TYPICAL ICRA KEY NOTES:
❑1 PROVIDE A TEMPORARY HEPA FILTERED NEGATIVE AIR FAN
FOR CONSTRUCTION AREA. MAINTAIN A 0.05" NEGATIVE
PRESSURE IN THIS AREA RELATIVE TO THE ADJACENT
SPACES. PROVIDE ADDITIONAL NEGATIVE AIR MACHINES AS
REQUIRED TO ACHIEVE MINIMUM NEGATIVE PRESSURE.
PROVIDE TEMPORARY DUST BARRIER PARTITIONS. ALL
EXISTING RETURN AND EXHAUST REGISTERS LOCATED
WITHIN THE RENOVATION AREA SHALL BE PROVIDED WITH
TEMPORARY CONSTRUCTION FILTERS. ROUTE TEMPORARY
120 FLEXIBLE DUCT FROM DISCHARGE OF HEPA UNIT TO
OUTSIDE BUILDING ENVELOPE. LOCATE EXHAUST FAN
DISCHARGE MINIMUM 25' -0" FROM OPERABLE WINDOWS
AND OUTSIDE AIR INTAKES.
FAN CRITERIA:
MANUFACTURER - HEPA-AIRE, MODEL - PREDATOR
1200 PAS
VARIABLE CFM - 1000 TO 1800 CFM
ELECTRICAL: 115 VOLTS, 3.5 FLA
QPROVIDE AN INCLINED MANOMETER, DIFFERENTIAL PRESSURE
TYPE, WITH WHITE FACE GAUGE AND BLACK LETTERS.
THIS SHALL BE USED BY THE CONTRACTOR TO RECORD,
ON A DAILY BASIS, THE NEGATIVE PRESSURE IN THE
RENOVATION AREA RELATIVE TO THE ADJACENT SPACES.
❑3 TEMPORARY CONSTRUCTION BARRIER.
® CONTRACTOR SHALL PROVIDE TEMPORARY CONSTRUCTION
FILTERS FOR ALL AIR DISTRIBUTION DEVICES LOCATED
WITHIN SCOPE OF WORK.
INFECTION CONTROL RISK ASSESSMENT (ICRA)
ALL WORK SHALL CONFORM WITH THE OWNER'S INFECTION CONTROL AND CONSTRUCTION POLICIES,
PROCESSES AND OWNER'S PROJECT SPECIFIC INFECTION CONTROL RISK ASSESSMENT PLAN.
ICRA MATRIX
IC RISK CONSTRUCTION ACTIVITY TYPE
LEVEL TYPE A TYPE B TYPE C
TYPE D
GROUP 1
CLASS I
CLASS II
CLASS II
CLASS III /IV
GROUP 2
CLASS I
CLASS II
CLASS III
CLASS IV
GROUP 3
CLASS I
CLASS III
CLASS III /IV
CLASS IV
GROUP 4
CLASS III
CLASS III /IV
CLASS III /IV
CLASS IV
INFECTION CONTROL RISK LEVELS
GROUP 1
LOWEST
GROUP 2
MEDIUM
GROUP 3
MEDIUM HIGH
GROUP 4
HIGHEST
OFFICE AREAS
ALL PATIENT CARE UNITS
EMERGENCY ROOM
TRANSPLANT CLINIC
CONFERENCE ROOMS
WAITING ROOMS*
RADIOLOGY AREAS
SURGERY SUITES
PUBLIC BATHROOMS
ROCP
RECOVERY ROOMS
WAITING ROOMS*
LABOR AND DELIVERY
LABOR & DELIVERY OR3/4
E
c
NURSERIES
CARDIAC CATH / ANGIO
•
W
PEDIATRICS
CVICU
co o
RIO SURGERY
OUTPATIENT UNITS
o
N ,�
ALL INTENSIVE CARE AREAS
DIALYSIS AND TRANSPLANT
NUCLEAR MEDICINE
ONCOLOGY / BONE MARROW
ADMISSION / DISCHARGE AREA
CARDIOLOGY
PHYSICAL THERAPY TANK AREA
HYPERBARIC MEDICINE
CAFETERIA
ENDOSCOPY
ECHOCARDIOGRAPHY
PHARMACY ADMIXTURE
LABORATORIES
PHARMACY
*DEPENDENT ON LOCATION
ICRA PLAN (TYPICAL ALL ROOMS ) 3 CONSTRUCTION ACTIVITY TYPES
SCALE: 1/8' = 1' - 0' INSPECTIONS AND NON - INVASIVE ACTIVITIES. INCLUDES, BUT IS NOT LIMITED TO, REMOVAL OF CEILING TILES FOR VISUAL INSPECTION LIMITED TO 1
TYPE A TILE PER 50 SQUARE FEET, PAINTING (BUT NOT SANDING) WALL COVERING, ELECTRICAL TRIM WORK, MINOR PLUMBING, AND ACTIVITIES WHICH DO NOT
GENERATE DUST OR REQUIRE CUTTING OF WALLS OR ACCESS TO CEILINGS OTHER THAN FOR VISUAL INSPECTION.
TYPE B SMALL SCALE, SHORT DURATION ACTIVITIES WHICH CREATE MINIMAL DUST. INCLUDES, BUT IS NOT LIMITED TO, INSTALLATION OF TELEPHONE AND
COMPUTER CABLING, ACCESS TO CHASE SPACES, CUTTING OF WALLS OR CEILING WHERE DUST MIGRATION CAN BE CONTROLLED.
ANY WORK WHICH GENERATES A MODERATE TO HIGH LEVEL OF DUST OR REQUIRES DEMOLITION OR REMOVAL OF ANY FIXED BUILDING COMPONENTS OR
TYPE C ASSEMBLIES. INCLUDES, BUT IS NOT LIMITED TO, SANDING OF WALL FOR PAINTING OR WALL COVERING, REMOVAL OF FLOOR COVERINGS, CEILING TILES
AND CASEWORK, NEW WALL CONSTRUCTION, MINOR DUCTWORK OR ELECTRICAL WORK ABOVE CEILINGS, MAJOR CABLING ACTIVITIES, AND ANY ACTIVITY
WHICH CANNOT BE COMPLETED WITHIN A SINGLE WORKSHIFT.
TYPE D MAJOR DEMOLITION AND CONSTRUCTION PROJECTS. INCLUDES, BUT IS NOT LIMITED TO, ACTIVITIES WHICH REQUIRE CONSECUTIVE WORK SHIFTS,
REQUIRE HEAVY DEMOLITION OR REMOVAL OF A COMPLETE CEILING SYSTEM, AND NEW CONSTRUCTION.
ICRA CLASSIFICATION SCHEDULE
CLASS I 1. EXECUTE WORK BY METHODS TO MINIMIZE RAISING DUST FROM CONSTRUCTION OPERATIONS.
2. IMMEDIATELY REPLACE ANY CEILING TILE DISPLACED FOR VISUAL INSPECTION.
❑ 3. MINOR DEMOLITION FOR REMODELING.
1. PROVIDES ACTIVE MEANS TO PREVENT AIRBORNE DUST FROM DISPERSING INTO ATMOSPHERE.
2. WATER MIST WORK SURFACES TO CONTROL DUST WHILE CUTTING.
3. SEAL UNUSED DOORS WITH DUCT TAPE.
CLASS II 4. BLOCK OFF AND SEAL AIR VENTS.
5. WIPE SURFACES WITH DISINFECTANT.
❑ 6. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINERS.
7. WET MOP AND /OR VACUUM WITH HEPA FILTERED VACUUM BEFORE LEAVING WORK AREA.
8. PLACE DUST MAT AT ENTRANCE AND EXIT OF WORK AREA.
9. REMOVE OR ISOLATE HVAC SYSTEM IN AREAS WHERE WORK IS BEING PERFORMED.
1. OBTAIN INFECTION CONTROL PERMIT BEFORE CONSTRUCTION BEGINS.
2. ISOLATE HVAC SYSTEM IN AREA WHERE WORK IS BEING DONE TO PREVENT CONTAMINATION OF THE DUCT SYSTEM.
3. COMPLETE ALL CRITICAL BARRIERS OR IMPLEMENT CONTROL CUBE METHOD BEFORE CONSTRUCTION BEGINS.
4. MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORK SITE UTILIZING HEPA EQUIPPED AIR FILTRATION UNITS AND MONITOR WITH MAGNEHELIC GAUGES.
5. DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL COMPLETE PROJECT IS THOROUGHLY CLEANED BY ENVIRONMENTAL SERVICES DEPARTMENT.
CLASS III
6. VACUUM WORK WITH HEPA FILTERED VACUUMS.
Pf 7. WET MOP WITH DISINFECTANT.
8. REMOVE BARRIER MATERIALS CAREFULLY TO MINIMIZE SPREADING OF DIRT AND DEBRIS ASSOCIATED WITH CONSTRUCTION.
9. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINERS.
10. COVER TRANSPORT RECEPTACLES OR CARTS. TAPE COVERING.
11. REMOVE OR ISOLATE HVAC SYSTEM IN AREAS WHERE WORK IS BEING PERFORMED.
1. OBTAIN INFECTION CONTROL PERMIT BEFORE CONSTRUCTION BEGINS.
2. ISOLATE HVAC SYSTEM IN AREA WHERE WORK IS BEING DONE TO PREVENT CONTAMINATION OF THE DUCT SYSTEM.
3. COMPLETE ALL CRITICAL BARRIERS OR IMPLEMENT CONTROL CUBE METHOD BEFORE CONSTRUCTION BEGINS.
4. MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORK SITE UTILIZING HEPA EQUIPPED AIR FILTRATION UNITS AND MONITOR WITH MAGNEHELIC GAUGES.
5. SEAL HOLES, PIPES, CONDUITS, AND PUNCTURES APPROPRIATELY.
6. CONSTRUCT ANTEROOM AND REQUIRE ALL PERSONNEL TO PASS THROUGH THIS ROOM SO THEY CAN BE VACUUMED USING A HEPA VACUUM CLEANER
BEFORE LEAVING WORK SITE OR THEY CAN WEAR CLOTH OR PAPER COVERALLS THAT ARE REMOVED EACH TIME THEY LEAVE THE WORK SITE.
CLASS IV 7. ALL PERSONNEL ENTERING WORK SITE ARE REQUIRED TO WEAR SHOE COVERS.
❑ 8. DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL COMPLETED PROJECT IS THOROUGHLY CLEANED BY THE ENVIRONMENTAL SERVICES DEPARTMENT AND
RELEASED BY SAFETY AND INFECTION CONTROL.
9. VACUUM WORK AREA WITH HEPA FILTERED VACUUMS.
10. WET MOP WITH DISINFECTANT.
11. REMOVE BARRIER MATERIALS CAREFULLY TO MINIMIZE SPREADING OF DIRT AND DEBRIS ASSOCIATED WITH CONSTRUCTION.
12. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINERS.
13. COVER TRANSPORT RECEPTACLES OR CARTS. TAPE COVERING.
14. REMOVE OR ISOLATE HVAC SYSTEM IN AREAS WHERE CONSTRUCTION IS BEING DONE.
PARTIAL 7th FLOOR PLAN - EDIT ME
SCALE: 1/8" = 1' -0"
Q WALL ASSEMBLY - THE 1, 2, 3, OR 4 HOUR FIRE-RATED GYPSUM WALLBOARD /STUD WALL
ASSEMBLY SHALL BE CONSTRUCTED OF THE MATERIALS AND IN THE MANNER DESCRIBED IN THE
INDIVIDUAL U300 OR U400 SERIES WALL OR PARTITION DESIGNS IN THE UL FIRE RESISTANCE
DIRECTORY.
O CONDUIT - NOM 4" DIA OR SMALLER STEEL ELECTRICAL METALLIC TUBING. A MAX OF ONE
CONDUIT IS PERMITTED IN THE FIRESTOP SYSTEM. CONDUIT TO BE INSTALLED NEAR CENTER OF
STUD CAVITY WIDTH AND TO BE RIGIDLY SUPPORTED ON BOTH SIDES OF WALL ASSEMBLY.
O3 FILL VOID OR CAVITY MATERIAL - CAULK FILL MATERIAL BEARING THE UL CLASSIFICATION MARKING
INSTALLED TO COMPLETELY FILL ANNULAR SPACE BETWEEN PIPE OR CONDUIT AND GYPSUM
WALLBOARD AND WITH A MIN 1/4" DIAM BEAD OF CAULK APPLIED TO PERIMETER OF CONDUIT AT
ITS EGRESS FROM THE WALL. CAULK INSTALLED SYMMETRICALLY ON BOTH SIDES OF WALL
ASSEMBLY. THE HOURLY F RATING OF THE FIRESTOP SYSTEM IS DEPENDENT UPON THE HOURLY
FIRE RATING OF THE WALL ASSEMBLY IN WHICH IT IS INSTALLED, AS SHOWN IN THE FOLLOWING
TABLE. THE HOURLY T RATING OF THE FIRESTOP SYSTEM IS DEPENDENT UPON THE TYPE OR SIZE
OF THE CONDUIT AND THE HOURLY FIRE RATING OF THE WALL ASSEMBLY IN WHICH IT IS
INSTALLED, AS TABULATED BELOW:
MAX CONDUIT ANNULAR SPACE, F RATING, HR. T RATING, HR.
DIAM, IN. IN.
1 0 TO 3/16 1 OR 2 0, 1 OR 2
1 1/4 TO 1/2 3 OR 4 3 OR 4
4 0 TO 1 -1/2 1 OR 2 0
6 1/4 TO 1/2 3 OR 4 0
12 3/16 TO 3/8 1 OR 2 0
CONDUIT PENETRATION OF FIREWALL
UL SYSTEM NO. W- L -1001
CADDY J- HOOKS.
FINISHED CEILING � j � - - - -
DATA CABLE
II
II
II
1" CONDUIT STUB I I CONDUIT IN WALL
ABOVE CEILING.
II
II
II
II
II
II
II
SINGLE GANG BOX WITH
OUTLET PLATE AND
JACKS
II
4 4 REVIEW EACH LOCATION FOR
4 4 HEIGHT REQUIREMENT.
44
TYPICAL VOICE /DATA OUTLET
No Scale
VOICE CABLE
1
cr%P% If-0%9P ♦ Mr- •
KEY PLAN NZY
ENGINEERING.,
FOR ARCHITECTURE
255 S. Orange Avenue
Suite 1600
Orlando, Florida 32801
PH: 407.841.9050
www.tic- engineers.com
EB #0000015
m Copyright 2009 TLC Engineering for Architecture, Inc.
a
A
i-
Revisions:
No. Date Description
N
haw
e�
s�
Seal
Jam
Florida
SUBMITTAL PERMIT AND BID SET
Project No.: 111363
Issue Date:
06/24/2011
Drawn By: TLC
Approved By: TLC
Scale: AS NOTED
Drawing Title:
ELECTRICAL
DETAILS
AND ICRA
Drawing No.:
E2-0011
a_+
a
U)
O
v
E
c
�M
L- M
•
W
U) co
L
.�
co o
Q
Q,
o
N ,�
in
Revisions:
No. Date Description
N
haw
e�
s�
Seal
Jam
Florida
SUBMITTAL PERMIT AND BID SET
Project No.: 111363
Issue Date:
06/24/2011
Drawn By: TLC
Approved By: TLC
Scale: AS NOTED
Drawing Title:
ELECTRICAL
DETAILS
AND ICRA
Drawing No.:
E2-0011