11-580REV-003II
i
(o
ua
rx
0
0
4
RENOVATION GENERAL NOTES
FLOOR PLAN GENERAL NOTES
0
EXISTING EXHAUST DUCT TO REMAIN AND COORDINATE TO
I - REFER TO SHEET A3.01 FOR PARTITION TYPES, GRAPHIC' KK
ACCOMODATE NEW WORK INSIDE POST PARTUM ROOMS AND
AND SYMBOLIC DESIGNATIONS,NOTES AND DETAILS.
POST PARTUM CORRIDOR,
Q
PROVIDE NEW RE-HEAT COILS, DIFFUSERS, AND DUCTWORK IN THE
2 - REFER TO SHEET A3.20 FOR TYPICALTOILET LAYOUTS AND
TOILET ACCESORY MOUNTING DIAGRAMS.
POST PARTUM ROOMS, SERVED FROM THE NEW AIR HANDLING UNIT
BEING INSTALLED UNDER THE SMH NICU 11 PROJECT.
3 - REFER TO SHEET A3.20 FOR WALL PROTECTION TYPEEAND
(D
PROVIDE NEW ACOUSTICAL CEILING TILES INSIDE POST PARTUM
DETAILS,
ROOM, CEILING INSIDE BATHROOM TO REMAIN.
4 - REFER TO SHEET A3,20 FOR LOCKER TYPE SCHEDULE.-
PROVIDE NEW LIGHT FIXTURES INSIDE THE POST PARTUM ROOM
5 - REFER TO SHEET A3.30 FOR DOOR INFORMATION,
(MULTIFUNCTION) AND BATHROOM (WALL MOUNTED)
SCHEDULES AND DETAILS.
INSTALL NEW FLOORING INSIDE POSTPARTUM ROOM AND
6 - REFER TO SHEET A3,50/A3.51 FOR CASEWORK DETAILS AND
BATHROOM, WITH NEW THRESHOLD IN BATHROOM,
INFORMATION,
(D
INSTALL NEW BATHROOM TILE, INCLUDING WALL TILE AND SHOWER
7 - REFER TO SHEET A3,52 FOR INTERIOR ELEVATIONS AND
PAN WITH FULL SHLUTTER,
CASEWORK ELEVATIONS.
INSTALL NEW DRAIN, SHOWER VALVES AND FIXTURES,
NIGHT LIGHTS INSIDE POST PARTUM ROOMS TO REMAIN.
PROVIDE NEW HVAC CONTROLS
GPAINT
ALL POST PARTUM ROOMS AND BATHROOMS,
Teti
AVAIMMMEMIM
THIRD FLOOR PLAIK
0 1 1/8" = V-0"
02011 HIES, INC,
BOCA RATON, FL 33431
SHEET TITLE
THIRD FLOOR
PLAN
CJ+��IK3
rl
SHEET TITLE
THIRD FLOOR
PLAN
CJ+��IK3