11-853R-010•
•
+r
■
•
w
•
..r
/ f i ••i i r/ 1` / 1 1 r•.
IS' ql '1 i 1'• r 1 1 is �' i 1'. / : 1
f 1 i• f
/ r� •a• 1• : r 1 1 r• r if•:r 1 r f i. /. f
r' r 1i•1 /• a � , ' / 1 '
/ r r a / r / •• r r 1•
r r / 1 r 1 r•/ r f .,
TEMPORARY 4. CONTRACTOR SHALL PROVIDE MECHANICAL WORK FOR PHASING AS REQUIRED OR DIRECTED BY THE ARCHITECT, REFER Tit,
ARCHITECTURAL PHASING PLAN. .BE PROVIDED WHEN NEW WORK
SERVICES NEEDING TO REMAIN ACTIVE COORDINATE E.., •, / OWNER f WEEKS
ADVANCE.
5. ALL EQUIPMENT 1 i UNDER THIS PROJECT E/ OVER f THE OWNER AT THE OWNER'S DISCRETION
UNLESS OTHERWISE 1 D►
RETURNED 6. CONTRACTOR SHALL REMOVE OR RELOCATE EXISTING THERMOSTATS WHERE NECESSARY. REMOVED THERMOSTATS SHALI_ BE
TO OWNER.
CONSULT 7. PROPERLY REMOVE AND DISPOSE OF ALL EXISTING TO BE REMOVED WAC DUCTWORK AND AIR DISTRIBUT10N DEVICES.
OWNER AND OBTAIN OWNERS APPROVAL PRIOR TO DISPOSAL OF 1 !i MATERIAL
8. PATCH HOLES S 1 FLOORS AFTER REMOVAL OF X DUCTWORK, i MATCH NEW OR
EXISTING 1 / AND FIRE RATING. THIS INCLUDES EXISTING OPENINGS IN RATED WALLS OR FLOORS.
9. PROVIDE PRECONSTRUCTION TEST & BALANCE FOR SUPPLY, RETURN AND EXHAUST OF EXISTING MECHANICAL EQUIPMENT
SERVING PROJECT AREA. INCLUDE i i STATIC PRESSURE IN MAIN DUCTS, PRESSURE, / f• HP AND
PRESSURE DROP ACROSS COILS 1 FILTERS, CHILLED WATER FLOW AND PRESSURE AT .
1 CONTRACTOR RESPONSIBLE FOR CLEANING ASSOCIATED AHU PRIOR TO FINAL TEST AND BALANCE. OF
COOLING ASSOCIATED AHU SHALL CONSIST OF REPLACING THE FILTERS, PRESSURE WASHING COOLING COILS AFTER REMOVAL, BACK
FLUSHING 1 AND ALIGNING FINS WITH A FIN STRAIGHTENING TOOL
11. ALL NEW / EXISTING AIR DISTRIBUTION DEVICES LOCATED WITHIN PROJECT AREA SHALL BE FITTED WITH TEMPORARY
CONSTRUCTION T THROUGHOUT PROJECT DURATION TO HELP PREVENT ACCUMULATION OF DUST IN DEVICES AND
DUCTWORK.
12. CAP ALL DEMOLISHED BRANCH DUCT AT DUCT MAIN. CAP AND SEAL OPENINGS DURING EN11RE RENOVATION OF THE WAC
DUCTWORK.
DEMOLISH DUCTWORK / AIR DISTRIBUTION DEVICES IN THE PROJECT
REMOVE i RELOCATE ALL EXISTING :1• f
DEMOLITION KEY NOTES:
../ 1 S •!'.•
• t S S' / S) 'S 1 i
.•1 tree � .r.,• ! 1 �. ./
�.�r • , 1 •r r •• •� `r r t
FAN CRITERIA:
MANUFACTURER - HEPA -AIRE, MODEL - PREDATOR 1200 PAS
VARIABLE CFM - 300 TO 1000 CFM
ELECTRICAL: 115 VOLTS, 3.5 FLA
PROVIDE AN INCLINED MANOMETER, DIFFERENTIAL PRESSURE
TYPE, WITH WHITE FACE GAUGE AND BLACK LETTERS WITH
MAXIMUM PRESSURE RANGE OF 0.1" W.G. THIS SHALL BE
USED BY THE CONTRACTOR TO RECORD, ON A DAILY BASIS,
THE NEGATIVE PRESSURE IN THE RENOVATION AREA RELATIVE
TO THE ADJACENT SPACES.
"' i • - •
INFECTION CONTROL RISK ASSESSMENT OCRA) --- --- I
ALL WORK SHALL CONFORM OWNER'S 1 CONTROL • r CONSTRUCTION POLICIES,
PROCESSES 1 OWNER'S ►•i JECT-SPECIFIC INFECTION CONTROL h N
1r - •'
I
IC RISK
CONSTRUCTION ACTIVITY TYPE
• 1
LEVEL
t• r
It
CLASS III/IV
r• 1
CLASS III/IV
r • �.
CLASS III/IV
CLASS III/IV
GROUP 2
GROUP 3
i.
MEDIUM
MEDIUM r
r
OFFICE AREAS
ALL PATIENT CARE UNITS
EMERGENCY ROOM
TRANSPLANT CLINIC
CONFERENCE ROOMS
WAITING ROOMS*
RADIOLOGY
PUBLIC BATHROOMS
RECOVERY ROOMS
WAITING ROOMS*
LABOR AND DELIVERY
LABOR & DELIVERY ORs
,-
NURSERIES
CARDIAC •
PEDIATRICS
R#
OUTPATIENT
ALL INTENSIVE - AREAS
DIALYSIS r TRANSPLANT
1-
NUCLEAR MEDICINE
ONCOLOGY / BONE MARROW
•r • DISCHARGE AREA
CARDIOLOGY
PHYSICAL THERAPY TANK AREA
HYPERBARIC MEDICINE
ECHOCARDIOGRAPHY
PHARMACY ADMIXTURE
LABORATORIES
"DEPENDENT ON • •
INSPECTIONS AND / ACTIVITIES. INCLUDES, NOT Si TO, REMOVAL O /• VISUAL INSPECTION 1 TO
TILE PER 50 SQUARE FEET, PAINTING (BUT NOT SANDING) WALL COVERING, ELECTRICAL TRIM WORK, MINOR PLUMBING, AND ACTIVITIES WHICH DO NOT
GENERATE DUST OR REQUIRE CUTTING OF WALLS OR ACCESS TO CEILINGS OTHER THAN FOR VISUAL INSPECTION.
SMALL SCALE. SHOR DURATION X WHICH CREATE MINIMAL DUST. M 1 BUT NOT ! TO, INSTALLATION OF S i' 1NE AND
COMPUTER CABLING, ACCESS TO CHASE SPACES, CUTTING OF WALLS OR CEILING WHERE DUST MIGRATION CAN BE CONTROLLED.
ANY WORK I • GENERATES A MODERATE TO HIGH LEVEL OF DUST ! • REQUIRES DEMOLITION OR REMOVAL OF +E1 BUILDING COMPONENTS OR
_
ASSEMBLIES. INCLUDES, BUT i Et TO, SANDING OF 1 • PAINTING OR WALL COVERING, REMOVAL OF ! FI • COVERINGS, CEILING
AND CASEWORK, NEW WALL CONSTRUCTION, MINOR DUCTWORK OR ELECTRICAL WORK ABOVE CEILINGS, MAJOR CABLING ACTIVITIES, AND ANY ACTIVITY
MICH r 7r WITHIN A SINGLE /• ti
CANNOT
i
MAJOR DEMOLMON AND CONSTRUCTION PROJECTS. INCLUDES, : 1 it / M ! ! OR
! DEMOLITION OR REMOVAL ! MPLETE CEILING SYSTEM, AND NEW CONSTRUCTION.
1. EXECUTE WORK BY METHODS TO MINIMIZE RAISING DUST FROM CONSTRUCTION OPERATIONS.
2. IMMEDIATELY REPLACE ANY CEILING TILE DISPLACED FOR VISUAL INSPECTION.
■
3. MINOR DEMOLITION Ff• REMODELING.
1. PROVIDES ACTIVE MEANS TO PREVENT AIRBORNE DUST FROM DISPERSING INTO ATMOSPHERE
2. MIST WORK TO CONTROL DUST WHILE CUTTING.
WATER
3. SEAL UNUSED DOORS DUCT TAPE
4. BLOCK OFF AND SEAL AIR VENTS.
5. i SURFACES
6. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINERS.
7. WET MOP AND/OR VACUUM WITH HEPA FILTERED VACUUM BEFORE LEAVING WORK AREk
• PLACE DUST MAT AT ENTRANCE r EXIT OF r'
• REMOVE OR ISOLATE HVAC SYSTEM IN AREAS WHERE WORK BEING PERFORMED.
1. OBTAIN INFECTION CONTROL PERMIT BEFORE 1 1
2. ISOLATE E. WORK IS BEING DONE TO PREVENT 1 OF THE DUCT SYSTEM.
3. COMPLETE CRITICAL BARRIERS OR IMPLEMENT CONTROL fl BEFORE ! 1
4. MAINTAIN NEGATIVE • PRESSURE WORK SITE UTILIZING .. EQUIPPED FILTRATION r MONITOR WITH MAGNEHELIC GAUGES.
5. DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL COMPLETE PROJECT IS THOROUGHLY CLEANED BY ENVIRONMENTAL SERVICES DEPARTMENT.
6. VACUUM r • E• . FILTERED
■
7. WET MOP WITH DISINFECTANT.
8. REMOVE BARRIER MATERIALS CAREFULLY TO MINIMIZE SPREADING OF DIRT AND DEBRIS ASSOCIATED WITH CONSTRUCTION.
9. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINERS.
r COVER TRANSPORT RECEPTACLES OR COVERING.
REMOVE OR ISOLATE HVAC SYSTEM IN AREAS WHERE 1' BEING PERFORMED.
OBTAIN INFECTION CONTROL E BEFORE 1 / BEGINS.
1. i
ISOLATE 2. E• E WORK IS BEING DONE TO PREVENT / / OF DUCT SYSTEM.
3. COMPLETE ALL CRITICAL BARRIERS OR IMPLEMENT CONTROL CUBE METHOD BEFORE CONSTRUCTION BEGINS.
4. MAINTAIN NEGATIVE . PRESSURE WORK UTILIZING E. , EQUIPPED AIR FILTRATION AND MONITOR WITH MAGNEHELIC
5 ' SEAL HOLES, PIPES. 1. r :r PUNCTURES APPROPRIATELY.
• / Tie r ! / THROUGH THIS ROOM SO THEY SI USING A HEPA VACUUM CLEMER
BEFORE LEAVING WORK SITE OR THEY CAN WEAR CLOTH OR PAPER COVERALLS THAT ARE REMOVED EACH TIME THEY LEAVE THE WORK SITE.
7. ALL PERSONNEL ENTERING WORK SITE ARE REQUIRED TO WEAR SHOE COVERS.
•
RELEASED BY SAFETY AND INFECTION CONTROL
' VACUUM WORK E• E• Ef VACUUMS.
1 WET MOP WITH DISINFECTANT.
REMOVE BARRIER a• r MINIMIZE SPREADING OF DIRT • f DEBRIS ASSOCIATED WITH CONSTRUCTION.
12. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINERS.
13. COVER TRANSPORT RECEPTACLES OR CARTS. TAPE COVERING.
REMOVE OR ISOLATE WERE 1 / BEING Ir
E LA
r
• I • lewis
9024 SW 152 STREET
PALMETTO BAY, FL 33157
PH: (305) 234-0576
EDWARD LEWIS ARCHITECT'S, INC.
AAC001678
C. EDWARD LEWIS AR 0009567
_ri41 J
255 S. Orange Avenue
/S�a�t�e �, 1600 32M
Phone: 407 -841 -9050
ENGINEERING Fax 407- 540 -0234
FOR ARCHITECTURE www.tic- engineers.com
0 Copyot 2010 TLC Engineering forAmhitetture, Im
EB JWOOO15 TLC NO:111355
Structural E40W
•
1 0
r
r
• ,
■ i
U) 1- RRIJ
•
111111110 0 1
rr
IL
i
r
•
w X�_
r
UJ
1
•
r
•
r
Ir •
Seal
Revision
FIELD COORDINATION 1/13/2012
Project Number
10 -0368
Date
MARCH, 2011
I
FLOOR DEMO ,
Dram brt ATT
Checked bys DCB
1 , ti 7