Loading...
11-580REV-003II i (o ua rx 0 0 4 RENOVATION GENERAL NOTES FLOOR PLAN GENERAL NOTES 0 EXISTING EXHAUST DUCT TO REMAIN AND COORDINATE TO I - REFER TO SHEET A3.01 FOR PARTITION TYPES, GRAPHIC' KK ACCOMODATE NEW WORK INSIDE POST PARTUM ROOMS AND AND SYMBOLIC DESIGNATIONS,NOTES AND DETAILS. POST PARTUM CORRIDOR, Q PROVIDE NEW RE-HEAT COILS, DIFFUSERS, AND DUCTWORK IN THE 2 - REFER TO SHEET A3.20 FOR TYPICALTOILET LAYOUTS AND TOILET ACCESORY MOUNTING DIAGRAMS. POST PARTUM ROOMS, SERVED FROM THE NEW AIR HANDLING UNIT BEING INSTALLED UNDER THE SMH NICU 11 PROJECT. 3 - REFER TO SHEET A3.20 FOR WALL PROTECTION TYPEEAND (D PROVIDE NEW ACOUSTICAL CEILING TILES INSIDE POST PARTUM DETAILS, ROOM, CEILING INSIDE BATHROOM TO REMAIN. 4 - REFER TO SHEET A3,20 FOR LOCKER TYPE SCHEDULE.- PROVIDE NEW LIGHT FIXTURES INSIDE THE POST PARTUM ROOM 5 - REFER TO SHEET A3.30 FOR DOOR INFORMATION, (MULTIFUNCTION) AND BATHROOM (WALL MOUNTED) SCHEDULES AND DETAILS. INSTALL NEW FLOORING INSIDE POSTPARTUM ROOM AND 6 - REFER TO SHEET A3,50/A3.51 FOR CASEWORK DETAILS AND BATHROOM, WITH NEW THRESHOLD IN BATHROOM, INFORMATION, (D INSTALL NEW BATHROOM TILE, INCLUDING WALL TILE AND SHOWER 7 - REFER TO SHEET A3,52 FOR INTERIOR ELEVATIONS AND PAN WITH FULL SHLUTTER, CASEWORK ELEVATIONS. INSTALL NEW DRAIN, SHOWER VALVES AND FIXTURES, NIGHT LIGHTS INSIDE POST PARTUM ROOMS TO REMAIN. PROVIDE NEW HVAC CONTROLS GPAINT ALL POST PARTUM ROOMS AND BATHROOMS, Teti AVAIMMMEMIM THIRD FLOOR PLAIK 0 1 1/8" = V-0" 02011 HIES, INC, BOCA RATON, FL 33431 SHEET TITLE THIRD FLOOR PLAN CJ+��IK3 rl SHEET TITLE THIRD FLOOR PLAN CJ+��IK3