Loading...
11-853R-007r r r • rt w- Ik • • • 9024 SW 152 STREET PALMETTO BAY, FL 33157 PH: (305) 2340576 EDWARD LEWIS ARCHITECTS, INC. AAC001678 C. EDWARD LEWIS AR OW9567 255 S. Orange Avenue Suite 1600 O Undo, Fbn& 32801 Phone: 407- 841 -9050 EN G I N E E R I N G Fax: 407- 540 -0234 FOR ARCHITECTURE rrwi:.tIc- engineemcom 0 Copyright 2010 TLC Engineering forAmhbdure, Inc. EB 10000015 TLC NO:111355 Stmtwal Eaaaoor FIRE PROTECTION SPECIFICATIONS FIRE PROTECTION DATA Z FIRE PROTECTION LEGEND NOTES GENERAL 1.00 - GENERAL PROVISIONS THE WATER BASED FIRE PROTECTION SYSTEM HAS BEEN DESIGNED IN COMPLIANCE WITH NFPA 13 -2002, F.S. SYMBOL DESCRIPTION - 61G15 -32, AND THE STATE OF FLORIDA AGENCY FOR HEALTHCARE ADMINISTRATION (ACHA) AS FOLLOWS: 1. FIRE PROTECTION SYSTEM TO COMPLY WITH NFPA 13 AND ALL APPLICABLE STA 'E- (;QDES. - p r THESE DRAWINGS ARE COMPLETE SPRINKLER DESIGN DRAWINGS FOR REVIEW BY ACHA FOR eK9 OR O% - CONTROL VALVE W/TAMPER SWITCH 1.1 PROVIDE ALL LABOR, MATERIAL AND EQUIPMENT FOR A COMPLETE AND PROPERLY STAGE III CONSTRUCTION DOCUMENTS. THE LAYOUT OF THE PIPING SYSTEM COMPLETED B Y TLC, IV -CHECK VALVE 2. FINAL INSPECTION AND APPROVAL BY LOCAL FIRE MARSHAL AND ARCHITECT/ENGINEER. , OPERATING FIRE PROTECTION SYSTEM. AND ARE IN COMPLIANCE WITH FLORIDA STATUTE 61G15- 32.003 AND - 32.004. i O - FLOW SWITCH 3. SPRINKLER SHOP DRAWINGS AND MATERIAL SUBMITTALS SHALL. BE SUBMITTED TO THE 1.2 CODES AND STANDARDS: THE FIRE SPRINKLER PROTECTION SYSTEMS INSTALLATION, EXISTING CONDITIONS: ARCHITECT /ENGINEER AND STATE FIRE MARSHAL AND SHALL BE APPROVED PRIOR TO ANY FLUSHING AND TESTING SHALL COMPLY WITH THE REQUIREMENTS OF NFPA 13 AND ALL LOCAL CODES HAVING JURISDICTION. THE EXISTING FIRE PROTECTION SYSTEM IS A WET SYSTEM DESIGNED AND CALCULATED TO LIGHT HAZARD '%e FDC - FIRE DEPARTMENT CONNECTION INSTALLATION. AND ORDINARY HAZARD GROUP 1 CLASSIFICATIONS. ea PIV - POST INDICATOR VALVE W/TAMPER SWITCH r • 4. PIPE ROUTING SHOWN IS SCHEMATIC ONLY. R IS THE RESPONSIBILITY OF THIS CONTRACTOR 1.3 PIPE THREAD PATTERN: ALL THREADS SHALL. BE IN ACCORDANCE WITH LOCAL FIRE • =FVC - FIRE VALVE CABINET TO PROVIDE ANY ADDITIONAL OFFSETS REQUIRED FOR PROPER INSTALLATION AND x DEPARTMENT SPECIFICATIONS AND NFPA 1963, 1998 REVISION. ENTIRE BUILDING (EXCEPT AS NOTED) ON FDV - STANDPIPE WITH FIRE DEPARTMENT VALVE COORDINATION WITH OTHER TRADES. 1.4 UL /FM APPROVAL ALL EQUIPMENT, VALVES, COUPLINGS, HANGERS AND DEVICES SHALL OCCUPANCY CLASSIFICATION: LIGHT HAZARD SYSTEM TYPE: WET PIPE 00-*& - SPRINKLER AND DRAIN RISER 5. PIPING IN AREAS WITH EXPOSED STRUCTURE SHALL BE INSTALLED AS HIGH AS POSSIBLE TO BE APPROVED BY UNDERWRITERS' LABORATORY (UL) OR FACTORY MUTUAL (FM) FOR DESIGN DENSITY: ,10 GPM /SQ. FL r - - BACKFLOW PREVENTOR W/TAMPER SWITCHES ALLOW THE OWNER MAXIMUM USE OF THE SPADE. USE IN FIRE PROTECTION SERVICE. HYDRAULIC C REMOTE AREA: 1,500 SQ. FT, 0 SPRINKLER ORIFICE SIZE: 1/2' - ROOF MANIFOLD 6. REFER TO ARCHITECTURAL REFLECTED CEILING PLANS FOR CEILING DESCRIPTIONS AND 1.5 U CENSURE: THE FIRE PROTECTION SYSTEMS SHALL BE INSTALLED BY A STATE OF FLORIDA CERTIFIED FIRE PROTECTION CONTRACTOR. DURATION OF SUPPLY: 30 MIN. O - HYDRAULIC REFERENCE NODE HEIGHTS. MAXIMUM COVERAGE /SPRINKLER HEAD: 225 SQ. FT. HOSE STREAM ALLOWANCE 100 GPM - NEW SPRINKLER PIPING 7. SPRINKLERS ARE TO BE COORDINATED WITH ALL DIFFUSERS, SPEAKERS, LIGHTING FIXTURES 1.6 Ali FIRE PROTECTION WORK SHALL. BE DONE IN A NEAT AND WORKMAN -LIKE MANNER. AND CEILING SYSTEMS. SPACING OF SPRINKLERS SHALL BE IN ACCORDANCE WITH NFPA 13 STORAGE. MECHANICAL AND ELECTRICAL ROOMS: F.C. I- - FLUSHING CONNECTION AND THE LISTING OF THE SPRINKLER. 1.7 CONTRACTOR SHALL SECURE AND PAY FOR ALL PERMITS AND FEES, ETC., REQUIRED FOR THE EXECUTION OF THIS WORK. OCCUPANCY CLASSIFICATION: ORDINARY HAZARD GROUP 1 SYSTEM TYPE WET PIPE 0 - EXISTING y2' UPRIGHT SPRINKLER 8. SPRINKLER LOCATIONS SHALL BE CENTERED IN THE TILE PROVIDE ARMOVER OR SWING JOINT 1.8 CONTRACTOR SHALL COORDINATE WORK WITH OTHER TRADES BEFORE DESIGN DENSITY: .15 GPM /SQ. FT. HYDRAULIC REMOTE AREA: 1,500 SQ. FT, - EXISTING y2" PENDENT SPRINKLER AS REQUIRED. FABRICATION OR INSTALLATION. OFFSETS AND /OR TRANSITIONS REQUIRED SHALL BE SPRINKLER ORIFICE SIZE 1/2' a� - EXISTING CONTROL VALVE W/TAMPER SWITCH 9. SPRINKLERS IN AREAS WITH EXPOSED STRUCTURE (OBSTRUCTED CONSTRUCTION) SHALL BE PROVIDED WITHOUT ADDITIONAL. COST. CONTRACTOR SHALL COORDINATE AND INSTALL DURATION OF SUPPLY 60 - 90 MIN. INSTALLED WITH DEFLECTOR 1' BELOW THE BOTTOM OF THE BEAM (MAXIMUM 22' BELOW WORK IN A TIMELY MANNER TO PREVENT DELAYS IN THE CONSTRUCTION. MAXIMUM COVERAGE /SPRINKLER HEAD: 130 SQ. FT. - EXISTING CHECK VALVE ROOF DECK). EXPOSED BAR JOISTS THAT HAVE SPRAY-ON FIRE PROOFING THAT MAKES THE 1.9 CONTRACTOR SHALL. BE RESPONSIBLE TO REPAIR OR REPLACE DAMAGED EQUIPMENT HOSE STREAM ALLOWANCE 250 GPM 0-0 - EXISTING FLOW SWITCH JOIST SOLID SHALL BE TREATED LIKE A BEAM WITH THE SPRINKLERS 1' BELOW THE BOTTOM OF THE FIRE PROOFING. AND /OR MATERIAL DESIGN CRITERIA: "� F00 - EXISTING FIRE DEPARTMENT CONNECTION 1.10 PIPING SHOP DRAWINGS: SUBMIT 1/8' SCALE PIPING SHOP DRAWINGS. SHOP DRAWINGS THE FOLLOWING PUBLICATIONS SHALL BE USED AS A REFERENCE FOR DESIGN OF THE FIRE SUPPRESSION SYSTEM ON THIS PROJECT. - EXISTING SPRINKLER PIPING 10, SLEEVE AND /OR FIRESTOP ALL PENETRATIONS THROUGH RATED WALLS, CEILINGS, AND FLOORS WITH U/L LISTED ASSEMBLIES. FIRESTOP ASSEMBLIES SHALL BE EQUAL OR EXCEED THE SHALL INCLUDE SPRINKLER PIPING CUT LENGTHS, OFFSETS, FITTINGS AND DEVICES, **x*- c*x - EXISTING SPRINKLER PIPING TO BE REMOVED RATING OF THE WALL, CEILING OR FLOOR. SEE ARCHITECTURAL DRAWINGS FOR FINAL FINISHES. ELEVATIONS, HANGER LOCATIONS, SPRINKLER HEAD COUNT BY TYPE, ELEVATION 1. NFPA 13, INSTALLATION OF SPRINKLER SYSTEMS 2002 EDITION pp__�� SECTIONS AND OTHER INSTALLATION INFORMATION. SUBMIT HYDRAULIC CALCULATIONS C7 - CONNECT TO EXISTING 11. PROVIDE ACCESS PANELS TO ALL VALVES ABOVE NON- ACCESSIBLE CEILINGS AND CHASES. PROVING THE VIABILITY OF THE MOST HYDRAULICALLY REMOTE AREAS OF THE PROJECT. �--- - DEMOLISH TO POINT INDICATED INDICATE HYDRAULIC REFERENCE POINTS AND SUBMIT COMPUTER ANALYZED NODAL � 12. PROVIDE A PERMANENTLY ATTACHED NAME TAG TO THE RISER STATING THE REQUIRED DESIGN CALCULATIONS IN BOTH TABULAR AND GRAPHICAL FORMATS. HYDRAULIC IMBALANCE SHALL NOT EXCEED 0.01 GPM AT ANY NODE, AND WATER VELOCITY SHALL NOT EXCEED FIRE PROTECTION DETAILS / ' t - REVISION REFERENCE CRITERIA FOR EACH HYDRAULICALLY DESIGNED SYSTEM. 20 FEET PER SECOND. DEMONSTRATE COMPLIANCE WITH THE REQUIREMENTS OF NFPA- 13 REGARDING DENSITY, AREA OF APPLICATION, SELECTION OF HYDRAULICALLY REMOTE t - DETAIL REFERENCE: TOP- DETAIL #, 13. PROVIDE SPRINKLERS UNDERNEATH ALL EXPOSED DUCTWORK WHICH IS OVER 48" WIDE AND AREAS, AND MAXIMUM COVERAGE PER SPRINKLER. BOTTOM- DRAWING# SHOWN ON SPACE HEADS AROUND ALL OBSTRUCTIONS IN ACCORDANCE WITH NFPA 13. HEADS UNDER DUCTS ARE NOT INDICATED ON THE DRAWINGS BUT ARE REQUIRED AND SHALL BE PROVIDED 1,11 COORDINATE ALL PIPE ROUTING WITH ALL OTHER TRADES PRIOR TO INSTALLATION. ROUTE ALL PIPING TO AVOID DUCTWORK, PIPING, AND BUILDING STRUCTURE. ST IN ACCORDANCE WITH NFPA 13. SPRINKLER LOCATIONS UNDER DUCTWORK AND AROUND OBSTRUCTIONS SHALL BE GOVERNED BY FINAL INSTALLED LOCATIONS. NOTE: SOME SYMBOLS SHOWN ON THIS LEGEND MAY NOT PERTAIN TO THIS PROJECT 14, PROVIDE SPRINKLERS AT THE TOP AND BOTTOM OF ALL STAIRWELLS AND AT THE LANDING OF EACH FLOOR THAT OPENS INTO MORE THAN ONE FIRE ZONE. FIRE SPRINKLER LE LEGEND 2.00 - BASIC MATERIALS AND METHODS a a ° 4 a ° ° c 15. PROVIDE SPRINKLER GUARDS ON ALL HEADS IN ELECTRIC ROOMS, , TELEPHONE ROOMS 2.1 GENERAL ONLY THE FOLLOWING MATERIALS DESIGNED FOR 175 PSIG CWP SHALL BE ° a " a 4 a a SYMBOL ORF TEMP RESPONSE K -FAC FINISH MODEL STYLE PLATE MFG. ELEVATOR ROOMS ELEVATOR SHAFTS AND ON ANY HEADS LESS THAN 7' -0' ABOVE THE ' • r/i 155' QUICK 5.62 CHROME F1FR RECESSED CHROME RELIABLE USED FOR FIRE PROTECTION PIPING UNLESS SPECIFICALLY INDICATED OTHERWISE. ALL Q 4 FLOOR PIPING MATERIALS SHALL HAVE A CORROSION RESISTANCE RATING (CCR) OF 1.0 OR a a ® 4 4 i6, IF SYSTEM PRESSURE EXCEEDS 100 PSI, ALL HANGERS ON END HEADS IN PENDANT POSITION �.; �� - - EXISTING - EXISTING EXISTING EXISTING EXISTING EXISTING GREATER. SWILL BE WITHIN 12' OF END OF LINE IN ACCORDANCE WITH NFPA 13. 2.2 PIPE: 2 INCH OR SMALLER PIPE, AND ALL THREADED PIPING SHALL BE BLACK STEEL, SCHEDULE 40, ASTM A-53. 2 -1/2 INCH AND LARGER PIPE MAY BE BLACK STEEL, SCHEDULE 17, COORDINATE PIPING WITH ALL ELECTRICAL EQUIPMENT (PANELS, TRANSFORMERS, ETC.) PRIOR 10, ASTM A -135. CONCRETE FASTENER TO ANY INSTALLATION. DO NOT ROUTE ANY PIPING OVER ANY ELECTRICAL PANELS UNDER ANY (U.L LISTED OR F.M. APPROVED) CIRCUMSTANCES. ANY PIPING RUN OVER ELECTRICAL SHALL BE REROUTED AT NO ADDITIONAL 2,3 FITTINGS: SCHEDULE 40 BLACK STEEL PIPE SWILL. BE JOINED BY MECHANICAL COST. COUPLINGS, THREADED OR WELDED FIRINGS; SCHEDULE 10 BLACK STEEL PIPE SHALL BE JOINED BY ROLLED GROOVE COUPLINGS OR WELDED FITTINGS ONLY. WELDED 18. PROVIDE 20 -GAUGE STEEL SPRINKLER CANOPY SHIELD AT SPRINKLERS IN TRASH CHUTE PER BRANCH CONNECTIONS WHICH ARE AT LEAST 2 NOMINAL PIPE SIZES SMALLER THAN THE ALL THREAD ROD NFPA 113. MAINS ARE PERMITTED. THREADED FITTINGS ARE ACCEPTABLE ONLY FOR PIPING 2 INCHES AND SMALLER. 19. SPRINKLERS IN ELEVATOR SHAFTS AND EQUIPMENT ROOMS ARE TO BE INTERMEDIATE TEMPERATURE 200TF SPRINKLERS PER NFPA 13. 2.4 HANGERS: ALL HANGER SPACING SHALL COMPLY WITH THE REQUIREMENTS OF NFPA -13. 20. WET BULK SUPPLY MAINS AND HOSE SUPPLY MAINS EXPOSED TO THE WEATHER SHALL. BE 2.5 SPRINKLER HEAD LOCATION: INSTALL SPRINKLER HEADS IN THE CENTER OF THE CEILING INSULATED AND PROVIDED WITH AN ALUMINUM JACKET. TILES FOR SUSPENDED CEILING APPLICATIONS. 2.6 SPRINKLER CAGE GUARD: PROVIDE HEAD GUARDS ON ALL HEADS IN ELECTRICAL ROOMS AND ON ALL HEADS LESS THAN 7' -O' ABOVE FINISHED FLOOR. GENERAL FIRE PROTECTION NOTES FOR 2.7 GAUGES: PROVIDE GAUGES AND GAUGE VALVES AS REQUIRED BY NFPA 13. GAUGE SCALE SHALL BE 0 -300 PSI UNLESS OTHERWISE INDICATED. PIPE HANGER RING FLORIDA HEALTHCARE PROJ. (STAGE III: 2.8 ACCESS PANELS: PROVIDE ACCESS PANELS TO ALL VALVES WITHIN CHASES OR ABOVE (U.L. LISTED OR F.M. APPROVED) NON- ACCESSIBLE CEILINGS. REFER TO ARCHITECTURAL DRAWINGS FOR CEILING TYPES. SPRINKLER SYSTEM TESTS: ABOVE GROUND GROUND PIPING SYSTEMS SHALL BE THE WATER-BASED FIRE PROTECTION SYSTEM HAS BEEN DESIGNED IN COMPLIANCE WITH TESTED, FOR A PERIOD OF 2 HOURS. THE TEST PRESSURE SHALL BE READ FROM A GAUGE NFPA 13 -2002, F.S. 61G15 -32, AND THE STATE OF FLORIDA AGENCY FOR HEALTHCARE LOCATED AT THE LOW ELEVATION POINT OF THE INDIVIDUAL SYSTEM OR PORTION OF THE ADMINISTRATION (AHCA) AS FOLLOWS: SYSTEM BEING TESTED. THE SPRINKLER PIPING SHALL NOT HAVE ANY LEAKS. REPAIR LEAKING JOINTS AND RETEST AS NECESSARY UNTIL ALL SYSTEMS HAVE BEEN TESTED. HANGER - CONCRETE 1 FLORIDA ADMINISTRATIVE CODE CHAPTER 1. THESE DRAWINGS REPRESENT A COMPU=TE SPRINKLER DESIGN AS REQUIRED FOR REVIEW BY AHCA FOR STAGE III CONSTRUCTION DOCUMENTS, IN CONJUNCTION WITH 3.00 FIRE PROTECTION NO Scale 61G15 NOTES ASSOCIATED HYDRAULIC CALCULATIONS AND A LAYOUT OF THE PIPING SYSTEM COMPLETED - VALVES AND ACCESSORIES -32 BY TLC, AND ARE THE COMPLETE ENGINEERING DOCUMENTS IN COMPLIANCE WITH FLORIDA STATUTE 61G15 -32.003 AND - 32.004. 3,1 QUICK RESPONSE SEMI - RECESSED SPRINKLERS: SPRINKLER HEADS SHILL BE 2. SUPPLEMENTAL INFORMATION HAS ALSO BEEN PROVIDED HEREIN TO ASSIST AHCA AND MANUFACTURED WITH PENDANT DEFLECTOR FOR INSTALLATION BELOW THE BRANCH LINE 1, THE FIRE PROTECTION SYSTEM SCOPE OF WORK SHALL INCLUDE THE PREPARATION OF THE FIRE OTHER AUTHORITIES HAVING JURISDICTION (AHJ) IN UNDERSTANDING THE OWNER'S INTENDED PROTECTION SYSTEM LAYOUT DOCUMENTS (WORKING PLANS). USE AND PROPOSED PROTECTION OF THE BUILDING PURSUANT TO F.S. 61G15- 32.003 (8} PROVIDE ALL EQUIPMENT, MATERIALS, COMPONENTS, ASSEMBLIES AND SUPPORT SYSTEMS REQUIRED, AS AND AS OUTLINED IN NFPA 13 - A14.1 AS PRELIMINARY PLANS TO PROVIDE A CLEAR REPRESENTATION OF THE HAZARD TO BE PROTECTED, THE SYSTEM DESIGN CONCEPT, THE ' " 1 90' ELL 1 gp� ELL DESCRIBED, IN NFPA 1 C FIRE PROTECTION C ONTRACTOR SHALL CONDUCT A HYDRANT FLOW TEST AND PERFORM PROPOSED WATER SUPPLY CONFIGURATION, AND BUILDING CONSTRUCTION INFORMATION .HYDRAULIC CALCULATIONS FOR PREPARATION OF THE FIRE PROTECTION SYSTEM LAYOUT DOCUMENTS (WORKING PLANS). PERTINENT TO THE SYSTEM LAYOUT AND DETAILING. 3. IN ACCORDANCE WITH F.S. 61G15 -32.004 (4), INSOFAR AS ADDITIONAL INFORMATION 2. THE FIRE PROTECTION DESIGN, CALCULATIONS, INSTALLATION AND THE ACCEPTANCE TESTING OF THE FIRE IS SHOWN IN THESE ENGINEERING DOCUMENTS THAN IS REQUIRED, TLC IS RESPONSIBLE FOR THE TECHNICAL ACCURACY OF THE WORK IN ACCORDANCE WITH APPLICABLE CODES, PROTECTION SYSTEM SHAM BE IN ACCORDANCE WITH NFPA 13, 2002 EDITION; NFPA 24, 2002 EDITION; STANDARDS AND SOUND ENGINEERING PRINCIPLES. THE FLORIDA BUILDING CODE AND THE FLORIDA FIRE PREVENTION CODE 2007 EDITION AND ALL LOCAL CODES REQUIRED BY THE AUTHORITY HAVING JURISDICTION. 4. SHOP DRAWINGS SHALL. BE DEVELOPED AND SUBMITTED BY THE FIRE PROTECTION SUB- CONTRACTOR AS FOLLOWS: 3. AREA OCCUPANCIES AND HAZARD CLASSIFICATIONS ARE LISTED IN THE DESIGN CRITERIA NOTE LOCATED ON A THE FIRE PROTECTION INSTAWNG SUBCONTRACTOR, IN ACCORDANCE WITH THE '-BRANCH LINE THE CONTRACT DOCUMENTS. FIRE PROTECTION SPECIFICATION SECTIONS, MUST PROVIDE LAYOUT DOCUMENTS OR WORKING PLANS (SHOP DRAWINGS) IN COMPLIANCE WITH F.S.61G15- 32.002 1x' /2 REDUCER 4. THE STRUCTURAL SUPPORTS AND OPENINGS FOR THE FIRE PROTECTION SYSTEM HAVE BEEN COORDINATED AND NFPA 13 CHAPTER 14 FOR TLC REVIEW. 1' DROP WITH THE STRUCTURAL ENGINEER. B. TLC WILL REVIEW THE SHOP DRAWINGS FOR ACCURACY, DESIGN INTENT AND COMPLIANCE WITH THE REQUIREMENTS OF F.S. 61G15 AND NFPA 13. G CEILING 5. ALL SYSTEM CONTROL VALVES SHALL BE PROVIDED WITH TAMPER SWITCHES AND INTERFACE WITH THE FRCP C. IF THE LAYOUT DOCUMENTS CONTAIN MATERIAL DEVIATIONS (ANY DEVIATION ON THE SUPERVISORY CIRCUIT, ALL FLOW SWITCHES SWILL INTERFACE WITH THE FRCP ON THE ALARM FROM THE DESIGN PARAMETERS ESTABLISHED AND DOCUMENTED IN THESE PLANS), THE FIRE PROTECTION SUB - CONTRACTOR SHALL REIMBURSE TLC CIRCUIT. ENGINEERING FOR ALL ENGINEERING FEES REQUIRED TO REVISE THE 6. THE FIRE PROTECTION CONTRACTOR SHALL PREPARE AND PROVIDE FIRE PROTECTION SYSTEM LAYOUT ENGINEERING DOCUMENTS AND FOR RESUBMISSION TO AHCA AND OTHER AHJ'S. DOCUMENTS WITH HYDRAULIC CALCULATIONS. D. A COPY OF THE APPROVED SHOP DRAWINGS AND ENGINEERING DOCUMENTS FIRE PROTECTION SYSTEM LAYOUT DOCUMENTS WITH HYDRAULIC CALCULATIONS SHALL BE SUBMITTED TO THE SHALL BE PROVIDED FOR AHJ REVIEW AS REQUIRED FOR PERMITS. ARCHITECT /ENGINEER AND THE LOCAL.. AHJ FOR ACCEPTANCE PRIOR TO PERMITTING. SPRINKLER HEAD 7. ALL FIRE PROTECTION EQUIPMENT AND COMPONENTS SHALL BE LISTED AND TESTED FOR FIRE PROTECTION USE. ALL FIRE PROTECTION EQUIPMENT AND COMPONENTS SHALL BE THE U.L LISTED AND FM APPROVED. 8. THE POINT OF SERVICE AND THE WATER SUPPLY CHARACTERISTIC'S FOR THE FIRE PROTECTION SYSTEM IS SHOWN ON THE FIRE PROTECTION SITE PLAN. FIRE PROTECTION DRAWING INDEX 9. THE WATER SUPPLY FOR THE FIRE PROTECTION SYSTEM HAS NOT SHOWN ANY EVIDENCE OF MICROBIAL SHE QCPTION ISSUED INDUCED CORROSION (MIC). THE FIRE PROTECTION CONTRACTOR SHALL NOTIFY THE ARCHITECT /ENGINEER OF ANY EVIDENCE OF MIC AND PROVIDE NECESSARY WATER TREATMENT AS NEED TO REDUCE OR ELIMINATE MIC. RETURN BEND 10. ALL METERING AND BACK FLOW PREVENTION DEVICES SHALL MEET WITH ALL WATER PURVEYORS REQUIREMENTS, FP 1 `! FIRE PRO K4 °�f�� °T� 1 „�_� ,y �, � . -� �0`E��i1(�`� YES No scale FP-2 FIRST FLOOR -`)) PROTECTION �� `.(1}�T L E YES ro 9a� Ik • • • 9024 SW 152 STREET PALMETTO BAY, FL 33157 PH: (305) 2340576 EDWARD LEWIS ARCHITECTS, INC. AAC001678 C. EDWARD LEWIS AR OW9567 255 S. Orange Avenue Suite 1600 O Undo, Fbn& 32801 Phone: 407- 841 -9050 EN G I N E E R I N G Fax: 407- 540 -0234 FOR ARCHITECTURE rrwi:.tIc- engineemcom 0 Copyright 2010 TLC Engineering forAmhbdure, Inc. EB 10000015 TLC NO:111355 Stmtwal Eaaaoor Seal ,Q0016119giley, P.E. ��. • d� 4!�4,,J35067 .••. *: 5067 STATE �' -,ct �• I& NAL ENS ®�t� _7l7'^ Project Nm bw 10 -0368 Date MARCH, 2011 Shoot T1tt• :IRE PROTECTION LEGEND Drape by TLS Chocked byr JAH � -117f ", No J4� Z I 0 r • , i m A r • r ' • w x v- -2 LDr r rt 0 Seal ,Q0016119giley, P.E. ��. • d� 4!�4,,J35067 .••. *: 5067 STATE �' -,ct �• I& NAL ENS ®�t� _7l7'^ Project Nm bw 10 -0368 Date MARCH, 2011 Shoot T1tt• :IRE PROTECTION LEGEND Drape by TLS Chocked byr JAH � -117f ", No J4�