12-1139-016rn
a
a
m
u
0
4
0
rn
a
rn
EXISTING LIMIT OF PROPOSED
TEMPORARY SPACE
PHYSICAL THERAPY
701
CONFERENCE
713
EXISTING
C A
700
■
FREC-74UT�CNS-
ITEI-1
RISK
GONSTRUGTION
PRO TECTION tYPE
C
PATIENT RISK
CROUP
NICzI -I*
RISK
PRECAUTION
CLASS
III 8 IV
* SEE NOTE 5ELOI.J: "A" PATIENTS ARE NOT i=RESENT
DURING WORK, THIS WILL GREATLY REDUCE RISK
EXISTING
OFFICE
712
O 0
O EXISTING EXISTING
O
OFFICE OFFICE
� 708 707
EX I'ST I—
TOIL T U °C°��
— W o
711 w��'
IL .� � �
EXISTING
OFFICE
706
A ",Jh,
rotN FLOOR IGRA CONSTRUCTION PLAN
&COLE: 1/4`-1'-0`
0 EXISTING
TOILET
702
IST
�I
EXIST IN
TO LE
J704
0
EXISTING
RECEPTION /WAITING
705
01
u
\�\
op�
i
ii
J
1
—._ ---T
ARE,
I►
KE Y f=L AN
CLOSE CEILING
W/ ro MILL
SEAL ALL
FENETRAi
FERIME
DUC'
CLOSE OPEN DUCTS U)/
POLY SEAL !1)/ DUC'
SEAL AROUI
FIFE ANI:
FENETRATI
THE FARTITIC
POLY B4
WITH DUC'
'5CALE: N.T.S.
RETARDENT
,D NAILER
5ALANCE OF FACILITY
T 1` 'ORARY [�)UeT fARTITION DETAIL
SCALE: 1/2 " =1' -0"
NOTES:
A.
ALL WORK WILL BE PERFORMED DURING NON OPERATIONAL TIME
WHEN PATIENTS ARE NOT PRESENT.*
B.
DESCRIPTION OF REQUIRED INFECTION CONTROL PRECAUTIONS
BY CLASS BEFORE CONSTRUCTION:
1J REMOVE OR ISOLATE HVAC SYSTEM AREA WHERE WORK IS
BEING DON TO PREVENT CONTAMINATION OF DUCT SYSTEM.
2e) COMPLETE ALL CRUCIAL BARRIERS I.E. SHEETROCK, PLYWOOD,
PLASTIC, TO SEAL AREA FROM NON WORK AREA OR IMPLIMENT
CONTROL CBE METHOD (CART WITH PLASTIC COVERING AND SEALED
CONNECTION TO WORK SITE WITH HEPA VACUM FOR VACUMING
PRIOR TO EXIT) BEFORE CONSTRUCTION BEGINS.
3.) MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORK SITE UTILIZING
HEPA EQUIPPED AIR FILTRATION UNITS.
4.) CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY
COVERED CONTAINERS.
ALL DIMENSIONS
ARE
AFFRO; <IMATE,
CORTR4.CTOR
TO YERfFY
Dl E 51 ON5 IN
FIELD.
"TYFICAL"
MEAN5 THAT ALL
SIMILAR ITEMS
ARE TO BE
HANDLES
51MILAR TOTHE
ONE MARKED
"TYPICAL"
w-
a�
O
z,
O
�QO
O
r m
�A
�r
5.) COVER TRANSPORT RECEPTACLES OR CARTS. TAPE COVERING
UNLESS SOLID LID. •'° °"
DESCRIPTION OF REQUIRED INFECTION CONTROL PRECAUTIONS 3�
� '
pp a r-TEF, CONSTRUCTION:
u
� Ea 'no w k
1.) DO NOT REMOVE 5ARRIER5 FROM WOW AREA UNTIL COMPLETED'
PROJECT IS INSPECTED BY THE OWNER'& SAFETY DEPARTMENT AND
'k INFECTION CONTROL DEPARTMENT AND THOROUGHLY CLEANS.Y B�ud�umc� DoAqN�pocs
L,
` � � THE OWNERS ENVIRONMENTAL SERVICES DEPARTMENT. kuB
5d244 X21
2.) REMOVE BARRIER MATERIALS CAREFULLY TO MINIMIZE 5PREADIN "' �5�- ��a.�a�
OF DIRT AND DE5R15 ASSOCIATED WITH CONSTRUCTION. �emHumb ` �
11041 05/01/12
3.) VACUM WORK AREA WITH HEPA FILTERED VACUMS. 1/q " =1' 5F(�
KAREN L. WARSECK, AIA
P
4.) WET MO AREA WITH DISINFECTANT. LICENSE AR 1322s
ctC' .j BUILDING DIAGNOSTICS
tT 5.) REMOVE ISOLATION OF HVAC SYSTEM IN AREAS WHERE WOW IS ASSOCIATES, Fa
BEING PERFORMED. LICENSE " AAF000114
fCRA -1