- U -0o Cr) LJL Q O Z W =HOC o= I- Z U) (0 Z) - I. O Q Q C/) 02 W MOV 41fi/ ' No. Off, IL \ �� rfill%,� DRAWN CHECKED DATE 11/12/12 REVISED SHEET N0. HVAC SCHEDULE, NOTES, SPECIFICATIONS,LEGEND AND DRAWING INDEX M0.01