12-1139-022APPUCABLE CODES
A. STATE, COUNTY, AND CITY HEALTH AND BUILDING CODES,
B. NFPA 51B, 2009 EDITION.
C. NFPA 70, 2008 EDITION.
D. NFPA 72, 2007 EDITION.
E. NFPA 90A, 2009 EDITION,
F. NFPA 101, LIFE SAFETY CODE, 2009 EDITION
G. FLORIDA BUILDING CODE— BUILDING, 2010 EDITION
H. FLORIDA BUILDING CODE— MECHANICAL, 2010
I. FLORIDA BUILDING CODE— PLUMBING, 2010
J. OTHER NFPA CODES AS REFERENCED BY STANDARD CODES.
K. FGI GUIDELINES FOR DESIGN AND CONSTRUCTION OF
HEALTHCARE FACILITIES 2010 EDITION
L. 2009 FLORIDA FIRE PREVENTION CODE
M. FLORIDA ADMINISTRATIVE CODE CHAPTER 59A -3.
N. FLORIDA ADMINISTRATIVE CODE CHAPTER 69A- 3.012.
0. FLORIDA ADMINISTRATIVE CODE CHAPTER 69A -60 SECTION 633.022.
TEST & BALANCE NOTES
1. PRECONSTRUCTION:
PRIOR TO COMMENCEMENT OF ANY HVAC WORK AN INDEPENDENT AABC OR NEBB CERTIFIED T &B
CONTRACTOR SHALL MEASURE AND DOCUMENT, IN A TYPED REPORT THE AIRFLOW QUANTITIES
PROVIDED OR EXHAUSTED BY ALL EXISTING EQUIPMENT AND DUCTS TO REMAIN THAT SERVE OR
ARE SERVED FROM THE RENOVATED AREA, SUBMIT DATA TO ENGINEER FOR REVIEW.
THE FOLLOWING INFORMATION IS REQUIRED:
— AIR FLOW �T` ALL AIR DEVICES IN RENOVATED AREAS).
— AIR FLOW RAVERSE AT MAINS AND BRANCH DUC S SERVING THE RENOVATED AREA(S).
AIR FLOW UNITS TRAVERSE) AT MAINS AND BRANCH DUCTS SERVING THE RENOVATED AREA(S).
— SUCTION AND DISCHARGE STATIC AT UNITS SERVING THE RENOVATED AREA(S).
— MEASURED FAN RPM, MOTOR AMPERAGE FOR ALL UNITS SERVING THE RENOVATED AREA(S).
— PROVIDE EXISTING UNIT AND MOTOR NAME PLATE DATE.
— CHILLED WATER AND HOT WATER TEMP AND FLOW TO AND FROM ALL AHU'S & FCU'S IN RENOVATED
AREA(S),
2. FINAL CONSTRUCTION:
UPON COMPLETION OF THE HVAC RENOVATION WORK, THE SAME CONTRACTOR SHALL REBALANCE
THE NEW AND EXISTING EQUIPMENT AND DUCTS TO PROVIDE INDICATED AIR QUANTITIES TO THE
RENOVATED SPACE. ANY ADDITION OF DAMPERS, ADJUSTMENTS, FAN SPEED, CHANGE OUT OF
PULLEYS, ETC.) REQUIRED FOR THIS SHALL BE INCLUDED IN THIS CONTRACTORS PROPOSAL.
3, FINAL REPORT:
SUBMIT FINAL TEST AND BALANCE REPORT TO ENGINEER FOR REVIEW AND ACCEPTANCE. ONE WEEK
PRIOR TO FINAL AHCA INSPECTION FOR EACH PHASE.
INFECTION CONTROL MEASURES
1. CONTRACTOR SHALL OBTAIN FROM THE OWNER A COPY OF THE INFECTION CONTROL
RISK ASSESSMENT (ICRA) PREPARED FOR THIS PROJECT. CONTRACTOR SHALL REVIEW
THE REQUIREMENTS IN THE REPORT AND PERFORM ALL WORK IN ACCORDANCE WITH
THOSE REQUIREMENTS, CONTRACTOR SHALL STRICTLY ADHERE TO THE LIMITS OF
THE CONSTRUCTION AREA, AND WHERE PHASING APPLIES SHALL ADHERE TO THE
PHASING PLAN. ANY WORK OUTSIDE THE CONSTRUCTION AREA SHALL BE COORDINATED
WITH THE OWNER AND PERFORMED IN ACCORDANCE WITH THE ICRA REPORT, UNDER
THE SUPERVISION OF THE OWNER'S REPRESENTATIVE OR OTHER DESIGNATED ICRA
COMMITTEE OFFICER.
2. TO THE EXTENT THAT IT IS REQUIRED BY THE ICRA, THE CONTRACTOR SHALL
ENDEAVOR TO MAINTAIN EXISTING LEVELS OF INDOOR AIR QUALITY IN AREAS
SURROUNDING AND ADJACENT TO THE CONSTRUCTION WORK ZONE, AND ELSEWHERE
IN THE FACILITY. IT SHOULD BE ANTICIPATED THAT THE ICRA REPORT WILL REQUIRE
MEASURES TO THIS EFFECT INCLUDING ERECTION OF CONSTRUCTION ZONE BARRIERS
AND PROVISION OF NEGATIVE AIR PRESSURE IN THE CONSTRUCTION ZONE RELATIVE
TO OTHER AREAS OF THE FACILITY.
3. IN ADDITION TO THE MEETING THE REQUIREMENTS OF THE ICRA REPORT, THE
CONTRACTOR AT A MINIMUM SHALL PROVIDE EQUIPMENTAND COMPONENTS
NECESSARY TO CREATE A NEGATIVE PRESSURE IN THE CONSTRUCTION WORK ZONE
RELATIVE TO ADJACENT AREA. EXISTING HVAC SYSTEMS AND COMPONENTS SHALL
NOT BE USED FOR THIS FUNCTION, UNLESS SPECIFICALLY APPROVED BY THE OWNER'S
INFECTION CONTROL OFFICER. THE CONCEPT AND ALL ASPECTS OF THIS WORK SHALL
BE DONE IN ACCORDANCE WITH THE ICRA REQUIREMENTS AND AT A MINIMUM AS
FOLLOWS:
VERIFY ALL EXISTING DUCTWORK WHICH PASSES THROUGH THE
CONSTRUCTION ZONE, AND IS TO REMAIN, IS SEALED (CAPPED) AND PROTECTED
DURING THE CONSTRUCTION DURATION.
AIR REMOVED FROM THE CONSTUCTION ZONE SHALL BE FILTERED AND /OR
DISCHARGED AS DIRECTED BY THE ICRA REPORT.
PRESENT THE NEGATIVE AIR PRESSURE PLAN TO THE OWNER FOR APPROVAL
BY THE INFECTION CONTROL COMMITTEE.
PROVIDE MEANS TO MONITOR AND VERIFY NEGATIVE PRESSURE IS BEING
MAINTAINED IN ACCORDANCE WITH THE ICRA REPORT, AND PROVIDE
DOCUMENTATION TO THE OWNER AS REQUIRED.
4. COORDINATE IN ADVANCE ANY REQUIRED EQUIPMENT SHUTDOWN WITH THE OWNER,
AND VERIFY BEFORE SHUTDOWN THAT EXISTING OR DESIRED AIR PRESSURE
RELATIONSHIPS WILL NOT BE ADVERSALY AFFECTED.
5. PROVIDE LAMIFLOW #LN -102 & LP -102 FOR CONSTRUCTION SITE NEGATIVE
PRESSURE MONITORING.
6. CONTRACTOR SHALL PROVIDE STICKEY MATTS AT THE CONSTRUCTION SITE
ENTRANCES IN ACCORDANCE WITH THE IRCA REPORT.
7. CONTRACTOR SHALL PROVIDE SPOT COOLERS AS REQUIRED DURING CONSTRUCTION TO
MAINTAIN THE CONSTRUCTION ENVIROMENT TO 75 DEGREES AS REQUIRED.
L
N
N
L
Q
a
0
0
U
0
rn
v c
m
N
0
N
LIP]
jIM001�ZON�ITA�;
project €r x
Ni„ONIIYl1NOINII RING y
10110H WAL NLlCINML lLAl11NN10lNIL
II •1
t1O1 TNLAiYT iNONANLNiI fIOYNIDA 4"11
�. IN.71 •IIt F.161.7$7.9 84
n iota w'�.u�
ate,.
ALL DIMENSIONS
AR E
APPROXIMATE,
CONTRACTOR To
VERIFY
DIMENSIONS IN
FIELD.
"TYPICAL" MEANS
THAT ALL. SIMILAR
ITEMS ARE To BE
HANDLES SIMILAR
TOTHE ONE
MARKED
"TYPICAL"
W
0
I
W
0—
Ln
0
Z
Buk&mq D'0kgf mAccs
Asso0kifFs
5824 SiditU q I oAd
v FL 3 Y021
954. 987,0206
PmJ®CP NWIIb11 �9ATE
110q 1 0�/�0/ 12
Sckk Dim" By
AS SHOWN -TQ L
BEN L. WARSECK, AIA
=NSE # AR 13228
LDING DIAGNOSTICS
30CIATES, PA
=NSE # AAF000114
wimq NUINI 6
M -3
~ 00
w w 0-)
CK ¢
v I
O —
O
—�
( LL
ao
LL
O
O Q
Buk&mq D'0kgf mAccs
Asso0kifFs
5824 SiditU q I oAd
v FL 3 Y021
954. 987,0206
PmJ®CP NWIIb11 �9ATE
110q 1 0�/�0/ 12
Sckk Dim" By
AS SHOWN -TQ L
BEN L. WARSECK, AIA
=NSE # AR 13228
LDING DIAGNOSTICS
30CIATES, PA
=NSE # AAF000114
wimq NUINI 6
M -3