Loading...
11-464-0027 I cn THE BOTTOM c-' THAN 7OR PIT Passenger Elevators #9 & 10 1st Floor SCALE: 1/4 1 Machine Room —Roof Level SCALE: 1/4 1, INSPECTOR THE CONNECTION OF EACH ELEVATOR MACHINE ROOM SHALL BE PROVIDED WITH A FLOW SWITCH, MAIN DRAIN AND INSPECTOR TEST CONNECTION. THE CONTROL VALVE SHALL ELECTRONICALLY SUPERVISED WITH TAMPER SWITCH, AS REQUIRE BY NFPA 1012006 TYPES OF SPRINKLERS WATER SUPPLY DESIGN CRITERIA CENTERLINE DATE OF TEST- RATED CAPACITY- jOTIME OF TEST: STATIC PRESSURE: 'RESIDUAL PRESSURE: GROOVED PIPE END GALLONS FLOWING: T = GPM AVAILABLE: I i PSI AVAILABLE: Machine Room —Roof Level SCALE: 1/4 1, INSPECTOR THE CONNECTION OF EACH ELEVATOR MACHINE ROOM SHALL BE PROVIDED WITH A FLOW SWITCH, MAIN DRAIN AND INSPECTOR TEST CONNECTION. THE CONTROL VALVE SHALL ELECTRONICALLY SUPERVISED WITH TAMPER SWITCH, AS REQUIRE BY NFPA 1012006 TYPES OF SPRINKLERS ABBREVIATIONS DESIGN CRITERIA CENTERLINE IL ELEVATION TOS = TOP OF STEEL G = GROOVED PIPE END T = THREADED PIPE END INSIDE HO SE F = PIPE FLAND END GE C-C = CENTER TO CENTE�-��� Machine Room —Roof Level SCALE: 1/4 1, INSPECTOR THE CONNECTION OF EACH ELEVATOR MACHINE ROOM SHALL BE PROVIDED WITH A FLOW SWITCH, MAIN DRAIN AND INSPECTOR TEST CONNECTION. THE CONTROL VALVE SHALL ELECTRONICALLY SUPERVISED WITH TAMPER SWITCH, AS REQUIRE BY NFPA 1012006 TYPES OF SPRINKLERS c z M 00911111 sky, 1 Ed kyj In STATE UCENSE#41126500012001 CONTRACT NO. Sll-044 SHEET NO. --E-2 OF F-R- LICENSE #9720