Loading...
12-1353-0121. PERFORM CONTRACT IN ACCORDANCE REQUIREMENTS AND PROCEDURES STIPULATED IN THE AIA DOCUMENT A201,1997 EDITION GENERAL CONDITIONS OF THE CONTRACT FOR CONSTRUCTION. 2. PERFORM WORK IN ACCORDANCE WITH APPLICABLE LOCAL CODES, ORDINANCES, AND REGULATIONS. SECTION 01110 - SUMMARY OF WORK 1. - PROJECT NAME: SOUTH MIAMI HOSPITAL ELECTRICAL RENOVATION - PROJECT LOCATION: 6200 SOUTHWEST 73RD STREET. SOUTH MIAMI, FL 33143 -OWNER: BAPTIST HEALTH OF SOUTH FLORIDA 2. WORK WILL BE CONSTRUCTED UNDER A SINGLE PRIME CONTRACT. 3. COOPERATE WITH SEPARATE CONTRACTORS SO THAT WORK UNDER THOSE CONTRACTS MAY BE CARRIED OUT SMOOTHLY, WITHOUT INTERFERING WITH OR DELAYING WORK UNDER THIS CONTRACT. 4. CONTRACTOR USE OF PREMISES: DURING CONSTRUCTION CONTRACTOR SHALL NOT HAVE FULL USE OF PREMISES. CONTRACTOR'S USE OF PREMISES IS LIMITED ALSO BY OWNER'S RIGHTTO PERFORM WORK OR EMPLOY OTHER CONTRACTORS ON PORTIONS OF PROJECT. 5. USE OF SITE: LIMIT USE OF PREMISES TO AREAS INDICATED. DO NOT DISTURB PORTIONS OF SITE BEYOND AREAS INDICATED. - ALLOW FOR WORK BY SEPARATE CONTRACTORS. - ALLOW FOR OWNER OCCUPANCY AND USE BY PUBLIC. - KEEP DRIVEWAYS AND ENTRANCES CLEAR. - DO NOT USE THESE AREAS FOR PARKING OR MATERIAL STORAGE. - SCHEDULE DELIVERIES TO MINIMIZE ON -SITE STORAGE OF MATERIALS AND EQUIPMENT. 6. FULL OWNER OCCUPANCY: OWNER WILL OCCUPY SITE AND EXISTING BUILDING DURING CONSTRUCTION. COOPERATE WITH OWNER TO MINIMIZE CONFLICTS AND FACILITATE OWNER USAGE. DO NOT INTERFERE WITH OWNER'S OPERATIONS. TPARTIAL OWNER OCCUPANCY: OWNER RESERVES RIGHT TO OCCUPY AND TO PLACE AND INSTALL EQUIPMENT IN COMPLETED AREAS OF BUILDING PRIOR TO SUBSTANTIAL COMPLETION. PLACING EQUIPMENT AND PARTIAL OCCUPANCY DO NOT CONSTITUTE ACCEPTANCE OF WORK. - OBTAIN A CERTIFICATE OF SUBSTANTIAL COMPLETION FOR EACH PORTION OF WORK PRIOR TO OWNER OCCUPANCY. - OBTAIN A CERTIFICATE OF OCCUPANCY FROM BUILDING OFFICIALS PRIOR TO OWNER OCCUPANCY. -MECHANICAL AND ELECTRICAL SYSTEMS SHALL BE OPERATIONAL AND REQUIRED INSPECTIONS AND TESTS COMPLETED PRIOR TO PARTIAL OWNER OCCUPANCY. UPON OCCUPANCY, OWNER WILL OPERATE AND MAINTAIN SYSTEMS SERVING OCCUPIED PORTIONS OF BUILDING. - OWNER WILL BE RESPONSIBLE FOR MAINTENANCE AND CUSTODIAL SERVICE FOR OCCUPIED PORTIONS OF BUILDING. SECTION 01250 - CONTRACT MODIFICATION PROCEDURES 1. MINOR CHANGES IN WORK: ARCHITECT WILL ISSUE INSTRUCTIONS AUTHORIZING MINOR CHANGES IN WORK ON ARCHITECTS STANDARD FORM. 2. PROPOSAL CHANGE REQUESTS: ARCHITECT WILL ISSUE A DESCRIPTION OF PROPOSED CHANGES IN WORK THAT REQUIRE ADJUSTMENT TO CONTRACT SUM OR TIME. DESCRIPTION MAY INCLUDE SUPPLEMENTAL OR REVISED DRAWINGS AND SPECIFICATIONS. 3. CONTRACTOR- INITIATED PROPOSALS: WHEN UNFORESEEN CONDITIONS REQUIRE MODIFICATIONS, CONTRACTOR MAY SUBMIT REQUEST FORA CHANGE TO ARCHITECT. -DESCRIBE PROPOSED CHANGE. - INDICATE REASONS FOR CHANGE AND EFFECT OF CHANGE ON CONTRACT SUM AND TIME. - INCLUDE AN ITEMIZED LIST OF PRODUCTS REQUIRED AND UNIT COSTS, WITH TOTALAMOUNT OF PURCHASES. - INDICATE TAXES, DELIVERY CHARGES, EQUIPMENT RENTAL, AND AMOUNTS OF TRADE DISCOUNTS. 4. PROPOSED CHANGE FORM: USE ARCHITECTS STANDARD FORM. 5. CONSTRUCTION CHANGE DIRECTIVE: WHEN OWNER AND CONTRACTOR DISAGREE ON TERMS OF A PROPOSED CHANGE, ARCHITECT MAY ISSUE A CONSTRUCTION CHANGE DIRECTIVE ON ARCHITECTS STANDARD FORM INSTRUCTING CONTRACTOR TO PROCEED WITH A CHANGE. CONSTRUCTION CHANGE DIRECTIVE CONTAINS A DESCRIPTION OF CHANGE AND DESIGNATES METHOD TO BE FOLLOWED TO DETERMINE CHANGE IN CONTRACT SUM OR TIME. 6. DOCUMENTATION: MAINTAIN DETAILED RECORDS ON A TIME AND MATERIAL BASIS OF WORK REQUIRED BY CONSTRUCTION CHANGE DIRECTIVE. AFTER COMPLETING CHANGE, SUBMITAN ITEMIZED ACCOUNTAND SUPPORTING DATA TO SUBSTANTIATE CONTRACT ADJUSTMENTS. 7. CHANGE ORDER PROCEDURES: UPON OWNER'S APPROVAL OF A PROPOSED CHANGE, ARCHITECT WILL ISSUE A CHANGE ORDER ON ARCHITECTS STANDARD FORM. SECTION 01291 - APPLICATIONS AND CERTIFICATIONS FOR PAYMENT 1. COORDINATE SCHEDULE OF VALUES AND APPLICATIONS FOR PAYMENT WITH CONTRACTOR'S CONSTRUCTION SCHEDULE, SUBMITTAL SCHEDULE, AND LIST OF SUBCONTRACTS. 2. SCHEDULE OF VALUES: COORDINATE PREPARATION OF SCHEDULE OF VALUES WITH PREPARATION OF CONTRACTOR'S CONSTRUCTION SCHEDULE. - CORRELATE LINE ITEMS IN SCHEDULE OF VALUES WITH OTHER REQUIRED ADMINISTRATIVE SCHEDULES AND FORMS - SUBMIT SCHEDULE OF VALUES AT EARLIEST POSSIBLE DATE BUT NO LATER THAN 7 DAYS BEFORE DATE SCHEDULED FOR SUBMITTAL OF INITIAL APPLICATIONS FOR PAYMENT. 3. FORMAT AND CONTENT: USE TABLE OF CONTENTS AS A GUIDE TO ESTABLISH FORMAT FOR SCHEDULE OF VALUES. PROVIDE AT LEAST ONE LINE rrEM FOR EACH SPECIFICATION SECTION. 4. APPLICATIONS FOR PAYMENT SHALL BE CONSISTENT WITH PREVIOUS APPLICATIONS AND PAYMENTS AS CERTIFIED BY ARCHITECT AND PAID FOR BY OWNER. R5. PAYMENT - APPLICATION TIMES: PAYMENT DATES ARE INDICATED IN AGREEMENT. PERIOD COVERED BY EACH APPLICATION IS PERIOD INDICATED IN AGREEMENT. 6. PAYMENT - APPLICATION FORMS: USE AIA DOCUMENT G702 AND CONTINUATION SHEETS G703 AS FORM FOR APPLICATIONS FOR PAYMENT. 7. APPLICATION PREPARATION: COMPLETE EVERY ENTRY, INCLUDING NOTARIZATION AND EXECUTION BY A PERSON AUTHORIZED TO SIGN ON BEHALF OF CONTRACTOR. - ENTRIES SHALL MATCH DATA ON SCHEDULE OF VALUES AND CONTRACTOR'S CONSTRUCTION SCHEDULE. USE UPDATED SCHEDULES IF REVISIONS WERE MADE. - INCLUDE AMOUNTS OF CHANGE ORDERS AND CONSTRUCTION CHANGE DIRECTIVES ISSUED PRIOR TO LAST DAY OF CONSTRUCTION PERIOD COVERED BY APPLICATION. SECTION 01310 - PROJECT MANAGEMENTAND COORDINATION 1. COORDINATION: COORDINATE CONSTRUCTION TO ASSURE EFFICIENT AND ORDERLY INSTALLATION OF EACH PART OF WORK. COORDINATE OPERATIONS THAT DEPEND ON EACH OTHER FOR PROPER INSTALLATION, CONNECTION AND OPERATION. -SCHEDULE OPERATIONS IN SEQUENCE REQUIRED TO OBTAIN BEST RESULTS WHERE INSTALLATION OF ONE PART DEPENDS ON INSTALLATION OF OTHER COMPONENTS BEFORE OR AFTER ITS OWN INSTALLATION. -COORDINATE INSTALLATION OF DIFFERENT COMPONENTS TO ASSURE MAXIMUM ACCESSIBILITY FOR MAINTENANCE, SERVICE AND REPAIR. - MAKE PROVISIONS TO ACCOMMODATE ITEMS SCHEDULED FOR LATER INSTALLATION. 2. ADMINISTRATIVE PROCEDURES: COORDINATE SCHEDULING AND TIMING OF REQUIRED PROCEDURES WITH OTHER ACTIVITIES TO AVOID CONFLICTS AND ASSURE ORDERLY PROGRESS. X 3. STAFF NAMES: SUBMIT A LIST OF CONTRACTOR'S STAFF ASSIGNMENTS, INCLUDING SUPERINTENDENT AND OTHER PERSONNEL AT PROJECT SITE; IDENTIFY INDIVIDUALS, THEIR DUTIES, RESPONSIBILITIES, ADDRESSES AND TELEPHONE NUMBERS. 4. REQUIRE INSTALLERS OF MAJOR COMPONENT TO INSPECT SUBSTRATE AND CONDITIONS UNDER WHICH WORK IS TO BE PERFORMED. DO NOT PROCEED UNTIL UNSATISFACTORY CONDITIONS HAVE BEEN CORRECTED. 5. COORDINATE TEMPORARY ENCLOSURES WITH INSPECTIONS AND TESTS, TO MINIMIZE NEED TO UNCOVER COMPLETED CONSTRUCTION. 6. CLEAN AND PROTECT CONSTRUCTION IN PROGRESS AND ADJOINING MATERIALS IN PLACE DURING HANDLING AND INSTALLATION. APPLY PROTECTIVE COVERING TO ASSURE PROTECTION FROM DAMAGE. 7. CLEAN AND MAINTAIN COMPLETED CONSTRUCTION AS NECESSARY THROUGH CONSTRUCTION PERIOD. ADJUST AND LUBRICATE OPERABLE COMPONENTS TO ASSURE OPERABILITY WITHOUT DAMAGING EFFECTS. 8. SUPERVISE CONSTRUCTION TO ASSURE THAT NO PART IS SUBJECT TO HARMFUL, DANGEROUS, OR DAMAGING EXPOSURE. SECTION 01315 - PROJECT MEETINGS 1. PRE - CONSTRUCTION CONFERENCE: ARCHITECT WILL SCHEDULE AND CONDUCT A PRE - CONSTRUCTION CONFERENCE AFTER "NOTICE TO PROCEED" AND PRIOR TO COMMENCEMENT OF CONSTRUCTION ACTIVITIES. REVIEW RESPONSIBILITIES AND PERSONNEL ASSIGNMENTS. 2. PRE - INSTALLATION CONFERENCE: CONDUCT A PRE - INSTALLATION CONFERENCE BEFORE EACH ACTIVITY THAT REQUIRES COORDINATION WITH OTHER CONSTRUCTION. INSTALLER AND REPRESENTATIVES OF MANUFACTURERS AND FABRICATORS INVOLVED IN INSTALLATION, AND COORDINATION OR INTEGRATION WITH OTHER MATERIALS AND INSTALLATIONS THAT HAVE PRECEDED OR WILL FOLLOW, SHALL ATTEND. ADVISE ARCHITECT OF SCHEDULED MEETING DATES. 3. PROGRESS MEETINGS: CONDUCT PROGRESS MEETINGS AT PROJECT SITE AT REGULAR INTERVALS. NOTIFY OWNER AND ARCHITECT OF SCHEDULED DATES. COORDINATE MEETING DATES WITH PREPARATION OF PAYMENT REQUEST. 4. REPORTING: NO LATER THAN 3 DAYS AFTER EACH MEETING, DISTRIBUTE COPIES OF MINUTES OF MEETING TO EACH PARTY PRESENT AND TO PARTIES WHO SHOULD HAVE BEEN PRESENT. INCLUDE A SUMMARY, IN NARRATIVE FORM, OF PROGRESS SINCE PREVIOUS MEETING. 5. SCHEDULE UPDATING: REVISE CONTRACTOR'S CONSTRUCTION SCHEDULE AFTER EACH MEETING WHERE REVISIONS HAVE BEEN MADE. ISSUE REVISED SCHEDULE CONCURRENTLY WITH REPORT OF EACH MEETING. SECTION 01330 - SUBMITTAL PROCEDURES 1. COORDINATE SUBMITTAL PREPARATION WITH PERFORMANCE OF CONSTRUCTION ACTIVITIES, AND WITH PURCHASING OR FABRICATION, DELIVERY, OTHER SUBMITTALS AND RELATED ACTIVITIES. 2. SUBMIT A FULLY DEVELOPED, BAR -CHART TYPE CONSTRUCTION SCHEDULE, WITHIN 30 DAYS OF DATE ESTABLISHED FOR COMMENCEMENT OF WORK. 3. PREPARE A DAILY CONSTRUCTION REPORT, RECORDING INFORMATION CONCERNING EVENTS AT SITE. 4. SUBMIT SHOP DRAWINGS, DRAWN TO ACCURATE SCALE. INDICATE DEVIATIONS FROM CONTRACT DOCUMENTS. DO NOT REPRODUCE CONTRACT DOCUMENTS OR COPY STANDARD INFORMATION AS BASIS OF SHOP DRAWINGS. 5. SUBMIT MINIMUM OF ONE REPRODUCIBLE AND TWO PRINTS OF SHOP DRAWINGS UNTIL FINAL ACCEPTANCE. SUBMIT ONE ADDITIONAL PRINT OF STRUCTURAL, MECHANICAL AND ELECTRICAL ITEMS. REPRODUCIBLE AND ONE PRINT WILL BE RETURNED TO GENERAL CONTRACTOR AFTER REVIEW. 6. COLLECT PRODUCT DATA INTO A SINGLE SUBMITTAL FOR EACH ELEMENT OR SYSTEM. MARK EACH COPY TO SHOW APPLICABLE CHOICES AND OPTIONS. WHERE PRODUCT DATA INCLUDES INFORMATION ON SEVERAL PRODUCTS, MARK COPIES TO INDICATE APPLICABLE INFORMATION. 7. SUBMIT MINIMUM OF FOUR COPIES OF PRODUCT DATA UNTIL FINAL ACCEPTANCE. SUBMIT ONE ADDITIONAL COPY OF STRUCTURAL, MECHANICAL AND ELECTRICAL ITEMS. THREE COPIES OF PRODUCT DATA WILL BE RETURNED TO GENERAL CONTRACTOR AFTER REVIEW. 8. SUBMIT FULL -SIZE SAMPLES CURED AND FINISHED AS SPECIFIED AND IDENTICAL TO PRODUCT PROPOSED. MOUNT, DISPLAY, OR PACKAGE SAMPLES TO FACILITATE REVIEW. 9. CONTRACTOR SHALL REVIEW AND STAMP SUBMITTALS WITH HIS APPROVAL. SUBMITTALS WHICH DO NOT BEAR CONTRACTOR'S APPROVAL STAMP SHALL BE RETURNED WITHOUT REVIEW. STAMP SHALL INCLUDE STATEMENT, "THIS SUBMITTAL HAS BEEN REVIEWED FOR COMPLIANCE WITH REQUIREMENTS OF WORK AND OF CONTRACT DOCUMENTS'. 10. ACCEPTANCE OF SHOP DRAWINGS, SAMPLES OR PRODUCT DATA WHICH DEVIATES FROM CONTRACT DOCUMENTS DOES NOT AUTHORIZE CHANGES TO CONTRACT SUM. SUBMIT IN WRITING AT TIME OF SUBMISSION ANY CHANGES TO CONTRACT SUM AFFECTED BY SUCH SHOP DRAWINGS, SAMPLES OR PRODUCT DATA, OTHERWISE, CLAIM FOR EXTRAS WILL NOT BE CONSIDERED. SECTION 01421 - REFERENCES 1. INDICATED REFERS TO GRAPHIC REPRESENTATIONS, NOTES, OR SCHEDULES ON DRAWINGS, PARAGRAPHS OR SCHEDULES IN SPECIFICATIONS, AND SIMILAR REQUIREMENTS IN CONTRACT DOCUMENTS. 2. DIRECTED, REQUESTED, AUTHORIZED, SELECTED, APPROVED, REQUIRED, AND PERMITTED MEAN DIRECTED BY ARCHITECT, REQUESTED BY ARCHITECT, AND SIMILAR PHRASES. 3. APPROVED, WHEN USED IN CONJUNCTION WITH ARCHITECT'S ACTION ON SUBMITTALS, APPLICATIONS, AND REQUESTS, IS LIMITED TO ARCHITECTS DUTIES AND RESPONSIBILITIES AS STATED IN CONDITIONS OF CONTRACT. 4. REGULATIONS INCLUDE LAWS, ORDINANCES, STATUTES, AND LAWFUL ORDERS ISSUED BY AUTHORITIES HAVING JURISDICTION, AS WELL AS RULES, CONVENTIONS, AND AGREEMENTS WITHIN CONSTRUCTION INDUSTRY THAT CONTROL PERFORMANCE OF WORK. 5. FURNISH MEANS SUPPLY AND DELIVER TO PROJECT SITE, READY FOR UNLOADING, UNPACKING, ASSEMBLY, INSTALLATION, AND SIMILAR OPERATIONS. 6. INSTALL DESCRIBES OPERATIONS AT PROJECT SITE INCLUDING UNLOADING, UNPACKING, ASSEMBLY, ERECTING, PLACING, ANCHORING, APPLYING, WORKING TO DIMENSION, FINISHING, CURING, PROTECTING, CLEANING, AND SIMILAR OPERATIONS. 7. PROVIDE MEANS TO FURNISH AND INSTALL, COMPLETE AND READY FOR INTENDED USE. 8. WHERE ACRONYMS OR ABBREVIATIONS ARE USED IN SPECIFICATIONS OR OTHER CONTRACT DOCUMENTS, THEY MEAN RECOGNIZED NAME OF TRADE ASSOCIATION, STANDARDS - GENERATING ORGANIZATION, AUTHORITIES HAVING JURISDICTION, OR OTHER ENTITY APPLICABLE TO CONTEXT OF TEXT PROVISION. 9. EXCEPT WHERE CONTRACT DOCUMENTS INCLUDE MORE STRINGENT REQUIREMENTS, APPLICABLE CONSTRUCTION INDUSTRY STANDARDS HAVE SAME FORCE AND EFFECT AS IF BOUND OR COPIED DIRECTLY INTO CONTRACT DOCUMENTS TO EXTENT REFERENCED. SUCH STANDARDS ARE MADE A PART OF CONTRACT DOCUMENTS BY REFERENCE. -COMPLY WITH STANDARDS IN EFFECT AS OF DATE OF CONTRACT DOCUMENTS. - WHERE COMPLIANCE WITH TWO OR MORE STANDARDS IS SPECIFIED REFER REQUIREMENTS TO ARCHITECT FOR DECISION BEFORE PROCEEDING. - QUANTITY OR QUALITY LEVEL SHOWN OR SPECIFIED SHALL BE MINIMUM PROVIDED OR PERFORMED. SECTION 01450 - QUALITY CONTROL 1. MAINTAIN QUALITY CONTROL OVER SUPPLIERS, MANUFACTURERS, PRODUCTS, SERVICES, SITE CONDITIONS, AND WORKMANSHIP, TO PRODUCE WORK OF SPECIFIED QUALITY. MATERIALS AND WORKMANSHIP NOT MEETING REQUIRED STANDARDS OR PERFORMANCE OBLIGATIONS SHALL BE REMOVED AND REPLACED AT CONTRACTOR'S EXPENSE, INCLUDING SUBSEQUENT TESTING. 2. PROVIDE INSPECTIONS AND TESTS SPECIFIED OR REQUIRED BY GOVERNING AUTHORITIES, EXCEPT WHERE SPECIFIED TO BE OWNER'S RESPONSIBILITY. COSTS SHALL BE INCLUDED IN CONTRACT. 3. OWNER WILL PROVIDE INSPECTIONS, TESTS AND SIMILAR QUALITY CONTROL SERVICES PERFORMED BY INDEPENDENT AGENCIES WHERE NOT SPECIFIEID TO BE CONTRACTOR'S RESPONSIBILITY. COSTS FOR THESE SERVICES ARE NOT INCLUDED IN CONTRACT SUM. 4. CONTRACTOR AND EACH AGENCY ENGAGED TO PERFORM INSPECTIONS AND TESTS SHALL COORDINATE SEQUENCE OF ACTIVITIES TO ACCOMMODATE SERVICES WITH A MINIMUM OF DELAY. CONTRACTOR AND EACH AGENCY SHALL COORDINATE ACTIVITIES TO AVOID REMOVING AND REPLACING CONSTRUCTION TO ACCOMMODATE INSPECTIONS AND TESTS. SECTION 01520 - TEMPORARY CONSTRUCTION AND FACILITIES 1. COMPLY WITH APPLICABLE LAWS AND REGULATIONS. 2. KEEP FACILITIES CLEAN AND NEAT. OPERATE IN A SAFE AND EFFICIENT MANNER. TAKE NECESSARY FIRE PREVENTION MEASURES. DO NOT OVERLOAD, OR PERMIT FACILITIES TO INTERFERE WITH PROGRESS. DO NOT ALLOW HAZARDOUS, DANGEROUS 611 i1NSANITARY CONDITIONS, OR PUBLIC NUISANCES TO DEVELOP OR PERSIST ON SITE. 3. PROVIDE NEW MATERIALS AND EQUIPMENT; OR UNDAMAGED PREVIOUSLY USED MATERIALS AND EQUIPMENT IN SERVICEABLE CONDITION. PROVIDE MATERIALS AND EQUIPMENT SUITABLE FOR USE INTENDED. - 4. TEMPORARY HEAT: PROVIDE TEMPORARY HEAT FOR CURING OR DRYING OF COMPLETED INSTALLATIONS OR PROTECTION OF INSTALLED CONSTRUCTION FROM ADVERSE EFFECTS OF LOW TEMPERATURES OR HIGH HUMIDITY. ' 5. STORAGE AND FABRICATION SHEDS: INSTALL SHEDS, EQUIPPED TO ACCOMMODATE MATERIALS AND EQUIPMENT INVOLVED. SHEDS MAY BE OPEN SHELTERS OR ENCLOSED SPACES WITHIN BUILDING. ^ SECTION 01600 - PRODUCT REQUIREMENTS - _ - _ _ _ 1. DELIVER, STORE AND HANDLE PRODUCTS IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS, USING METHODS THAT WILL PREVENT DAMAGE, DETERIORATION AND LOSS. - SCHEDULE DELIVERY TO MINIMIZE LONG -TERM STORAGE AND PREVENT OVERCROWDING CONSTRUCTION SPACES. COORDINATE WITH INSTALLATION TO ENSURE MINIMUM HOLDING TIME. - DELIVER PRODUCTS IN MANUFACTURER'S ORIGINAL SEALED CONTAINER OR PACKAGING SYSTEM, COMPLETE WITH LABELS AND INSTRUCTIONS FOR HANDLING, STORING, PROTECTING AND INSTALLING. - STORE PRODUCTS SUBJECT TO DAMAGE BY ELEMENTS ABOVE GROUND, UNDER COVER IN A WEATHER TIGHT ENCLOSURE, WITH VENTILATION ADEQUATE TO PREVENT CONDENSATION. MAINTAIN TEMPERATURE AND HUMIDITY WITHIN RANGE REQUIRED BY MANUFACTURER'S INSTRUCTIONS. 2. COMPLY WITH MANUFACTURER'S INSTALLATION INSTRUCTIONS AND RECOMMENDATIONS, TO EXTENT THAT THEY ARE MORE STRINGENT THAN REQUIREMENTS IN CONTRACT DOCUMENTS. 3. INSPECT MATERIAL IMMEDIATELY UPON DELIVERY AND AGAIN PRIOR TO INSTALLATION. REJECT DAMAGED AND DEFECTIVE ITEMS. 4. PROVIDE ATTACHMENT AND CONNECTION DEVICES AND METHODS NECESSARY FOR SECURING EACH CONSTRUCTION ELEMENT. SECURE EACH CONSTRUCTION ELEMENT TRUE TO LINE AND LEVEL. ALLOW FOR EXPANSION AND BUILDING MOVEMENT. 5. INSTALL EACH COMPONENT DURING WEATHER CONDITIONS AND PROJECT STATUS THAT WILL ENSURE BEST RESULTS. ISOLATE EACH PART FROM INCOMPATIBLE MATERIAL AS NECESSARY TO PREVENT DETERIORATION. 6. HANDLE, INSTALL, CONNECT, CLEAN, CONDITION AND ADJUST PRODUCTS IN ACCORDANCE WITH SUCH INSTRUCTIONS AND IN CONFORMITY WITH SPECIFIED REQUIREMENTS. 7. PERFORM WORK IN ACCORD WITH MANUFACTURER'S INSTRUCTIONS. DO NOT OMIT ANY PREPARATORY STEP OR INSTALLATION PROCEDURE UNLESS SPECIFICALLY MODIFIED OR EXEMPTED BY CONTRACT DOCUMENTS. SECTION 01630 - PRODUCT SUBSTITUTION PROCEDURES 1. BIDS SHALL BE BASED UPON PROVIDING SPECIFIED MATERIALS, PRODUCTS, ACCEPTABLE MANUFACTURERS, ORGANIZATIONS, AND APPLICATIONS; IDENTIFIED IN THESE SPECIFICATIONS OR INDICATED ON DRAWINGS. 2. REQUESTS FOR CHANGES IN PRODUCTS, MATERIALS, EQUIPMENT, AND METHODS OF CONSTRUCTION REQUIRED BY CONTRACT DOCUMENTS PROPOSED BY CONTRACTOR AFTER AWARD OF CONTRACT ARE CONSIDERED REQUESTS FOR -SUBSTITUTIONS.- 3. SUBMIT SEPARATE REQUEST FOR EACH PRODUCT SUBSTITUTION, SUPPORTED WITH COMPLETE DATA, TECHNICAL LITERATURE, DRAWINGS AND SAMPLES AS APPROPRIATE. BURDEN OF PROOF OF EQUALITY RESTS WITH CONTRACTOR. 4. BY MAKING REQUEST FOR SUBSTITUTION, CONTRACTOR REPRESENTS THAT HE HAS PERSONALLY INVESTIGATED PROPOSED SUBSTITUTION PRODUCT AND DETERMINED THAT IT IS EQUAL TO OR SUPERIOR IN ALL RESPECTS TO THAT SPECIFIED. 5. REQUESTS FOR SUBSTITUTIONS WILL BE REVIEWED WITH REASONABLE PROMPTNESS, AND CONTRACTOR, WILL BE NOTIFIED IN WRITING, OF DECISION TO ACCEPT OR REJECT REQUESTED SUBSTITUTION. 6. OWNER RESERVES THE RIGHT TO ACCEPT OR REJECT PROPOSED SUBSTITUTIONS. EACH REQUEST SHALL STATE AMOUNT OF SAVINGS TO OWNER, IF SUBSTITUTION IS ACCEPTED. ACCEPTANCE OF PROPOSED SUBSTITUTION DOES NOT CONSTITUTE APPROVAL OR INCLUSION IN ARCHITECTS AND CONSULTANTS DOCUMENTS. 7. COST OF TESTING REQUIRED FOR ANALYSIS OF PROPOSED SUBSTITUTION SHALL BE PAID FOR BY CONTRACTOR AT TESTING AGENCY SELECTED AND APPROVED BY OWNER.F LOW 8. SHOULD SUBSTITUTION BE ACCEPTED, CONTRACTOR SHALL BE RESPONSIBLE TO MAKE NECESSARY ADJUSTMENTS IN WORK WHICH MAY BE AFFECTED AS RESULT OF SUBSTITUTION AT NO ADDITIONAL COST. 9. CONTRACTOR WARRANTS THAT SUBSTITUTED MATERIAL OR SYSTEM WILL PERFORM SAME AS ORIGINAL SPECIFIED MATERIAL OR SYSTEM WOULD HAVE PERFORMED. SHOUPROPER FU❑ -III D ACCEPTED SUBSTITUTION FAILTO PERFORM AS REQUIRED, CONTRACTOR SHALL REPLACE SUBSTITUTE MATERIAL OR SYSTEM WITH THAT SPECIFIED AND BEAR COSTS INCURRED THEREBY. 10. WHERE SPECIFICATIONS DESCRIBE A PRODUCT OR ASSEMBLY, LISTING EXACT CHARACTERISTICS REQUIRED, WITHOUT USE OF A BRAND OR TRADE NAME, PROVIDE A PRODUCT OR ASSEMBLY THAT PROVIDES CHARACTERISTICS AND OTHERWISE COMPLIES WITH CONTRACT REQUIREMENTS. 11. WHERE SPECIFICATIONS REQUIRE COMPLIANCE WITH PERFORMANCE REQUIREMENTS, PROVIDE PRODUCTS THAT COMPLY WITH THESE REQUIREMENTS, AND ARE RECOMMENDED BY MANUFACTURER FOR APPLICATION INDICATED. 12. WHERE SPECIFICATIONS REQUIRE COMPLIANCE WITH IMPOSED CODE, STANDARD OR REGULATION, SELECT PRODUCT THAT COMPLIES WITH STANDARDS, CODES OR REGULATIONS SPECIFIED. 13. FOR PRODUCTS PROPRIETARILY SPECIFIED BY A "NAMED MANUFACTURER' AND MODEL NAME OR NUMBER, THIS IS TO ESTABLISH STANDARD OF QUALITY. 14. FOR PRODUCTS SPECIFIED BY NAMING SEVERAL "ACCEPTABLE MANUFACTURERS -, SELECT ONE OF PRODUCTS OR MANUFACTURERS NAMED, WHICH COMPLIES WITH CONTRACT DOCUMENTS. REQUESTS FOR MANUFACTURER'S PRODUCTS NOT LISTED MUST BE SUBMITTED AS SUBSTITUTIONS. 15. FOR PRODUCTS SPECIFIED BY NAMING ONLY ONE PRODUCT OR MANUFACTURER, CONTRACTOR MUST SUBMIT REQUEST AS FOR SUBSTITUTIONS FOR PRODUCT OR MANUFACTURER NOT SPECIFICALLY NAMED. 16. FOR PRODUCTS SPECIFIED BY NAMING ONLY ONE PRODUCT AND MANUFACTURER AND INDICATED AS "NO SUBSTITUTE", THERE IS NO OPTION. SECTION 01731 - CUTTING AND PATCHING 1. DO NOT CUT AND PATCH STRUCTURAL ELEMENTS IN MANNER THAT WOULD REDUCE LOAD - CARRYING CAPACITY OR LOAD DEFLECTION RATIO. 2. DO NOT CUT AND PATCH EXPOSED SURFACES, IN MANNER THAT WOULD REDUCE THE BUILDING'S AESTHETIC QUALITIES, OR RESULT IN VISUAL EVIDENCE OF CUTTING AND PATCHING. 3. REPLACE, PATCH, AND REPAIR MATERIAL AND SURFACES CUT OR DAMAGED IN SUCH MANNER AS NOT TO VOID EXISTING WARRANTIES. 4. USE MATERIALS IDENTICAL TO EXISTING MATERIALS. IF NOT AVAILABLE OR CANNOT BE USED, USE MATERIALS THAT MATCH EXISTING ADJACENT SURFACES TO FULLEST EXTENT POSSIBLE. USE MATERIALS WHOSE PERFORMANCE WILL EQUAL OR SURPASS THOSE OF EXISTING MATERIALS. 5. PROTECT EXISTING CONSTRUCTION TO PREVENT DAMAGE. PROVIDE PROTECTION FROM ADVERSE WEATHER CONDITIONS FOR PORTIONS THAT MIGHT BE EXPOSED DURING CUTTING AND PATCHING OPERATIONS. 6. AVOID CUTTING EXISTING PIPE, CONDUIT OR DUCTWORK SERVING THE BUILDING, BUT SCHEDULED TO BE REMOVED OR RELOCATED UNTIL PROVISIONS HAVE BEEN MADE TO BYPASS THEM. 7. CUT EXISTING CONSTRUCTION USING METHODS THAT WILL NOT DAMAGE ELEMENTS RETAINED OR ADJOINING CONSTRUCTION. 8. RESTORE EXPOSED FINISHES OF PATCHED AREAS AND EXTEND FINISH INTO ADJOINING CONSTRUCTION IN MANNER THAT WILL ELIMINATE EVIDENCE OF PATCHING AND REFINISHING. 9. WHERE PATCHING OCCURS IN SMOOTH PAINTED SURFACE, EXTEND FINAL PAINT COAT OVER ENTIRE UNBROKEN SURFACE CONTAINING PATCH, AFTER PATCHED AREA HAS RECEIVED PRIMER AND SECOND COAT. SECTION 01735 - ALTERATIONS PROJECT PROCEDURES 1. OWNER WILL OCCUPY THE PREMISES DURING CONSTRUCTION PERIOD. COORDINATE WITH REQUIREMENTS OF OWNER TO MAINTAIN CONTINUITY OF OWNER'S OPERATIONS. 2. EXISTING FACILITIES SHALL REMAIN IN FULL OPERATION DURING CONSTRUCTION WORK. MAINTAIN ACCESS TO BUILDING AT ALL TIMES. PREVENT INTERRUPTION IN UTILITIES OR SERVICES. 3. DO NOT BLOCK REQUIRED FIRE EXITS. KEEP ENTRANCES OPEN, CLEAN AND NEAT. 4. DO NOT DISCONNECT EXISTING UTILITIES UNTIL NEW ONES HAVE BEEN INSTALLED. GIVE WRITTEN NOTICE TO OWNER PRIOR TO INTERRUPTION OF EXISTING FUNCTIONING UTILITY. 5. PROVIDE PROTECTION AS REQUIRED FOR PUBLIC, AND OWNER'S PERSONNEL. CONDUCT OPERATIONS TO INSURE LEAST INCONVENIENCE TO EMPLOYEES AND GENERAL PUBLIC. 6. MAINTAIN PRESENT ROOFS AND WALLS IN WATERPROOF CONDITION. SEAL OPENINGS AND EXPOSED PORTIONS OF CONSTRUCTION, WATERTIGHT UNTIL NEW WORK IS IN PLACE. 7. INSTALL TEMPORARY DUST TIGHT NON- COMBUSTIBLE PARTITIONS. ERECT AT ALL PLACES WHERE NECESSARY TO PROTECT PRESENT BUILDINGS FROM WEATHER AND DUST. PROVIDE ACCESS DOORS AS REQUIRED. 8. MAINTAIN EXISTING FIRE PROTECTION. SECTION 01736 - SELECTIVE DEMOLITION 1. SUBMIT SCHEDULE INDICATING PROPOSED SEQUENCE OF OPERATIONS FOR REVIEW PRIOR TO START OF WORK. INCLUDE COORDINATION FOR SHUTOFF, CAPPING, AND CONTINUATION OF UTILITY SERVICES AS REQUIRED. 2. COMPLY WITH GOVERNING EPA NOTIFICATION REGULATIONS BEFORE STARTING DEMOLITION. COMPLY WITH HAULING AND DISPOSAL REGULATIONS OF AUTHORITIES HAVING JURISDICTION. 3. OWNER WILL OCCUPY PORTIONS OF THE BUILDING IMMEDIATELY ADJACENT TO DEMOLITION AREA. CONDUCT DEMOLITION SO THAT OWNER'S OPERATIONS WILL NOT BE DISRUPTED. PROVIDE NOT LESS THAN 72 HOURS' NOTICE TO OWNER OF ACTIVITIES THAT WILL AFFECT OWNER'S OPERATIONS. 4. SURVEY THE CONDITION OF THE BUILDING TO DETERMINE WHETHER REMOVING ANY ELEMENT MIGHT RESULT IN STRUCTURAL DEFICIENCY OR UNPLANNED COLLAPSE OF ANY PORTION OF THE STRUCTURE OR ADJACENT STRUCTURES DURING DEMOLITION 5. MAINTAIN EXISTING UTILITIES INDICATED TO REMAIN IN SERVICE AND PROTECT THEM AGAINST DAMAGE DURING DEMOLITION OPERATIONS. 6. LOCATE, IDENTIFY, SHUT OFF, DISCONNECT, AND SEAL OR CAP OFF UTILITY SERVICES INDICATED TO BE DEMOLISHED. 7. WHERE UTILITY SERVICES ARE REQUIRED TO BE REMOVED, RELOCATED, OR ABANDONED, PROVIDE BYPASS CONNECTIONS TO MAINTAIN CONTINUITY OF SERVICE TO OTHER PARTS OF THE BUILDING BEFORE PROCEEDING WITH DEMOLITION 8. MAINTAIN FIRE PROTECTION SERVICES DURING DEMOLITION OPERATIONS. 9. PROVIDE TEMPORARY BARRICADES AND OTHER FORMS OF PROTECTION AS REQUIRED TO PROTECT OWNER'S PERSONNEL AND GENERAL PUBLIC FROM INJURY DUE TO DEMOLITION WORK. 10. CONDUCT DEMOLITION OPERATIONS AND REMOVE DEBRIS TO ENSURE MINIMUM INTERFERENCE WITH OTHER ADJACENT OCCUPIED AND USED FACILITIES. 11. CONDUCT DEMOLITION OPERATIONS TO PREVENT INJURY TO PEOPLE AND DAMAGE TO ADJACENT FINISHES, FACILITIES, AND SURFACES TO REMAIN. ENSURE SAFE PASSAGE OF PEOPLE AROUND SELECTIVE DEMOLITION AREA 12. ERECT AND MAINTAIN DUSTPROOF PARTITIONS AND TEMPORARY ENCLOSURES TO LIMIT DUSTAND DIRT MIGRATION, AND TO SEPARATE AREAS FROM FUMES AND NOISE. 13. CLEAN ADJACENT FINISHES AND IMPROVEMENTS OF DUST, DIRT, AND DEBRIS CAUSED BY DEMOLITION OPERATIONS. RETURN ADJACENTAREAS TO CONDITION EXISTING BEFORE STARTOF DEMOLITION. 14. PROMPTLY DISPOSE OF DEMOLISHED MATERIALS. DO NOT ALLOW DEMOLISHED MATERIALS TO ACCUMULATE ON -SITE. TRANSPORT DEMOLISHED MATERIALS OFF OWNER'S PROPERTY AND LEGALLY DISPOSE OF THEM. SECTION 01770 - CLOSEOUT PROCEDURES 1. ON RECEIPT OF A REQUEST FOR SUBSTANTIAL COMPLETION INSPECTION, ARCHITECT WILL PROCEED OR ADVISE CONTRACTOR OF UNFILLED REQUIREMENTS. ARCHITECT WILL PREPARE CERTIFICATE OF SPROPER FU❑ LLUBSTANTIAL COMPLETION FOLLOWING INSPECTIO OR ADVISE CONTRACTOR OF CONSTRUCTION THAT MUST BE COMPLETED OR CORRECTED BEFORE CERTIFICATE WILL BE ISSUED. 2. MAINTAIN A CLEAN, UNDAMAGED SET OF REPRODUCIBLE PRINTS OF CONTRACT DRAWINGS. MARK -UP THESE DRAWINGS TO SHOW ACTUAL INSTALLATION. MARK DRAWING SHOWING CONDITIONS ACCURATELY. GIVE PARTICULAR ATTENTION TO CONCEALED ELEMENTS THA WOULD BE DIFFICULT TO MEASURE AND RECORD AT A LATER DATE. 3. MAINTAIN ONE COPY OF PROJECT MANUAL, INCLUDING ADDENDA. MARK TO SHOW VARIATIONS IN ACTUAL WORK PERFORMED IN COMPARISON WITH SPECIFICATIONS AND MODIFICATIONS. GIVE PARTICULAR ATTENTION TO SUBSTITUTIONS, SELECTION OF OPTIONS AND SIMILAR INFORMATION ON ELEMENTS THAT ARE CONCEALED OR CANNOT BE READILY DISCERNED LATER BY DIRECT OBSERVATION. 4. MAINTENANCE MANUALS: ORGANIZE MAINTENANCE DATA INTO SETS OF MANAGEABLE SIZE. BIND IN INDIVIDUAL HEAVY -DUTY 2 -INCH, 3 -RING VINYL - COVERED BINDERS, WITH POCKET FOLDERS FOR FOLDED SHEET INFORMATION. MARK IDENTIFICATION ON FRONTAND SPINE EACH BINDER. 5. OPERATING AND MAINTENANCE INSTRUCTIONS: ARRANGE FOR INSTALLER OF EQUIPMENT THAT REQUIRES REGULAR MAINTENANCE TO MEET WITH OWNER'S PERSONNEL TO PROVIDE INSTRUCTION IN PROPER OPERATION AND MAINTENANCE. 6. FINAL CLEANING: EMPLOY EXPERIENCED WORKERS FOR FINAL CLEANING. CLEAN EACH SURFACE TO CONDITION EXPECTED IN A COMMERCIAL BUILDING CLEANING AND MAINTENANCE PROGRAM. REMOVE TEMPORARY PROTECTION AND FACILITIES. 7. COMPLY WITH REGULATIONS OF AUTHORITIES HAVING JURISDICTION AND SAFETY STANDARDS FOR CLEANING. REMOVE WASTE MATERIALS FROM SITE AND DISPOSE OF IN A LAWFUL MANNER. Smith Seckman Reid, Inc. SGO West Hillsboro, Suite 300 Deerfield Beach, FL 33441 (954) 421 -1260 FAX: (954) 421 -1466 www.ssr-inc.com Firm Certification - EB- 0000857 John E. Moulder PE - 33200 Michael A. Steward PE - 65701 SSR JOB # 1232030.0 HI<S HKS ARCHITECTS, INC. #AA F000119 1221 BRICKELL AVENUE SUITE 1220 MIAMI, FL 33131 305 -416 -6100 I KEYPLAN W W J co r ~ cc i �� WQ 0 �o cn � 0 _ W �_j G N = 0z Cn Wn rU) V W DRAWN CHECKED DATE 11 -12 -12 REVISED SHEET N0. SPECIFICATIONS A3 -0