Loading...
11-489-002r LID 12 �a w i # y.., r t. a r • a r. .. • • ♦ � i i , i i • ". . SCHEDULE NEW CONSTRUCTION #i OWNER WELL IN ADVANCE. # r r I I a a Ilf-11:11SIMALINKAV 11111 r DUCTWORK NO DUCT SMOKE DETECTOR(S) X X SUPPLY DUCTWORK X RETURN OR EXHAUST X DUCTWORK 340 SUPPLY DIFFUSER X AIR QUANTITY 120 R. --- -- RETURN GRILLE & AIR X QUANTITY - CONICAL TEE CONN. BELLOUTH CONN. 450 THROAT TAP BRANCH CONNECTION W PR RADIUS ELBOW R /W -1. I�Z �__ TURNING VANES IN ELBOW M.V.D. MANUAL VOL. DAMPER # r # 11 ill , !i •!r # •! # 2#1111 N a IT, 13 11 . , ill • DUCTWORK 1. INTERIOR SUPPLY AND RETURN AIR DUCTWORK IN CEILING SPACE ROOF INSULATION r R-6.0 FIBERGLASS. "m Eli s ii r� YES N NO DUCT SMOKE DETECTOR(S) X X FIRE DAMPER(S) X X SMOKE DAMPER(S) X X FIRE RATED ENCLOSURE X X FIRE RATED ROOF /FLOOR CEILING ASSEMBLY X X FIRE STOPPING (SEE ARCH.) X X SMOKE CONTROL X X m 1. AIR DEVICE SIZES & SCHEDULED AIRFLOW ARE SCHEDULE OTHERWISE NOTED ON HVAC FLOOR PLANS. 3. ALL i • DEVICES # INSTALLED INACCESSIBLE 1 # DRYWALL SHALL BE PROVIDED MANUAL F• r BLADE DAMPERS. 4- ALL AIR DEVICES INSTALLED IN ACCESSIBLE AND/OR LAY—IN CEILINGS SHALL HAVE A MANUAL VOLUME DAMPER INSTALLED BRANCH TAKE—OFF. BRANCH 5. MAXIMUM PRESSURE DROP FOR ALL t• DEVICES SHALL NOT # 0.10 IN. W.G. t• TO i r: r a a- DEVICES SHALL BE WHITE UNLESS OTHERWISE NOTED. ROUND ADAPTER 7. MAXIMUM RATING FOR a ♦. • DEVICES SHALL # EXCEED r 8. ALL AIR DEVICES SHALL BE ALUMINUM CONSTRUCTION UNLESS OTHERWISE NOTED. 9. THROW VALUES ARE FOR TERMINAL VELOCITIES OF 100 s: # s 1. .. i i# OR GRILLE MFGR & MODEL FACE SIZE BRANCH DUCT SIZE MODULE TITUS GI 0I 0 - �L �IIII � �,� Idyl �� � �� U I� � Uq � �I �� �I �� �I� ��� � I • IMI I TITUS S� it MI I� III �I lOxIO � III � � � �I � III � MI I �► � MCI IIII MI � �!Iil� ����iu u������� u(�� Ir • � 1 r • � • i 11 Ft I IT, 1:41 ?R1148 1111012:101 oixilm-130 W ol r r s' •', r a a.. a r a r r a s r r r: • •. 1. THE CONTRACTOR SHALL PROTECT THE INTERIOR OF ALL DUCTWORK AND AIR HANDLING UNITS FROM THE ACCUMULATION OF DIRT AND DUST USUALLY ASSOCIATED WITH THE FINISHING STAGES OF THE CONSTRUCTION WORK. EQUIPMENT SUPPLY AIR RETURN AIR EXHAUST AIR OUTSIDE AIR EXIST/NEW EXIST/NEW EXIST/NEW EXIST/NEW AHU —EN 6400 / 8500 5900 / 6000 — 2500 / 2500 AHU —ES 7650 / 7750 3600 / 3900 — 3650 / 3650 AHU —NE 11275 / 11475 7350 / 7550 — 3925 / 3925 AHU —NW 9250 / 9300 7050 / 7100 — 2200 / 2200 AHU —SE 10250 / 10300 8650 / 8700 — 1600 ! 1600 AHU —SW 10500 / 10650 7250 / 7400 — 3250 / 3250 AHU -2 -1 1400 / 1450 1200 /1250 — 200 / 200 DRAWING INDEX SHEET SHEET TITLE NUMBER O.1 HVAC SCHEDULES, NOTES, LEGEND AND DRAWING INDEX MO.2 HVAC SPECIFICATIONS M1.0 CONSTRUCTION ZONE SCHEDULES, NOTES AND DETAILS M1.1 SECOND FLOOR CONSTRUCTION ZONE VENTILATION PLAN M1.2 THIRD FLOOR CONSTRUCTION ZONE VENTILATION PLAN M1.3 FOURTH FLOOR CONSTRUCTION ZONE VENTILATION PLAN 1.4 FIFTH FLOOR CONSTRUCTION ZONE VENTILATION PLAN M1.5 SIXTH FLOOR CONSTRUCTION ZONE VENTILATION PLAN M2.1 SECOND FLOOR PLAN — DUCTWORK — HVAC M2.2 THIRD FLOOR PLAN — DUCTWORK — HVAC 2.3 FOURTH FLOOR PLAN — DUCTWORK — HVAC 2.4 FIFTH FLOOR PLAN — DUCTWORK — HVAC M2.5 SIXTH FLOOR PLAN — DUCTWORK — HVAC M3.1 HVAC DETAILS F ®i • e®1 r CHECKED DATE 05-05-11 r • � • i 11 Ft I IT, 1:41 ?R1148 1111012:101 oixilm-130 W ol r r s' •', r a a.. a r a r r a s r r r: • •. 1. THE CONTRACTOR SHALL PROTECT THE INTERIOR OF ALL DUCTWORK AND AIR HANDLING UNITS FROM THE ACCUMULATION OF DIRT AND DUST USUALLY ASSOCIATED WITH THE FINISHING STAGES OF THE CONSTRUCTION WORK. EQUIPMENT SUPPLY AIR RETURN AIR EXHAUST AIR OUTSIDE AIR EXIST/NEW EXIST/NEW EXIST/NEW EXIST/NEW AHU —EN 6400 / 8500 5900 / 6000 — 2500 / 2500 AHU —ES 7650 / 7750 3600 / 3900 — 3650 / 3650 AHU —NE 11275 / 11475 7350 / 7550 — 3925 / 3925 AHU —NW 9250 / 9300 7050 / 7100 — 2200 / 2200 AHU —SE 10250 / 10300 8650 / 8700 — 1600 ! 1600 AHU —SW 10500 / 10650 7250 / 7400 — 3250 / 3250 AHU -2 -1 1400 / 1450 1200 /1250 — 200 / 200 DRAWING INDEX SHEET SHEET TITLE NUMBER O.1 HVAC SCHEDULES, NOTES, LEGEND AND DRAWING INDEX MO.2 HVAC SPECIFICATIONS M1.0 CONSTRUCTION ZONE SCHEDULES, NOTES AND DETAILS M1.1 SECOND FLOOR CONSTRUCTION ZONE VENTILATION PLAN M1.2 THIRD FLOOR CONSTRUCTION ZONE VENTILATION PLAN M1.3 FOURTH FLOOR CONSTRUCTION ZONE VENTILATION PLAN 1.4 FIFTH FLOOR CONSTRUCTION ZONE VENTILATION PLAN M1.5 SIXTH FLOOR CONSTRUCTION ZONE VENTILATION PLAN M2.1 SECOND FLOOR PLAN — DUCTWORK — HVAC M2.2 THIRD FLOOR PLAN — DUCTWORK — HVAC 2.3 FOURTH FLOOR PLAN — DUCTWORK — HVAC 2.4 FIFTH FLOOR PLAN — DUCTWORK — HVAC M2.5 SIXTH FLOOR PLAN — DUCTWORK — HVAC M3.1 HVAC DETAILS F ®i • e®1 r CHECKED DATE 05-05-11 F ®i • e®1 r CHECKED DATE 05-05-11 r CHECKED DATE 05-05-11 CHECKED DATE 05-05-11