Loading...
11-854-023LA KIM [a i • 1. EXISTING WET FIRE SPRINKLER .SYSTEM WAS ORGINALLY CALCULATED AS A LIGHT HAZARD OCCUPANCY AT .10 GPM /900 S.F. COORDINATE O DUCTWORK. EXISTING FIRE SPRINKLER PIPING AS NEEDED FOR INSTALLATION OF PHASE COORDINATION BETWEEN ALL TRADES SHALL BE COMPLETED PRIOR TO DEMOLITION. 3, CONTRACTOR SHALL COORDINATE TEMPORARY PHASING IN PHASE ONE WITH ANAL CEILING LAYOUT IN FOUR, • • ARCHITECTURAL DRAWINGS • PHASING REQUIREMENTS AND REFLECTED CEILING PLANS. 00% M ®t /P tngineer Structural Engineer i i • e i e .ATIA�Vff A[11 g � (� �.e pp -� � � m�7� j.'az� t P rr. 00% M ®t /P tngineer Structural Engineer i i • e Revision Chockedby, DCB Shoot Number i 0 .j CIO r 0 CL rr CE, 0 S" .J UJ • C14 L orm o • • Revision Chockedby, DCB Shoot Number