11-464-0027
I
cn
THE BOTTOM
c-' THAN
7OR PIT
Passenger Elevators #9 & 10 1st Floor
SCALE: 1/4 1
Machine Room —Roof Level
SCALE: 1/4 1,
INSPECTOR
THE CONNECTION OF EACH ELEVATOR MACHINE ROOM SHALL BE PROVIDED WITH A
FLOW SWITCH, MAIN DRAIN AND INSPECTOR TEST CONNECTION.
THE CONTROL VALVE SHALL ELECTRONICALLY SUPERVISED WITH TAMPER SWITCH,
AS REQUIRE BY NFPA 1012006
TYPES OF SPRINKLERS
WATER SUPPLY
DESIGN CRITERIA
CENTERLINE
DATE OF TEST-
RATED CAPACITY-
jOTIME OF TEST:
STATIC PRESSURE:
'RESIDUAL PRESSURE:
GROOVED PIPE END
GALLONS FLOWING:
T =
GPM AVAILABLE:
I
i PSI AVAILABLE:
Machine Room —Roof Level
SCALE: 1/4 1,
INSPECTOR
THE CONNECTION OF EACH ELEVATOR MACHINE ROOM SHALL BE PROVIDED WITH A
FLOW SWITCH, MAIN DRAIN AND INSPECTOR TEST CONNECTION.
THE CONTROL VALVE SHALL ELECTRONICALLY SUPERVISED WITH TAMPER SWITCH,
AS REQUIRE BY NFPA 1012006
TYPES OF SPRINKLERS
ABBREVIATIONS
DESIGN CRITERIA
CENTERLINE
IL
ELEVATION
TOS = TOP OF STEEL
G =
GROOVED PIPE END
T =
THREADED PIPE END
INSIDE HO SE
F =
PIPE
FLAND END
GE
C-C = CENTER TO CENTE�-���
Machine Room —Roof Level
SCALE: 1/4 1,
INSPECTOR
THE CONNECTION OF EACH ELEVATOR MACHINE ROOM SHALL BE PROVIDED WITH A
FLOW SWITCH, MAIN DRAIN AND INSPECTOR TEST CONNECTION.
THE CONTROL VALVE SHALL ELECTRONICALLY SUPERVISED WITH TAMPER SWITCH,
AS REQUIRE BY NFPA 1012006
TYPES OF SPRINKLERS
c z M
00911111 sky, 1 Ed kyj In
STATE UCENSE#41126500012001 CONTRACT NO. Sll-044 SHEET NO. --E-2 OF
F-R- LICENSE #9720