Loading...
11-580REV-008Yt • FLOORS PATIENT 9 l l i SYMBOLS FALL •' NOT .. .- IN ALL DRAWINGS. x_111 PRESSURE SYMBOLS ARE SHOWN SCHEMATIC AND MAY NOT BE TO SCALE. AFF ABOVE FINISHED FLOOR PROXCT ONLY. r B. PATCH OPENINGS i ] i DESCRIPTION III INCL"G OPENINGS. WHERE TAPS OR DUCTWORK ARE M BE PAR'nAL THIRD FLOOR DEMOLITION PLAN — MECHANICAL PIPING �IIf .. LOW PRESSURE STEAM i r EW EQ DESIGNATION FINS PER INCH ��� LAWS, CODES, AND ORDINANCES RELATING TO BUILDING AND PUBLIC SAFETf. LOW PRESSURE CONDENSATE RETURN � i- EQUIP. :.-' ;iii MARK) ����� EXISTING OPENING AND IS TO BE SECURED WITH SHEET METAL BF BELOW FLOOR, BLIND FLANGE DIFFUSER NEW DESIGNATION PUMPED CONDENSATE HORIZONTAL GSF GENERAL DOMESTIC OT WATER EXISTING TO REMAIN DOMESTIC HOT E- RETURN MANUAL VOLUME DAMPER EXISTING EQUIPMENT �wlw ■III II �I SANITARY N NEW CONDENSATE DRAIN OCCUPANCIES AND WOIK CONTRACTOR SHALL COORDINATE WITH HOSPITAL ENTATIVE. CRU CONDENSATE RETURN UNIT OBD OPPOSED BLADE DAMPER PUMPED SANITARY CU CONDENSING ` I " rlll l� RELOCATED REPRESENTATIVE ■III r i i i RA EXIS11NG DUCT TO BE RE3AOVED OR RELOCATED ww�wlwrtw PARTITION AND CEILING SYSTEM SUPPORM MERE INDEPENDENT SUPPORT IS NOT POSSIBLE AN ENGINEERED SUPPORT DO DIGITAL OUTPUT RCA DIRECTION i Ire .rr NEW SUPPLY DIFFUSER DS DISCONNECT SWITCH RLA RELIEF AIR I I , EXISTING SA SUPPLY DIFFUSER I ► ]1 OR NOT, LONGER ', • '',]I' ':EDH ELECTRIC DUCT HEATER UH UNIT HEATER I l II # LX1511NU 5 IFFUSER TO REMOVED i RELOCATED 3 ELECTRIC J� VARIABLE - VOLUME DUCTWORK THAT HAS MISSING OR DAMAGED INSULA71ON PER SPECIFICATIONS m NEW . OR EXHAUST I WH WATER HEATER EXISTING R OR TEMPERATURE r, PRESSURE RELIEF VALVE SUPPLY i AUTOMATIC 2—WAY CONTROL M. EXISTING - OR al GRILLE TO BE REMOVED OR RELOCATED i . TIC 3—WAY CONTRO FILTER MIXING BOX L ALL EXMTING DIFFLISERS. EQUIPMENT AND PIPING REMOVED ]i + :`, CONSTRUCTION SMALL N. NEW SLOT DIFFUSER VALVE/IBALANCING COCK ���`Ir11I'II ■ r SOLENOID A�� �Ill�lrl EXISTING SLOT DIFFUSER INCHES WATER COLUMN (PRESSURE) I EXISTING SLOT DIFFUSER � - - i �• - RELOCATED HYDRAULIC ! ARRESTOR :' ]I M r r" EXISTING THERMOSTAT i BE REMOVED i THERMOSTATIC AIR VENT 45- PRESSURE TAP W/ VOLUME DAMPER VACCUUM BREAKER !SV SAFETY VALVE CONICAL i DAMPER MCI I SYSTEM) li+]r AIR ■ CONICAL VOLUME DAMPER try FLOOR DRAIN - ` I MANUAL VOLUME DAMPER DUCT rli DETECTOR FLOOR CLEANOUT OR GRADE CLEANOUT FIRE DAMPER(S) SMOKE DAMPER CLEANOUT OR WALL CLEANOUT FIRE/SMOKE FIRE/SMOKE DAMPER _ i M r MOTORIZED r . . E- FIRE RATED ROOF/ FLOOR CE3UNG ASSEMBLY � i Iw1111111111�— i�rrrrir BAROMETRIC DAMPER « .11,11 CHILLED WATER SUPPLY a I CHILLED WATER RETURN PIPE THERMOMETER WELL �62PUCABLE COUES: ;BUILDING CONDENSER E STRAINER WITH BLOW—OFF CONDENSER WATER RETURN PIPE !: 2009 REV. MEC i! REFRIGERANT LIi r PIPE !# HOSPITAL 1 rr 2006 AIA GUIDELINES HEALTH CARE STEAM BUCKET TRAP REFRIGERANT GAS PIPE �I a� i # FASTING a HEATING SUPPLY HEATING WATER RETURN ELECTRIC SWITCH i #: MWB iA21RAE WINTER DESIQN CONDITIONS NOTE # ]I iBUILDING SPACE DESIGN TEMPEHAJURES ROIRMTS EQUIPMENT EXIST. EF SCHEDULE AFFECTED BY SCOPE FOR IMS SUMMER DB WINTER r- PRUCT ONLY. . r al DESIGN ' DESIGN PAVILION � WING GENERAL SERVES PAVILION # -nON ISOLA ROOMS R S E����S lli�li FLOORS .. ii FLOORS PATIENT 9 l l EXISTING AHLI SC';"HEDULE i : `Ii ` #` ]# 1J: REPRESENTS ECIUIPMENT al BY SCOPE !' MISDICTION. ALL EQUIPMENT, MATERIALS CONTROLS. ETMIALL BE NEW UNLESS NOTED OTHMWLT AND SMALL Ill ALL AFF ABOVE FINISHED FLOOR PROXCT ONLY. r B. PATCH OPENINGS i ] i - - i `+r Al I' ANALOG INCL"G OPENINGS. WHERE TAPS OR DUCTWORK ARE M BE PAR'nAL THIRD FLOOR DEMOLITION PLAN — MECHANICAL PIPING U L�ir i i �j. _ i r ;+Uj rll (r;.S ) FINS PER INCH ��� LAWS, CODES, AND ORDINANCES RELATING TO BUILDING AND PUBLIC SAFETf. EIFC BELOW + ` 31 COUNG � GENMAI- CONTRACTOR EXISTING OPENING AND IS TO BE SECURED WITH SHEET METAL BF BELOW FLOOR, BLIND FLANGE r� PAVILION WING GENERAL EXHAUST HORIZONTAL BG BELOW GRADE GSF GENERAL EXISTING TO REMAIN FLOORS PATIENT 9 l l FIRE ALARM SEQUENCE OF OPERATION # ', ' ++ I” ► i I it tit i a lag AND COIJBINATION FIRE/SMOKE DAMPERS SERVING SYSTEMS THAT SHUT OFF UPON FIRE ALARM SMALL CLOSE DURING FIRE ALAFM " FIRE NAN FAN COIL UNIT (FCU-366) SHALL SHUT DOM. FCU-366 SHALL BE MONITORED BUILDING 1 I to E 1PI An �' r 0 FACILITY I yQ1001i � K %19 BONG USED ARE TO BE REMOVED BACK M THE MAIN ABOVE AC CEILING PATCHED AS PER ITEM B BELOW. MISDICTION. ALL EQUIPMENT, MATERIALS CONTROLS. ETMIALL BE NEW UNLESS NOTED OTHMWLT AND SMALL Ill ALL AFF ABOVE FINISHED FLOOR COIL UNIT B. PATCH OPENINGS i ] Al I' ANALOG INCL"G OPENINGS. WHERE TAPS OR DUCTWORK ARE M BE PAR'nAL THIRD FLOOR DEMOLITION PLAN — MECHANICAL PIPING REMOVED, THE FOLLOWING SHAII OCCUR ANALOG OUTPUT CONTRACTOR SMALL OBTAIN FINS PER INCH LAWS, CODES, AND ORDINANCES RELATING TO BUILDING AND PUBLIC SAFETf. EIFC BELOW + ` 31 COUNG GIC GENMAI- CONTRACTOR EXISTING OPENING AND IS TO BE SECURED WITH SHEET METAL BF BELOW FLOOR, BLIND FLANGE GEF GENERAL EXHAUST COORDINATE THE EXACT LOCATION OF MECHANICAL AND PLUMBING EQUIPWNT WITH THE LOCATIONS OF LIGHT FIXTURES, PIPINCN BG BELOW GRADE GSF GENERAL Bv BUTTERFLY VALVE MVD MANUAL VOLUME DAMPER ASSEMBLY SCREVED IN PLACE. II �I CRU COMPUTER ROOM UNIT N NEW IT IS THE INTENT OF a.` DOCUMENTS C ] # ALLOW ALL CELING CONSTRUCTION ► HEIGHTS • BE r ON OCCUPANCIES AND WOIK CONTRACTOR SHALL COORDINATE WITH HOSPITAL ENTATIVE. CRU CONDENSATE RETURN UNIT OBD OPPOSED BLADE DAMPER PIPING AS RE# ',al M MEET CU CONDENSING ` I " R RELOCATED REPRESENTATIVE G. DI DIGITAL INPUT RA RETURN AIR PARTITION AND CEILING SYSTEM SUPPORM MERE INDEPENDENT SUPPORT IS NOT POSSIBLE AN ENGINEERED SUPPORT DO DIGITAL OUTPUT RCA RECIRCULATED (RETURN) AIR K ALL WOW SHALL BE SCHMULED AND PERFORMED IN STRICT COORDINATION WITH ARCHITECTURAL PHASING PLANS AND WITH DS DISCONNECT SWITCH RLA RELIEF AIR i EXISTING SA SUPPLY {" I ► ]1 OR NOT, LONGER ', • '',]I' ':EDH ELECTRIC DUCT HEATER UH UNIT HEATER WHERE REQUIRED. 3 ELECTRIC VAV VARIABLE - VOLUME DUCTWORK THAT HAS MISSING OR DAMAGED INSULA71ON PER SPECIFICATIONS EXHAUST . WH WATER HEATER ARCHITECT SHALL HAVE FINAL APPROVAL OF ALL GRILLE, DIFFUSER, AND THERMOSTAT LOCATIONS H. ANY PIPING AND DUCTWORK WHICH MUST REMAIN AS PART OF AN ACTIVE SYSTEM AND IS IN SUPPLY vmP WATER —SOURCE I`' M. COORDINATE ALL AIR DEVICE LOCATIONS AND MOUNTING FRAME STYLES WITH LIGHTING PLANS AND ARCHITECTURAIL REFLECTED EXHAUST FILTER MIXING BOX L ALL EXMTING DIFFLISERS. EQUIPMENT AND PIPING REMOVED ]i + :`, CONSTRUCTION SMALL N. CIA OUTSIDE IN HG INCHES MERCURY .., - CHW CHWED WATER IN WC INCHES WATER COLUMN (PRESSURE) UNLESS UNO NOTED OTHERWISE :' ]I M PRV PRESSURE RELIEF VALVE TAV THERMOSTATIC AIR VENT !SV SAFETY VALVE MA SYSTEM) li+]r AIR LE LAUNDRY EQUIPMENT DUCT rli DETECTOR FIRE DAMPER(S) i M r FIRE RATED ROOF/ FLOOR CE3UNG ASSEMBLY ED a + 1O CITY/STATE MIAMI , FLORIDA �62PUCABLE COUES: ;BUILDING !• !: 2009 REV. MEC i! !# HOSPITAL 1 2006 AIA GUIDELINES HEALTH CARE LATITUDE: DEG. i i r 1DEG. W. LONG. ;# 91/78 i #: MWB iA21RAE WINTER DESIQN CONDITIONS 9SIX rz iBUILDING SPACE DESIGN TEMPEHAJURES 72 SUMMER DB WINTER r- •8 i- ,SUPPLY ' lal „`a.� 1 is IDEG. F. DRY FIRE ALARM SEQUENCE OF OPERATION # ', ' ++ I” ► i I it tit i a lag AND COIJBINATION FIRE/SMOKE DAMPERS SERVING SYSTEMS THAT SHUT OFF UPON FIRE ALARM SMALL CLOSE DURING FIRE ALAFM " FIRE NAN FAN COIL UNIT (FCU-366) SHALL SHUT DOM. FCU-366 SHALL BE MONITORED BUILDING 1 I to E 1PI An �' r 0 FACILITY I yQ1001i � K %19 BONG USED ARE TO BE REMOVED BACK M THE MAIN t PATCHED AS PER ITEM B BELOW. MISDICTION. ALL EQUIPMENT, MATERIALS CONTROLS. ETMIALL BE NEW UNLESS NOTED OTHMWLT AND SMALL Ill ALL ] # Ait # • IF APPROVED BY THE OWNER, BE OF QUALITY AS REPRESENTED BY SCHEDULED M. B. PATCH OPENINGS i ] I INCL"G OPENINGS. WHERE TAPS OR DUCTWORK ARE M BE PAR'nAL THIRD FLOOR DEMOLITION PLAN — MECHANICAL PIPING REMOVED, THE FOLLOWING SHAII OCCUR EL CONTRACTOR SMALL OBTAIN LAWS, CODES, AND ORDINANCES RELATING TO BUILDING AND PUBLIC SAFETf. • OPMGS IN 1HE MAIN DUCTS ARE # BE COVERED WITH A SHEET METAL PATCH. THE PATCH IS M BE LARGER THAN THE Co CONTRACTOR SMALL FURNISH ALL MATERIALS, EWPMENT, AND LABOR REQUIRED FOR A COMPLETE WORMG AND COORDINATED EXISTING OPENING AND IS TO BE SECURED WITH SHEET METAL SYSTEM SCREWS FOUR INCHES ON CENTERS. D. COORDINATE THE EXACT LOCATION OF MECHANICAL AND PLUMBING EQUIPWNT WITH THE LOCATIONS OF LIGHT FIXTURES, PIPINCN CONDUIT, AND OTHER CONSTRUCTION, PROPER EQUIPMENT. • A LIBERAL CIUANTITY OF IN RESISTANT ADHESIVE IS TO BE APPLIED TO THE OF THE METAL PATCH AND THE E. COORDINATE THE LOCATION OF DUC7WORK AND PIPING WITH 07HER TRADES AND PROVIDE OFFSETS IN DUCTWORK AND PIPING AS ASSEMBLY SCREVED IN PLACE. II �I REQUIIRED. C. ALL •', SMALL BE PERFORMED `r COORDINATION WI7H H#ti„ SCHMULES. F. IT IS THE INTENT OF a.` DOCUMENTS C ] # ALLOW ALL CELING CONSTRUCTION ► HEIGHTS • BE r ON OCCUPANCIES AND WOIK CONTRACTOR SHALL COORDINATE WITH HOSPITAL ENTATIVE. ARCH17ECTURAL DRAWINGS. COORDINATE THE LOCATION OF DUCTWORK AND PIPING AND PROVIDE OFFSETS IN DUCTWCRK AND PIPING AS RE# ',al M MEET D- ALL _, HOSPITAL #3Ch. ! • # # t # ♦ SCHEDULED al REPRESENTATIVE G. CONDUIT, PIPING, AND DUCTWORK SMALL BE INDEPENDENTLY SUPPORTED. AND EACH SUPPORT SMALL BE INDEPENDENT OF PARTITION AND CEILING SYSTEM SUPPORM MERE INDEPENDENT SUPPORT IS NOT POSSIBLE AN ENGINEERED SUPPORT SYSTEM SHALL BE UTILIZED. FIEID VERIFY 1 AND LOCATIONS OF ALL EXISTING DUCTWORK + PIPING PF40R TO DEMOLITION OF EXISTING r'+ DEMOLITION W1', K ALL WOW SHALL BE SCHMULED AND PERFORMED IN STRICT COORDINATION WITH ARCHITECTURAL PHASING PLANS AND WITH COORDINATED W11H THE NEW WORK M ASSURE DEMOLITION. v SCHEDULES, OCCUPi AND i F. REMOVE ALL EXMTNG SPECIFICALLY • WHETHER I ► ]1 OR NOT, LONGER ', • '',]I' L REMOVE >t, #3.`* MATERIAL AND DEBRIS AND CLEAN ALL EWPMENT UPON COMPLETION OF • i MUCH G. REMOVE AND CAP EXISTING BRANCH PIPING AND DUCTWORK NO LONGER REQUIRED M WHERE REQUIRED. REMAIN I RONSULATE PIPING AND K ALL CONNECTION 5 OF MATERIALS DUCTWORK THAT HAS MISSING OR DAMAGED INSULA71ON PER SPECIFICATIONS L ARCHITECT SHALL HAVE FINAL APPROVAL OF ALL GRILLE, DIFFUSER, AND THERMOSTAT LOCATIONS H. ANY PIPING AND DUCTWORK WHICH MUST REMAIN AS PART OF AN ACTIVE SYSTEM AND IS IN 1 CONFLICT #' SHAII BE RELOCATED AT NO ADDITIONAL COST OVER THE M. COORDINATE ALL AIR DEVICE LOCATIONS AND MOUNTING FRAME STYLES WITH LIGHTING PLANS AND ARCHITECTURAIL REFLECTED CONTRACT AMOUNT. CEILING PLANS. L ALL EXMTING DIFFLISERS. EQUIPMENT AND PIPING REMOVED ]i + :`, CONSTRUCTION SMALL N. COORDINATE ALL WALL Mr 3► DEVICE # • ARCHITECTURAL ]' #' ELEVATIONS, •., P. PROVIDE ROUND DUCTS TO ALL AIR DEVICES UNLESS NOTED OTHERWISE. DUCT SIZE SMALL MATCH I` DEVICE NECK SIZE OR THE TARE IN AIR DEVICE SCHEDULE, WHICHEVER IS LARGER. FLEXIBLE DUCTS SMALL BE S12ED Q PROVIDE • DAMPER IN EACH DEVICE RUNOUT - OUT DUCT AS FAR FROM DEVICE AS POSSIBLE. 8 BRICKELL AVENUE, 6TH FLOOR MIAMI, FL 33131 t 1 GENMAI- INFORMATION — MECHANICAL ► i `'� I V fill a 11. 113 I PAR'nAL THIRD FLOOR DEMOLITION PLAN — MECHANICAL PIPING ill ll`!1 PARTIAL THIRD FLOOR PLAN — MECHANICAL PIPING [ I Illlw ' �r jlm NUT 4 r mul M IM! II �I PARTIAL THIRD FLOOR MEDiANICAL ICRA PLAN I 8 BRICKELL AVENUE, 6TH FLOOR MIAMI, FL 33131 KEY PLAN R"o, �, s.� • • 1 # 1 ISSUE �• 1, i • +rf +. Aft i 1 KEY PLAN R"o, �, s.� • • 1 # 1 ISSUE �• 1, i