12-1115-004V AREA 106% SP14E'MMWTI�'�
DESCRIPTION
BY EXISTING AUT1
EXISTING SPRINKLER PIPE TO REMAIN
SPRINKLER SYSTEM P1,519ASUM
M
CONNECT • EXIS11NG AT THIS POINT
OBTAINED FRON
4 &*fti 6111 z t 2(*2t:a ■ W1
AL
11 1 1
A*=
it
0
VEST.,,
_
U, L T 'E_ i
_T_
ii
_T_
_71
2-1/2"
C> IT- 1 0-6 1!
ZO
04
)_9
1 -8X
1" DOWN To SPRINKLER
HEAD BELON DUCT
9' ---(D L
4"-0
4
02-
OFFIC I . 8
ST OR.
ELEVATOR LOBBY
1)110 *10
7011
i 7_7
WAITING
%
GENERAL NOTES:
11- SCOPE OF WORK FOR THIS PROJECT: DEMOLITION AND NEW INSTALLATION OF A
PORTION OF THE EXISTING FIRE SPRINKLER SYSTEM. NEW FIRE SPRINKLER LAYOUT TO
SUIT NEW FLOOR PLAN LAYOUT, WITH NO CHANGE IN OCCUPANCY OR COVERAGE, TO
CONFORM WITH THE NFPA 13 EDITION 2007 AND LOCAL REGULATIONS.
2- EXISTING FIRE PROTECTION SYSTEM TO REMAIN IN SERVICE DURING ALL PHASES OF
CONSTRUCTION.
3- FIRE SPRINKLER HEADS ARE QUICK RESPONSE.
4- SPRINKLER HEADS SHALL BE INSTALLED "CENTER OF TILE" ALLOWING 1" VARIANCE FROM
THE GEOMETRIC CENTER OF THE TILE.
5- SPRINKLER HEADS SHALL BE LOCATED A MINIMUM 12" FROM ANY CEILING OBSTRUCTION.
6- ALL DIMENSIONS ARE CENTER TO CENTER UNLESS NOTED OTHERWISE.
7- REFER TO SPRINKLER HEAD SCHEDULE FOR HEAD DESCRIPTIONS.
8- THE SMALLEST FIRE SPRINKLER PIPE SIZE UTILIZED THROUGHOUT THIS PROJECT SHALL
BE V stab
i
l to 12' bellow
9- NEW SPRINKLER HEADS ADDED UNDER THIS PROJECT DO NOT CONSTITUTE OR FALL Ceiling or slob
WITHIN THE HYDRAULIC MOST REMOTE AREA. AS SUCH, HYDRAULIC CALCULATIC
NOT REQUIRED AND WILL NOT BE PROVIDED UNDER THIS PROJECT.
SOLID CONCRETE
CONSTRUCTION
318 ALL- THREAD ROD-i-i-iii""""ii"""*"'
3/8 CONCRETE
DROP-IN ANCHOR
HANGER RING
I -NEW UPRIGHT SPRINKLER HEAD.
2.NEW 1" SPRIG UP.
HANGER DETAIL 3-NEW 1" BRANCH LINE.
rain ne
In SVV Wn St SW 6=
r>p-M St
. .. . ...... — -------
4-NEW I' ARM—OVER.
5•NEW 1" DROP.
6-NEW UPRIGHT SPRINKLER HEAD
BELOW DUCT.
NEW CONSTRUCTION LEGEND
DESCRIPTION
EXISTING SPRINKLER PIPE TO REMAIN
M
CONNECT • EXIS11NG AT THIS POINT
4 &*fti 6111 z t 2(*2t:a ■ W1
NEW FIRE SPRINKLER HEAD
KEYPLAN
AREA I
AREA 2--,,,,
N
f'\ 3rd Floor Level
N111
ILI 1111
179"
Ar
iFIRE PROTECTION CONTRACTOR:
NATIONAL FIRE PROTECTION LLC
3125 W COMMERCIAL BLVD Suite 200
FT LAUDERDALE, FL 33309
(954) 739-8107 Fax (954) 739-5471
www.natlfire.com
Area of Work
Area #2. New Fire Sprinkler.,
1 Job:
HAFTIST HEALTH SOUTH FLORIDA
OBSTETRICAL/NICU OR
6200 SW 73 Street
South Miami, F1 33143
Hydraulic Reference Points
VI1MG UPRIGHT SPRMER
Contract No.
68039
Elev. Below Top of Steel
Elev. Above Flnished noor
-Drawn-By
Med Garcia
Elev. of Top of Steel
Ceiling Height
M_
Rise up or down
Date
09-05-2012
Point of connection
- -
Contractor THORNTON CONSTRUCTION CO INC
4300 Biscayne Blvd. SUITE W07
Miami, FL 33137
Not In Cont mct
Upproval By
City • South Miami
Totial
"i
Sheet—
179"
Ar