Loading...
11-853R-010• • +r ■ • w • ..r / f i ••i i r/ 1` / 1 1 r•. IS' ql '1 i 1'• r 1 1 is �' i 1'. / : 1 f 1 i• f / r� •a• 1• : r 1 1 r• r if•:r 1 r f i. /. f r' r 1i•1 /• a � , ' / 1 ' / r r a / r / •• r r 1• r r / 1 r 1 r•/ r f ., TEMPORARY 4. CONTRACTOR SHALL PROVIDE MECHANICAL WORK FOR PHASING AS REQUIRED OR DIRECTED BY THE ARCHITECT, REFER Tit, ARCHITECTURAL PHASING PLAN. .BE PROVIDED WHEN NEW WORK SERVICES NEEDING TO REMAIN ACTIVE COORDINATE E.., •, / OWNER f WEEKS ADVANCE. 5. ALL EQUIPMENT 1 i UNDER THIS PROJECT E/ OVER f THE OWNER AT THE OWNER'S DISCRETION UNLESS OTHERWISE 1 D► RETURNED 6. CONTRACTOR SHALL REMOVE OR RELOCATE EXISTING THERMOSTATS WHERE NECESSARY. REMOVED THERMOSTATS SHALI_ BE TO OWNER. CONSULT 7. PROPERLY REMOVE AND DISPOSE OF ALL EXISTING TO BE REMOVED WAC DUCTWORK AND AIR DISTRIBUT10N DEVICES. OWNER AND OBTAIN OWNERS APPROVAL PRIOR TO DISPOSAL OF 1 !i MATERIAL 8. PATCH HOLES S 1 FLOORS AFTER REMOVAL OF X DUCTWORK, i MATCH NEW OR EXISTING 1 / AND FIRE RATING. THIS INCLUDES EXISTING OPENINGS IN RATED WALLS OR FLOORS. 9. PROVIDE PRECONSTRUCTION TEST & BALANCE FOR SUPPLY, RETURN AND EXHAUST OF EXISTING MECHANICAL EQUIPMENT SERVING PROJECT AREA. INCLUDE i i STATIC PRESSURE IN MAIN DUCTS, PRESSURE, / f• HP AND PRESSURE DROP ACROSS COILS 1 FILTERS, CHILLED WATER FLOW AND PRESSURE AT . 1 CONTRACTOR RESPONSIBLE FOR CLEANING ASSOCIATED AHU PRIOR TO FINAL TEST AND BALANCE. OF COOLING ASSOCIATED AHU SHALL CONSIST OF REPLACING THE FILTERS, PRESSURE WASHING COOLING COILS AFTER REMOVAL, BACK FLUSHING 1 AND ALIGNING FINS WITH A FIN STRAIGHTENING TOOL 11. ALL NEW / EXISTING AIR DISTRIBUTION DEVICES LOCATED WITHIN PROJECT AREA SHALL BE FITTED WITH TEMPORARY CONSTRUCTION T THROUGHOUT PROJECT DURATION TO HELP PREVENT ACCUMULATION OF DUST IN DEVICES AND DUCTWORK. 12. CAP ALL DEMOLISHED BRANCH DUCT AT DUCT MAIN. CAP AND SEAL OPENINGS DURING EN11RE RENOVATION OF THE WAC DUCTWORK. DEMOLISH DUCTWORK / AIR DISTRIBUTION DEVICES IN THE PROJECT REMOVE i RELOCATE ALL EXISTING :1• f DEMOLITION KEY NOTES: ../ 1 S •!'.• • t S S' / S) 'S 1 i .•1 tree � .r.,• ! 1 �. ./ �.�r • , 1 •r r •• •� `r r t FAN CRITERIA: MANUFACTURER - HEPA -AIRE, MODEL - PREDATOR 1200 PAS VARIABLE CFM - 300 TO 1000 CFM ELECTRICAL: 115 VOLTS, 3.5 FLA PROVIDE AN INCLINED MANOMETER, DIFFERENTIAL PRESSURE TYPE, WITH WHITE FACE GAUGE AND BLACK LETTERS WITH MAXIMUM PRESSURE RANGE OF 0.1" W.G. THIS SHALL BE USED BY THE CONTRACTOR TO RECORD, ON A DAILY BASIS, THE NEGATIVE PRESSURE IN THE RENOVATION AREA RELATIVE TO THE ADJACENT SPACES. "' i • - • INFECTION CONTROL RISK ASSESSMENT OCRA) --- --- I ALL WORK SHALL CONFORM OWNER'S 1 CONTROL • r CONSTRUCTION POLICIES, PROCESSES 1 OWNER'S ►•i JECT-SPECIFIC INFECTION CONTROL h N 1r - •' I IC RISK CONSTRUCTION ACTIVITY TYPE • 1 LEVEL t• r It CLASS III/IV r• 1 CLASS III/IV r • �. CLASS III/IV CLASS III/IV GROUP 2 GROUP 3 i. MEDIUM MEDIUM r r OFFICE AREAS ALL PATIENT CARE UNITS EMERGENCY ROOM TRANSPLANT CLINIC CONFERENCE ROOMS WAITING ROOMS* RADIOLOGY PUBLIC BATHROOMS RECOVERY ROOMS WAITING ROOMS* LABOR AND DELIVERY LABOR & DELIVERY ORs ,- NURSERIES CARDIAC • PEDIATRICS R# OUTPATIENT ALL INTENSIVE - AREAS DIALYSIS r TRANSPLANT 1- NUCLEAR MEDICINE ONCOLOGY / BONE MARROW •r • DISCHARGE AREA CARDIOLOGY PHYSICAL THERAPY TANK AREA HYPERBARIC MEDICINE ECHOCARDIOGRAPHY PHARMACY ADMIXTURE LABORATORIES "DEPENDENT ON • • INSPECTIONS AND / ACTIVITIES. INCLUDES, NOT Si TO, REMOVAL O /• VISUAL INSPECTION 1 TO TILE PER 50 SQUARE FEET, PAINTING (BUT NOT SANDING) WALL COVERING, ELECTRICAL TRIM WORK, MINOR PLUMBING, AND ACTIVITIES WHICH DO NOT GENERATE DUST OR REQUIRE CUTTING OF WALLS OR ACCESS TO CEILINGS OTHER THAN FOR VISUAL INSPECTION. SMALL SCALE. SHOR DURATION X WHICH CREATE MINIMAL DUST. M 1 BUT NOT ! TO, INSTALLATION OF S i' 1NE AND COMPUTER CABLING, ACCESS TO CHASE SPACES, CUTTING OF WALLS OR CEILING WHERE DUST MIGRATION CAN BE CONTROLLED. ANY WORK I • GENERATES A MODERATE TO HIGH LEVEL OF DUST ! • REQUIRES DEMOLITION OR REMOVAL OF +E1 BUILDING COMPONENTS OR _ ASSEMBLIES. INCLUDES, BUT i Et TO, SANDING OF 1 • PAINTING OR WALL COVERING, REMOVAL OF ! FI • COVERINGS, CEILING AND CASEWORK, NEW WALL CONSTRUCTION, MINOR DUCTWORK OR ELECTRICAL WORK ABOVE CEILINGS, MAJOR CABLING ACTIVITIES, AND ANY ACTIVITY MICH r 7r WITHIN A SINGLE /• ti CANNOT i MAJOR DEMOLMON AND CONSTRUCTION PROJECTS. INCLUDES, : 1 it / M ! ! OR ! DEMOLITION OR REMOVAL ! MPLETE CEILING SYSTEM, AND NEW CONSTRUCTION. 1. EXECUTE WORK BY METHODS TO MINIMIZE RAISING DUST FROM CONSTRUCTION OPERATIONS. 2. IMMEDIATELY REPLACE ANY CEILING TILE DISPLACED FOR VISUAL INSPECTION. ■ 3. MINOR DEMOLITION Ff• REMODELING. 1. PROVIDES ACTIVE MEANS TO PREVENT AIRBORNE DUST FROM DISPERSING INTO ATMOSPHERE 2. MIST WORK TO CONTROL DUST WHILE CUTTING. WATER 3. SEAL UNUSED DOORS DUCT TAPE 4. BLOCK OFF AND SEAL AIR VENTS. 5. i SURFACES 6. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINERS. 7. WET MOP AND/OR VACUUM WITH HEPA FILTERED VACUUM BEFORE LEAVING WORK AREk • PLACE DUST MAT AT ENTRANCE r EXIT OF r' • REMOVE OR ISOLATE HVAC SYSTEM IN AREAS WHERE WORK BEING PERFORMED. 1. OBTAIN INFECTION CONTROL PERMIT BEFORE 1 1 2. ISOLATE E. WORK IS BEING DONE TO PREVENT 1 OF THE DUCT SYSTEM. 3. COMPLETE CRITICAL BARRIERS OR IMPLEMENT CONTROL fl BEFORE ! 1 4. MAINTAIN NEGATIVE • PRESSURE WORK SITE UTILIZING .. EQUIPPED FILTRATION r MONITOR WITH MAGNEHELIC GAUGES. 5. DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL COMPLETE PROJECT IS THOROUGHLY CLEANED BY ENVIRONMENTAL SERVICES DEPARTMENT. 6. VACUUM r • E• . FILTERED ■ 7. WET MOP WITH DISINFECTANT. 8. REMOVE BARRIER MATERIALS CAREFULLY TO MINIMIZE SPREADING OF DIRT AND DEBRIS ASSOCIATED WITH CONSTRUCTION. 9. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINERS. r COVER TRANSPORT RECEPTACLES OR COVERING. REMOVE OR ISOLATE HVAC SYSTEM IN AREAS WHERE 1' BEING PERFORMED. OBTAIN INFECTION CONTROL E BEFORE 1 / BEGINS. 1. i ISOLATE 2. E• E WORK IS BEING DONE TO PREVENT / / OF DUCT SYSTEM. 3. COMPLETE ALL CRITICAL BARRIERS OR IMPLEMENT CONTROL CUBE METHOD BEFORE CONSTRUCTION BEGINS. 4. MAINTAIN NEGATIVE . PRESSURE WORK UTILIZING E. , EQUIPPED AIR FILTRATION AND MONITOR WITH MAGNEHELIC 5 ' SEAL HOLES, PIPES. 1. r :r PUNCTURES APPROPRIATELY. • / Tie r ! / THROUGH THIS ROOM SO THEY SI USING A HEPA VACUUM CLEMER BEFORE LEAVING WORK SITE OR THEY CAN WEAR CLOTH OR PAPER COVERALLS THAT ARE REMOVED EACH TIME THEY LEAVE THE WORK SITE. 7. ALL PERSONNEL ENTERING WORK SITE ARE REQUIRED TO WEAR SHOE COVERS. • RELEASED BY SAFETY AND INFECTION CONTROL ' VACUUM WORK E• E• Ef VACUUMS. 1 WET MOP WITH DISINFECTANT. REMOVE BARRIER a• r MINIMIZE SPREADING OF DIRT • f DEBRIS ASSOCIATED WITH CONSTRUCTION. 12. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINERS. 13. COVER TRANSPORT RECEPTACLES OR CARTS. TAPE COVERING. REMOVE OR ISOLATE WERE 1 / BEING Ir ­E LA r • I • lewis 9024 SW 152 STREET PALMETTO BAY, FL 33157 PH: (305) 234-0576 EDWARD LEWIS ARCHITECT'S, INC. AAC001678 C. EDWARD LEWIS AR 0009567 _ri41 J 255 S. Orange Avenue /S�a�t�e �, 1600 32M Phone: 407 -841 -9050 ENGINEERING Fax 407- 540 -0234 FOR ARCHITECTURE www.tic- engineers.com 0 Copyot 2010 TLC Engineering forAmhitetture, Im EB JWOOO15 TLC NO:111355 Structural E40W • 1 0 r r • , ■ i U) 1- RRIJ • 111111110 0 1 rr IL i r • w X�_ r UJ 1 • r • r Ir • Seal Revision FIELD COORDINATION 1/13/2012 Project Number 10 -0368 Date MARCH, 2011 I FLOOR DEMO , Dram brt ATT Checked bys DCB 1 , ti 7