11-489-002r
LID
12
�a
w
i # y.., r t. a r • a r. .. • • ♦ � i i , i i • ".
. SCHEDULE NEW CONSTRUCTION #i OWNER WELL IN
ADVANCE.
# r r I I a a Ilf-11:11SIMALINKAV 11111 r
DUCTWORK
NO
DUCT SMOKE DETECTOR(S) X
X
SUPPLY DUCTWORK
X
RETURN OR EXHAUST
X
DUCTWORK
340
SUPPLY DIFFUSER
X
AIR QUANTITY
120 R. --- --
RETURN GRILLE & AIR
X
QUANTITY
-
CONICAL TEE CONN.
BELLOUTH CONN.
450 THROAT TAP
BRANCH CONNECTION
W
PR
RADIUS ELBOW R /W -1.
I�Z �__
TURNING VANES IN
ELBOW
M.V.D.
MANUAL VOL. DAMPER
# r # 11 ill , !i •!r # •!
# 2#1111 N a IT, 13 11
. , ill •
DUCTWORK
1. INTERIOR SUPPLY AND RETURN AIR DUCTWORK IN CEILING SPACE
ROOF INSULATION r R-6.0 FIBERGLASS.
"m Eli s ii r�
YES N
NO
DUCT SMOKE DETECTOR(S) X
X
FIRE DAMPER(S) X
X
SMOKE DAMPER(S) X
X
FIRE RATED ENCLOSURE X
X
FIRE RATED ROOF /FLOOR CEILING ASSEMBLY X
X
FIRE STOPPING (SEE ARCH.) X
X
SMOKE CONTROL X
X
m
1. AIR DEVICE SIZES & SCHEDULED AIRFLOW ARE SCHEDULE OTHERWISE NOTED ON HVAC FLOOR PLANS.
3. ALL i • DEVICES # INSTALLED INACCESSIBLE 1 # DRYWALL SHALL BE PROVIDED MANUAL F• r BLADE DAMPERS.
4- ALL AIR DEVICES INSTALLED IN ACCESSIBLE AND/OR LAY—IN CEILINGS SHALL HAVE A
MANUAL VOLUME DAMPER INSTALLED BRANCH TAKE—OFF.
BRANCH
5.
MAXIMUM PRESSURE DROP FOR ALL t• DEVICES SHALL NOT # 0.10 IN. W.G. t• TO
i r:
r a a- DEVICES SHALL BE WHITE UNLESS OTHERWISE NOTED. ROUND ADAPTER
7. MAXIMUM RATING FOR a ♦. • DEVICES SHALL # EXCEED r
8. ALL AIR DEVICES SHALL BE ALUMINUM CONSTRUCTION UNLESS OTHERWISE NOTED.
9. THROW VALUES ARE FOR TERMINAL VELOCITIES OF 100 s: # s 1. .. i i# OR GRILLE
MFGR & MODEL FACE SIZE BRANCH DUCT SIZE
MODULE
TITUS GI 0I 0 - �L �IIII � �,� Idyl �� � �� U I� � Uq � �I �� �I �� �I� ��� � I •
IMI I
TITUS S� it MI I� III �I lOxIO � III � � � �I � III � MI I �► �
MCI IIII MI � �!Iil� ����iu u������� u(�� Ir • � 1
r • � • i
11 Ft I IT, 1:41 ?R1148 1111012:101 oixilm-130 W
ol
r r s' •', r a a.. a r a r r a s r r r:
• •.
1. THE CONTRACTOR SHALL PROTECT THE INTERIOR OF ALL DUCTWORK AND AIR HANDLING UNITS FROM THE
ACCUMULATION OF DIRT AND DUST USUALLY ASSOCIATED WITH THE FINISHING STAGES OF THE
CONSTRUCTION WORK.
EQUIPMENT SUPPLY AIR RETURN AIR EXHAUST AIR OUTSIDE AIR
EXIST/NEW EXIST/NEW EXIST/NEW EXIST/NEW
AHU —EN 6400 / 8500 5900 / 6000 — 2500 / 2500
AHU —ES 7650 / 7750 3600 / 3900 — 3650 / 3650
AHU —NE 11275 / 11475 7350 / 7550 — 3925 / 3925
AHU —NW 9250 / 9300 7050 / 7100 — 2200 / 2200
AHU —SE 10250 / 10300 8650 / 8700 — 1600 ! 1600
AHU —SW 10500 / 10650 7250 / 7400 — 3250 / 3250
AHU -2 -1 1400 / 1450 1200 /1250 — 200 / 200
DRAWING INDEX
SHEET SHEET TITLE
NUMBER
O.1 HVAC SCHEDULES, NOTES, LEGEND AND DRAWING INDEX
MO.2 HVAC SPECIFICATIONS
M1.0 CONSTRUCTION ZONE SCHEDULES, NOTES AND DETAILS
M1.1 SECOND FLOOR CONSTRUCTION ZONE VENTILATION PLAN
M1.2 THIRD FLOOR CONSTRUCTION ZONE VENTILATION PLAN
M1.3 FOURTH FLOOR CONSTRUCTION ZONE VENTILATION PLAN
1.4 FIFTH FLOOR CONSTRUCTION ZONE VENTILATION PLAN
M1.5 SIXTH FLOOR CONSTRUCTION ZONE VENTILATION PLAN
M2.1 SECOND FLOOR PLAN — DUCTWORK — HVAC
M2.2 THIRD FLOOR PLAN — DUCTWORK — HVAC
2.3 FOURTH FLOOR PLAN — DUCTWORK — HVAC
2.4 FIFTH FLOOR PLAN — DUCTWORK — HVAC
M2.5 SIXTH FLOOR PLAN — DUCTWORK — HVAC
M3.1 HVAC DETAILS
F ®i • e®1
r
CHECKED
DATE 05-05-11
r • � • i
11 Ft I IT, 1:41 ?R1148 1111012:101 oixilm-130 W
ol
r r s' •', r a a.. a r a r r a s r r r:
• •.
1. THE CONTRACTOR SHALL PROTECT THE INTERIOR OF ALL DUCTWORK AND AIR HANDLING UNITS FROM THE
ACCUMULATION OF DIRT AND DUST USUALLY ASSOCIATED WITH THE FINISHING STAGES OF THE
CONSTRUCTION WORK.
EQUIPMENT SUPPLY AIR RETURN AIR EXHAUST AIR OUTSIDE AIR
EXIST/NEW EXIST/NEW EXIST/NEW EXIST/NEW
AHU —EN 6400 / 8500 5900 / 6000 — 2500 / 2500
AHU —ES 7650 / 7750 3600 / 3900 — 3650 / 3650
AHU —NE 11275 / 11475 7350 / 7550 — 3925 / 3925
AHU —NW 9250 / 9300 7050 / 7100 — 2200 / 2200
AHU —SE 10250 / 10300 8650 / 8700 — 1600 ! 1600
AHU —SW 10500 / 10650 7250 / 7400 — 3250 / 3250
AHU -2 -1 1400 / 1450 1200 /1250 — 200 / 200
DRAWING INDEX
SHEET SHEET TITLE
NUMBER
O.1 HVAC SCHEDULES, NOTES, LEGEND AND DRAWING INDEX
MO.2 HVAC SPECIFICATIONS
M1.0 CONSTRUCTION ZONE SCHEDULES, NOTES AND DETAILS
M1.1 SECOND FLOOR CONSTRUCTION ZONE VENTILATION PLAN
M1.2 THIRD FLOOR CONSTRUCTION ZONE VENTILATION PLAN
M1.3 FOURTH FLOOR CONSTRUCTION ZONE VENTILATION PLAN
1.4 FIFTH FLOOR CONSTRUCTION ZONE VENTILATION PLAN
M1.5 SIXTH FLOOR CONSTRUCTION ZONE VENTILATION PLAN
M2.1 SECOND FLOOR PLAN — DUCTWORK — HVAC
M2.2 THIRD FLOOR PLAN — DUCTWORK — HVAC
2.3 FOURTH FLOOR PLAN — DUCTWORK — HVAC
2.4 FIFTH FLOOR PLAN — DUCTWORK — HVAC
M2.5 SIXTH FLOOR PLAN — DUCTWORK — HVAC
M3.1 HVAC DETAILS
F ®i • e®1
r
CHECKED
DATE 05-05-11
F ®i • e®1
r
CHECKED
DATE 05-05-11
r
CHECKED
DATE 05-05-11
CHECKED
DATE 05-05-11