11-853-010GENERAL ' DEMOLITION NOTES: 1. THE DEMOLITION PLAN IS INTENr # TO PROVIDE THE CONTRACTOR WITH A GENERAL KNOWLEDGE OF CONDITIONS WITHIN THE PROJECT AREA. EXISTING EQUIPMENT, STRUCTURE, DUCTWORK, ETC. LOCATED ON DRAWING WERE DERIVED FROM EXISTING DRAWINGS AND LIMITED FIELD OBSERVATIONS. THIS DRAWING MAY NOT BE ALL INCLUSIVE OF SERVICES THAT EXIST IN THE PROJECT AREA. CONTRACTOR r LOCATIONS PRIOR TO ANY DEMOLITION WORK. ANY DEVIATIONS IMPACTING WORK SHOWN ON THESE DOCUMENTS SHALL BE REPORTED TO THE ARCHITECT AND ENGINEER PRIOR TO BEGINNING DEMOLITION. BEGINNING OF DEMOLITION SHALL SIGNIFY CONTRACTORS ACCEPTANCE OF EXISTING CONDITIONS. CONTRACTOR IS RESPONSIBLE #• ALL REQUIRED DEMOLITION SHOWN ON PLANS OR NOT. t CONTRACTOR SHALL PERFORM PRE-BID SURVEY TO FIELD-VERIFY AND COORDINATE ALL DIMENSIONS PRIOR TO PROCUREMENT #r FABRICATION. r CONDITIONS SHALL GOVERN. rr•t #• OTHER TRADES FEATURES, INVOLVED. COORDINATE NEW WORK WITH EXISTING ELEMENTS SUCH AS THE BUILDING STRUCTURE AND ARCHITECTURAL •r r PIPING, PLUMBING, / ELECTRICAL CONDUIT. COST OF REROUTING r:. #. •. it PIPING DUE O CONFLICTS WITH EXISTING CONDITIONS BE PAID B r ri 3. Ali MECHANICAL SYSTEMS SERVING OTHER OR FLOORS THAT RUN THROUGH PROJECT ACTIVE DURING CONSTRUCTION SO AS NOT TO CAUSE ANY DISRUPTION TO THESE OTHER SPACES. 4. CONTRACTOR PROVIDE #. FOR PHASING AS REQUIRED 1. DIRECTED BY THE ARCHITECT, REFER TO TEMPORARY MECHANICAL SERVICES SHALL BE PROVIDED WHEN NEW WORK AFFECTS ARCHITECTURAL PHASING SERVICES NEEDING TO REMAIN COORDINATE SERVICE INTERRUP11ONS WITH OWNER AT LEAST TWO WEEKS IN ADVANCE. 5. ALL EQUIPMENT • # r UNDER PROJECT 1 OVER TO THE OWNER AT THE # DISCRETION OTHERWISE UNLESS # r RETURNED 6. CONTRACTOR SHALL REMOVE OR RELOCATE EXISTING THERMOSTATS WHERE NECESSARY. REMOVED THERMOSTATS SHALL BE TO OWNER. 7. PROPERLY REMOVE AND DISPOSE OF ALL EXISTING TO BE REMOVED WAC DUCTWORK AND AJR DISTRIBUTION DEVICES. CONSULT WITH OWNER AND OBTAIN OWNERS APPROVAL PRIOR TO DISPOSAL OF REMOVED MATERIAL 8. PATCH HOLES LEFT IN WALLS AND FLOORS AFTER REMOVAL OF EXISTING DUCTWORK, CONDUIT, ETC... TO MATCH NEW OR EXISTING CONSTRUCTION r FIRE RATING. 1 OPENINGS IN RATED WALLS OR FLOORS. PROJECT 9. PROVIDE PRECONSTRUCTION TEST & BALANCE FOR SUPPLY, RETURN AND EXHAUST OF EXISTING MECHANICAL EQUIPMENT SERVING AREA. INCLUDE # r STATIC PRESSURE IN MAIN DUCTS, rr MOTOR HP AND PRESSURE DROP ACROSS # r FILTERS, CHILLED WATER 11 r PRESSURE r CONTRACTOR RESPONSIBLE FOR CLEANING ASSOCIATED PRIOR TO FINAL TEST AND BALANCE. CLEANING OF ASSOCIATED AHU SHALL CONSIST OF O ' NG COILS AFTER REMOVAL, FLUSHING COOLING ! AND ALIGNING FINS WrTH A FIN STRAIGHTENING TOOL. 11. ALL NEW AND EXISTING AIR DISTRIBUTION DEVICES LOCATED WITHIN PROJECT AREA SHALL BE FITTED WITH TEMPORARY CONSTRUCTION THROUGHOUT PROJECT DURATION # ACCUMULA11ON OF DUST IN DEVICES AND DUCTWORK. 12. CAP ALL DEMOLISHED BRANCH DUCT AT DUCT MAIN. CAP AND SEAL OPENINGS DURING ENTIRE RENOVATION OF THE WAC DUCTWORK. REMOVE 13. DEMOLISH ALL EXISTING DUCTWORK AND AIR DISTRIBUTION DEVICES IN THE PROJECT AREA. a RELOCATE ALL EXISTING THERMOSTATS. r i c� v M V tt 4 ,p / Ln - �f f 0 i N y' l r # 1 r # i r, Ri + +F, MODEL PREDATOR 1200 PAS VARIABLE r# TO 1000 CFM ELECTRICAL 115 VOLTS, 3.5 FLA PROVIDE AN INCLINED MANOMETER, DIFFERENTIAL PRESSURE TYPE, WITH WHITE FACE GAUGE 1 BLACK LETTERS WITH MAXIMUM PRESSURE RANGE OF 0.1" W.G. THIS SHALL BE USED BY THE CONTRACTOR TO RECORD, ON A DAILY BASIS, THE NEGATIVE PRESSURE IN THE RENOVATION TO THE ADJACENT 1:&-1 els] - 111 r • SCALE: I /8' = 1 • -O• �f �f. F iii G ��C)' �ar� f INFEC11ON CONTROL RISK ASSESSIVIENT--OCRAY ALL WORK SHALL CONFORM WITH THE OWNER'S INFECTION CONTROL AND CONSTRUCTION POCCI& PROCESSES AND OWNER'S PROJECT- SPECIFIC INFECTION CONTROL RISK ASSESSMENT PLAN.- --- --- ♦ i a IC RISK LEVEL CONSTRUCTION ACTIVITY TYPE - -A _ - - TYPE A TYPE B TYPE C TYPE D GROUP 1 CLASS I CLASS II CLASS II CLASS III /IV GROUP 2 CLASS I CLASS II CLASS III CLASS IV GROUP 3 CLASS I CLASS III CLASS III /IV CLASS IV GROUP 4 CLASS III CLASS III /IV CLASS III /IV CLASS IV Z nZ�1"0"Z PE#" I,II1 0I rli ••... I :;I J LOWEST ME/ MEDIUM HIGH HIGHEST OFFICE AREAS ALL PATIENT CARE UNITS EMERGENCY ROOM TRANSPLANT CLINIC CONFERENCE ROOMS WAITING ROOMS* RADIOLOGY AREAS SURGERY SUITES PUBLIC BATHROOMS .f RECOVER Y ROOMS WAITING ROOMS* LABOR AND DELIVERY LABOR & DELIVERY ORs IL f CC; PEDIATRICS i AFEA OF WORK r • RIO SURGERY OUTPATIENT UNITS ALL INTENSIVE CARE AREAS DIALYSIS AND TRANSPLANT i / NUCLEAR MEDICINE ONCOLOGY BONE A R r i LL ADMISSION /DISCHARGE AREA CARDIOLOGY PHYSICAL THERAPY TANK AREA HYPERBARIC MEDICINE ECHOCARDIOGRAPHY I_ LABORATORIES • SMALL SCALE, SHORT DURATION ACTIVITIES MICH CREATE MINIMAL DUST. INCLUDES, BUT IS NOT LIMITED TO, INSTALLATION OF TELEPHONE AND COMPUTER CABLING, ACCESS TO CHASE SPACES, CUTTING OF WALLS OR CEILING MERE DUST MIGRATION CAN BE CONTROLLED. MY WORK WHICH GENERATES A MODERATE TO HIGH LEVEL OF DUST OR REQUIRES DEMOLITION OR REMOVAL OF XEa BUILDING # `r E OR ASSEMBLIES. INCLUDES, BUT IS NOT LIMITED TO, SANDING OF WALL FOR PAINTING OR WALL COVERING, REMOVAL OF FLOOR COVERINGS, CEILING 1 S AND CASEWORK, NEW WALL CONSTRUCTION, MINOR DUCTWORK OR ELECTRICAL WORK ABOVE CEILINGS, MAJOR CABLING ACTIVITIES, AND ANY ACTIVITY MICH CANNOT BE # • _ r WITHIN A SINGLE WORKSHIFT. MAJOR DEMOLITION ANf CONSTRUCTION r.f INCLUDES, BUT IS # LIMITED TO, ACTIVITIES MICH REQUIRE CONSECUTIVE WORK SHIFTS, • REQUIRE DEMOLITION OR REMOVAL OF ! AND NEW CONSTRUCTION. • 1. EXECUTE WORK 11 # MINIMIZE RAISING DUST FROM CONSTRUCTION OPERATIONS. IMMEDIATELY 2. DISPLACED i . INSPECTION. ■ 3. MINOR DEMOLITION F#• REMODELING. 1. PROVIDES ACTIVE MEANS TO PREVENT AIRBORNE DUST FROM DISPERSING INTO ATMOSPHERE. 2. WATER MIST WORK SURFACES TO CONTROL DUST MILE CUTTING. 3. SEAL UNUSED DOORS DUCT TAPE. �. 4. BLOCK OFF ANDSEALAIR 5. WIPE SURFACES WITH DISINFECTANT. 6. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINERS. 7. WET MOP AND/OR • , FILTERED BEFORE WORK , i 8. PLACE DUST MAT AT ENTRANCE AND EXIT OF O REMOVE 9. OR ISOLATE HVAC SYSTEM IN AREAS WHERE #• • r• r 1. OBTAIN INFECTION CONTROL PERMIT BEFORE CONSTRUCTION BEGINS. 2. ISOLATE HVAC SYSTEM IN AREA WHERE WORK IS BEING DONE TO PREVENT CONTAMINATION OF THE DUCT SYSTEM. 3. COMPLETE ALL CRITICAL BARRIERS OR IMPLEMENT CONTROL CUBE METHOD BEFORE CONSTRUCTION BEGINS. 4. MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORK SITE UTILIZING HEPA EQUIPPED AIR FILTRATION UNITS AND MONITOR WITH MAGNEHELIC GAUGES. `�. WORK HE., FILTERED ■ 7. WET MOP WITH DISINFECTANT. 8. REMOVE BARRIER MATERIALS CAREFULLY TO MINIMIZE SPREADING OF DIRT AND DEBRIS ASSOCIATED WITH CONSTRUCTION. 9. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINERS. COVER #R OR CARTS. TAPE ISOLATE 11. REMOVE OR ISOLATE HVAC SYSTEM IN AREAS WHERE WORK IS BEING PERFORMED. 1. OBTAIN INFECTION CONTROL PERMIT BEFORE CONSTRUCTION BEGINS. 2. r• DONE TO PREVENT CONTAMINATION OF DUCT SYSTEM. HOLES, 3. COMPLETE ALL CRITICAL BARRIERS OR IMPLEMENT CONTROL CUBE METHOD BEFORE CONSTRUCTION BEGINS. 4. MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORK SITE UTILIZING HEPA EQUIPPED AIR FILTRATION UNITS AND MONITOR WITH MAGNEHELIC GAUGES. 5. SEAL PIPES, i r r PUNCTURES APPROPRIATELY. 6. CONSTRUCT ANTEROOM AND REQUIRE ALL PERSONNEL TO PASS THROUGH THIS ROOM SO THEY CAN BE VACUUMED USING A HEPA VACUUM Cl EANER BEFORE LEAVING WORK SITE OR THEY CAN WEAR CLOTH OR PAPER THAT ARE REMOVED EACH TIME THEY LEAVE THE WORK SITE. 7. ALL PERSONNEL ENTERING WORK SITE ARE REQUIRED f # COVERS. . 8. DO NOT REMOVE BARRIERS •! #+ COMPLETED PROJECT IS THOROUGHLY CLEANED BY THE ENVIRONMENTAL SERVICES DEPARTMENT r RELEASED r INFECTION CONTROL. r VACUUM WORK ., FILTERED 10. WET i` WITH DISINFECTANT. REMOVE CAREFULLY TO MINIMIZE SPREADING OF DIRT AND DEBRIS ASSOCIATED 12. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINERS. 13. COVER TRANSPORT RECEPTACLES OR CARTS. TAPE COVERING. 14. REMOVE OR ISOLATE HVAC SYSTEM IN AREAS MERE CONSTRUCTION IS BEING DONE. �0 � 9024 SW 152 STREET PALMETTO BAY, FL 33157 PH: (305) 234-0576 EDWARD LEWIS ARCHITECTS, INC. AAC001678 C. EDWARD LEWIS AR 0009567 ' ri 4A A.X 'l_�T IN255 S. Orange Avenue Suite 1600 Orlando, Florida 32801 Phone: 407- 841 -9050 EN G I N E E R I N G Fax: 407- 540 -0234 FOR ARCHITECTURE www.tic- engineers.com C Copyright 2010 TLC Engineering for Architecture, Inc. EB #0000015 TLC N0: 111403 Structural En&oor • y " Orl ` ! i .f i i�YYJ •F IL f CC; i AFEA OF WORK r • i Y" • i i / �, r i LL KEY PLAN �0 � 9024 SW 152 STREET PALMETTO BAY, FL 33157 PH: (305) 234-0576 EDWARD LEWIS ARCHITECTS, INC. AAC001678 C. EDWARD LEWIS AR 0009567 ' ri 4A A.X 'l_�T IN255 S. Orange Avenue Suite 1600 Orlando, Florida 32801 Phone: 407- 841 -9050 EN G I N E E R I N G Fax: 407- 540 -0234 FOR ARCHITECTURE www.tic- engineers.com C Copyright 2010 TLC Engineering for Architecture, Inc. EB #0000015 TLC N0: 111403 Structural En&oor P.E. 35067 0 cc 0 • r ATE OF lJ!® Project Number 10 -036B Date MARCH, 2011 Sheet Title 1 st FLOOR DEMO PLAN W C Drawn bye ATT Checked by, DCB Sheet Number x • ! i i IL f CC; i e r • i • i i / �, r i LL i a. • r Id UJ i i • (L Llj 11 • P.E. 35067 0 cc 0 • r ATE OF lJ!® Project Number 10 -036B Date MARCH, 2011 Sheet Title 1 st FLOOR DEMO PLAN W C Drawn bye ATT Checked by, DCB Sheet Number x