11-671-001w a 1; } } J �F i ARCHITECTURAL a. &° 7 IN ACCORDANCE WITH ALL APPLICABLE CITY ORDINANCES AND REQUIREMENTS_ LS-01 EXISTING 2ND FLOOR LIFE SAFETY PLAN 2. DEMOLITION SHALL BE IN ACCORDANCE WITH NFPA 241 (2004), AND THE DEMOLITION PLAN INCLUDED LS-02 - IN THESE DRAWINGS_ q f� ,< 3. PERMITS: THE OWNER SHALL BE RESPONSIBLE FOR PAYING FOR THE MASTER PERMIT_ THE 2ND AND 3RD FLOORS GENERAL CONTRACTOR. SHALL BE RESPONSIBLE FOR OBTAINING AND PAYING FOR ALL OTHER A1.02 is zr ' ::,, , .... ", 1. . < OCCUPANCY_ �y TUBE ROUTING PLANS 4_ QUALIFICATION OF CONTRACTOR: THE GENERAL CONTRACTOR AND ALL SUBCONTRACTORS AND JM ENGINEERS, INC F" .; i j .. '.'' .:; .`', EO-01 , 5 AND SCHEDULES INCLUDE ALL COSTS REQUIRED TO PROVIDE SATISFACTORY COMPLETION OF THE WORK, INCLUDING E2.01 NEW PNEUMATIC TUBE STATION, REMOVAL, RELOCATION, AND REPLACEMENT OF ALL OBJECTS AND OBSTRUCTIONS WHICH MAY BE g ROUTING PLAN - 2ND FLOOR ENCOUNTERED DURING THE. COURSE OF THE WORK_ ,mss NEW PNEUMATIC TUBE STATION, 6_ THE GENERAL CONTRACTOR SHALL CARRY OUT THE WORK TO FULL COMPLETION_ ANY MATERIAL CL '!­ IROUTING PLAN - 3RD FLOOR AND LABOR WHICH IS OBVIOUSLY NECESSARY TO COMPLETE THE WORK AND TO COMPLY WITH 0 EXISTING SINGLE LINE RISER DIAGRAM REGULATIONS MUST BE PROVIDED AT NO ADDITIONAL COST TO THE OWNER, WHETHER OR NOT -0 * Q NORTH TOWER 7. THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFICATION AND COORDINATION WITH OTHER TRADES AND THEIR WORK TO ENSURE COMPLIANCE WITH THE DRAWINGS_ Q X Z r 8. THE GENERAL CONTRACTOR SHALL REFER TO THE ELECTRICAL DRAWINGS AS REQUIRED FOR ANY w a 1; } } J �F i ARCHITECTURAL a. &° 7 IN ACCORDANCE WITH ALL APPLICABLE CITY ORDINANCES AND REQUIREMENTS_ LS-01 EXISTING 2ND FLOOR LIFE SAFETY PLAN 2. DEMOLITION SHALL BE IN ACCORDANCE WITH NFPA 241 (2004), AND THE DEMOLITION PLAN INCLUDED LS-02 EXISTING 3RD FLOOR LIFE SAFETY PLAN IN THESE DRAWINGS_ q f� INFECTION CONTROL AND RISK ASSESSMENT 3. PERMITS: THE OWNER SHALL BE RESPONSIBLE FOR PAYING FOR THE MASTER PERMIT_ THE 2ND AND 3RD FLOORS GENERAL CONTRACTOR. SHALL BE RESPONSIBLE FOR OBTAINING AND PAYING FOR ALL OTHER A1.02 DEMOLITION PLAN, PARTITION DETAILS AND NOTES zr A2.01 NEW PNEUMATIC TUBE STATION, TRANSFER UNIT AND OCCUPANCY_ TUBE ROUTING PLANS 4_ QUALIFICATION OF CONTRACTOR: THE GENERAL CONTRACTOR AND ALL SUBCONTRACTORS AND JM ENGINEERS, INC SPECIALTY CONTRACTOR SHALL BE LICENSED BY THE STATE OF FLORIDA AND BE FULLY INSURED. 5001 SW 74 CT, SUITE 209 ELECTRICAL 5_ THE GENERAL CONTRACTOR MUST EXAMINE THE LOCATIONS OF ALL PROPOSED WORK AND BECOME w a 1; } } J �F a 2 LOCATIC A0.01 SCALE: N.T.S. AREA PLAN - 3RD FLOOR PROJECT GENERAL DATA PRQJECT NAME LABOR & DELIVERY PNEUMATIC TUBE STATION PRQJECT LOCATION SOUTH MIAMI HOSPITAL, NORTH TOWER 2ND AND 3RD FLOORS AHCA CLIENT CODE /FILE NUMBER 23/100154 AHCA PROJECT ID- SUBMISSION NUMBER 173 -001 SCOPE OF WORK THE WORK TO BE PERFORMED UNDER THESE PERMIT DRAWINGS IS A NEW PNEUMATIC TUBE STATION (PTS) AT THE 3RD FLOOR LABOR & DELIVERY AREA, THE INSTALLATION OF AN ABOVE CEILING PNEUMATIC TRANSFER STATION AT THE 2ND FLOOR SICU, AND NECESSARY POWER FOR THE CONNECTION OF THE STATION AND TRANSFER UNIT_ THE NEW TUBE STATION REQUIRES CONSTRUCTION OF A GYPSUM BOARD AND METAL STUD ENCLOSURE. MINOR DEMOLITION OF CABINETRY AND A SMALL AMOUNT OF FLOORING WILL BE NECESSARY_ THE EXISTING CABINETRY AND NURSES STATION DESK IS TO RECEIVE A NEW HIGH PRESSURE LAMINATE FINISH_ THE WORK WILL BE PERFORMED BY TWO CONTRACTORS: A) GENERAL CONTRACTOR RESPONSIBLE FOR: • ALL DEMOLITION WORK SHOWN ON A1.02_ • ALL NEW CONSTRUCTION WORK SHOWN ON 3/A2.01 AND A/A2.01. • ALL ICRA SHOW ON 1/A1.02_ • ALL NOTES PERTAINING TO THE GENERAL CONTRACTOR_ • ALL WORK SHOWN ON THE ELECTRICAL DRAWINGS. B) PNEUMATIC TUBE INSTALLING CONTRACTOR (SWISSLOG) RESPONSIBLE FOR: • ROUTING, COORDINATION OF ROUTING AND INSTALLATION OF PNEUMATIC TUBE SYSTEM, INCLUDING PNEUMATIC TUBE STATION, TRANSFER UNIT, HORIZONTAL AND VERTICAL TiUBING AND ALL RELATED MATERIALS_ • CORING OF EXISTING CONCRETE FLOOR SLAB. • FIRE STOPPING OF ALL FLOOR, WALL AND CEILING PENETRATIONS SHOWN ON THE DRAWINGS_ • DiUST BARRIERS AS REQUIRED FOR TRANSFER STATION AND TUBE INSTALLATION ON 2ND AND 3RD FLOORS_ • REMOVAL AND REPLACEMENT OF CEILING TILES_ 17. WORKMANSHIP: ALL MATERIALS AND EQUIPMENT SPECIFIED SHALL BE NEW AND ALL WORKMANSHIP SHALL BE FIRST CLASSFOLLOWING THE MANUFACTURERS SPECIFICATIONS ALONG WITH THE BEST TRADE PRACTICES AND STANDARDS_ 18_ THE GENERAL CONTRACTOR SHALL FURNISH ALL LABOR MATERIALS AND EQUIPMENT ( UNLESS OTHERWISE NOTED) REQUIRED FOR THE COMPLETION OF THE JOB IN ACCORDANCE WITH THESE DRAWINGS. 19. THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR ALL MATERIALS ONCE DELIVERED TO THE SITE. THIS INCLUDES BOTH THOSE SUPPLIED BY THE GENERAL CONTRACTOR AND THOSE FURNISHED BY THE OWNER_ HE /SHE IS TO PROVIDE PROTECTION FROM THEFT, VANDALISM, WEATHER, OR ANY OTHER POTENTIAL SOURCE OF DAMAGE OR LOSS_ 20. AT THE END OF EACH DAY, THE SITE OF WORK SHALL BE CLEANED UP OF ALL RUBBISH, REFUSE, SCRAP MATERIALS AND DEBRIS CAUSED BY THIS PROJECT, AND IT SHALL PRESENT A NEAT, ORDERLY AND WORKMANLIKE APPEARANCE_ COORDINATE CLEAN -UP WITH THE INFECTION CONTROL POLICIES NOTED ON THE ICRA PLAN INCLUDED IN THESE DRAWINGS_ A /r- r1 NORTH TOE 3 LocxnON PLAN - 2ND FLOOR AO.01 SCALE: N.T.S. N EE aB _, INDEX OF DRAWINGS ARCHITECT GENERAL NOTES_ ARCHITECTURAL 1. ALL WORK SHALL BE IN ACCORDANCE WITH THE GOVERNING CODES NOTED ON THIS DRAWING, AND AO.01 PROJECT INFORMATION AND INDEX OF DRAWINGS IN ACCORDANCE WITH ALL APPLICABLE CITY ORDINANCES AND REQUIREMENTS_ LS-01 EXISTING 2ND FLOOR LIFE SAFETY PLAN 2. DEMOLITION SHALL BE IN ACCORDANCE WITH NFPA 241 (2004), AND THE DEMOLITION PLAN INCLUDED LS-02 EXISTING 3RD FLOOR LIFE SAFETY PLAN IN THESE DRAWINGS_ A1.01 INFECTION CONTROL AND RISK ASSESSMENT 3. PERMITS: THE OWNER SHALL BE RESPONSIBLE FOR PAYING FOR THE MASTER PERMIT_ THE 2ND AND 3RD FLOORS GENERAL CONTRACTOR. SHALL BE RESPONSIBLE FOR OBTAINING AND PAYING FOR ALL OTHER A1.02 DEMOLITION PLAN, PARTITION DETAILS AND NOTES PERMITS, FEES, AND INSPECTIONS REQUIRED TO COMPLETE THE PROJECT AND OBTAIN A CERTIFICATE OF A2.01 NEW PNEUMATIC TUBE STATION, TRANSFER UNIT AND OCCUPANCY_ TUBE ROUTING PLANS 4_ QUALIFICATION OF CONTRACTOR: THE GENERAL CONTRACTOR AND ALL SUBCONTRACTORS AND JM ENGINEERS, INC SPECIALTY CONTRACTOR SHALL BE LICENSED BY THE STATE OF FLORIDA AND BE FULLY INSURED. 5001 SW 74 CT, SUITE 209 ELECTRICAL 5_ THE GENERAL CONTRACTOR MUST EXAMINE THE LOCATIONS OF ALL PROPOSED WORK AND BECOME EO-01 GENERAL ELECTRICAL NOTES, SYMBOL LEGEND FAMILIAR WITH ALL PHYSICAL CONDITIONS AND ANY OBSTRUCTIONS TO THE WORK. THE BID PRICE SHALL AND SCHEDULES INCLUDE ALL COSTS REQUIRED TO PROVIDE SATISFACTORY COMPLETION OF THE WORK, INCLUDING E2.01 NEW PNEUMATIC TUBE STATION, REMOVAL, RELOCATION, AND REPLACEMENT OF ALL OBJECTS AND OBSTRUCTIONS WHICH MAY BE ROUTING PLAN - 2ND FLOOR ENCOUNTERED DURING THE. COURSE OF THE WORK_ E2.02 NEW PNEUMATIC TUBE STATION, 6_ THE GENERAL CONTRACTOR SHALL CARRY OUT THE WORK TO FULL COMPLETION_ ANY MATERIAL CL '!­ IROUTING PLAN - 3RD FLOOR AND LABOR WHICH IS OBVIOUSLY NECESSARY TO COMPLETE THE WORK AND TO COMPLY WITH 0 EXISTING SINGLE LINE RISER DIAGRAM REGULATIONS MUST BE PROVIDED AT NO ADDITIONAL COST TO THE OWNER, WHETHER OR NOT -0 SPECIFICALLY SHOWN OR SPECIFIED ON THE DRAWINGS. Q 7. THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFICATION AND COORDINATION WITH OTHER TRADES AND THEIR WORK TO ENSURE COMPLIANCE WITH THE DRAWINGS_ Q Ln 8. THE GENERAL CONTRACTOR SHALL REFER TO THE ELECTRICAL DRAWINGS AS REQUIRED FOR ANY O ADDITIONAL INFORMATION NEEDED TO PROPERLY PROCEED WITH DEMOLITION AND CONSTRUCTION OF O THE PROJECT_ orn *-� 9_ THE GENERAL CONTRACTOR SHALL CORRELATE THE CONTRACT DOCUMENTS WITH SHOP DRAWINGS, p FIELD DIMENSIONS, AND EXISTING CONDITIONS PRIOR TO PROCEEDING WITH THE WORK. HE /SHE AND N SHALL REPORT ANY DISCREPANCIES OR POTENTIAL CONFLICTS IN WRITING TO THE ARCHITECT BEFORE O0 N STARTING THE WORK. 10_ THE DIMENSIONS INDICATED ARE APPROXIMATE DIMENSIONS AND ARE SUBJECT TO ADJUSTMENT BASED :Z� ON EXISTING CONSTRUCTION CONDITIONS AND FIELD MEASUREMENTS. THE GENERAL CONTRACTOR -0 SHALL FIELD VERIFY ALL CONDITIONS AND DIMENSIONS AND NOTIFY ARCHITECT OF ANY DISCREPANCIES ,—i FROM THE PLANS PRIOR TO COMMENCEMENT OF CONSTRUCTION_ COMMENCEMENT OF WORK SHALL CD CONSTITUTE FULL ACCEPTANCE OF SITE CONDITIONS_ DO NOT SCALE DRAWINGS. 0 NI 11- THE GENERAL CONTRACTOR SHALL EXECUTE ALL ICRA POLICIES AND PROCEDURES SHOWN ON THESE DRAWINGS INGS AND THOSE PROVIDED BY THE OWNER_ NOISE, DEBRIS AND DUST MIGRATION TO ADJACENT ,—i AREAS MUST BE CONTAINED BY INSTALLING TEMPORARY ENCLOSURES AND BARRIERS SPECIFIED BY THE HOSPITAL'S ICRA PLAN_ THE EXACT LOCATION AND QUANTITY OF TEMPORARY PARTITIONS REQUIRED IS TO BE DETERMINED BY HOSPITAL'S ICRA POLICY_ THE GENERAL CONTRACTOR SHALL PROVIDE WALK -OFF p�1 MATS AT ALL ENTRY /EXITS OF THE CONSTRUCTION SITE_ WALK -OFF MATS MUST BE CLEANED OR U CHANGED DAILY TO AVOID DISPERSION OF DUST OUTSIDE WORK AREA- -0 12_ NO DEVIATION FROM THE DRAWINGS IS PERMITTED WITHOUT OBTAINING APPROVAL FROM THE F-- ARCHITECT IN THE FORM OF A SUPPLEMENTAL SKETCH OR REVISED PERMIT DRAWING U ip fu 13. THE GENERAL CONTRACTOR SHALL NOT TOUCH OR IN ANY WAY COMPROMISE EXISTING FIRE/ FLAME / E SMOKE SPREAD RATINGS AND SYSTEMS OR COMPROMISE ANY MEANS OF EGRESS_ a14_ THE GENERAL CONTRACTOR SHALL REMOVE, REPAIR, RESTORE AND REPLACE EXISTING CONSTRUCTION WHEN SHOWN ON THE DRAWINGS AND AS NEEDED FOR COMPLETION OF THE WORK_ CUT ALL OPENINGS REQUIRED AND REPAIR AFTER CUTTING_ ALL PROTRUSIONS, MARKS, CRACKS, EVIDENCE OF DEFICIENT > OR DAMAGED CONDITIONS, SPLITS, CHIPPING, SPALLING, BREAKS, MISSING OR MISALIGNED PARTS, � ITEMS OUT OF ADJUSTMENT, UNSOUND, BENT, TORN OR OTHERWISE DEFICIENT OR DAMAGED SHALL BE Ll CORRECTED, REPLACED, RESTORED OR REPAIRED. METHOD AND PROCEDURE MUST BE APPROVED BY dS THE ARCHITECT AND PROJECT MANAGER- 0 -0 15_ DO NOT CUT, DRILL OR ALTER THE BUILDING STRUCTURE WITHOUT THE PRIOR APPROVAL OF THE fu J ARCHITECT AND PROJECT MANAGER_ 16_ PROTECTION: THE GENERAL CONTRACTOR SHALL PROTECT ADJACENT PARTS OF EXISTING BUILDING i FROM DAMAGE DURING ALL PHASES OF DEMOLITION AND CONSTRUCTION AND BE LIABLE FOR SAME_ N CD ,-1 O a. a 2 LOCATIC A0.01 SCALE: N.T.S. AREA PLAN - 3RD FLOOR PROJECT GENERAL DATA PRQJECT NAME LABOR & DELIVERY PNEUMATIC TUBE STATION PRQJECT LOCATION SOUTH MIAMI HOSPITAL, NORTH TOWER 2ND AND 3RD FLOORS AHCA CLIENT CODE /FILE NUMBER 23/100154 AHCA PROJECT ID- SUBMISSION NUMBER 173 -001 SCOPE OF WORK THE WORK TO BE PERFORMED UNDER THESE PERMIT DRAWINGS IS A NEW PNEUMATIC TUBE STATION (PTS) AT THE 3RD FLOOR LABOR & DELIVERY AREA, THE INSTALLATION OF AN ABOVE CEILING PNEUMATIC TRANSFER STATION AT THE 2ND FLOOR SICU, AND NECESSARY POWER FOR THE CONNECTION OF THE STATION AND TRANSFER UNIT_ THE NEW TUBE STATION REQUIRES CONSTRUCTION OF A GYPSUM BOARD AND METAL STUD ENCLOSURE. MINOR DEMOLITION OF CABINETRY AND A SMALL AMOUNT OF FLOORING WILL BE NECESSARY_ THE EXISTING CABINETRY AND NURSES STATION DESK IS TO RECEIVE A NEW HIGH PRESSURE LAMINATE FINISH_ THE WORK WILL BE PERFORMED BY TWO CONTRACTORS: A) GENERAL CONTRACTOR RESPONSIBLE FOR: • ALL DEMOLITION WORK SHOWN ON A1.02_ • ALL NEW CONSTRUCTION WORK SHOWN ON 3/A2.01 AND A/A2.01. • ALL ICRA SHOW ON 1/A1.02_ • ALL NOTES PERTAINING TO THE GENERAL CONTRACTOR_ • ALL WORK SHOWN ON THE ELECTRICAL DRAWINGS. B) PNEUMATIC TUBE INSTALLING CONTRACTOR (SWISSLOG) RESPONSIBLE FOR: • ROUTING, COORDINATION OF ROUTING AND INSTALLATION OF PNEUMATIC TUBE SYSTEM, INCLUDING PNEUMATIC TUBE STATION, TRANSFER UNIT, HORIZONTAL AND VERTICAL TiUBING AND ALL RELATED MATERIALS_ • CORING OF EXISTING CONCRETE FLOOR SLAB. • FIRE STOPPING OF ALL FLOOR, WALL AND CEILING PENETRATIONS SHOWN ON THE DRAWINGS_ • DiUST BARRIERS AS REQUIRED FOR TRANSFER STATION AND TUBE INSTALLATION ON 2ND AND 3RD FLOORS_ • REMOVAL AND REPLACEMENT OF CEILING TILES_ 17. WORKMANSHIP: ALL MATERIALS AND EQUIPMENT SPECIFIED SHALL BE NEW AND ALL WORKMANSHIP SHALL BE FIRST CLASSFOLLOWING THE MANUFACTURERS SPECIFICATIONS ALONG WITH THE BEST TRADE PRACTICES AND STANDARDS_ 18_ THE GENERAL CONTRACTOR SHALL FURNISH ALL LABOR MATERIALS AND EQUIPMENT ( UNLESS OTHERWISE NOTED) REQUIRED FOR THE COMPLETION OF THE JOB IN ACCORDANCE WITH THESE DRAWINGS. 19. THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR ALL MATERIALS ONCE DELIVERED TO THE SITE. THIS INCLUDES BOTH THOSE SUPPLIED BY THE GENERAL CONTRACTOR AND THOSE FURNISHED BY THE OWNER_ HE /SHE IS TO PROVIDE PROTECTION FROM THEFT, VANDALISM, WEATHER, OR ANY OTHER POTENTIAL SOURCE OF DAMAGE OR LOSS_ 20. AT THE END OF EACH DAY, THE SITE OF WORK SHALL BE CLEANED UP OF ALL RUBBISH, REFUSE, SCRAP MATERIALS AND DEBRIS CAUSED BY THIS PROJECT, AND IT SHALL PRESENT A NEAT, ORDERLY AND WORKMANLIKE APPEARANCE_ COORDINATE CLEAN -UP WITH THE INFECTION CONTROL POLICIES NOTED ON THE ICRA PLAN INCLUDED IN THESE DRAWINGS_ A /r- r1 NORTH TOE 3 LocxnON PLAN - 2ND FLOOR AO.01 SCALE: N.T.S. N EE aB _, INDEX OF DRAWINGS ARCHITECT ARCHITECTURAL BC ARCHITECTS AIA, INC. AO.01 PROJECT INFORMATION AND INDEX OF DRAWINGS 4942 S. LE JEUNE RD, SUITE 200 LS-01 EXISTING 2ND FLOOR LIFE SAFETY PLAN CORAL GABLES, FL 33146 LS-02 EXISTING 3RD FLOOR LIFE SAFETY PLAN TEL. (305) 663-8182 A1.01 INFECTION CONTROL AND RISK ASSESSMENT 2ND AND 3RD FLOORS A1.02 DEMOLITION PLAN, PARTITION DETAILS AND NOTES ELECTRICAL ENGINEER A2.01 NEW PNEUMATIC TUBE STATION, TRANSFER UNIT AND TUBE ROUTING PLANS JM ENGINEERS, INC 5001 SW 74 CT, SUITE 209 ELECTRICAL MIAMI, FL 33155 EO-01 GENERAL ELECTRICAL NOTES, SYMBOL LEGEND TEL. (305) 663 -2944 AND SCHEDULES E2.01 NEW PNEUMATIC TUBE STATION, ROUTING PLAN - 2ND FLOOR E2.02 NEW PNEUMATIC TUBE STATION, '!­ IROUTING PLAN - 3RD FLOOR E3.01 EXISTING SINGLE LINE RISER DIAGRAM b O 11 O .J - .•i. •. . ' Sts s o ' v x we AIA, Inc_ ' #AA0003360 Architecture Planning Construction Administration BC Architects AIA, Inc. 4942 LeJeune Road Suite 200 Coral Gables, FL 33146 Tel. 305.663.8182 Fax 305.663.8882 Firm License Number: AA0003360 BC ARCHITECTS 2011 C ALL RIGHTS RESERVED ay Pi>k w a +' ` "� ° °B? :x to A t , awl r�•--..."' f... k , $taA SIGNED BY: LAWRENCE S. COHAN FLORIDA ARCHITECT �i41l PROJECT DATA CLASSIFICATION OF WORK LEVEL 2 ALTERATION PER 2007 FBC EXISTING BUILDING OCCUPANCY CLASSIFICATION INSTITUTIONAL GROUP 1 -2, FBC 2007, SECTION 308.3 HOSPITAL OCCUPANCY COUNT EXISTING TO REMAIN PROPOSED USE PNEUMATIC TUBE STATION FOR THE L &D NURSES' USE ISSUE RECORD: " 06/13/11 100% DD'S — CHECK SET TYPE OF CONSTRUCTION TYPE I - FBC TABLE 601 06/28/11 PERMIT ISSUE FIRE PROTECTION FULLY SPRINKLERED AREA OF WORK NEW PNEUMATIC TUBE STATION=: +- 10 S_F_ LOCATED B.C. Comm. No. 1101.02 WITHIN EXISTING NURSES STATION AREA. NO NEW Scale: NTS SQUARE FOOTAGE_ Drawn: V,1 Checked: LC NEW TRANSFER UNIT: LOCATED ABOVE EXISTING CADD File: 1 101.02_AO.01 CEILING_ NO NEW SQUARE FOOTAGE. ''' "' 1>1 DEPT. IV1 3:rxai aG DEPT. a,RAJ S �G11011 SHEET TITLE GOVERNING CODES - FLORIDA BUILIDNG CODE 2007, W/ 2009 SUPPLEMENTS - GUIDELINES FOR DESIGN AND CONSTRUCTION, OO °r HEALTH CARE FACILITIES, 2006 EDITION_ , -mi PROJECT INFORMATION - FLORIDA FIRE PREVENTION CODE, 2007 - NFPA 101, LIFE SAFETY CODE, 2006 ° "`Y` AND - FLORIDA ADMINISTRATIVE CODE 59A-3.081 INDEX OF DRAWINGS NATIONAL ELECTRICAL CODE (NFPA 70), 2008 GOVERNING AGENCIES FLORIDA AGENCY FOR HEALTH CARE ADMINISTRATION CITY OF SOUTH MIAMI SHEET No. AOsOl