Loading...
12-1139-016rn a a m u 0 4 0 rn a rn EXISTING LIMIT OF PROPOSED TEMPORARY SPACE PHYSICAL THERAPY 701 CONFERENCE 713 EXISTING C A 700 ■ FREC-74UT�CNS- ITEI-1 RISK GONSTRUGTION PRO TECTION tYPE C PATIENT RISK CROUP NICzI -I* RISK PRECAUTION CLASS III 8 IV * SEE NOTE 5ELOI.J: "A" PATIENTS ARE NOT i=RESENT DURING WORK, THIS WILL GREATLY REDUCE RISK EXISTING OFFICE 712 O 0 O EXISTING EXISTING O OFFICE OFFICE � 708 707 EX I'ST I— TOIL T U °C°�� — W o 711 w��' IL .� � � EXISTING OFFICE 706 A ",Jh, rotN FLOOR IGRA CONSTRUCTION PLAN &COLE: 1/4`-1'-0` 0 EXISTING TOILET 702 IST �I EXIST IN TO LE J704 0 EXISTING RECEPTION /WAITING 705 01 u \�\ op� i ii J 1 —._ ---T ARE, I► KE Y f=L AN CLOSE CEILING W/ ro MILL SEAL ALL FENETRAi FERIME DUC' CLOSE OPEN DUCTS U)/ POLY SEAL !1)/ DUC' SEAL AROUI FIFE ANI: FENETRATI THE FARTITIC POLY B4 WITH DUC' '5CALE: N.T.S. RETARDENT ,D NAILER 5ALANCE OF FACILITY T 1` 'ORARY [�)UeT fARTITION DETAIL SCALE: 1/2 " =1' -0" NOTES: A. ALL WORK WILL BE PERFORMED DURING NON OPERATIONAL TIME WHEN PATIENTS ARE NOT PRESENT.* B. DESCRIPTION OF REQUIRED INFECTION CONTROL PRECAUTIONS BY CLASS BEFORE CONSTRUCTION: 1J REMOVE OR ISOLATE HVAC SYSTEM AREA WHERE WORK IS BEING DON TO PREVENT CONTAMINATION OF DUCT SYSTEM. 2e) COMPLETE ALL CRUCIAL BARRIERS I.E. SHEETROCK, PLYWOOD, PLASTIC, TO SEAL AREA FROM NON WORK AREA OR IMPLIMENT CONTROL CBE METHOD (CART WITH PLASTIC COVERING AND SEALED CONNECTION TO WORK SITE WITH HEPA VACUM FOR VACUMING PRIOR TO EXIT) BEFORE CONSTRUCTION BEGINS. 3.) MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORK SITE UTILIZING HEPA EQUIPPED AIR FILTRATION UNITS. 4.) CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINERS. ALL DIMENSIONS ARE AFFRO; <IMATE, CORTR4.CTOR TO YERfFY Dl E 51 ON5 IN FIELD. "TYFICAL" MEAN5 THAT ALL SIMILAR ITEMS ARE TO BE HANDLES 51MILAR TOTHE ONE MARKED "TYPICAL" w- a� O z, O �QO O r m �A �r 5.) COVER TRANSPORT RECEPTACLES OR CARTS. TAPE COVERING UNLESS SOLID LID. •'° °" DESCRIPTION OF REQUIRED INFECTION CONTROL PRECAUTIONS 3� � ' pp a r-TEF, CONSTRUCTION: u � Ea 'no w k 1.) DO NOT REMOVE 5ARRIER5 FROM WOW AREA UNTIL COMPLETED' PROJECT IS INSPECTED BY THE OWNER'& SAFETY DEPARTMENT AND 'k INFECTION CONTROL DEPARTMENT AND THOROUGHLY CLEANS.Y B�ud�umc� DoAqN�pocs L, ` � � THE OWNERS ENVIRONMENTAL SERVICES DEPARTMENT. kuB 5d244 X21 2.) REMOVE BARRIER MATERIALS CAREFULLY TO MINIMIZE 5PREADIN "' �5�- ��a.�a� OF DIRT AND DE5R15 ASSOCIATED WITH CONSTRUCTION. �emHumb ` � 11041 05/01/12 3.) VACUM WORK AREA WITH HEPA FILTERED VACUMS. 1/q " =1' 5F(� KAREN L. WARSECK, AIA P 4.) WET MO AREA WITH DISINFECTANT. LICENSE AR 1322s ctC' .j BUILDING DIAGNOSTICS tT 5.) REMOVE ISOLATION OF HVAC SYSTEM IN AREAS WHERE WOW IS ASSOCIATES, Fa BEING PERFORMED. LICENSE " AAF000114 fCRA -1