Loading...
11-671-005N EXISTING ATC AND SUSPENSION SYSTEM (CUT BACK) NEW ATC SUSPENSION WALL ANGLE 3 5/8" 25 GA. METAL STUDS AT 16" O.C.- 1 LAYER OF 6/8" GYPSUM DRYWALL ONE SIDE OF Z) ivu FINISHED FLOOR AND BASE FLOOR SLAB NOTE; 4j" STUDS SHALL BE FASTENED TO HEAD, ATTACHED TO SLAB ABOVE. DRYWALL MAY TERMINATE 6" ABOVE CEILING UNDERSIDE OF SLAB SECTION @ CEILING PLAN VIEW SECTION @ FLOOR GENERAL DEMOLITION NOTES 1. DEMOLITION SHALL BE IN ACCORDANCE WITH NFPA 241 (2004). 2. CONTRACTOR SHALL TAKE ALL PRECAUTION TO PROTECT AND BRACE EXISTING STRUCTURES, PARTITIONS, DOORS, CEILINGS AND ALL SURFACES TO REMAIN AND TO ENSURE THE SAFETY OF ALL WORKERS WITHIN THE CONSTRUCTION AND THE NON - CONSTRUCTION AREAS. 3. WHERE PORTIONS OF A WALL AND /OR CEILING IS TO BE REMOVED, CONTRACTOR SHALL TAKE APPROPRIATE PRECAU11ON TO BRACE ALL EXISTING STRUCTURES, WALLS AND CEILINGS TO REMAIN AS NECESSARY. 4. FIELD VERIFY ALL DIMENSIONS AND EXISTING CONDITIONS, REPORT ANY EXISTING CONDITIONS THAT WILL PREVENT THE DEMOLITION OR CONSTRUCTION OF THE INTENDED ITEMS, OR REQUIRE THE MODIFICATION OF DIMENSIONS. ANY DISCREPANCIES, CONFLICTS AND DEVIATIONS FROM INFORMATION SHOWN SHALL BE BROUGHT TO THE HOSPITAL'S P.M. AND ARCHITECT'S ATTENTION PRIOR TO PROCEEDING WITH THE WORK. 5. ALL SALVAGEABLE MATERIALS TO BE REMOVED AND STORED ACCORDING TO OWNER'S REQUEST, COORDINATE WITH HOSPITAL'S P.M. 6. ITEMS TO BE REMOVED OR RELOCATED SHALL BE DONE IN A SAFE, ORDERLY MANNER WITHOUT DAMAGE TO OTHER PARTS OF THE PREMISES, ANY RESULTING DAMAGE OR LOSS SHALL BE CORRECTED OR REPLACED. 7. ALL DAMAGED EXISTING WALLS, WALL FINISHES, CEILINGS, FLOORING, MOLDINGS, ETC. TO REMAIN SHALL BE PATCHED OR REPAIRED AS NECESSARY TO MATCH SURROUNDING EXISTING WALLS, WALL FINISHES, CEILINGS, FLOORING, MOLDINGS, ETC. REPAIR ANY AND ALL OBJECTS DAMAGED DURING THE DEMOLITION PHASE TO CONDITION PRIOR TO DEMOLITION. 8. VERIFY THAT ALL APPROPRIATE UTILITIES HAVE BEEN DISCONNECTED AND PROPERLY CAPPED TO INSURE SAFETY. 9. REFER TO MECHANICAL, ELECTRICAL, PLUMBING AND FIRE PROTECTION DRAWINGS FOR DEMOLITION OF UTILITIES. 10. UPON COMPLETION OF DEMOLITION OPERATIONS, CONTRACTOR SHALL REMOVE ALL TOOLS, EQUIPMENT AND DEBRIS LEAVING ALL AREAS CLEAN AND PREPARED FOR NEW CONSTRUCTION. 11. LOCATION OF CONSTRUCTION DUMPSTER TO BE COORDINATED WITH HOSPITAL P.M. CONTRACTOR SHALL BY NO MEANS USE EXISTING HOSPITAL'S DUMPSTERS OR WASTE DISPOSAL CONTAINERS. 12. PROMPTLY DISPOSE OF MATERIALS RESULTING FROM DEMOLITION OPERATIONS. DO NOT ALLOW MATERIALS TO ACCUMULATE AT THE PROJECT SITE. MATERIALS SHALL BE SWEPT AND CARTED OFF (CLOSED CART) AND LEGALLY DISPOSED OF OFF SITE ON A DAILY BASIS IN ACCORDANCE WITH THE HOSPITAL'S ICRA POLICY. 13. ASBESTOS AND OTHER HAZARDOUS MATERIALS: A LIMITED ASBESTOS AND HAZARDOUS MATERIALS SURVEY FOR THE LABOR & DELIVERY PNEUMATIC TUBE STATION RENOVATION AREAS HAS BEEN PREPARED BY EE &G ENVIRONMENTAL SERVICES, LLC, DATED JUNE 6, 2011. ACCORDING TO THE REPORT, ASBESTOS WAS NOT IDENTIFIED IN AMOUNTS GREATER THAN 1 PERCENT IN THE SAMPLED MATERIALS. THIS REPORT SHALL BE PART OF THE DEMOLITION/ CONSTRUCTION PERMIT DOCUMENTS AND CONTRACTOR SHALL KEEP A COPY OF THE SURVEY AT THE CONSTRUCTION SITE DURING ENTIRE CONSTRUCTION PROJECT, 14. CONTRACTOR SHALL ABIDE BY ALL REQUIREMENTS OF BAPTIST HEALTH SOUTH FLORIDA ET AL, CONCERNING, BUT NOT LIMITED TO, CONSTRUCTION DEBRIS DISPOSAL, CONSTRUCTION WORK PATH AND RESTRICTIONS, ACCEPTABLE WORKING HOURS AND NOISE LEVELS, PROTECTION OF NON - CONSTRUCTION AREAS, MITIGATION OF AIRBORNE DUST AND PARTICULATES (ICRA), AND ANY AND ALL WORK PROCEDURES REQUIRED BY THE HOSPITALS' CONSTRUCTION SERVICE DEPARTMENT. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO REVIEW, COORDINATE AND EXECUTE THESE PROCEDURES PRIOR TO AND THROUGHOUT CONSTRUCTION, CUT BACK EXISTING ATC AND SUSPENSION SYSTEM +- 12" TO ALLOW FOR NEW DRYWALL PARTITION WITH NEW WALL ANGLE TC SUSPENSION ANGLE F YPSUM DRYWALL (ONE n ON 3 -5/8", 25 GA. STUDS 0 16" O.C. `�' 0 4 STUD RUNNER -5/8" STUD "BOX XX ATIC TUBE STATION, WISSLOG'S APPROVED OIC STATION SHOP GS r-. � N SES' TION ¢ I 1-- .. YPSUM DRYWALL DE) ON 3 -5/8 ", METAL STUDS C. �y 0 LO CT BASE, . EXISTING CN NEW A WALL 5/8" G SIDE) METAL 3-5/8" TWO 3 BEAM" PNEUM SEE S PNEUM DRAWIN NUR STA 5/8" G (ONE SI 25 GA. 16" 0. NEW V MATCH * VERIFY DIMENSION WITH SWISSLOG'S APPROVED PNEUMATIC STATION SHOP DRAWINGS EXISTING CEILING, NO CHANGES PNEUMATIC TUBING. SEE APPROVED PNEUMATIC STATION SHOP DRAWINGS. MIN. 139 -5/8" CLEAR HEIGHT REQUIRED FOR TUBE SWEEP EXISTING WALL, NO CHANGES MED. PREP. ROOM A PARTITON TYPE A B PARTITON TYPE B/ SECTION THRU NEW STATION A1.02 SCALE: N.T.S. A1.02A SCALE: 3/4" = 1' -0" 4' -0" GC TO FIELD VERIFY 2 L+D - CABINETRY AND COUNTER DEMOLITION PLAN (Al-02A SCALE: 3/8" = 1' -0" 1 L+D DEMOLITION PLAN + NOTES A1.02 SCALE: 3/8" = 1' -0" DEMOLITION NOTES lA - REMOVE EXISTING COUNTER, BASE CABINET, UPPER CABINETS AND BACKSPLASH AS SHOWN. CONTRACTOR TO VERIFY EXACT DIMENSION ON FIELD. 1B - EXISTING CABINETS TO REMAIN, 1 C - EXISTING SINK TO REMAIN. 1D - REMOVE LAMINATE FINISH AT COUNTER AND UPPER CABINETS TO REMAIN. (D- REMOVE EXISTING LINOLEUM BASE AT AREA TO BE ENCLOSED BY NEW WALLS. PROTECT EXISTING ADJACENT FLOORING AND BASE. O3 - REMOVE EXISTING ELECTRICAL OUTLETS AND ASSOCIATED WIRING AND CONDUITS FROM AREA IMPACTED BY RENOVATION WORK AS INDICATED ON THE ELECTRICAL DRAWINGS. F- REMOVE GWB SOFFIT ABOVE REMOVED CABINETS AND TEMPORARILY REMOVE ATC AT AREA IMPACTED BY RENOVATION WORK. 5A - CONSTRUCT TEMPORARY INSULATED DUSTPROOF BARRIERS ( VISQUEEN PLASTIC). DUSTPROOF BARRIER AT ANTE ROOM SHALL HAVE ACCESS ZIPPER. 56 - DUSTPROOF BARRIER WITHOUT ACCESS ZIPPER. F- CHECK FOR EXISTING WALLS OR PORTION OF WALLS AROUND WORK AREA THAT DO NOT EXTEND ALL THE WAY UP TO THE BOTTOM OF SLAB ABOVE AND CHECK FOR UNSEALED PENETRATIONS: INSTALL VISQUEEN (TO FIT TIGHT) FOR DUST PROTECTION IN THOSE AREAS. O7 - PROVIDE NEGATIVE AIR PRESSURE WITHIN SITE OF WORK DURING DEMOLITION AND CONSTRUCTION BY USE OF SUITABLE HEPA EQUIPPED AIR FILTRATION UNITS. NEGATIVE AIR TO BE MAINTAINED AT A MINIMUM OF 0.01 INCHES STATIC PRESSURE DURING CONSTRUCTION. REFER TO HOSPITAL'S ICRA PLAN FOR EXACT PROCEDURES. O- PROVIDE PRESSURE MANOMETER TO MONITOR NEGATIVE PRESSURE. F- TEMPORARILY BLOCK OFF ANY EXISTING HVAC GRILLES ABOVE THE AREAS OF WORK TO PREVENT CONTAMINATION OF FLOOR DUCT SYSTEM. 10 - PROTECT ADJACENT FLOORS /CARPETS WITH "STICKY MATS ". 11 - CONTRACTOR SHALL KEEP EGRESS DOORS AND CORRIDORS OPEN AND CLEAR FOR EMERGENCY EGRESS, DEMOLITION PLAN LEGEND TO BE DEMOLISHED EXISITNG TO REMAIN -- TEMPORARY DUSTPROOF PARTITION NOT PART OF THE WORK AIA, Inc. >a: >. Wes: Architecture Planning Construction Administration BC Architects AIA, Inc. 4942 LeJeune Road Suite 200 Coral Gables, FL 33146 Tel. 305.663.8182 Fax 305,663,8882 Firm License Number: AA0003360 BC ARCHITECTS 2011 (1 ALL RIGHTS SE1,,VED t T. '`- t4 t. SIGNED BY: LAWRENCE S. COHAN_ FLORIDA ARCHITECT "s -fit Labor & Delivery Pneumatic Tube Station SOUTH MIAMI HOSPITAL 2nd AND 3rd FLOORS 6200 SW 73 STREET SOUTH MIAMI, FLORIDA 33143 OWNER: BAPTIST HEALTH SOUTH FLORIDA, INC. 8900 North Kendall Drive, Miami, Florida 33176 NO. I DATE I REVISIONS 1 ISSUE RECORD: 06/13/11 100% DD'S - CHECK SET 06/28/11 PERMIT ISSUE B.C. Comm. No. 1101.02 Scale: AS NOTED Drawn: Checked: CADD File: 1101.02_A1.02 11AA4) SHEET TITLE T. DEMOLITION PLAN, 'ON PARTITION DETAILS A AND NOTES SHEET No. A1.02