Loading...
11-672-004Ln a� vi E .o n 00 0 N 0 N N cD 3 0 N w co a a� r Ln i o_ w I 0 Q U U 0 o_ I V) I co 0 I 0 N J E3-1 ❑2 DM TYPICAL ICRA KEY NOTES: ❑1 PROVIDE A TEMPORARY HEPA FILTERED NEGATIVE AIR FAN FOR CONSTRUCTION AREA. MAINTAIN A 0.05" NEGATIVE PRESSURE IN THIS AREA RELATIVE TO THE ADJACENT SPACES. PROVIDE ADDITIONAL NEGATIVE AIR MACHINES AS REQUIRED TO ACHIEVE MINIMUM NEGATIVE PRESSURE. PROVIDE TEMPORARY DUST BARRIER PARTITIONS. ALL EXISTING RETURN AND EXHAUST REGISTERS LOCATED WITHIN THE RENOVATION AREA SHALL BE PROVIDED WITH TEMPORARY CONSTRUCTION FILTERS. ROUTE TEMPORARY 120 FLEXIBLE DUCT FROM DISCHARGE OF HEPA UNIT TO OUTSIDE BUILDING ENVELOPE. LOCATE EXHAUST FAN DISCHARGE MINIMUM 25' -0" FROM OPERABLE WINDOWS AND OUTSIDE AIR INTAKES. FAN CRITERIA: MANUFACTURER - HEPA-AIRE, MODEL - PREDATOR 1200 PAS VARIABLE CFM - 1000 TO 1800 CFM ELECTRICAL: 115 VOLTS, 3.5 FLA QPROVIDE AN INCLINED MANOMETER, DIFFERENTIAL PRESSURE TYPE, WITH WHITE FACE GAUGE AND BLACK LETTERS. THIS SHALL BE USED BY THE CONTRACTOR TO RECORD, ON A DAILY BASIS, THE NEGATIVE PRESSURE IN THE RENOVATION AREA RELATIVE TO THE ADJACENT SPACES. ❑3 TEMPORARY CONSTRUCTION BARRIER. ® CONTRACTOR SHALL PROVIDE TEMPORARY CONSTRUCTION FILTERS FOR ALL AIR DISTRIBUTION DEVICES LOCATED WITHIN SCOPE OF WORK. INFECTION CONTROL RISK ASSESSMENT (ICRA) ALL WORK SHALL CONFORM WITH THE OWNER'S INFECTION CONTROL AND CONSTRUCTION POLICIES, PROCESSES AND OWNER'S PROJECT SPECIFIC INFECTION CONTROL RISK ASSESSMENT PLAN. ICRA MATRIX IC RISK CONSTRUCTION ACTIVITY TYPE LEVEL TYPE A TYPE B TYPE C TYPE D GROUP 1 CLASS I CLASS II CLASS II CLASS III /IV GROUP 2 CLASS I CLASS II CLASS III CLASS IV GROUP 3 CLASS I CLASS III CLASS III /IV CLASS IV GROUP 4 CLASS III CLASS III /IV CLASS III /IV CLASS IV INFECTION CONTROL RISK LEVELS GROUP 1 LOWEST GROUP 2 MEDIUM GROUP 3 MEDIUM HIGH GROUP 4 HIGHEST OFFICE AREAS ALL PATIENT CARE UNITS EMERGENCY ROOM TRANSPLANT CLINIC CONFERENCE ROOMS WAITING ROOMS* RADIOLOGY AREAS SURGERY SUITES PUBLIC BATHROOMS ROCP RECOVERY ROOMS WAITING ROOMS* LABOR AND DELIVERY LABOR & DELIVERY OR3/4 E c NURSERIES CARDIAC CATH / ANGIO • W PEDIATRICS CVICU co o RIO SURGERY OUTPATIENT UNITS o N ,� ALL INTENSIVE CARE AREAS DIALYSIS AND TRANSPLANT NUCLEAR MEDICINE ONCOLOGY / BONE MARROW ADMISSION / DISCHARGE AREA CARDIOLOGY PHYSICAL THERAPY TANK AREA HYPERBARIC MEDICINE CAFETERIA ENDOSCOPY ECHOCARDIOGRAPHY PHARMACY ADMIXTURE LABORATORIES PHARMACY *DEPENDENT ON LOCATION ICRA PLAN (TYPICAL ALL ROOMS ) 3 CONSTRUCTION ACTIVITY TYPES SCALE: 1/8' = 1' - 0' INSPECTIONS AND NON - INVASIVE ACTIVITIES. INCLUDES, BUT IS NOT LIMITED TO, REMOVAL OF CEILING TILES FOR VISUAL INSPECTION LIMITED TO 1 TYPE A TILE PER 50 SQUARE FEET, PAINTING (BUT NOT SANDING) WALL COVERING, ELECTRICAL TRIM WORK, MINOR PLUMBING, AND ACTIVITIES WHICH DO NOT GENERATE DUST OR REQUIRE CUTTING OF WALLS OR ACCESS TO CEILINGS OTHER THAN FOR VISUAL INSPECTION. TYPE B SMALL SCALE, SHORT DURATION ACTIVITIES WHICH CREATE MINIMAL DUST. INCLUDES, BUT IS NOT LIMITED TO, INSTALLATION OF TELEPHONE AND COMPUTER CABLING, ACCESS TO CHASE SPACES, CUTTING OF WALLS OR CEILING WHERE DUST MIGRATION CAN BE CONTROLLED. ANY WORK WHICH GENERATES A MODERATE TO HIGH LEVEL OF DUST OR REQUIRES DEMOLITION OR REMOVAL OF ANY FIXED BUILDING COMPONENTS OR TYPE C ASSEMBLIES. INCLUDES, BUT IS NOT LIMITED TO, SANDING OF WALL FOR PAINTING OR WALL COVERING, REMOVAL OF FLOOR COVERINGS, CEILING TILES AND CASEWORK, NEW WALL CONSTRUCTION, MINOR DUCTWORK OR ELECTRICAL WORK ABOVE CEILINGS, MAJOR CABLING ACTIVITIES, AND ANY ACTIVITY WHICH CANNOT BE COMPLETED WITHIN A SINGLE WORKSHIFT. TYPE D MAJOR DEMOLITION AND CONSTRUCTION PROJECTS. INCLUDES, BUT IS NOT LIMITED TO, ACTIVITIES WHICH REQUIRE CONSECUTIVE WORK SHIFTS, REQUIRE HEAVY DEMOLITION OR REMOVAL OF A COMPLETE CEILING SYSTEM, AND NEW CONSTRUCTION. ICRA CLASSIFICATION SCHEDULE CLASS I 1. EXECUTE WORK BY METHODS TO MINIMIZE RAISING DUST FROM CONSTRUCTION OPERATIONS. 2. IMMEDIATELY REPLACE ANY CEILING TILE DISPLACED FOR VISUAL INSPECTION. ❑ 3. MINOR DEMOLITION FOR REMODELING. 1. PROVIDES ACTIVE MEANS TO PREVENT AIRBORNE DUST FROM DISPERSING INTO ATMOSPHERE. 2. WATER MIST WORK SURFACES TO CONTROL DUST WHILE CUTTING. 3. SEAL UNUSED DOORS WITH DUCT TAPE. CLASS II 4. BLOCK OFF AND SEAL AIR VENTS. 5. WIPE SURFACES WITH DISINFECTANT. ❑ 6. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINERS. 7. WET MOP AND /OR VACUUM WITH HEPA FILTERED VACUUM BEFORE LEAVING WORK AREA. 8. PLACE DUST MAT AT ENTRANCE AND EXIT OF WORK AREA. 9. REMOVE OR ISOLATE HVAC SYSTEM IN AREAS WHERE WORK IS BEING PERFORMED. 1. OBTAIN INFECTION CONTROL PERMIT BEFORE CONSTRUCTION BEGINS. 2. ISOLATE HVAC SYSTEM IN AREA WHERE WORK IS BEING DONE TO PREVENT CONTAMINATION OF THE DUCT SYSTEM. 3. COMPLETE ALL CRITICAL BARRIERS OR IMPLEMENT CONTROL CUBE METHOD BEFORE CONSTRUCTION BEGINS. 4. MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORK SITE UTILIZING HEPA EQUIPPED AIR FILTRATION UNITS AND MONITOR WITH MAGNEHELIC GAUGES. 5. DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL COMPLETE PROJECT IS THOROUGHLY CLEANED BY ENVIRONMENTAL SERVICES DEPARTMENT. CLASS III 6. VACUUM WORK WITH HEPA FILTERED VACUUMS. Pf 7. WET MOP WITH DISINFECTANT. 8. REMOVE BARRIER MATERIALS CAREFULLY TO MINIMIZE SPREADING OF DIRT AND DEBRIS ASSOCIATED WITH CONSTRUCTION. 9. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINERS. 10. COVER TRANSPORT RECEPTACLES OR CARTS. TAPE COVERING. 11. REMOVE OR ISOLATE HVAC SYSTEM IN AREAS WHERE WORK IS BEING PERFORMED. 1. OBTAIN INFECTION CONTROL PERMIT BEFORE CONSTRUCTION BEGINS. 2. ISOLATE HVAC SYSTEM IN AREA WHERE WORK IS BEING DONE TO PREVENT CONTAMINATION OF THE DUCT SYSTEM. 3. COMPLETE ALL CRITICAL BARRIERS OR IMPLEMENT CONTROL CUBE METHOD BEFORE CONSTRUCTION BEGINS. 4. MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORK SITE UTILIZING HEPA EQUIPPED AIR FILTRATION UNITS AND MONITOR WITH MAGNEHELIC GAUGES. 5. SEAL HOLES, PIPES, CONDUITS, AND PUNCTURES APPROPRIATELY. 6. CONSTRUCT ANTEROOM AND REQUIRE ALL PERSONNEL TO PASS THROUGH THIS ROOM SO THEY CAN BE VACUUMED USING A HEPA VACUUM CLEANER BEFORE LEAVING WORK SITE OR THEY CAN WEAR CLOTH OR PAPER COVERALLS THAT ARE REMOVED EACH TIME THEY LEAVE THE WORK SITE. CLASS IV 7. ALL PERSONNEL ENTERING WORK SITE ARE REQUIRED TO WEAR SHOE COVERS. ❑ 8. DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL COMPLETED PROJECT IS THOROUGHLY CLEANED BY THE ENVIRONMENTAL SERVICES DEPARTMENT AND RELEASED BY SAFETY AND INFECTION CONTROL. 9. VACUUM WORK AREA WITH HEPA FILTERED VACUUMS. 10. WET MOP WITH DISINFECTANT. 11. REMOVE BARRIER MATERIALS CAREFULLY TO MINIMIZE SPREADING OF DIRT AND DEBRIS ASSOCIATED WITH CONSTRUCTION. 12. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINERS. 13. COVER TRANSPORT RECEPTACLES OR CARTS. TAPE COVERING. 14. REMOVE OR ISOLATE HVAC SYSTEM IN AREAS WHERE CONSTRUCTION IS BEING DONE. PARTIAL 7th FLOOR PLAN - EDIT ME SCALE: 1/8" = 1' -0" Q WALL ASSEMBLY - THE 1, 2, 3, OR 4 HOUR FIRE-RATED GYPSUM WALLBOARD /STUD WALL ASSEMBLY SHALL BE CONSTRUCTED OF THE MATERIALS AND IN THE MANNER DESCRIBED IN THE INDIVIDUAL U300 OR U400 SERIES WALL OR PARTITION DESIGNS IN THE UL FIRE RESISTANCE DIRECTORY. O CONDUIT - NOM 4" DIA OR SMALLER STEEL ELECTRICAL METALLIC TUBING. A MAX OF ONE CONDUIT IS PERMITTED IN THE FIRESTOP SYSTEM. CONDUIT TO BE INSTALLED NEAR CENTER OF STUD CAVITY WIDTH AND TO BE RIGIDLY SUPPORTED ON BOTH SIDES OF WALL ASSEMBLY. O3 FILL VOID OR CAVITY MATERIAL - CAULK FILL MATERIAL BEARING THE UL CLASSIFICATION MARKING INSTALLED TO COMPLETELY FILL ANNULAR SPACE BETWEEN PIPE OR CONDUIT AND GYPSUM WALLBOARD AND WITH A MIN 1/4" DIAM BEAD OF CAULK APPLIED TO PERIMETER OF CONDUIT AT ITS EGRESS FROM THE WALL. CAULK INSTALLED SYMMETRICALLY ON BOTH SIDES OF WALL ASSEMBLY. THE HOURLY F RATING OF THE FIRESTOP SYSTEM IS DEPENDENT UPON THE HOURLY FIRE RATING OF THE WALL ASSEMBLY IN WHICH IT IS INSTALLED, AS SHOWN IN THE FOLLOWING TABLE. THE HOURLY T RATING OF THE FIRESTOP SYSTEM IS DEPENDENT UPON THE TYPE OR SIZE OF THE CONDUIT AND THE HOURLY FIRE RATING OF THE WALL ASSEMBLY IN WHICH IT IS INSTALLED, AS TABULATED BELOW: MAX CONDUIT ANNULAR SPACE, F RATING, HR. T RATING, HR. DIAM, IN. IN. 1 0 TO 3/16 1 OR 2 0, 1 OR 2 1 1/4 TO 1/2 3 OR 4 3 OR 4 4 0 TO 1 -1/2 1 OR 2 0 6 1/4 TO 1/2 3 OR 4 0 12 3/16 TO 3/8 1 OR 2 0 CONDUIT PENETRATION OF FIREWALL UL SYSTEM NO. W- L -1001 CADDY J- HOOKS. FINISHED CEILING � j � - - - - DATA CABLE II II II 1" CONDUIT STUB I I CONDUIT IN WALL ABOVE CEILING. II II II II II II II SINGLE GANG BOX WITH OUTLET PLATE AND JACKS II 4 4 REVIEW EACH LOCATION FOR 4 4 HEIGHT REQUIREMENT. 44 TYPICAL VOICE /DATA OUTLET No Scale VOICE CABLE 1 cr%P% If-0%9P ♦ Mr- • KEY PLAN NZY ENGINEERING., FOR ARCHITECTURE 255 S. Orange Avenue Suite 1600 Orlando, Florida 32801 PH: 407.841.9050 www.tic- engineers.com EB #0000015 m Copyright 2009 TLC Engineering for Architecture, Inc. a A i- Revisions: No. Date Description N haw e� s� Seal Jam Florida SUBMITTAL PERMIT AND BID SET Project No.: 111363 Issue Date: 06/24/2011 Drawn By: TLC Approved By: TLC Scale: AS NOTED Drawing Title: ELECTRICAL DETAILS AND ICRA Drawing No.: E2-0011 a_+ a U) O v E c �M L- M • W U) co L .� co o Q Q, o N ,� in Revisions: No. Date Description N haw e� s� Seal Jam Florida SUBMITTAL PERMIT AND BID SET Project No.: 111363 Issue Date: 06/24/2011 Drawn By: TLC Approved By: TLC Scale: AS NOTED Drawing Title: ELECTRICAL DETAILS AND ICRA Drawing No.: E2-0011