12-1353-014HVAC GENERAL NOTES
1. HVAC DRAWINGS ARE DIAGRAMMATICAL IN NATURE AND REPRESENT
EXISTING CONDITIONS BASED ON DRAWINGS AND SITE OBSERVATIONS.
CONTRACTOR IS RESPONSIBLE FOR FIELD VERIFICATION OF ALL ACTUAL
CONDITIONS INCLUDING PIPING LOCATIONS AND SIZES.
2. DUE TO DRAWINGS BEING DIAGRAMMATICAL IN NATURE RISERS AND
DROPS ARE NOT SHOWN - CONTRACTOR SHALL INCLUDE THESE IN THE
BID - WHERE POSSIBLE ALL RISERS AND DROPS SHALL BE CONSTRUCTED
USING 45 DEGREE OR LONG RADIUS ELBOWS.
3. PROVIDE AND INSTALL NECESSARY PIPING INCREASERS /REDUCERS AS
REQUIRED FOR EQUIPMENT CONNECTIONS. CONSULT MANUFACTURER'S
DATA FOR ACTUAL PIPING CONNECTIONS SIZES, INCLUDING, BUT NOT
LIMITED TO THOSE SHOWN.
4. SCHEDULE NEW CONSTRUCTION WORK WITH THE OWNER WELL IN
ADVANCE.
5. ALL FINISHES AND SURFACES TO REMAIN WHICH ARE DAMAGED DURING
CONSTRUCTION WORK SHALL BE REPAIRED OR REPLACED TO THE
SATISFACTION OF THE OWNER AT NO ADDITIONAL COST TO THE OWNER.
6. NO PIPING OR CONDUIT SHALL BE INSTALLED UNTIL IT IS COORDINATED
WITH ALL OTHER TRADES AFFECTED. PROVIDE ALL OFFSETS REQUIRED
TO AVOID INTERFERENCE WITH OTHER TRADES: EXISTING CONDITIONS AND
WITH THE STRUCTURE, INCLUDING, BUT NOT LIMITED TO, THOSE SHOWN.
7. REFER TO DETAIL SHEETS AND SPECIFICATIONS FOR ADDITIONAL
INSTALLATION REQUIREMENTS.
8. CONTRACTOR SHALL SUBMIT A COMPLETE LIST OF EQUIPMENT AND
ITEMS TO BE REMOVED TO THE OWNER. ALL ITEMS THAT THE OWNER
WISHES TO RETAIN SHALL BE TURNED OVER TO OWNER AND THE
REMAINDER SHALL BE REMOVED FROM THE SITE AND DISPOSED OF IN A
PROPER MANNER BY CONTRACTOR.
9. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO PERFORM ALL WORK
NECESSARY TO PREPARE THE STRUCTURE FOR THE INSTALLATION
AND /OR DEMOLITION WORK OF THE MECHANICAL SYSTEMS. ALL HOLES,
OPENINGS AND ANY DAMAGED MATERIALS OR SURFACES SHALL BE
REPAIRED AND FINISHED TO MATCH EXISTING.
10. ALL DEMOLITION WORK SHALL COMPLY WITH NFPA 241 AND THE
REQUIREMENTS OF THE OWNER.
11. EXISTING SYSTEMS SHOWN ON THE DRAWINGS ARE BASED ON
AVAILABLE RECORD DRAWINGS. THIS INFORMATION IS ONLY PARTIALLY
VERIFIED. THE CONTRACTOR IS RESPONSIBLE TO FIELD VERIFY AND
INVESTIGATE ALL CONDITIONS THAT AFFECTS THE WORK PRIOR TO
SUBMITTING THE BID.
12. PROVIDE CLEAR ACCESS TO VALVES.
13. ALL PIPING MATERIALS SHALL BE PROTECTED WHILE BEING SHIPPED TO
THE SITE, STORED ON SITE AND AS INSTALLATION PROGRESSES. PIPING
STORED ON SITE PRIOR TO INSTALLATION SHALL BE OFF THE FLOOR.
PIPING SHALL BE END CAPPED.
14. PROVIDE MAINTENANCE MANUALS FOR ALL PIECES OF EQUIPMENT FOR
OWNERS USE FOR PREVENTATIVE MAINTENANCE AND GENERAL RECORDS.
IDENTIFY EACH PIECE OF EQUIPMENT IN A TABBED, 3 RING BINDER
THAT MATCHES THE LABELS ON THE EQUIPMENT.
SCOPE OF WORK
1. INSTALL 4 FAN COIL UNITS IN EXISTING ELECTRICAL ROOMS.
2. INSTALL CHILLED WATER LINES TO FAN COIL UNITS.
230100 - BASIC MECHANICAL REQUIREMENTS
A. CODES & REFERENCES
1. FLORIDA STATE BUILDING CODES 2010.
2. NFPA 101 (2009)
3. NFPA 90A (2009)
4. NFPA 99 (2005)
5. FACILITIES GUIDELINE INSTITUTE GUIDELINES FOR DESIGN &
CONSTRUCTION OF HEALTHCARE FACILITIES, 2010.
FAN COIL UNIT SCHEDULE
1. SEE PLANS FOR R/L HAND PIPING CONNECTIONS. 4. PROVIDE VIBRATION ISOLATION.
2. PROVIDE STAINLESS STEEL DRAIN PAN. 5. PROVIDE OPEN PROTOCAL INTERFACE FOR BUILDING AUTOMATION CONTROLS.
3. PROVIDE OVERFLOW PROTECTION. WATERGUARD OR EQUAL. 6. PROVIDE CONDENSATE PUMP.
(DENT.
TYPE
MANUFACTURER &
MODEL NO.
FAN
MINIMUM
OUTSIDE AIR
FILTERS
COOLING COIL
FAN
WEIGHT
(LBS)
CFM
EXT.
GPM
E.W.T.
E.A.D.B.
E.A.W.B.
SENSIBLE
TOTAL
COIL /ROWS
PIPE CONN
MAX WTR
H.P.
FLA
ELEC.
MAIN
BUILDING SECOND FLOOR PLAN - DEMOLITION - HVAC
M2.01
S.P.
BUILDING FIRST FLOOR PLAN - NEW CONSTRUCTION -
HVAC
M2.02
NORTH TOWER FIRST FLOOR PLAN - NEW CONSTRUCTION -
HVAC
M2.03
CAPACITY
CAPACITY
- HVAC
SIZE
PR. DROP
DETAILS & CONTROLS
FCU -M -1
COMPACT
CONCEALED
TRANE
FC -P -020
245
_
-
1' THROW AWAY
1.2
45
80
67
4.4
5.9
2
5/8
8.0
1
3.1
120/1/60
81
FCU -M -2
COMPACT
CONCEALED
TRANE
FC -P -080
675
-
-
1' THROW AWAY
4.6
45
80
67
15.3
22.6
q
5/e
10.6
1
3.1
120/1/60
147
FCU -M -3
COMPACT
CONCEALED
TRANE
FC -P -020
245
-
-
1' THROW AWAY
1.2
45
80
67
4.4
5.9
2
5/8
8.0
1
3.1
120/1/60
81
FCU -N -1
COMPACT
CONCEALED
TRANE
FC -P -020
245
-
-
1' THROW AWAY
1.2
45
80
67
4.4
5.9
2
5 '
/e
8.0
1
3.1
120/1/60
81
FCU -N -2
COMPACT
CONCEALED
TRANE
FC -P -030
310
-
-
1' THROW AWAY
1.6
45
80
67
5.9
7.9
3
5 '
/e
3.8
1
3.1
120/1/60
81
HVAC LEGEND
PIPING
- CHS CHILLED WATER
SUPPLY
- CHR CHILLED WATER
RETURN
�(51 SHUT -OFF VALVE
O THERMOSTAT (ADJUST.)
MECHANICAL EXISTING FIELD CONDITIONS
MECHANICAL CONTRACTOR IS REQUIRED PRIOR TO FINAL INSPECTIONS TO LABEL ALL
NEW AND EXISTING PIPES, VALVES, BOXES, AHU'S, FAN COILS, ETC. WITH
PROPER TAGS AND LABELS. (SEE BOOK SPECIFICATIONS FOR LABELING).
CONTRACTOR SHALL WORK WITH OWNER /FACILITIES STAFF TO DETERMINE ALL
EXISTING SERVICES FUNCTIONS, SOURCES, NAMES, ETC FOR PROPER IDENTIFICATION.
ALL IDENTIFICATIONS SHALL BE CLEARLY NOTED ON AS BUILT CONDITIONS AND SHALL
BE TURNED OVER TO OWNER AND DESIGN TEAM FOR FINAL RECORDS.
CONTRACTOR IS REQUIRED TO HAVE LABELING AND IDENTIFICATION COMPLETED
PRIOR TO 757. INSPECTIONS AND /OR COMPLETION OF CONSTRUCTION.
B. SCOPE OF WORK
1. PROVIDE ALL REQUIRED PERMITS, LABOR, MATERIAL AND EQUIPMENT REQUIRED TO
COMPLETE THE SCOPE OF THE PROJECT SHOWN ON THE DRAWINGS COMPLETE AND
READY FOR OCCUPANCY AND USE BY OWNER. THE WORK SHALL INCLUDE BUT IS NOT
LIMITED TO:
a. REMOVAL, RELOCATION AND RE- INSTALLATION OF EXISTING EQUIPMENT AND
SYSTEM.
b. CONNECTIONS TO EXISTING OR NEW EQUIPMENT AND SYSTEMS.
C. MODIFICATION OF EXISTING CHILLED OR HOT WATER SYSTEMS, STEAM SYSTEMS,
CONDENSATE DRAINAGE, DUCTWORK, TEMPERATURE CONTROLS AND LIFE - SAFETY
SYSTEMS.
d. CUTTING AND PATCHING TO REMOVE EXISTING OR INSTALL NEW WORK.
e. CLEANING AND TESTING.
f. INSTRUCTION TO OWNER'S PERSONNEL.
2. PROVIDE ALL BUILDING PENETRATIONS REQUIRED TO COMPLETE PROJECT. ALL
PENETRATIONS SHALL BE PATCHED AND SEALED WATERTIGHT. MAINTAIN FIRE
RATINGS OF EXISTING STRUCTURE.
3. PROVIDE ALL NECESSARY EQUIPMENT, PIPE SUPPORTS AND MATERIALS REQUIRED
FOR INSTALLATION PER THE REQUIREMENTS OF LOCAL, STATE OR FEDERAL
CODES.
C. REQUIRED SHOP DRAWINGS
1. INSULATION.
2. FAN COIL UNITS.
3. VALVES.
4. PIPES.
D. MAINTENANCE MANUALS
1. PROVIDE MAINTENANCE MANUALS FOR ALL NEW EQUIPMENT CONTAINING ALL
OPERATING AND MAINTENANCE DATA, SUBMITTALS, WARRANTEES, DIAGRAMS,
INSPECTION REPORTS AND VALVE LISTS IN A 3 RING BINDER WITH POCKETS FOR
DRAWINGS. PROVIDE OWNER WITH MINIMUM OF 2 COPIES.
E. RECORD DRAWINGS
1. THE CONTRACTOR SHALL MAINTAIN AN ACCURATE RECORD OF ALL CHANGES MADE
TO THE CONTRACT DOCUMENTS.
2.THE CONTRACTOR SHALL PROVIDE THE ENGINEER 2 SETS OF COMPLETED RECORD
'DRAWINGS.
3.THE PROJECT WILL NOT BE CONSIDERED COMPLETE UNTIL ACCURATE RECORD
DRAWINGS ARE DELIVERED.
HAZARDOUS MATERIAL NOTES
1. PORTIONS OF THE EXISTING SYSTEM MAY CONTAIN HAZARDOUS MATERIAL
(ASBESTOS). COORDINATE WITH THE OWNER TO DETERMINE THE LOCATION
AND TYPES OF HAZARDOUS MATERIALS.
2. THE OWNER IS RESPONSIBLE FOR THE IDENTIFICATION, REMOVAL AND
DISPOSAL OF HAZARDOUS MATERIAL AND IS NOT TO BE INCLUDED AS
PART OF THE WORK OF THIS CONTRACT UNLESS SPECIFICALLY IDENTIFIED
AS SUCH.
3. IF ANY MATERIAL APPEARS TO CONTAIN HAZARDOUS MATERIAL AND WAS
NOT PREVIOUSLY IDENTIFIED. THE CONTRACTOR IS TO INFORM THE OWNER
TO RECEIVE INSTRUCTIONS ON HOW TO PROCEED.
TEST & BALANCE NOTES
1. FINAL CONSTRUCTION:
UPON COMPLETION OF THE HVAC RENOVATION WORK, THE TEST AND BALANCE
CONTRACTOR SHALL BALANCE EQUIPMENT TO PROVIDE INDICATED AIR QUANTITIES
TO THE SPACE. ANY ADDITION ADJUSTMENTS REQUIRED FOR THIS SHALL BE
INCLUDED IN THIS CONTRACTORS PROPOSAL.
2. FINAL REPORT:
SUBMIT FINAL TEST AND BALANCE REPORT TO ENGINEER FOR REVIEW AND
ACCEPTANCE ONE WEEK PRIOR TO FINAL AHCA INSPECTION FOR EACH PHASE.
HVAC SPECIFICATIONS
F. SUBSTITUTIONS 230523 - VALVES
1. EQUIPMENT AND DESIGN OF SYSTEMS INDICATED ON THE DESIGN DRAWINGS AND
WITHIN THESE SPECIFICATIONS SHALL BE CONSIDERED AS 'SPECIFIED STANDARD'
OF QUALITY. NO SUBSTITUTIONS SHALL BE MADE WITHOUT PRIOR WRITTEN APPROVAL
OF THE ENGINEER 10 DAYS PRIOR TO BID DATE.
2. ANY DEVIATION FROM SPECIFIED EQUIPMENT THAT AFFECTS THE ELECTRICAL
REQUIREMENTS SHALL BE COORDINATED BY THE MECHANICAL CONTRACTOR AND
EQUIPMENT VENDOR WITH THE ELECTRICAL CONTRACTOR PRIOR TO SUBMITTING
BIDS.
230500 - BASIC MATERIALS AND METHODS
A. LABELING
1. PROVIDE RIGID PLASTIC EMBOSSED EQUIPMENT NAME TAGS FOR ALL NEW EQUIPMENT
AND DISCONNECTS. SETON NAMEPLATE CORPORATION.
2. PROVIDE VALVE TAGS ON ALL NEW AND RELOCATED VALVES. VALVE TAGS SHALL
MATCH TAGS USED AT THE EXISTING FACILITY. TAGS SHALL BE SECURED TO VALVES
WITH BRASS CHAINS. PROVIDE UPDATED INFORMATION ON ALL NEW VALVES TO THE
EXISTING VALVE CHART.
3. PROVIDE SETON SNAP ON PIPE LABELS ON ALL NEW PIPING. PIPE LABELS TO MATCH SIZE
AND TYPE USED AT THE EXISTING FACILITY AND COMPLY WITH ANSI Al 3.1. LABELS SHALL
BE APPLIED CLOSE TO VALVES, CHANGES IN PIPE DIRECTIONS, BRANCHES, PIPES
PASSING THROUGH WALLS OR FLOORS AND EVERY 20 FEET IN STRAIGHT RUNS OF PIPING
AND AT LEAST ONE TIME PER ROOM.
B. HANGERS AND SUPPORTS
1. PROVIDE ALL NECESSARY PIPE SUPPORTS, HANGERS, RODS, CLAMPS AND ATTACHMENTS
TO PROPERLY INSTALL AND SUPPORT PIPING AND EQUIPMENT FROM THE BUILDING
STRUCTURE.
2. PROVIDE ANY ANGLE IRON OR UNISTRUT AND SUSPENSION RODS REQUIRED TO INSTALL
EQUIPMENT AND PIPING.
3. THE USE OF BAILING WIRE OR PERFORATED METAL STRAPPING IS NOT PERMITTED FOR
SUPPORTS.
C. WARRANTY /GUARANTEE
1. THE CONTRACTOR SHALL WARRANTY /GUARANTEE AND MAINTAIN THE STABILITY OF
WORK AND MATERIALS AND KEEP SAME IN PERFECT REPAIR AND CONDITION OF THE
PERIOD OF ONE YEAR.
2. DEFECTS OF ANY KIND DUE TO THE FAULTY WORK OR MATERIALS APPEARING
DURING THE ABOVE MENTIONED PERIOD MUST BE IMMEDIATELY MADE GOOD BY
THE CONTRACTOR AT HIS OWN EXPENSE TO THE ENTIRE SATISFACTION OF THE
OWNER AND ENGINEER. SUCH RECONSTRUCTION AND REPAIRS SHALL INCLUDE
DAMAGE TO THE FINISH OR FURNISHING OF THE BUILDING RESULTING FROM THE
ORIGINAL DEFECT OR REPAIR THERETO.
230600 - PIPING
A. DO NOT USE MECHANICALLY COUPLED JOINTS OR T- DRILLED TEES ON HVAC
SYSTEMS.
B. SCHEDULE 40 ASTM A53 GRADE B SEAMLESS BLACK STEEL PIPE WITH CLASS 150
MALLEABLE IRON FITTINGS USED FOR:
1. CHILLED WATER 2' BELOW, THREADED JOINTS, ABOVE 21/j WELDED JOINTS.
C. TYPE L HARD COPPER PIPE WITH WROUGHT COPPER FITTINGS AND SOLDERED
JOINTS OR VIEGA PRO. PRESS.
I. HVAC CHILLED WATER UP TO 11/j OPTION UP TO 21/j.
D. PVC PIPE IS NOT TO BE USED ON MECHANICAL SYSTEMS.
A. NIBCO, STOCKHAM, CRANE, MILWAUKEE, APPOLLO OR KITZ.
B. HVAC WATER VALVES (NIBCO NUMBERS INDICATED BELOW).
1. SHUT OFF BELOW 3' FIGURE T585 -70 OR S585 -70, 2 PIECE, FULLY PORTED
600 psi, BALL VALVE. PROVIDE RAISED STEM HANDLE FOR INSULATION.
230501 - SLEEVES
A. SLEEVES TO BE 18 GAUGE SHEET METAL OR SCHEDULE 40 PIPE. SLEEVE THE
FOLLOWING:
1. MASONRY WALLS SLEEVE ALL PIPE PENETRATIONS.
2. FIRE RATED DRY WALL PARTITIONS SLEEVE STEAM SUPPLY AND RETURN AND HEATING
WATER.
3. NON -FIRE RATED PARTITIONS NO SLEEVES REQUIRED. SEAL WALL TO INSULATION.
4. USE U.L. LISTED ASSEMBLY FOR ALL PENETRATIONS THROUGH RATED CONSTRUCTION.
230548 - VIBRATION ISOLATION
A. ACCEPTABLE MANUFACTURERS:
1. MASON INDUSTRIES.
2. KINETICS NOISE CONTROL.
3. KORFUND.
4. AMBER BOOTH.
B. MASON TYPE HS CEILING FOR SUSPENDED FAN COIL UNIT.
230700 - INSULATION
A. INSULATION, ADHESIVES, COATINGS, SEALERS, TAPES, ETC. SHALL HAVE A FLAME
SPREAD OF 25 OR LESS AND SMOKE DEVELOPMENT OF 50 OR LESS IN ACCORDANCE
WITH ASTM E -84, NFPA 225, UL 723 AND MEET THE REQUIREMENTS OF NFPA 90A.
ALL INSULATING R- VALUES TO MEET THE REQUIREMENTS OF THE FLORIDA ENERGY
CODE.
B. CELLULAR GLASS PIPE INSULATION, PITTSBURGH CORNING 'FOAMGLASS' WITH ASJ.
1. CHILLED WATER PIPING 2' AND UNDER - 11/1 THICK.
230923 - TEMPERATURE CONTROLS
A. EXTEND EXISTING CONTROL SYSTEM TO NEW EQUIPMENT AND PROVIDE ALL
MODIFICATIONS NECESSARY FOR A FULLY FUNCTIONING SYSTEM.
B. FAN COIL UNIT
1. THE EXISTING CONTROL SYSTEM IS TO BE MODIFIED BY THE OWNERS EXISTING
CONTROL VENDOR.
2. AUTOMATIC CONTROL VALVES SHALL BE FULLY PROPORTIONING WITH MODULATING
PLUG OR V -PORT INNER GUIDES OR LINEAR CHARACTERISTIC BALL TYPE. THE VALVE
SHALL BE QUIET IN OPERATION AND FAIL -SAFE IN THE NORMALLY 'COOLING' POSITION
IN THE CONTROL EVENT OF CONTROL FAILURE. CONTROL VALVES SHALL BE SIZED
BY THE CONTROL MANUFACTURER AND SHALL BE WARRANTED TO MEET THE HEATING
AND COOLING LOADS AS SPECIFIED. CONTROL VALVES SHALL BE SUITABLE FOR THE
PRESSURE CONDITIONS AND SHALL CLOSE AGAINST THE DIFFERENTIAL PRESSURE
INVOLVED. VALVE OPERATORS SHALL BE OF THE PNEUMATIC OR ELECTRIC 24 VOLT
MECHANICAL DEMOLITION NOTES
1. FOR EQUIPMENT AND SYSTEMS TO REMAIN IT SHALL BE THE CONTRACTOR'S
RESPONSIBILITY TO VERIFY THE CONDITION OF, EXACT SIZES AND LOCATION OF
EXISTING DUCT AND PIPING ETC. BEFORE DEMOLITION WORK IS BEGUN. REPORT
ANY DISCREPANCIES BETWEEN PLANS AND ACTUAL FIELD CONDITIONS TO THE
OWNER AND ENGINEER PRIOR TO THE COMMENCEMENT OF DEMOLITION WORK.
2. REMOVE THE INDICATED HVAC ITEMS AS SHOWN ON PLANS, THIS INCLUDES ALL
HANGERS, STRAPS AND RELATED MATERIAL. AS DIRECTED THIS MATERIAL
SHALL BE REMOVED FROM THE SITE OR TURNED OVER TO THE OWNER (AS
DIRECTED BY THE OWNER).
3. CAP AND SEAL AIR TIGHT ALL POINTS AT WHICH DUCTWORK IS REMOVED FROM
DUCTWORK THAT WILL REMAIN.
4. PATCH AND MATCH OPENINGS IN WALLS TO MAINTAIN THE INTEGRITY OF THE
WALL WHERE AIR DEVICES, DUCTS, PIPING, ETC. HAVE BEEN REMOVED.
(MAINTAIN THE EXISTING RATINGS).
5. CONTRACTOR SHALL VERIFY CLEARANCE REQUIREMENTS AND INDICATE
ROUTING OF NEW PIPES AS RISES AND DROPS MAY BE NECESSARY DUE
TO EXISTING FIELD CONDITIONS.
6. ALL DEMOLITION WORK SHALL COMPLY WITH NFPA 241 AND THE REQUIREMENTS
OF THE OWNER.
DUCT AND PIPE INSULATION
PIPING
1. CHILLED WATER PIPING: (FOAM GLASS MIN. K =.27)
-PIPES 2' OR LESS = 1 i/j THICK
TYPE. BODY PRESSURE RATING AND CONNECTION TYPE (SCREWED FLANGED OR
FLANGED) SHALL CONFORM TO PIPE SCHEDULE ELSEWHERE IN THIS SPECIFICATION.
3. CONTROL CONTRACTOR SHALL PROVIDE ALL WIRING REQUIRED FOR THE CONTROL
SYSTEM TO OPERATE. IF THE JOB CONTAINS SMOKE DAMPERS THEY SHALL ALSO
BE WIRED BY T.C.C.
4. MOUNT THERMOSTATS 48' A.F.F. ALIGN WITH LIGHT SWITCHES, DOOR SWINGS AND
OTHER WALL MOUNTED DEVICES.
5. COORDINATE FINAL LOCATION OF THERMOSTATS WITH THE OWNER PRIOR TO
INSTALLATION.
230593 - TEST AND BALANCE
A. PROVIDE COMPLETE TEST AND BALANCE OF ALL WATER AND AIR SYSTEMS IN
ACCORDANCE WITH NEBB (NATIONAL ENVIRONMENTAL BALANCING BUREAU) OR AABC
(ASSOCIATED AIR BALANCE COUNCIL) STANDARDS.
B. TEST AND BALANCE FIRM SHALL BE:
1 • EARL HAYGOOD, INC. - (305) 266 -7070.
2. GFS CONSULTING - (305) 992 -4348.
C. CONTRACTOR SHALL:
1. VISIT SITE AT START OF PROJECT AND COORDINATE REQUIRED BALANCING EQUIPMENT
AND DAMPERS WITH MECHANICAL CONTRACTOR.
2. AIR SYSTEMS:
a. MAKE CHANGES TO BELTS, PULLEYS, DAMPERS, VOLUME BOXES, ETC. TO OBTAIN
DESIGN CONDITIONS AS REQUIRED BY TAB PROCEDURES.
b. BALANCE SUPPLY, RETURN AND EXHAUST AIR OUTLETS WITHIN 10% OF DESIGN
WHILE MAINTAINING REQUIRED PRESSURE RELATIONSHIPS. RECORD DESIGN AND
ACTUAL TOTALS.
c. MEASURE AND REPORT FAN RPM, FAN SUCTION PRESSURE, FAN DISCHARGE
PRESSURE, FAN TOTAL PRESSURE AND PRESSURE DROP ACROSS COMPONENTS.
DESIGN AND ACTUAL SUPPLY, RETURN, OUTSIDE AND EXHAUST AIR.
d. ACTUAL AND DESIGN NAMEPLATE AMPERAGE ON FAN MOTORS.
e. PRESSURE DIFFERENTIAL ACROSS DUCT SMOKE DETECTORS.
f. ADJUST FANS FOR LOWEST STATIC PRESSURE REQUIRED TO DELIVER TO OUTLETS
AS NOTED IN NEBB OR AABC PROCEDURES.
3. WATER SYSTEMS:
a. ADJUST AND RECORD ACTUAL GPM AND SYSTEM SUCTION AND DISCHARGE
PRESSURES (STATIC AND OPERATING).
B. MOTOR DESIGN AND ACTUAL AMPERAGE AT PUMPS.
c. DESIGN AND ACTUAL GPM AND TEMPERATURE DIFFERENCE ACROSS COILS,
CONVERTERS, CHILLER AND TOWERS.
d. ADJUST AND RECORD SYSTEM MAKEUP PRESSURE, RELIEF PRESSURE SETTING AND
EXPANSION TANK PRESSURE.
4. CONFIRM OPERATION OF ALL CONTROLS, MANOMETERS AND SENSING DEVICES.
5. ON AHCA REVIEWABLE PROJECTS PROVIDE WRITTEN REPORT AT LEAST ONE WEEK
BEFORE FINAL INSPECTION AND PROVIDE A TECHNICIAN DURING FINAL INSPECTION
OF PROJECT.
6. CONTRACTOR SHALL PROVIDE FINAL SHEAVE CHANGE OUT AND ADJUSTMENT FOR
MAXIMUM AMPRAGE TO INCLUDE DIRTY FILTER ALLOWANCE LOADING ALLOWING THE
VFD TO RAMP UP IN RESPONSE TO FILTER LOADING.
mi h
er an
el , nc.
699 -West Hillsboro, Suite 300
OeerYield Beach, FL 33441
(954) 421 -1260
- - - r AX: (954) 421 -1466
www.ssr- inc.com
Firm Certification - EB- 0000857
John E. Moulder PE - 33200
Michael A Steward PE - 65701
SSR JOB # 1232030.0
W vJ CY)
�: 1--
T
Z �M
cry O w W M
O lZ Q
Z = W CF/-)-CE
-F- U -0o
Cr) LJL
Q O
Z
W
=HOC o=
I- Z U) (0 Z)
- I. O
Q Q C/)
02
W
MOV 41fi/
' No.
Off,
IL
\ �� rfill%,�
DRAWN
CHECKED
DATE 11/12/12
REVISED
SHEET N0.
HVAC SCHEDULE, NOTES,
SPECIFICATIONS,LEGEND
AND DRAWING INDEX
M0.01
DRAWING INDEX
SHEET
NUMBER
SHEET TITLE
MO.01
HVAC
SCHEDULE, NOTES, SPECIFICATIONS, LEGEND AND DRAWING INDEX
MO.02
HVAC
CONSTRUCTION ZONE VENTILATION SCHEDULE, NOTES
& DETAIL
M1.00
HVAC
CONSTRUCTION ZONE VENTILATION PLANS
M1.01
MAIN
BUILDING FIRST FLOOR PLAN - DEMOLITION - HVAC
M1.02
NORTH TOWER FIRST FLOOR PLAN - DEMOLITION - HVAC
M1.03
MAIN
BUILDING SECOND FLOOR PLAN - DEMOLITION - HVAC
M2.01
MAIN
BUILDING FIRST FLOOR PLAN - NEW CONSTRUCTION -
HVAC
M2.02
NORTH TOWER FIRST FLOOR PLAN - NEW CONSTRUCTION -
HVAC
M2.03
MAIN
BUILDING SECOND FLOOR PLAN - NEW CONSTRUCTION
- HVAC
M3.01
HVAC
DETAILS & CONTROLS
TYPE. BODY PRESSURE RATING AND CONNECTION TYPE (SCREWED FLANGED OR
FLANGED) SHALL CONFORM TO PIPE SCHEDULE ELSEWHERE IN THIS SPECIFICATION.
3. CONTROL CONTRACTOR SHALL PROVIDE ALL WIRING REQUIRED FOR THE CONTROL
SYSTEM TO OPERATE. IF THE JOB CONTAINS SMOKE DAMPERS THEY SHALL ALSO
BE WIRED BY T.C.C.
4. MOUNT THERMOSTATS 48' A.F.F. ALIGN WITH LIGHT SWITCHES, DOOR SWINGS AND
OTHER WALL MOUNTED DEVICES.
5. COORDINATE FINAL LOCATION OF THERMOSTATS WITH THE OWNER PRIOR TO
INSTALLATION.
230593 - TEST AND BALANCE
A. PROVIDE COMPLETE TEST AND BALANCE OF ALL WATER AND AIR SYSTEMS IN
ACCORDANCE WITH NEBB (NATIONAL ENVIRONMENTAL BALANCING BUREAU) OR AABC
(ASSOCIATED AIR BALANCE COUNCIL) STANDARDS.
B. TEST AND BALANCE FIRM SHALL BE:
1 • EARL HAYGOOD, INC. - (305) 266 -7070.
2. GFS CONSULTING - (305) 992 -4348.
C. CONTRACTOR SHALL:
1. VISIT SITE AT START OF PROJECT AND COORDINATE REQUIRED BALANCING EQUIPMENT
AND DAMPERS WITH MECHANICAL CONTRACTOR.
2. AIR SYSTEMS:
a. MAKE CHANGES TO BELTS, PULLEYS, DAMPERS, VOLUME BOXES, ETC. TO OBTAIN
DESIGN CONDITIONS AS REQUIRED BY TAB PROCEDURES.
b. BALANCE SUPPLY, RETURN AND EXHAUST AIR OUTLETS WITHIN 10% OF DESIGN
WHILE MAINTAINING REQUIRED PRESSURE RELATIONSHIPS. RECORD DESIGN AND
ACTUAL TOTALS.
c. MEASURE AND REPORT FAN RPM, FAN SUCTION PRESSURE, FAN DISCHARGE
PRESSURE, FAN TOTAL PRESSURE AND PRESSURE DROP ACROSS COMPONENTS.
DESIGN AND ACTUAL SUPPLY, RETURN, OUTSIDE AND EXHAUST AIR.
d. ACTUAL AND DESIGN NAMEPLATE AMPERAGE ON FAN MOTORS.
e. PRESSURE DIFFERENTIAL ACROSS DUCT SMOKE DETECTORS.
f. ADJUST FANS FOR LOWEST STATIC PRESSURE REQUIRED TO DELIVER TO OUTLETS
AS NOTED IN NEBB OR AABC PROCEDURES.
3. WATER SYSTEMS:
a. ADJUST AND RECORD ACTUAL GPM AND SYSTEM SUCTION AND DISCHARGE
PRESSURES (STATIC AND OPERATING).
B. MOTOR DESIGN AND ACTUAL AMPERAGE AT PUMPS.
c. DESIGN AND ACTUAL GPM AND TEMPERATURE DIFFERENCE ACROSS COILS,
CONVERTERS, CHILLER AND TOWERS.
d. ADJUST AND RECORD SYSTEM MAKEUP PRESSURE, RELIEF PRESSURE SETTING AND
EXPANSION TANK PRESSURE.
4. CONFIRM OPERATION OF ALL CONTROLS, MANOMETERS AND SENSING DEVICES.
5. ON AHCA REVIEWABLE PROJECTS PROVIDE WRITTEN REPORT AT LEAST ONE WEEK
BEFORE FINAL INSPECTION AND PROVIDE A TECHNICIAN DURING FINAL INSPECTION
OF PROJECT.
6. CONTRACTOR SHALL PROVIDE FINAL SHEAVE CHANGE OUT AND ADJUSTMENT FOR
MAXIMUM AMPRAGE TO INCLUDE DIRTY FILTER ALLOWANCE LOADING ALLOWING THE
VFD TO RAMP UP IN RESPONSE TO FILTER LOADING.
mi h
er an
el , nc.
699 -West Hillsboro, Suite 300
OeerYield Beach, FL 33441
(954) 421 -1260
- - - r AX: (954) 421 -1466
www.ssr- inc.com
Firm Certification - EB- 0000857
John E. Moulder PE - 33200
Michael A Steward PE - 65701
SSR JOB # 1232030.0
W vJ CY)
�: 1--
T
Z �M
cry O w W M
O lZ Q
Z = W CF/-)-CE
-F- U -0o
Cr) LJL
Q O
Z
W
=HOC o=
I- Z U) (0 Z)
- I. O
Q Q C/)
02
W
MOV 41fi/
' No.
Off,
IL
\ �� rfill%,�
DRAWN
CHECKED
DATE 11/12/12
REVISED
SHEET N0.
HVAC SCHEDULE, NOTES,
SPECIFICATIONS,LEGEND
AND DRAWING INDEX
M0.01