12-1353-001SCOPE OF WORK SOUTH MIAMI HOSPITAL MAIN &NORTH ATS REPLACEMENTS fit' �`f THE SCOPE OF THIS PROJECT IS TWO PHASES: PHASE 1: REPLACE EXISTING AUTOMATIC TRANSFER SWITCHES (ATS'S) IN MAIN BUILDING & NORTH TOWER WHICH ARE FROM THE ORIGINAL BUILDING CONSTRUCTION. PHASE 2: REPLACE EXISTING ELECTRICAL DISTRIBUTION IN MAIN BUILDING WHICH IS FROM THE ORIGINAL BUILDING CONSTRUCTION. WORK ALSO INCLUDES RE- FEEDING EXISTING LOADS IN ORDER TO FACILITATE REPLACEMENT OF EQUIPMENT AND AS WELL AS OTHER WORK WITHIN THE ELECTRICAL ROOMS TO PROVIDE A BETTER ENVIRONMENT FOR THE NEW EQUIPMENT. THIS WORK INCLUDES GENERAL CLEANUP AND REMOVAL OF ABANDONED EQUIPMENT, PROVIDING AIR CONDITIONING IN ELECTRIC ROOMS AND PAINTING EXISTING ELECTRICAL ROOMS. z1h Ln cl N S" tls ca t 761h Ter(J"e S'.^J 74th St C a t! W'v y C3 `1h rY SVJ 75th Te lf,)C-'- C'1, � 761.11 St CPy TCrra c�+ svi 77th Tet(ttrl' �t CL *J 7P.ttl Tcrtnr:i: r, 1 G} C7. S>„rt �ygt11 C) L<sr•.i7 H +- 3rrr'" ?11.'11:j'' H ; •^ ". I tics M 4� r, � " SW 741h St f' ,��• n C 31 .; c� P,r LOCATION MAP NORTH BHSF #16630 -1217 6200 SW 73RD STREET SOUTH MIAMI, FL 33143 November 12, 2012 U1 jylJ 00111 01 u* U1 1 22 SW 691h St Smith Beckman Reid, Inc. 600 West Hillsboro, Suite 300 Deerfield Beach, FL 33441 (954) 421 -1260 FAX: (954) 421 -1466 M www.ssr - inc.com SSR JOB # 1232030.0 ,1 0 x;')01 i\ l.. .' 71 st St Sw 72nd St t } �l i Gf cr+ R.) SIN 7.3th St SV`J 741h St = r• try G,� SW 74th Ly SW 76111 St to Cn u \ n t- _ SIN 77111 Tertacv SVJ 78th St to try � cry K, SHEET INDEX LS -11 PARTIAL FIRST FLOOR - LIFE SAFETY PLAN LS -12 PARTIAL FIRST FLOOR - LIFE SAFETY PLAN LS -21 PARTIAL SECOND FLOOR - LIFE SAFETY PLAN LS -22 PARTIAL SECOND FLOOR - LIFE SAFETY PLAN LS -32 THIRD FLOOR - LIFE SAFETY PLAN LS -41 FOURTH FLOOR - LIFE SAFETY PLAN LS -51 FIFTH FLOOR - LIFE SAFETY PLAN LS -61 SIXTH FLOOR - LIFE SAFETY PLAN LS -71 SEVENTH FLOOR - LIFE SAFETY PLAN A2 -0 FLOOR PLAN SECTIONS, ELEV & DETAILS A3 -0 SPECIFICATIONS A3 -1 SPECIFICATIONS M0.01 HVAC SCHEDULE, NOTES, SPECIFICATIONS, LEGEND AND DRAWING INDEX M0.02 HVAC CONSTRUCTION ZONE VENTILATION SCHEDULE, NOTES & DETAIL M1.00 HVAC CONSTRUCTION ZONE VENTILATION PLANS M1.01 MAIN BUILDING FIRST FLOOR PLAN - DEMOLITION - HVAC M1.02 NORTH TOWER FIRST FLOOR PLAN - DEMOLITION - HVAC M1.03 MAIN BUILDING SECOND FLOOR PLAN - DEMOLITION - HVAC M2.01 MAIN BUILDING FIRST FLOOR PLAN NEW CONSTRUCTION HVAC M2.02 NORTH TOWER FIRST FLOOR PLAN - NEW CONSTRUCTION - HVAC M2.03 MAIN BUILDING SECOND FLOOR PLAN - NEW CONSTRUCTION - HVAC M3.01 HVAC DETAILS & CONTROLS FP0.01 FIRE PROTECTION NOTES, LEGENDS, DETAILS AND DRAWING INDEX FP0.02 FIRE PROTECTION SPECIFICATIONS FP0.03 FIRE PROTECTION SPECIFICATIONS FP2.01 MAIN BUILDING FIRST FLOOR PLAN - DEMOLITION & NEW CONSTRUCTION - FIRE PROTECTION FP2.02 NORTH TOWER FIRST FLOOR PLAN - DEMOLITION & NEW CONSTRUCTION - FIRE PROTECTION FP2.03 MAIN BUILDING SECOND FLOOR PLAN - DEMOLITION & NEW CONSTRUCTION - FIRE PROTECTION P0.01 PLUMBING NOTES, LEGEND, DETAILS AND DRAWING INDEX P0.02 PLUMBING SPECIFICATIONS P2.01 MAIN BUILDING FIRST FLOOR PLAN - PLUMBING P2.02 NORTH TOWER FIRST FLOOR PLAN - PLUMBING P2.03 MAIN BUILDING SECOND FLOOR PLAN - PLUMBING E0.01 ELECTRICAL LEGEND, ABBREVIATIONS & DRAWING INDEX E1.01 OVERALL FLOOR PLAN - FIRST FLOOR - ELECTRICAL E1.02 OVERALL FLOOR PLAN - SECOND FLOOR - ELECTRICAL E1.03 OVERALL FLOOR PLAN - FOURTH, FIFTH & SIXTH FLOORS - ELECTRICAL E1.04 OVERALL FLOOR PLAN - SEVENTH FLOOR & PENTHOUSE /ROOF - ELECTRICAL E2.01 MAIN BLDG ENLARGED ELEC RM FLOOR PLANS - PHASE 1 E2.02 NORTH TOWER ENLARGED ELEC RM FLOOR PLAN - PHASE 1 E2.03 MAIN BLDG ENLARGED ELEC RM FLOOR PLANS - PHASE 2 E3.01 ELECTRICAL RISER DIAGRAMS - PHASE 1 E3.02 ELECTRICAL RISER DIAGRAMS - PHASE 2 E4.01 PANELBOARD SCHEDULES E4.02 PANELBOARD SCHEDULES ti flt t 01 D C,3 w c:. r: t! W'v y C3 `1h rY SVJ 75th Te lf,)C-'- C'1, � 761.11 St CPy TCrra c�+ svi 77th Tet(ttrl' �t CL *J 7P.ttl Tcrtnr:i: r, 1 G} C7. S>„rt �ygt11 C) L<sr•.i7 H +- 3rrr'" ?11.'11:j'' H ; •^ ". I tics M 4� r, � " SW 741h St f' ,��• n C 31 .; c� P,r LOCATION MAP NORTH BHSF #16630 -1217 6200 SW 73RD STREET SOUTH MIAMI, FL 33143 November 12, 2012 U1 jylJ 00111 01 u* U1 1 22 SW 691h St Smith Beckman Reid, Inc. 600 West Hillsboro, Suite 300 Deerfield Beach, FL 33441 (954) 421 -1260 FAX: (954) 421 -1466 M www.ssr - inc.com SSR JOB # 1232030.0 ,1 0 x;')01 i\ l.. .' 71 st St Sw 72nd St t } �l i Gf cr+ R.) SIN 7.3th St SV`J 741h St = r• try G,� SW 74th Ly SW 76111 St to Cn u \ n t- _ SIN 77111 Tertacv SVJ 78th St to try � cry K, SHEET INDEX LS -11 PARTIAL FIRST FLOOR - LIFE SAFETY PLAN LS -12 PARTIAL FIRST FLOOR - LIFE SAFETY PLAN LS -21 PARTIAL SECOND FLOOR - LIFE SAFETY PLAN LS -22 PARTIAL SECOND FLOOR - LIFE SAFETY PLAN LS -32 THIRD FLOOR - LIFE SAFETY PLAN LS -41 FOURTH FLOOR - LIFE SAFETY PLAN LS -51 FIFTH FLOOR - LIFE SAFETY PLAN LS -61 SIXTH FLOOR - LIFE SAFETY PLAN LS -71 SEVENTH FLOOR - LIFE SAFETY PLAN A2 -0 FLOOR PLAN SECTIONS, ELEV & DETAILS A3 -0 SPECIFICATIONS A3 -1 SPECIFICATIONS M0.01 HVAC SCHEDULE, NOTES, SPECIFICATIONS, LEGEND AND DRAWING INDEX M0.02 HVAC CONSTRUCTION ZONE VENTILATION SCHEDULE, NOTES & DETAIL M1.00 HVAC CONSTRUCTION ZONE VENTILATION PLANS M1.01 MAIN BUILDING FIRST FLOOR PLAN - DEMOLITION - HVAC M1.02 NORTH TOWER FIRST FLOOR PLAN - DEMOLITION - HVAC M1.03 MAIN BUILDING SECOND FLOOR PLAN - DEMOLITION - HVAC M2.01 MAIN BUILDING FIRST FLOOR PLAN NEW CONSTRUCTION HVAC M2.02 NORTH TOWER FIRST FLOOR PLAN - NEW CONSTRUCTION - HVAC M2.03 MAIN BUILDING SECOND FLOOR PLAN - NEW CONSTRUCTION - HVAC M3.01 HVAC DETAILS & CONTROLS FP0.01 FIRE PROTECTION NOTES, LEGENDS, DETAILS AND DRAWING INDEX FP0.02 FIRE PROTECTION SPECIFICATIONS FP0.03 FIRE PROTECTION SPECIFICATIONS FP2.01 MAIN BUILDING FIRST FLOOR PLAN - DEMOLITION & NEW CONSTRUCTION - FIRE PROTECTION FP2.02 NORTH TOWER FIRST FLOOR PLAN - DEMOLITION & NEW CONSTRUCTION - FIRE PROTECTION FP2.03 MAIN BUILDING SECOND FLOOR PLAN - DEMOLITION & NEW CONSTRUCTION - FIRE PROTECTION P0.01 PLUMBING NOTES, LEGEND, DETAILS AND DRAWING INDEX P0.02 PLUMBING SPECIFICATIONS P2.01 MAIN BUILDING FIRST FLOOR PLAN - PLUMBING P2.02 NORTH TOWER FIRST FLOOR PLAN - PLUMBING P2.03 MAIN BUILDING SECOND FLOOR PLAN - PLUMBING E0.01 ELECTRICAL LEGEND, ABBREVIATIONS & DRAWING INDEX E1.01 OVERALL FLOOR PLAN - FIRST FLOOR - ELECTRICAL E1.02 OVERALL FLOOR PLAN - SECOND FLOOR - ELECTRICAL E1.03 OVERALL FLOOR PLAN - FOURTH, FIFTH & SIXTH FLOORS - ELECTRICAL E1.04 OVERALL FLOOR PLAN - SEVENTH FLOOR & PENTHOUSE /ROOF - ELECTRICAL E2.01 MAIN BLDG ENLARGED ELEC RM FLOOR PLANS - PHASE 1 E2.02 NORTH TOWER ENLARGED ELEC RM FLOOR PLAN - PHASE 1 E2.03 MAIN BLDG ENLARGED ELEC RM FLOOR PLANS - PHASE 2 E3.01 ELECTRICAL RISER DIAGRAMS - PHASE 1 E3.02 ELECTRICAL RISER DIAGRAMS - PHASE 2 E4.01 PANELBOARD SCHEDULES E4.02 PANELBOARD SCHEDULES 0 x;')01 i\ l.. .' 71 st St Sw 72nd St t } �l i Gf cr+ R.) SIN 7.3th St SV`J 741h St = r• try G,� SW 74th Ly SW 76111 St to Cn u \ n t- _ SIN 77111 Tertacv SVJ 78th St to try � cry K, SHEET INDEX LS -11 PARTIAL FIRST FLOOR - LIFE SAFETY PLAN LS -12 PARTIAL FIRST FLOOR - LIFE SAFETY PLAN LS -21 PARTIAL SECOND FLOOR - LIFE SAFETY PLAN LS -22 PARTIAL SECOND FLOOR - LIFE SAFETY PLAN LS -32 THIRD FLOOR - LIFE SAFETY PLAN LS -41 FOURTH FLOOR - LIFE SAFETY PLAN LS -51 FIFTH FLOOR - LIFE SAFETY PLAN LS -61 SIXTH FLOOR - LIFE SAFETY PLAN LS -71 SEVENTH FLOOR - LIFE SAFETY PLAN A2 -0 FLOOR PLAN SECTIONS, ELEV & DETAILS A3 -0 SPECIFICATIONS A3 -1 SPECIFICATIONS M0.01 HVAC SCHEDULE, NOTES, SPECIFICATIONS, LEGEND AND DRAWING INDEX M0.02 HVAC CONSTRUCTION ZONE VENTILATION SCHEDULE, NOTES & DETAIL M1.00 HVAC CONSTRUCTION ZONE VENTILATION PLANS M1.01 MAIN BUILDING FIRST FLOOR PLAN - DEMOLITION - HVAC M1.02 NORTH TOWER FIRST FLOOR PLAN - DEMOLITION - HVAC M1.03 MAIN BUILDING SECOND FLOOR PLAN - DEMOLITION - HVAC M2.01 MAIN BUILDING FIRST FLOOR PLAN NEW CONSTRUCTION HVAC M2.02 NORTH TOWER FIRST FLOOR PLAN - NEW CONSTRUCTION - HVAC M2.03 MAIN BUILDING SECOND FLOOR PLAN - NEW CONSTRUCTION - HVAC M3.01 HVAC DETAILS & CONTROLS FP0.01 FIRE PROTECTION NOTES, LEGENDS, DETAILS AND DRAWING INDEX FP0.02 FIRE PROTECTION SPECIFICATIONS FP0.03 FIRE PROTECTION SPECIFICATIONS FP2.01 MAIN BUILDING FIRST FLOOR PLAN - DEMOLITION & NEW CONSTRUCTION - FIRE PROTECTION FP2.02 NORTH TOWER FIRST FLOOR PLAN - DEMOLITION & NEW CONSTRUCTION - FIRE PROTECTION FP2.03 MAIN BUILDING SECOND FLOOR PLAN - DEMOLITION & NEW CONSTRUCTION - FIRE PROTECTION P0.01 PLUMBING NOTES, LEGEND, DETAILS AND DRAWING INDEX P0.02 PLUMBING SPECIFICATIONS P2.01 MAIN BUILDING FIRST FLOOR PLAN - PLUMBING P2.02 NORTH TOWER FIRST FLOOR PLAN - PLUMBING P2.03 MAIN BUILDING SECOND FLOOR PLAN - PLUMBING E0.01 ELECTRICAL LEGEND, ABBREVIATIONS & DRAWING INDEX E1.01 OVERALL FLOOR PLAN - FIRST FLOOR - ELECTRICAL E1.02 OVERALL FLOOR PLAN - SECOND FLOOR - ELECTRICAL E1.03 OVERALL FLOOR PLAN - FOURTH, FIFTH & SIXTH FLOORS - ELECTRICAL E1.04 OVERALL FLOOR PLAN - SEVENTH FLOOR & PENTHOUSE /ROOF - ELECTRICAL E2.01 MAIN BLDG ENLARGED ELEC RM FLOOR PLANS - PHASE 1 E2.02 NORTH TOWER ENLARGED ELEC RM FLOOR PLAN - PHASE 1 E2.03 MAIN BLDG ENLARGED ELEC RM FLOOR PLANS - PHASE 2 E3.01 ELECTRICAL RISER DIAGRAMS - PHASE 1 E3.02 ELECTRICAL RISER DIAGRAMS - PHASE 2 E4.01 PANELBOARD SCHEDULES E4.02 PANELBOARD SCHEDULES