PROVIDE THE FOLLOWING FILTERS
WITH PORTABLE AIR SCRUBBER:
STAGE 1 PRE - FILTER: ONE -INCH —
DEEP FIBER TRAPPER
STAGE 2 PRE - FILTER: TWO -INCH rr
MERV 7
STAGE 3 CARBON PRE - FILTER: NOT
REQUIRED �.._
STAGE 4 FINAL - FILTER:
METAL -FRAME 59.97% OR HIGHER _______- ------------------
HEPA FILTER.
INSTALL DUCTS AS
INDICATED ON
FLOOR PLANS
/ 0I,,Trr F
EXACT AIR QUANTITIES SHALL NE AS
REQUIRED TO MAINTAIN —A- 0.02
VD ASSURE DIFFERENTIAL
75 CFM / ` VD fi 7
AIRFLOW / TERRACE
12X12
DIFFUSER METAL FLEX /
ADJACENT SPACE
PORTABLE
AIR SCRUBBER -•-�– \�
TRANSFER 75 CFM WITH HEPA FILTER Tl FV
UNDER DOOR EPVICC
Q
/J!� /i,\
PORTABLE AIR SCRUBBER TO BE SIMILAR TO: ABATEMENT TECHNOLOGIES/ <'�' /�/ V
PAS2400, FRED 1200. OR FRED 600. N
�\.
\\ '
� STAIR SERVICE =-
AIR SCRUBBER DETAIL ��� cOPPIoOP CL
02SCALE:NTS
�� "�
eggs 0000 r • •iii • • • •
••• Y • W u • W • i
• H I<S
2121 Ponce de Leon Blvd., Suite 350 • Coral Gables, FL 33134 • y _ _
i • Y • •
�i••,OWNEk • •
phone: 305.569.1692 •'
Professional Consulting Engineers pax: 305.569.1693 `I3t.PT SET r -IEALTI I,OUTi-i FL61RUDA
Austin Dallas • Denver • Houston • Nashville 6865 RED ROAD
Miami Phoenix Richmond - Washington D.C. CORAL GABLES, FLORIDA 33146
cord project number: 410393.000 ARCHITECT
EB00007658 FL AA F000119
HKS ARCHITECTS, INC.
1221 BRICKELL AVENUE, SUITE 1220
MIAMI, FL 33131
M.E.P. ENGINEERS
CCRD PARTNERS
2121 PONCE DE LEON BOULEVARD
E 50
1. T
TTPE D, HIWLbI RISK, W►55 IV. S
SUIT 3
3. I
ISOLATE HVAC SYSTEM IN AREA WHERE WORK IS BEING DONE TO PREVENT CONTAMINATION OF THE
DUCT SYSTEM. I
INTERIORS
4. C
COMPLETE ALL CRITICAL BARRIERS OR IMPLEMENT CONTROL CUBE METHOD BEFORE CONSTRUCTION I
IN.DESIGN, INC.
BEGINS. 2
2030 NW BOCA RATON BOULEVARD
5. M
MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORK SITE UTILIZING HEPA /CARBON EQUIPPED AIR FILTRATION S
SUITE 3
UNITS. B
BOCA RATON, FL 33146
6. S
SEAL HOLES, PIPES, CONDUITS, AND PUNCTURES APPROPRIATELY.
7. C
CONSTRUCT ANTEROOM (AS REQUIRED) AND REQUIRE ALL PERSONNEL TO PASS THROUGH THIS ROOM SO
THEY CAN BE VACUUMED USING A HEPA VACUUM CLEANER BEFORE LEAVING WORK SITE OR THEY CAN
WEAR CLOTH OR PAPER COVERALLS THAT ARE REMOVED EACH TIME THEY LEAVE THE WORK SITE
3. A
ALL PERSONNEL ENTERING WORK SITE ARE REQUIRED TO WEAR SHOE COVERS.
9. D
DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL COMPLETE PROJECT IS THOROUGHLY CLEANED BY
THE ENVIRONMENTAL SERVICES DEPT.
10. V
VACUUM WORK WITH HERA FILTERED VACUUMS. F
F�
11. W
WET MOP WITH DISINFECTANT.
12. R
REMOVE BARRIER MATERIALS CAREFULLY TO MINIMIZE SPREADING OF DIRT AND DEBRIS ASSOCIATED WITH
13. C
CONSTRUCTION.
O
14. C
COVER TRANSPORT RECEPTACLES OR CARTS. TAPE COVERING.
15. U
UPON COMPLETION, R
M
DO NOT REQUIRE NEGATIVE AIR MACHINES AND /OR CONSTRUCTION BARRIER ISOLATION. HEPA VACUUM W
SHALL BE USED TO CLEAN WITHIN THE CUBE AFTER THE WORK HAS BEEN COMPLETED. •
•�
Q
17. P
PORTABLE HEPA FILTER NEGATIVE AIR MACHINE(S) SHALL BE INSTALLED TO C
ROOM. AIR QUANTITY SHALL BE ADJUSTED TO MAINTAIN A MINIMUM OF 0.02' W.g. NEGATIVE PRESSURE. a
a
VISUAL PRESSURE INDICATOR WILL BE INSTALLED AT THE ENTRANCE AFTER INSTALLATION OF
CONSTRUCTION BARRIER WALLS AND THE ABOVE MEASURES, A CERTIFIED TEST AND BALANCE FIRM a
• Poo E
a
SHALL CONFIRM THAT THE ABOVE ITEMS ARE IN PLACE AND WORKING PRIOR TO STARTING DEMOLITION. •
ET ,
CONTRACTOR SHALL COMPLY WITH OWNER REQUIREMENTS FOR INFECTION CONTROL. FINAL FILTER
EFFICIENCY SHALL BE 99.97 %%% OR HIGHER FOR 1 MICRON PARTICLES. DO NOT POSITIVELY
PRESSURIZE EXISTING DUCTWORK. USE THE NEGATIVE AIR MACHINE FOR SPOT FILTRATION/EXHAUST "
"^' -
-
SERVICE WHEN WORKING ABOVE THE CEILING OUTSIDE THE WALLS OF THE RENOVATED SPACE v
v
19. S
STRONG ODORS ARE NOT EXPECTED DUE TO THE SCOPE OF WORK. +
+, n
n
19. R
REFERENCE ARCHITECTURAL PLANS FOR LOCATION OF TEMPORARY CONSTRUCTION WALLS AND PHASING. n
n/
20. R
REFERENCE INFECTION CONTROL CONSTRUCTION PERMIT FOR ADDITIONAL REQUIREMENTS.
21. R
REFERENCE CONSTRUCTION DOCUMENTS FOR ADDITIONAL R
LEGEND NOTES
OCONTRACTOR SHALL INSTALL NEGATIVE HERA AIR MACHINE AND TEMPORARY ROUND FLEX
DUCT FROM MACHINE AS INDICATED. REMOVE AT END OF CONSTRUCTION.
UCONTRACTOR SHALL INSTALL MAGNETIC DRAFT GAUGE MAINTAIN 0.02-
W.C. NEGATIVE PRESSURE.
IN THE CONSTRUCTION AREA
CONTRACTOR SHALL COVER AIR DEVICES WITH VISQUEEN PLASTIC. CONTRACTOR SHALL CLOSE
SUPPLY, RETURN, AND EXHAUST DAMPERS THAT SERVE THE AREAS OF RENOVATION PRIOR TO
COVERING AIR DEVICES WITH VISQUEEN PLASTIC. CONTRACTOR SHALL REMOVE VISQUEEN PLASTIC AND
REBALANCE SPACE AS INDICATED ON FLOOR PLAN AFTER THE RENOVATION IS COMPLETE.
�4 TEMPORARILY CONNECT TO NEAREST EMERGENCY POWER. CONTRACTOR SHALL PROVIDE ALL NECESSARY
ELECTRICAL APPURENTECES AS REQUIRED FOR THIS CONNECTION.
TEMPORARY CONSTRUCTION WALL/ VISQUEEN PLASTIC. REFER TO ARCHITECTURAL PLANS.
OTEMPORARY ROUND FLEX DUCT SIZED FOR 0.1' W.G. AT A MAXIMUM OF 1,200 FPM.
OREMOVE WINDOW GLAZING AND INSTALL 3/4' PLYWOOD OVER WINDOW OPENING. PROVIDE ROUND DUCT
COLLARS IN PLYWOOD TO FIT TEMPORARY ROUND AIR DUCTS AS INDICATED. AT THE END OF
CONSTRUCTION REMOVE PLYWOOD AND INSTALL GLAZING AS REQUIRED.
OCONTRACTOR SHALL INSTALL NEGATIVE HERA AIR MACHINE AS INDICATED. REMOVE AT END OF
CONSTRUCTION.
2
KEY PLAN
i
REVISION
1 LT
�
�• ` ��- - - -'� � � /�i> � - :\� ` ROOM
i`.
/ \ c` �.� �` . 358
TLT ` a
350A
-D F A� IT
�. �r I/� �� .. %��i/ \A y 7
,)17
i PATIPNT �,' �
,.��V \\ 357
THIRD FLOOR MECHANICALCALE01 s. va .-0
A PLAN
�..
,. JIEN
PATIENT CORI;IDOR'1
ROOM TLT.
G3G02 357A
jG
TLT 4
HKS PROJECT NUMBER
/ % \ ✓ TI T //
356, . / ,1 7 6
/� 14262.000
351A PATIENT �,r DATE
ROOM J
3 �> 04. i '1.20'11
ISSUE
PooMT O
BIDDING &
TI T
\353
`� � ��-5 A � `� v PERMITTING SET
BRIDGE
\ / T 03C01
SHEET TITLE
STAIR
TLT �{ P� IEMT THIRD FLOOR
354 MECHANICAL
l ICRA FLAN
SHEET NO.
02011 HKS, INC.
musc