Loading...
11-489-004INLET PLENUM i ( S l an = i . r PAr • `1 / � r r r; r ml A At 1 r r i t l 04 NU r SCRUBBER r CHART r r r r CONSTRUCTION s VENTILATION CONSTRUCTION CONTAINMENT <=8 FEET VENTILATION NOTES r iW FLOOR AREA CEILING PLAN BALANCE y CEILING CEILING 9PAS MODEL r AT 2100/700 CFM. FILTRATION REQUIRED Ca/Cb/Cd, (SO. FT.) HEIGHT HEIGHT HEIGHT + AMPS FILTRATION MODEL � r r a �� � 1. � r i 1 r a ► !t r FROM O i O OF r � RISK ASSESSMENT i • i ! a r CONSTRUCTION AREA a � r J ai a l i r ADJUSTING AND BAL THE ANCING t REQUIREMENTS i r b r PERFORM r rr • r AT 600/50 r II III I THOSE r • r ADHERE SHALL a a � a a � r i TYPED FOLLOWING INFORMATION: THE CONSTRUCTION AREA, AND WHERE PHASING APPLIES SHALL ADHERE TO THE NOTE: AIRFLOW REDUCTION ALLOWANCE OF 15% FOR EXHAUST DUCT COLLAR AND 25 w • ! # � PHASING PLAN. COORDINATED A.) SPEED SETTING OF ! ADDITIONAL FEET WITH THE i AIRFLOW y i* OWNER PERFORMED IN # i ACCORDANCE REPORT, UNDER aay1. EXHAUST. FOR r• O OF DUCT. PAS MODEL 00 THE SUPERVISION OF OWNER'S ICRA REQUIRES A 101 ROUND CONNECTION COLLAR AND PAS MODEL 2400 REQUIRED COMMITTEE OFFICER. B.) i • a' READING OF ALL AIR SCRUBBER GAUGES. PRESSURE + ROUND CONNECTION COLLAR. i ri } r 1. } * { } V D.) VERIFY ROOM PRESSURE DIFFERENTIAL MONITORS LOCATED NEAR DOORWAY ENTRANCE TO CONSTRUCTION ZONE ARE READING WITHIN +/- 10% OF FIELD READINGS OF ITEM 3 ABOVE. E.) VERIFY THREE ALARM r , FUNCTIONING ON ROOM PRESSURE CONSTRUCTION O NEGATIVE PRESSURE 1. MINIMUM NEGATIVE PRESSURE IN CONSTRUCTION ZONE PER OWNER'S r ' f r � i f i } # , y i i a ♦ r� a a a BELOW 1# • • REQUIREMENTS 0.02' ANY DEFICIENCIES IN MEETING THE OWNER'S f REQUIREMENTS FOR AIR. ADJUST DISCHARGE # i VOLUME O * a NEGATIVE PRESSURE MACHINE O RELATIVE NEGATIVE OR „ } i a BE OF 0.02* PRESSURE • r r' ROOM i IDENTIFIED FINAL REPORT. i i i' DIFFERENTIAL MONITOR r Y MAXIMUM 0.04' NEGATIVE PRESSURE 3. DISCHARGE AIR TO ADJACENT ZONE ACCEPTABLE PROVIDED THE AIR IS PASSED THROUGH , r , FILTER • •. OWNERS • , REQUIREMENTS. VERIFY ALL EXISTING DUCTWORK THROUGH CONSTRUCTION AND REMAIN, SEALED AND PROTECTED EQUIPMENT SPECIFICATIONS DURING CONSTRUCTION DURATION. COVER AND 1 ALL DIFFUSERS, SCRUBBER SIZES ARE BASED ON ACHIEVING A MINIMUM REGISTERS , GRILLES. 1. ROOM PRESSURE MONITOR - ABATEMENT TECHNOLOGIES MODEL HCRPM-3N2 OF 10 AIR CHANGES/HR IN THE CONTAINMENT AREA PER AIR REMOVED FROM THE CONSTRUCTION SHALL BE • r AND/OR # r * . •. :r ♦ OR EQUIVALENT. t # r * S r FOLLOWING FEATURES: HOSPITALS • , REQUIREMENTS. REFER r DISCHARGED a i # i CONSTRUCTION i i ZONE VENTILATION SCRUBBER T i SCHEDULE AND SP A.) WALL MOUNT, r DISPLAY, O a " 400 AMPS. * 0 t a.:: PLAN. THIS SHEET FOR SCRUBBER INFORMATION AND CAPACITY. R , r i PLUG-IN i VERIFY NEGATIVE PRESSURE IS BEING MAINTAINED IN B.) ACCURACY +/- 1% OF SCALE, ALARM ACCURACY 1% OF SETPOINT. MONITOR ACCORDANCE ! WITH THE ICRA REPORT. , r PROVIDE DOCUMENTATION OWNER a REQUIRED. LOCAL/REMOTE a a ALARM SPOT * 1 r REMOTE. CONTACTS THAN * EQUAL �, WITH RATED FOR 1 AMPS t i VAC. 4. COORDINATE IN ADVANCE a REQUIRED ► • rr OWNER, r ADJUSTABLE t a * DELAY SET FOR THREE MAXIMUM AND VERIFY i ! i SHUTDOWN a Y r DESIRED t i PRESSURE AUTO CALIBRATION DATE J r MEMORY #. ALARMS. RELATIONSHIPS NOT BE ADVERSALY AFFECTED. L ME r' DATE 05-0; REVISED