11-489-004INLET PLENUM
i
( S l an = i .
r
PAr • `1 / � r r r; r ml
A
At 1 r r i t l 04 NU
r SCRUBBER r CHART
r
r
r r
CONSTRUCTION s
VENTILATION
CONSTRUCTION
CONTAINMENT <=8 FEET
VENTILATION NOTES r iW
FLOOR AREA CEILING
PLAN BALANCE
y
CEILING CEILING
9PAS MODEL r AT 2100/700 CFM. FILTRATION REQUIRED Ca/Cb/Cd, (SO. FT.) HEIGHT HEIGHT HEIGHT
+ AMPS
FILTRATION
MODEL � r r a �� �
1.
� r i 1 r a ► !t r FROM O i O OF r
�
RISK ASSESSMENT i • i ! a r CONSTRUCTION AREA
a � r J ai a l
i r ADJUSTING AND BAL
THE ANCING
t REQUIREMENTS i r b r PERFORM
r
rr • r AT 600/50
r
II
III I
THOSE r • r ADHERE SHALL a a � a a � r i
TYPED
FOLLOWING INFORMATION:
THE CONSTRUCTION AREA, AND WHERE PHASING APPLIES SHALL ADHERE TO THE NOTE: AIRFLOW REDUCTION ALLOWANCE OF 15% FOR EXHAUST DUCT COLLAR AND 25
w
•
! # �
PHASING PLAN.
COORDINATED
A.) SPEED SETTING OF ! ADDITIONAL FEET WITH THE i AIRFLOW y i*
OWNER
PERFORMED IN
#
i ACCORDANCE REPORT, UNDER
aay1.
EXHAUST.
FOR r• O OF DUCT. PAS MODEL 00
THE SUPERVISION OF OWNER'S ICRA REQUIRES A 101 ROUND CONNECTION COLLAR AND PAS MODEL 2400 REQUIRED
COMMITTEE OFFICER. B.) i
•
a' READING OF ALL AIR SCRUBBER GAUGES. PRESSURE + ROUND CONNECTION COLLAR.
i ri } r 1. } * { } V
D.) VERIFY ROOM PRESSURE DIFFERENTIAL MONITORS LOCATED NEAR DOORWAY
ENTRANCE TO CONSTRUCTION ZONE ARE READING WITHIN +/- 10% OF FIELD
READINGS OF ITEM 3 ABOVE.
E.) VERIFY THREE ALARM r , FUNCTIONING ON ROOM PRESSURE CONSTRUCTION O NEGATIVE PRESSURE
1. MINIMUM NEGATIVE PRESSURE IN CONSTRUCTION ZONE PER OWNER'S
r ' f r � i f i } # , y i i a ♦ r� a a a
BELOW 1# • • REQUIREMENTS 0.02'
ANY DEFICIENCIES IN MEETING THE OWNER'S f REQUIREMENTS FOR AIR.
ADJUST DISCHARGE # i VOLUME O * a NEGATIVE PRESSURE
MACHINE O
RELATIVE NEGATIVE OR „ } i a
BE OF 0.02* PRESSURE • r r'
ROOM
i IDENTIFIED FINAL REPORT.
i i i' DIFFERENTIAL MONITOR r Y MAXIMUM 0.04' NEGATIVE
PRESSURE
3. DISCHARGE AIR TO ADJACENT ZONE ACCEPTABLE PROVIDED THE AIR IS PASSED
THROUGH , r , FILTER • •. OWNERS • , REQUIREMENTS.
VERIFY ALL EXISTING DUCTWORK THROUGH
CONSTRUCTION AND REMAIN, SEALED AND PROTECTED
EQUIPMENT SPECIFICATIONS
DURING CONSTRUCTION DURATION. COVER AND 1 ALL DIFFUSERS,
SCRUBBER SIZES ARE BASED ON ACHIEVING A MINIMUM
REGISTERS , GRILLES.
1. ROOM PRESSURE MONITOR - ABATEMENT TECHNOLOGIES MODEL HCRPM-3N2 OF 10 AIR CHANGES/HR IN THE CONTAINMENT AREA PER
AIR REMOVED FROM THE CONSTRUCTION SHALL BE • r AND/OR # r * . •. :r ♦ OR EQUIVALENT.
t # r * S r FOLLOWING FEATURES: HOSPITALS • , REQUIREMENTS. REFER
r
DISCHARGED a i # i CONSTRUCTION i i ZONE VENTILATION SCRUBBER T i SCHEDULE AND SP
A.) WALL MOUNT, r DISPLAY, O a "
400 AMPS. * 0 t a.::
PLAN. THIS SHEET FOR SCRUBBER INFORMATION AND CAPACITY.
R , r i
PLUG-IN i VERIFY NEGATIVE PRESSURE IS BEING MAINTAINED IN B.) ACCURACY +/- 1% OF SCALE, ALARM ACCURACY 1% OF SETPOINT.
MONITOR ACCORDANCE ! WITH THE ICRA REPORT. , r PROVIDE DOCUMENTATION
OWNER a REQUIRED. LOCAL/REMOTE a a ALARM SPOT * 1 r REMOTE. CONTACTS THAN * EQUAL �, WITH
RATED FOR 1 AMPS t i VAC.
4. COORDINATE IN ADVANCE a REQUIRED ► • rr OWNER, r ADJUSTABLE t a * DELAY SET
FOR THREE MAXIMUM
AND VERIFY i ! i SHUTDOWN a Y r DESIRED t i PRESSURE AUTO CALIBRATION DATE J r MEMORY #. ALARMS.
RELATIONSHIPS NOT BE ADVERSALY AFFECTED.
L
ME
r'
DATE 05-0;
REVISED