Loading...
12-1303-0020 0 J a MECHANICAL SYMBOLS ALL SYMBOLS SHOWN MAY NOT APPEAR IN ALL DRAWINGS. SYMBOLS ARE SHOWN SCHEMATIC AND MAY NOT BE TO SCALE. - CHWS- _ CHS CHILLED WATER SUPPLY PIPE - _ CHR SYMBOL CHILLED WATER RETURN PIPE FCU DESCRIPTION CWS- CONDENSER WATER SUPPLY PIPE e NEW EQUIPMENT DESIGNATION (TOP - EQUIP. ABBREV., BOTTOM - MARK) CWR- CONDENSER WATER RETURN PIPE q® NEW DIFFUSER DESIGNATION (TOP - SCHEDULE DESIG., BOTTOM - CFM) RL REFRIGERANT LIQUID PIPE RG REFRIGERANT GAS PIPE BF NEW EQUIPMENT HWS - HEATING WATER SUPPLY HWR- HEATING WATER RETURN GSF �4{�h BV EXISTING EQUIPMENT -HPS HIGH PRESSURE STEAM 7H NEW DUCT -HPR HIGH PRESSURE CONDENSATE RETURN - - -LPS - -- LOW PRESSURE STEAM OBD OPPOSED BLADE DAMPER EXISTING DUCT TO REMAIN - -LPR - -- LOW PRESSURE CONDENSATE RETURN RELOCATED EXISTING DUCT TO BE REMOVED OR RELOCATED - PCR PUMPED CONDENSATE RETURN CD CONDENSATE DRAIN ® NEW SUPPLY DIFFUSER RECIRCULATED (RETURN) AIR DIRECTION OF SLOPE DISCONNECT SWITCH ® RELIEF AIR EXISTING SUPPLY DIFFUSER TO REMAIN EXISTING DIRECTION OF FLOW SUPPLY AIR EXPANSION LOOP �y EXISTING SUPPLY DIFFUSER TO BE REMOVED OR RELOCATED ♦_ GATE VALVE zNEW RETURN GRILLE - --}F}- EF BUTTERFLY VALVE WHP zEXISTING SF RETURN GRILLE TO REMAIN -� BALL VALVE e- GLOBE VALVE _ / I EXISTING RETURN GRILLE TO BE REMOVED OR RELOCATED EA AUTOMATIC 2 -WAY CONTROL VALVE ® NEW EXHAUST GRILLE OA AUTOMATIC 3 -WAY CONTROL VALVE IN HG ® CHW EXISTING EXHAUST GRILLE TO REMAIN T PLUG VALVE/BALANCING COCK -�}- CHECK VALVE ��S J EXISTING EXHAUST GRILLE TO BE REMOVED OR RELOCATED �7 HYDRAULIC SHOCK ARRESTOR TAV NEW SLOT DIFFUSER -ml- VALVE IN VERTICAL MA EXISTING SLOT DIFFUSER N.I.C. UNION - - -- EXISTING SLOT DIFFUSER TO BE REMOVED OR RELOCATED -o-- VACCUUM BREAKER -- FLEXIBLE DUCT 00 P -TRAP Q SENSOR FLOOR DRAIN W/ P -TRAP O THERMOSTAT O HUB DRAIN T; EXISTING THERMOSTAT TO BE REMOVED OR RELOCATED No FLOOR CLEANOUT OR GRADE CLEANOUT Z5 Jt. AIR TRANSFER QUANTITY (CFM) I CLEANOUT OR WALL CLEANOUT �-�- CONICAL TAP WITH VOLUME DAMPER + PETE'S PLUG CONICAL TAP W/O VOLUME DAMPER GAUGE COCK ® SQUARE TO ROUND DUCT TRANSITION THERMOMETER ALL EXISTING CEILING DIFFUSERS SHALL BE REUSED, REMOVED AND STORED OR MANUAL VOLUME DAMPER FIRE DAMPER :LF THERMOMETER WELL SMOKE DAMPER ©i W STRAINER WITH BLOW -OFF VALVE CONTRACTOR SHALL SEAL ALL LEAKS IN EXISTING DUCTWORK & PIPING AND NEW DUCTWORK &PIPING. FIRE /SMOKE DAMPER V0�? F & T STEAM TRAP NEGATOR SPRING Pe MOTORIZED DAMPER -�- 0 �\\ STEAM BUCKET TRAP APPROXIMATE LOCATION. NEW EQUIPMENT DUCTWORK IS SHOWN BY EAVY CONNECT TO EXISTING O ELECTRIC PNEUMATIC SWITCH MECHANICAL ABBREVIATIONS AC ABOVE COUNG EOM END OF MAIN DRIP AFF ABOVE FINISHED FLOOR FCU FAN COIL UNIT AI ANALOG INPUT FPB FAN POWERED BOX AO ANALOG OUTPUT FP1 FINS PER INCH BFC BELOW FINISHED CEILING GC GENERAL CONTRACTOR BF BELOW FLOOR, BLIND FLANGE GEF GENERAL EXHAUST FAN BG BELOW GRADE GSF GENERAL SUPPLY FAN BV BUTTERFLY VALVE MVD MANUAL VOLUME DAMPER CRAC COMPUTER ROOM UNIT N NEW CRU CONDENSATE RETURN UNIT OBD OPPOSED BLADE DAMPER CU CONDENSING UNIT R RELOCATED DI DIGITAL INPUT RA RETURN AIR DO DIGITAL OUTPUT RCA RECIRCULATED (RETURN) AIR DS DISCONNECT SWITCH RLA► RELIEF AIR E EXISTING SCI SUPPLY AIR EDH ELECTRIC DUCT HEATER UH UNIT HEATER EUH ELECTRIC UNIT HEATER WH WATER HEATER EF EXHAUST FAN WHP WATER -SOURCE HEAT PUMP SF SUPPLY FAN H. ALL NECESSARY SHUTDOWNS OR OUT OF PHASE WORK SHALL BE SCHEDULED WITH THE HOSPITAL REPRESENTATIVE. CAV CONSTANT AIR VOLUME EA EXHAUST AIR FMB FILTER MIXING BOX OA OUTSIDE AIR IN HG INCHES MERCURY (PRESSURE) CHW CHILLED WATER IN WC INCHES WATER COLUMN (PRESSURE) UNO UNLESS NOTED OTHERWISE IBT INVERTED BUCKET TRAP PRV PRESSURE RELIEF VALVE TAV THERMOSTATIC AIR VENT SV SAFETY VALVE MA (STEAM SYSTEM) MIXED AIR N.I.C. NOT IN CONTRACT LE LAUNDRY EQUIPMENT PUMP SCHEDULE DESIG. SERVES TYPE �• GPM TDH (FT) ELECTRICAL MANUFACTURER/MODEL NO. REMARKS/NOTES HP RPM VOLT/PHASE OUTSIDE AIR CFM TOTAL CFM RETURN CFM OUTSIDE AIR CFM AHU -1 -3 GENERAL ADMIN 2920 1825 1095 3320 1870 HP- RHC -1S -7 RHC -1S -7 CIRCULATOR N/A 1.4 6.9 0.025 3250 120/1/60 TACO L0410 MATCH EXISTING COIL PUMPS HP- RHC -1S -8 RHC -1S -8 CIRCULATOR N/A 1.4 6.9 0.025 3250 120/1/60 TACO L0410 MATCH EXISTING COIL PUMPS HP- RHC -1S -9 RHC -1S -9 CIRCULATOR N/A 2.4 6.9 0.025 3250 120/1/60 TACO L0410 MATCH EXISTING COIL PUMPS P- RHC -1S -10 r 1RHC -1S -10 CIRCULATOR N/A 1.4 6.9 0.025 3250 120/1/60 TACO L0410 MATCH EXISTING COIL PUMPS I REHEAT COIL SCHEDULE MARK CFM COIL SIZE FACE 10" (MAX) BTUH EAT -F LAT •F I APD -IN (MAX) I EWT @F WATER ArF GPM WATER 6P-FT (MAX) OUTSIDE AIR CFM TOTAL CFM RETURN CFM OUTSIDE AIR CFM AHU -1 -3 GENERAL ADMIN 2920 1825 1095 3320 1870 1450 RHC -1 S-7 375 10x8 500 13000 55 85 0.3 126 106 1.4 5 RHC -1S-8 750 18xB 500 24300 55 85 0.3 126 106 2.4 5 RHC -1S -9 325 10x8 500 13000 55 85 0.3 126 106 1.4 5 RHC -1S-10 300 10x8 500 13000 55 85 0.3 126 106 1.4 5 EXIST. EF SCHEDULE MARK SERVICE PRE T +B NEW DESIGN EF -1 -3 GENERAL 1120 1050 FINAL FlLT. MANUFACTURER/MODEL N0. TOTAL CFM RETURN CFM 1.1. LFAN TO SHUT DOWN ON FIRE ALARM. 2. VERIFY INTERLOCK WITH AHU -1 -3, IF NOT INTERLOCKED, PROVIDE. EXISTING AHU SCHEDULE DESIG. SERVICE PRE T &B CFM NEW DESIGN CFM � � PRE FlLT. FINAL FlLT. MANUFACTURER/MODEL N0. TOTAL CFM RETURN CFM OUTSIDE AIR CFM TOTAL CFM RETURN CFM OUTSIDE AIR CFM AHU -1 -3 GENERAL ADMIN 2920 1825 1095 3320 1870 1450 MERV 7 MERV 14 EXISTING ON OMM O E Ln t0 Q. M o r N Tt ) fl7 C N •- L O x O .-L O O t NNU a L• O W xOm c .. > .. NOTES:. 1. AHU TO SHUT DOWN ON FIRE ALARM. THREADED ROD SIZE PER SMACNA (TYP) SHEET L DUCT 04DUCT NO SCALE W.I.- Well Depth f -10- (254) • UFF10 -0� 15" (381) UFF15 Sealant (NIRC) _ _ Typlcel All - - Continuous Angles and Sides F,,I.nare (shipped loose) Fasteners to ds Installed 3 1) a- Feel from to be and Ile (9051 - �- me. cc CODUN79FLAM BALL VALVE (FOR { _. +i-• Mulllon Support. Y1 -OF� 14: 5" (127) deep, at wME520MD �• �.- ;2 ultlsection alnive -I pinta only Flange Frame a, 3 !, ~" BALL VALVE ., EXTERIOR v , MODULATING 2 -WAY �� ` VALVE. PROVIDE 3 -WAY Y VALVE AS DESCRIBED ON PLAN 0 END UNITS Notes: I • .� r I i 1 The installation shown harem must be followed strictly to ensure compliance with Miami -Dade NOA 2 Continuous mstalletion angles and fasteners are _ shipped loose and require installation in the field i' �t r~ 1 £�• 3 Anchors or fasteners into the wall are not regmred - • "�,(I 4 Ruskin is not responsible for determining the suitability of the etrucNre �1j; !.l 5 Shims may be remared to achieve consistent _ UFF sleeve, eontlnuou. BALL VALVE (FOR clearance between louver and opening on all -�- m pedrneter wda. (shims not mrluded) -- - -- - - -- '� r - - BALANCING) 6 NIRC - Not in Ruskin s Contract UFF Sl- Depth .� 12 "(305) -UFF10 ,. 17 "(432) -UFF15 0 5 LOUVER INSTALLATION DETAIL- NO SCALE AIR FLOW SUPPORT DETAIL .41 ';�p r- 112' BALL VALVE I' W UNION, TYP. IItial N INTAKE DUCT,SEE PLANS FOR SIZE 0 2NO IN -LINE scue NOTE: CONNECT SUPPLY LINE TO LEAVING AR SIDE OF COIL IF CONNECTIONS ARE DIRECTLY ABOVE EACH OTHER, CONNECT SUPPLY TO BOTTOM. 112" ALL THREADED STEEL HANGER ROD, SECURE TO STRUCTURE WITH DOUBLE NUTS,TYPICAL(MIN. OF 4). VIBRATION ISOLATOR. TYPICAL (MIN. 4) DISCONNECT BACKDRAFT DAMPER,SEE SCHEDULE FOR TYPE FAN DETAIL 1' MINIMUM OPENING OVERLAP ON ALL SIDES OF DAMPER OPERATOR /ACTUATOR ( MAY BE REQUIRED TO BE OUT OF AIRSTREAM ) AUXILIARY OPERATING JACK SHAFT FUSIBLE LINK WITH LOCK MOUNTING ANGLES - WALL BELT GENERAL NOTES: A. ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE APPLICABLE FLOMDA UNION' = STATEWIDE BUILDING CODE STATE AND LOCAL CODES IBC, AIA, IMC, NEC THE, NATIONAL FIR7- PROTECTION ASSOCIATION (NFPA). AND THE LOCAL AUTHORITIES HAVING JURISDICTION. ALL EQUIPMENT, MATERIALS, CONTROLS, ETC. SHALL BE NEW UNLESS NOTED OTHERWISE AND SHALL MATCH ALL FACILITY STANDARDS OR IF APPROVED BY THE OWNER, - BE OF THE SM E - QUALITY AS REPRESENTED BY THE SCHEDULED ITEM. =- - - B. CONTRACTOR SHALL OBTAIN ALL NECESSARY PERMITS, PAY ALL FEES, ANft COIOPLY WITH ALL NATIONAL, STATE, AND MUNICIPAL LAWS, CODES, AND ORDINANCES RELATING 70 BUILDING AND PUBLIC SAFETY. C. CONTRACTOR SHALL FURNISH ALL MATERIALS, EQUIPMENT, AND LABOR REQUIRED FOR A COMPLETE WORKING AND COORDINATED SYSTEM. D. COORDINATE THE EXACT LOCATION OF MECHANICAL AND PLUMBING EQUIPMENT WITH THE LOCATIONS OF LIGHT FIXTURES, PIPING, CONDUIT, AND OTHER CONSTRUCTION, TO ALLOW FOR PROPER ACCESS TO SERVICE EQUIPMENT. E COORDINATE THE LOCATION OF DUCTWORK AND PIPING WITH OTHER TRADES AND PROVIDE OFFSETS IN DUCTWORK AND PIPING AS REQUIRED. F. IT IS THE INTENT OF THESE DOCUMENTS TO ALLOW ALL CEILING CONSTRUCTION AND HEIGHTS TO BE AS SHOWN. COORDINATE THE LOCATION OF DUCTWORK AND PIPING AND PROVIDE OFFSETS IN DUCTWORK AND PIPING AS REQUIRED TO MEET THIS INTENT. G. CONDUIT, PIPING, AND DUCTWORK SHALL BE INDEPENDENTLY SUPPORTED, AND EACH SUPPORT SHALL BE INDEPENDENT OF PARTITION AND CEILING SYSTEM SUPPORTS. WHERE INDEPENDENT SUPPORT IS NOT POSSIBLE AN ENGINEERED SUPPORT SYSTEM SHALL BE UTILIZED. H. ALL WORK SHALL BE SCHEDULED AND PERFORMED IN STRICT COORDINATION WITH ARCHITECTURAL PHASING PLANS AND WITH HOSPITAL SCHEDULES, OCCUPANCIES, AND WORK. I. PROTECT EQUIPMENT AND WORK FROM DAMAGE DURING HANDLING AND INSTALLATION UNTIL COMPLETION OF CONSTRUCTION. J. REMOVE ALL EXCESS MATERIAL AND DEBRIS AND CLEAN ALL EQUIPMENT UPON COMPLETION - - E cc LOCATION CFM GENERAL DEMO NOTES. a � � MANUFACTURER/MODEL NO. A D� -:.2 _0 ; 0 �C U DRIVE -CO - M N M to - - 0 - - M ill 10 to C v) O M .-i T"t t0 f0 to - - !1- k0 t0 . . 400 0.5 -°t o ° Ly o 0 CO ON OMM O E Ln t0 Q. M o r N Tt ) fl7 C N •- L O x O .-L O O t NNU a L• O W xOm c .. > .. w o aoi uoi 07 0 C) ELI • -� W a v • Uj TAPS OR DUCTWORK ARE TO BE REMOVED, THE FOLLOWING SHALL OCCUR: U zza¢ N BE SECURED WITH SHEET METAL SCREWS FOUR INCHES ON CENTERS • A LIBERAL QUANTITY OF FIRE RESISTANT ADHESIVE IS TO BE APPLIED TO THE Q EDGES OF THE METAL PATCH AND THE ASSEMBLY SCREWED IN PLACE ALL WORK SHALL BE PERFORMED IN STRICT COORDINATION WITH HOSPITAL Uj REVISIONS OF WORK. TOUCH UP WITH PAINT WHERE REQUIRED. MARK: REMARKS: Ke ALL CONNECTION BETWEEN PIPES OF DISSIMILAR MATERIALS SHALL BE MADE WITH DIELECTRIC UNIONS L DUCT SIZES ARE NET FREE AREA M. PROVIDE ROUND DUCTS TO ALL AIR DEVICES UNLESS NOTED OTHERWISE. DUCT SIZE SHALL MATCH AIR DEVICE NECK SIZE OR THE TABLE IN AIR DEVICE SCHEDULE. WHICHEVER IS LARGER. FLEXIBLE DUCTS SHALL BE SIZED SIMILARLY. N. INSTALL SPACE SENSOR ADJACENT TO LATCH SIDE OF DOOR IN SPACE INDICATED. U.N.O. INDICATED LOCATIONS ARE APPROXIMATE. AVOID HEAT PRODUCING EQUIPMENT. 0. INSTALL TURNING VANES IN ALL 90 DEGREE SQUARE ELBOWS IN SUPPLY, RETURN, AND EXHAUST DUCTS. (NONE ALLOWED IN COMBUSTION AIR DUCTS). P. MULTI-BLADE DAMPERS OF ANY TYPE INSTALLED WITHIN 36' OF AN ELBOW OR OTHER FITTING SHALL BE INSTALLED WITH THE DAMPER BLADE SHAFTS PARALLEL TO THE AIRSTREAM FLOW DIRECTION UPSTREAM OF THE FITTING. Qe FIRE. SMOKE. AND FIRE/SMOKE DAMPERS WILL BE REQUIRED AT ALL DUCT PENETRATIONS THRU RATED WALLS. COORDINATE WITH LIFE- SAFETY PLAN. R. MECHANICAL CONTRACTOR SHALL BE RESPONSIBLE FOR PRICING ALL FIRE, SMOKE. AND FIRE /SMOKE DAMPERS REQUIRED BY CODE MECHANICAL CONTRACTOR SHALL REPORT EXISTING FIRE. SMOKE. FIRE /SMOKE DAMPERS TO THE ENGINEER BEFORE PRICING. S DEMONSTRATE TO OWNER'S REPRESENTATIVE THAT ALL INSTALLED CONTROLS ARE WORKING PROPERLY WITHOUT ERRORS PRIOR TO RELEASING SYSTEM TO OWNER. Te MAKE RELOCATION AND /OR REPAIRS NECESSITATED BY THE CONDITIONS AT THE SITE OR AS DIRECTED BY THE OWNER, WITHOUT ADDITIONAL COST TO THE OWNER. REPAIR, PAINT AND /OR RESTORE TO GOOD FUNCTIONAL CONDITION SUCH AS EQUIPMENT, MATERIAL, WALLS. CEILING, FINISHES, CEILING GRID AND ITEMS SCHEDULE FOR RELOCATION AND /OR EXISTING TO REMAIN, WHICH ARE DAMAGED DURING DISMANTLING OR REASSEMBLE OPERATIONS PROVIDE NEW MATERIALS, FITTINGS AND APPURTENANCES REQUIRED TO COMPLETE THE RELOCATION AND TO RESTORE TO GOOD OPERATING ORDER. PERFORM THE RELOCATION WORK IN ACCORDANCE TO APPLICABLE CODES ASD STANDARDS, USING SKILLED WORKERS. GENERAL PIPING NOTES A CONTRACTOR TO PROVIDE ACCESS DOORS IF REQUIRED FOR ACCESS TO CAPS AND ANY VALVES THAT ARE NOT ACCESSIBLE VERIFY SIZE AND LOCATIONS WITH MECHANICAL CONTRACTOR. B. HWC BRANCH PIPING SHALL BE A MINIMUM OF 314' U.N.O. V MAXIMUM A.4SMOKE /FIRE DAMPER CLEAN THE AREA OF CONSTRUCTION AFTER THE COMPLETION OF THE PROJECT. R. THE MECHANICAL CONTRACTOR SHALL ADJUST AND REBALANCE THE AIR CONDITIONING SYSTEM AND EXHAUST SYSTEM TO PROPER DESIGN VOLUME AS SHOWN MUST COMPLY WITH U.L 555 S ON PLAN. S ANY EXISTING WALLS DAMAGED FROM PIPING OR DUCTWORK THAT WAS REMOVED SHALL BE PATCHED AND SEALED TO MEET THE FULL INTEGRITY OF THE REMAINING WALL COORDINATE WITH ARCHITECTURAL PLANS FOR RATINGS OF WALLS INSTALLATION WEATHER SPECIFICALLY CA REPLACE ALL EXISTING TSTATS SHOWN ON PLANS OR NOT. WITH NEW SPACE SENSORS REHEAT COIL PIPING DETAIL V NO SCALE OPERATION: A FIRE DAMPER MODE HIGH TEMPERATURE MELTS FUSIBLE LINK. CLOSING FIRE DAMPER 03NO SCALE Be SMOKE DAMPER MODE SMOKE DETECTOR UPON SENSING HEAT/SMOKE ACTUATES DAMPER MOTOR TO CLOSE DAMPER FAN SCHEDULE DESIG. cc LOCATION CFM GENERAL DEMO NOTES. W ELECTRICAL MOTOR DATA MANUFACTURER/MODEL NO. A D� REMOVE ONLY THE WORK THAT SERVES THE AREA OF DEMOLITION. PROVISIONS TYPE U DRIVE TS (FPM) SHALL BE MADE BY THE CONTRACTOR TO PREVENT DISRUPTING ADJACENT AREAS IN WHICH WORK IS BEING PERFORMED. B.H.P. VOLT/PH STARTER EF-1 -3B G ENERRAAL COUNG 400 0.5 B. PROVIDE ADDITIONAL VALVES, TAPS, TEMPORARY DUCTWORK AND /OR PIPING AS NECESSARY TO PROVIDE UNINTERRUPTED SERVICE TO AREAS OUTSIDE OF THE SCOPE O 1976 W - OF WORK IN WHICH WORK BEING PERFORMED. NO GREENHECK /CSP -A700 39 DISCHARGE DUCT, C. SEE PLANS FOR ALL CAPPED DUCT TAPS AND CONNECTING DUCTS THAT ARE NOT BANG USED ARE SIZE TO BE REMOVED BACK TO THE MAIN DUCT AND PATCHED AS PER ITEM F BELOW. D. PATCH OPENINGS IN EXISTING DUCTWORK THAT IS TO REMAIN INCLUDING OPENINGS WHERE Uj TAPS OR DUCTWORK ARE TO BE REMOVED, THE FOLLOWING SHALL OCCUR: 0 OPENINGS IN THE MAIN DUCTS ARE TO BE COVERED WITH A SHEET METAL PATCH. THE PATCH IS TO BE LARGER THAN THE EXISTING OPENING AND IS TO O BE SECURED WITH SHEET METAL SCREWS FOUR INCHES ON CENTERS • A LIBERAL QUANTITY OF FIRE RESISTANT ADHESIVE IS TO BE APPLIED TO THE Q EDGES OF THE METAL PATCH AND THE ASSEMBLY SCREWED IN PLACE ALL WORK SHALL BE PERFORMED IN STRICT COORDINATION WITH HOSPITAL Uj SCHEDULES, OCCUPANCIES AND WORK. CONTRACTOR SHALL COORDINATE WITH HOSPITAL REPRESENTATIVE. ♦/� H. ALL NECESSARY SHUTDOWNS OR OUT OF PHASE WORK SHALL BE SCHEDULED WITH THE HOSPITAL REPRESENTATIVE. I. FIELD VERIFY THE EXACT SIZES AND LOCATIONS OF ALL EXISTING DUCTWORK AND PIPING PRIOR TO DEMOLITION OF ANY EXISTING WORK. THE DEMOLITION WORK SHALL Uj DUCT J. BE COORDINATED WITH THE NEW WORK TO ASSURE PROPER LIMITS OF DEMOLITION. REMOVE ALL EXISTING EQUIPMENT AND ASSOCIATED PIPING, WHETHER SPECIFICALLY INDICATED OR NOT, THAT IS NO LONGER REQUIRED. Ke REMOVE AND CAP EXISTING BRANCH PIPING AND DUCTWORK NO LONGER REQUIRED TO REMAIN AS PART OF AN ACTIVE SYSTEM, AT THE APPROPRIATE MAIN. FUSIBLE ROD REINSULATE PIPING AND DUCTWORK THAT HAS MISSING OR DAMAGED INSULATION PER SPECIFICATIONS L ANY PIPING AND DUCTWORK WHICH MUST REMAIN AS PART OF AN ACTIVE SYSTEM ��. L ���i, AND IS IN CONFLICT WITH THE NEW LAYOUT SHALL BE RELOCATED AT NO ADDITIONAL COST OVER THE DAMPER FRAME M. CONTRACT AMOUNT. ALL EXISTING DIFFUSERS, EQUIPMENT AND PIPING REMOVED DURING CONSTRUCTION �•�`�,�` SHALL REMAIN THE PROPERTY OF THE OWNER AND SHALL BE STORED, REMOVED FROM THE JOB SITE OR DISPOSED OF AS DIRECTED BY THE OWNER'S 74 REPRESENTATIVE. N. ALL EXISTING CEILING DIFFUSERS SHALL BE REUSED, REMOVED AND STORED OR I !D DISPOSED OF AS DIRECTED BY THE OWNER'S REPRESENTATIVE ©i W 0. CONTRACTOR SHALL SEAL ALL LEAKS IN EXISTING DUCTWORK & PIPING AND NEW DUCTWORK &PIPING. V0�? NEGATOR SPRING Pe �AND 0 �\\ - CAULKING MATERIAL S- JOINT. SLEEVE APPROXIMATE LOCATION. NEW EQUIPMENT DUCTWORK IS SHOWN BY EAVY TO DUCT Q. CONTRACTOR SHALL BE RESPONSIBLE FOR REMOVING AND /OR DISPOSING OF ALL ITEMS THAT ARE NOT NECESSARY IN THE COMPLETION OF THE PROJECT AND SHALL V MAXIMUM A.4SMOKE /FIRE DAMPER CLEAN THE AREA OF CONSTRUCTION AFTER THE COMPLETION OF THE PROJECT. R. THE MECHANICAL CONTRACTOR SHALL ADJUST AND REBALANCE THE AIR CONDITIONING SYSTEM AND EXHAUST SYSTEM TO PROPER DESIGN VOLUME AS SHOWN MUST COMPLY WITH U.L 555 S ON PLAN. S ANY EXISTING WALLS DAMAGED FROM PIPING OR DUCTWORK THAT WAS REMOVED SHALL BE PATCHED AND SEALED TO MEET THE FULL INTEGRITY OF THE REMAINING WALL COORDINATE WITH ARCHITECTURAL PLANS FOR RATINGS OF WALLS INSTALLATION WEATHER SPECIFICALLY CA REPLACE ALL EXISTING TSTATS SHOWN ON PLANS OR NOT. WITH NEW SPACE SENSORS REHEAT COIL PIPING DETAIL V NO SCALE OPERATION: A FIRE DAMPER MODE HIGH TEMPERATURE MELTS FUSIBLE LINK. CLOSING FIRE DAMPER 03NO SCALE Be SMOKE DAMPER MODE SMOKE DETECTOR UPON SENSING HEAT/SMOKE ACTUATES DAMPER MOTOR TO CLOSE DAMPER FAN SCHEDULE DESIG. AREA SERVE LOCATION CFM EXT. S.P. FAN DATA ELECTRICAL MOTOR DATA MANUFACTURER/MODEL NO. (S) REMARKS/NOTES TYPE RPM DRIVE TS (FPM) WATTS B.H.P. VOLT/PH STARTER EF-1 -3B G ENERRAAL COUNG 400 0.5 INUNE 1090 DIRECT 1976 350 - 120/60/1 NO GREENHECK /CSP -A700 39 ALL FAN NOTES: 1. PROVIDE WITH DISCONNET 2. BACK DRAFT DAMPER. 3. FAN TO SHUT DOWN ON FIRE ALARM 4. PROVIDE PITH SPEED CONTROL 5. INTERLOCK WITH EXISTING AHU -1 -3 6. MAX SONES a 2.5 HVAC DESIGN REQUIRES YES NO DUCT SMOKE DETECTOR X FIRE DAMPER(S) X SMOKE DAMPER(S) X FIRE RATED ENCLOSURE X FIRE RATED ROOF/ FLOOR CEILING ASSEMBLY X FIRE STOPPING X SMOKE CONTROL X APPLICABLE CODES 1. FLORIDA BUILDING CODE 2010 EDITION 2. FLORIDA MECHANICAL CODE, 2010 EDITION 3. FLORIDA PLUMBING CODE, 2010 EDITION 4. GUIDEUNES FOR DESIGN AND CONSTRUCTION OF HOSPITAL AND HEALTH CARE FACILITIES (GUIDELINES 2010 EDITION) 5. NFPA 101 (2006) 6. NFPA 99 (2005) 7. STATE FIRE PROVENTION CODE 4A60 (2001) & AIA GUIDELINES (2010) 9. FIRE MARSHALL'S RULE 4A3.012 F.A.C. (JANUARY 1, 2001) 10. NFPA 70 (2008) 11. NFPA 110 (2005) KEYPLAN Job No: 412480.000 eta 11 -05 -2012 Sheet Title: GENERAL NOTES AND DETAILS Sheet No: M0.00