Loading...
11-580REV-002I! Ill; to] 4 1 am== J... ... .. ... . .... .. .... I MY TYPICAL GENERAL NOTES TYPICAL DEMOLITION NOTES I - THE CONSTRUCTION DRAWINGS SHOW THE LIMITS OF CONSTRUCTION BARRIERS, CONSTRUCTION ACCESS ROUTES FOR WORKERS, MATERIALS, AND REMOVE EXISTING WALLS) AS INDICATED, INCLUDING TRASH. .. . ......... ALL DOORS, ELECTRICAL, DATA. REMOVE EXISTING THAT WILL MINIMIZE THE AMOUNT OF DISTURBANCE TO THE EXISTING HOSPITAL OPERATIONS, ALL WORK AREAS SHOULD BE SURROUNDED BY 6 MIL POLY E EC ROOM CEILINGS, CASEWORK AND FLOOR FINISHES, ALL 2 - HEAVY SOLID LINES INDICATE CONSTRUCTION PARTITIONS, DUST MIGRATION, EXISTING STRUCTURE TO REMAIN. 3 - DASHED LINES INDICATE EXTENT OF DEMOLITION. EDITION, NFPA 10 2002 EDITION, NFPA 72 2002 EDITION, NFPA 101-CHAPTER 18 AND NFPA 241 DURING TEMPORARY CONSTRUCTION, CONTRACTOR TO 2 REMOVE ALL PLUMBING FIXTURES IN THEIR ENTIRETY, CAP 4 - ONLY THE WORK INDICATED BY THE NUMBERED DEMOLITION NOTES SHALL BE DONE IN THE ROOMS DESIGNATED IN THE PLANS. CONTRACTOR TO MAINTAIN FULLY SPRINKLERED BUILDING DURING CONSTRUCTION. PLUMBING LINES UNDER SLAB LINE, PATCH AND REPAIR FLOOR TO ACCEPT NEW FLOOR FINISH, 2t 5/8, 18 - WHEREA REQUIRED FIRE ALARM SYSTEM IS OUT OF SERVICE FOR MORE THAN 4 HOURS INA24-HOUR PERIOD, THE AUTHORITY HAVING JURISDICTION SHALL BE NOTIFIED, AND THE BUILDING SHALL BE EVACUATED OR AN APPROVED FIRE WATCH SHALL BE PROVIDED FOR ALL PARTIES LEFT UNPROTECTED 5 - I HR FIRE-RATED TEMPORARY CONSTRUCTION PARTITION (REF. AD.01 FOR DETAIL AND FOR LOCATION). TEMPORARY CONSTRUCTION BARRIER NEEDS BY THE SHUTDOWN UNTIL THE FIRE ALARM SYSTEM HAS BEEN RETURNED TO SERVICE, 3 REMOVE EXISTING DOOR, FRAME AND HARDWARE, TO BE INSTALLED FOR THE CONTAINMENT OF DUST. JURISDICTION SHALL BE NOTIFIED, AND THE BUILDING SHALL BE EVACUATED OR AN APPROVED FIRE WATCH SHALL BE PROVIDED FOR ALL PARTIES LEFT UNPROTECTED BY THE SHUTDOWN UNTIL THE SPRINKLER SYSTEM HAS BEEN RETURNED TO SERVICE. 6 - CONTRACTOR TO PROVIDE AND MAINTAIN NEGATIVE PRESSURE RELATIONSHIP BETWEEN DEMOLITION/CONSTRUCTION AREA AND EXISTING HOSPITAL 4 REMOVE FLOOR FINISH AS REQUIRED, CLEAN AND AT ALL TIMES. NEGATIVE PRESSURE SHALL BE MAINTAINED PRIOR TO ANY DEMOLITION/CONSTRUCTION WORK, A MANOMETER SHALL BE USED TO VERIFY PREPARE FLOOR SUBSTRATE FOR NEW FLOOR, PRESSURES AND A DAILY LOG SHALL BE MAINTAINED, CONTRACTOR MAY USE NEGATIVE PRESSURE HERA FILTERED AIR MACHINES OR EXHAUST AIR DIRECTLY TO THE OUTSIDE, REMOVE SUSPENDED CEILING AND LIGHTING FIXTURES AS REQUIRED 7 - CONTRACTOR TO ENSURE THAT LOCATION OF DEMOLITION /CONSTRUCTION EXHAUST IS NOT WITHIN 25 FT, OF HOSPITAL FRESH AIR INTAKE, 1 6 1 EXISTING CEILING TO REMAIN IN THIS AREA, 8 - THIRD PARTY INSPECTION IS REQUIRED TO DOCUMENT THAT THE CONSTRUCTION BARRIERS ARE OPERATIONAL AND NEGATIVE AIR MACHINES ARE WORKING AS NEEDED EACH DAY, 7 1 EXISTING 4" SANITARY PIPE TO REMAIN, 9 - OWNER TO REMOVE ALL EXISTING FURNITURE WITHIN ROOMS IN WHICH RENOVATION WORK IS TO OCCUR. REMOVE EXISTING WALL FINISHES AND LIGHTING FIXTURES. 10 - CONTRACTOR MUST COMPLY TO ALL APPLICABLE CODE REQUIREMENTS AND SPECIFICALLY TO: (NFPA 101 LIFE SAFETY CODE 2006 EDITION-CHAPTER 18 SECTION 18,7.9.2 AND NFPA 241-2000 EDITION - SAFEGUARDING CONSTRUCTION, REPAIR AND IMPROVEMENT OPERATIONS.) 9 REPLACE DOOR AND HARDWARE, FRAME TO REMAIN, 11 - CONTRACTOR IS TO MAINTAIN ALL LIFE SAFETY REQUIREMENTS INCLUDING EGRESS AT ALL TIMES DURING THE WORK IN ACCORDANCE WITH NFPA 101 CHAPTER 18, NFPA 241, AND ALL OTHER APPLICABLE CODES. 12 - CONSTRUCTION PERSONNEL AND MATERIALS MUST ADHERE AND ONLY ACCESS CONSTRUCTION AREA THROUGH THE CONSTRUCTION ROUTE, CONTRACTOR TO PROVIDE AND MAINTAIN A SAFE, PROTECTED AND UNOBSTRUCTED ROUTE AT ALL TIMES IN ACCORDANCE WITH NFPA 101- CHAPTER 18, NFPA 241, (REFERENCE APHA 1-14 FOR PATH) 13 - COVER ALL EXISTING DOORS TO REMAIN IN DEMOLITION AREAS WITH 6 MILL POLY AND SEAL ALL SEAMS AND EDGES WITH 3" DUCT TAPE TO LIMIT DUST TRANSFER TO EXISTING ROOMS PRIOR TO DEMOLITION/CONSTRUCTION, CONTRACTOR TO VERIFY WITH SMOKE LEAK TEST. 14 - PROVIDE 6 MIL POLY. ZIPPER DUST BARRIER OVER DOOR AT CONSTRUCTION ENTRY TO LIMIT DUST MIGRATION PRIOR TO DEMOLITION/CONSTRUCTION. DOORS TO REMAIN CLOSED AT ALL TIMES WHEN NOT IN USE, 15 - INSTALL TEMPORARY 6 MIL PLASTIC CONSTRUCTION BARRIER AROUND THE CONSTRUCTION ZONE OF EACH DUST PARTITION TO MINIMIZE DUST MIGRATION, PROVIDE NEGATIVE AIR MACHINE ON EACH SIDE OF BARRIER. .. . ......... 16 - CONTRACTOR TO COORDINATE ALL WORK ABOVE THE CEILING OUTSIDE OF CONSTRUCTION WALLS AND DEVELOP A SCHEDULE WITH THE OWNER THAT WILL MINIMIZE THE AMOUNT OF DISTURBANCE TO THE EXISTING HOSPITAL OPERATIONS, ALL WORK AREAS SHOULD BE SURROUNDED BY 6 MIL POLY E EC ROOM AND ALL SEAMS TAPED TO MINIMIZE DUST MIGRATION, BLOCK ALL EXISTING MECHANICAL SUPPLY AND RETURN VENTS IN CONSTRUCTION AREA TO PREVEN F DUST MIGRATION, 17 - CONTRACTOR TO VERIFY LOCATIONS OF SPRINKLER HEADS AND LIFE SAFETY DEVICES IN ACCORDANCE WITH THE REQUIREMENTS OF NFPA 13 2002 EDITION, NFPA 10 2002 EDITION, NFPA 72 2002 EDITION, NFPA 101-CHAPTER 18 AND NFPA 241 DURING TEMPORARY CONSTRUCTION, CONTRACTOR TO ROOM 2A TEMPORARILY RELOCATE OR ADD SPRINKLER HEADS OR OTHER LIFE SAFETY DEVICES AS REQUIRED DUE TO TEMPORARY CONSTRUCTION BARRIERS, CONTRACTOR TO MAINTAIN FULLY SPRINKLERED BUILDING DURING CONSTRUCTION. IF 2t 5/8, 18 - WHEREA REQUIRED FIRE ALARM SYSTEM IS OUT OF SERVICE FOR MORE THAN 4 HOURS INA24-HOUR PERIOD, THE AUTHORITY HAVING JURISDICTION SHALL BE NOTIFIED, AND THE BUILDING SHALL BE EVACUATED OR AN APPROVED FIRE WATCH SHALL BE PROVIDED FOR ALL PARTIES LEFT UNPROTECTED L16) BY THE SHUTDOWN UNTIL THE FIRE ALARM SYSTEM HAS BEEN RETURNED TO SERVICE, 19 - WHERE A REQUIRED AUTOMATIC SPRINKLER SYSTEM IS OUT OF SERVICE FOR MORE THAN 4 HOURS IN A 24-HOUR PERIOD, THE AUTHORITY HAVING CORRIDOR c JURISDICTION SHALL BE NOTIFIED, AND THE BUILDING SHALL BE EVACUATED OR AN APPROVED FIRE WATCH SHALL BE PROVIDED FOR ALL PARTIES LEFT UNPROTECTED BY THE SHUTDOWN UNTIL THE SPRINKLER SYSTEM HAS BEEN RETURNED TO SERVICE. .......... .. ............ ............... . ... ..... ...... ........... ......... I MULTI-PURPOSE VAL ROOM WORK AREA 8 0 1/8' 4t7 L o-, . ...... ................. . TT- REMOVE EXISTING A/C FAN COIL UNITS AND "PIPING7 REMOVE EXISTING DUCTWORK IN POST PARTUM COR'PlIO0F EL EV 3 I r '. EL EV 4 ELEVATOR LOBBY EXISTING E EC ROOM ELEV 5 PIP I BLOOD GAS MED ROOM 10 11 [1)2 1'3j IF 2t 5/8, L16) TT- REMOVE EXISTING A/C FAN COIL UNITS AND "PIPING7 REMOVE EXISTING DUCTWORK IN POST PARTUM COR'PlIO0F EL EV 3 I r '. EL EV 4 ELEVATOR LOBBY . .... ......... .......... . MECH .. MATERIALS ROUTE THIRD FLOOR DEMO PLAN 0 02011 HKS, INC, REVISION NO, DESCRIPTION DATE COORDINATION 2 ___PC-02 05,04.2012 HKS PROJECT NUMBER 14262.000 DATE 06003.2011 ISSUE 71F�ERMIT SlEli F �il IS STAIR 3 IF . .... ......... .......... . MECH .. MATERIALS ROUTE THIRD FLOOR DEMO PLAN 0 02011 HKS, INC, REVISION NO, DESCRIPTION DATE COORDINATION 2 ___PC-02 05,04.2012 HKS PROJECT NUMBER 14262.000 DATE 06003.2011 ISSUE 71F�ERMIT SlEli F �il IS