Loading...
11-382-025MECHANICAL SYMBOLS MECHANICAL ABBREVIATIONS YES AC ABOVE CEILING ALL SYMBOLS SHOWN MAY NOT APPEAR IN ALL DRAWINGS. HIGH PRESSURE CONDENSATE RETURN SYMBOLS ARE SHOWN SCHEMATIC AND MAY NOT BE TO SCALE. LOW PRESSURE STEAM SYMBOL DESCRIPTION FCU A NEW EQUIPMENT DESIGNATION DOMESTIC COLD WATER # (TOP - EQUIP. ABBREV., BOTTOM - MARK) FAN POWERED BOX DOMESTIC HOT WATER RETURN FIRE STOPPING NEW DIFFUSER DESIGNATION ANALOG INPUT e (TOP - SCHEDULE DESIG., BOTTOM - CFM) PUMPED SANITARY LINE - - - - - - NEW EQUIPMENT 4,896 FPI FINS PER INCH DIRECTION OF FLOW B. AO EL3EXISTING GATE VALVE NONE EQUIPMENT HORIZONTAL BALL VALVE -- - -/•� -- GC NEW DUCT TEMPERATURE AND PRESSURE RELIEF VALVE C. BFC EXISTING DUCT AUTOMATIC 3 -WAY CONTROL VALVE NONE i - -- �� EXISTING DUCT TO BE REMOVED OR RELOCATED SOLENOID VALVE —��-- _J__J GENERAL EXHAUST FAN HYDRAULIC SHOCK ARRESTOR <X:I+ ® NEW SUPPLY DIFFUSER UNION NONE VACCUUM BREAKER DO EXISTING SUPPLY DIFFUSER E GSF F -7 EXISTING SUPPLY DIFFUSER TO BE REMOVED OR RELOCATED O BG BELOW GRADE CLEANOUT OR WALL CLEANOUT F. PETE'S PLUG NEW R/A OR EXHAUST GRILLE BUTTERFLY VALVE MVD MANUAL VOLUME DAMPER THERMOMETER WELL EXISTING R/A OR EXHAUST GRILLE CRU COMPUTER ROOM UNIT N EXISTING R/A OR EXHAUST GRILLE TO BE REMOVED OR RELOCATED CRU CONDENSATE RETURN UNIT OBD OPPOSED BLADE DAMPER ELECTRIC PNEUMATIC SWITCH NEW SLOT DIFFUSER PARTITION AND CEILING SYSTEM SUPPORTS. WHERE INDEPENDENT SUPPORT IS NOT POSSIBLE AN ENGINEERED SUPPORT CU -AAr FLEXIBLE DUCT RELOCATED E. FIELD VERIFY THE EXACT SIZES AND LOCATIONS OF ALL EXISTING DUCTWORK AND PIPING PRIOR TO DEMOLITION OF ANY EXISTING WORK. THE DEMOUTION WORK SHALL BE EXISTING SLOT DIFFUSER DI DIGITAL INPUT -- EXISTING SLOT DIFFUSER TO BE REMOVED OR RELOCATED HOSPITAL SCHEDULES, OCCUPANCIES, AND WORK. OT THERMOSTAT DIGITAL OUTPUT RCA T; EXISTING THERMOSTAT TO BE REMOVED OR RELOCATED DS DISCONNECT SWITCH 45' PRESSURE TAP W/ VOLUME DAMPER RELIEF AIR CONICAL TAP WITH VOLUME DAMPER EXISTING SA - CONICAL TAP W/O VOLUME DAMPER EDH J MANUAL VOLUME DAMPER UNIT HEATER DUCTWORK THAT HAS MISSING OR DAMAGED INSULATION PER SPECIFICATIONS. EUH FIRE DAMPER VAV VARIABLE AIR VOLUME L SMOKE DAMPER EXHAUST FAN WH WATER HEATER FIRE /SMOKE DAMPER SF SUPPLY FAN M ❑ MOTORIZED DAMPER EA EXHAUST AIR BAROMETRIC DAMPER FILTER MIXING BOX ALL EXISTING DIFFUSERS, EQUIPMENT AND PIPING REMOVED DURING CONSTRUCTION SHALL — CHS — CHILLED WATER SUPPLY PIPE IN HG INCHES MERCURY (PRESSURE) — CHR — CHILLED WATER RETURN PIPE CHILLED WATER IN WC CS CONDENSER WATER SUPPLY PIPE UNO UNLESS NOTED OTHERWISE CR CONDENSER WATER RETURN PIPE PRV RL REFRIGERANT LIQUID PIPE THERMOSTATIC AIR VENT THE EQUIPMENT SHALL BE REPLACED OR REPAIRED TO THE SATISFACTION OF THE RG REFRIGERANT GAS PIPE HS HEATING WATER SUPPLY SV HR HEATING WATER RETURN MIXED AIR PROVIDE MANUAL VOLUME DAMPER IN EACH AIR DEVICE RUNOUT DUCT AS FAR FROM AIR DEVICE AS POSSIBLE MECHANICAL ABBREVIATIONS FIRE ALARM SEQUENCE OF OPERATION UPON FIRE ALARM AHU• -EN AND ASSOCIATED EXHAUST FAN(S) SHALL SHUT DOWN. HVAC DESIGN REQUIRES YES AC ABOVE CEILING — HPR HIGH PRESSURE CONDENSATE RETURN - - -LPS - -- LOW PRESSURE STEAM AFF ABOVE FINISHED FLOOR FCU FAN COIL UNIT - DOMESTIC COLD WATER -- — FPB FAN POWERED BOX DOMESTIC HOT WATER RETURN FIRE STOPPING AI ANALOG INPUT CONDENSATE DRAIN P PUMPED SANITARY LINE - - - - - - VENT LINE 4,896 FPI FINS PER INCH DIRECTION OF FLOW B. AO ANALOG OUTPUT GATE VALVE NONE BUTTERFLY VALVE HORIZONTAL BALL VALVE -- - -/•� -- GC GENERAL CONTRACTOR TEMPERATURE AND PRESSURE RELIEF VALVE C. BFC BELOW FINISHED CEILING AUTOMATIC 3 -WAY CONTROL VALVE NONE PLUG VALVE /BALANCING COCK HORIZONTAL SOLENOID VALVE —��-- GEF GENERAL EXHAUST FAN HYDRAULIC SHOCK ARRESTOR <X:I+ OF BELOW FLOOR, BLIND FLANGE UNION NONE VACCUUM BREAKER DO P -TRAP E GSF GENERAL SUPPLY FAN HUB DRAIN O BG BELOW GRADE CLEANOUT OR WALL CLEANOUT F. PETE'S PLUG BV BUTTERFLY VALVE MVD MANUAL VOLUME DAMPER THERMOMETER WELL !s CRU COMPUTER ROOM UNIT N NEW CRU CONDENSATE RETURN UNIT OBD OPPOSED BLADE DAMPER ELECTRIC PNEUMATIC SWITCH PARTITION AND CEILING SYSTEM SUPPORTS. WHERE INDEPENDENT SUPPORT IS NOT POSSIBLE AN ENGINEERED SUPPORT CU CONDENSING UNIT R RELOCATED E. FIELD VERIFY THE EXACT SIZES AND LOCATIONS OF ALL EXISTING DUCTWORK AND PIPING PRIOR TO DEMOLITION OF ANY EXISTING WORK. THE DEMOUTION WORK SHALL BE H. DI DIGITAL INPUT RA RETURN AIR HOSPITAL SCHEDULES, OCCUPANCIES, AND WORK. DO DIGITAL OUTPUT RCA RECIRCULATED (RETURN) AIR DS DISCONNECT SWITCH RLA RELIEF AIR E EXISTING SA SUPPLY AIR EDH ELECTRIC DUCT HEATER UH UNIT HEATER DUCTWORK THAT HAS MISSING OR DAMAGED INSULATION PER SPECIFICATIONS. EUH ELECTRIC UNIT HEATER VAV VARIABLE AIR VOLUME L ff EXHAUST FAN WH WATER HEATER SF SUPPLY FAN WIP WATER - SOURCE HEAT PUMP EA EXHAUST AIR FMB FILTER MIXING BOX ALL EXISTING DIFFUSERS, EQUIPMENT AND PIPING REMOVED DURING CONSTRUCTION SHALL OA OUTSIDE AIR IN HG INCHES MERCURY (PRESSURE) CHW CHILLED WATER IN WC INCHES WATER COLUMN (PRESSURE) DUCT SIZES ARE NET FREE AREA. UNO UNLESS NOTED OTHERWISE IBT INVERTED BUCKET TRAP PRV PRESSURE RELIEF VALVE TAV THERMOSTATIC AIR VENT THE EQUIPMENT SHALL BE REPLACED OR REPAIRED TO THE SATISFACTION OF THE SIMILARLY. (STEAM SYSTEM) SV SAFETY VALVE MA MIXED AIR PROVIDE MANUAL VOLUME DAMPER IN EACH AIR DEVICE RUNOUT DUCT AS FAR FROM AIR DEVICE AS POSSIBLE DISPOSED OF AS DIRECTED BY THE OWNER'S REPRESENTATIVE LE LAUNDRY EQUIPMENT IL R. INSTALL SPACE THERMOSTAT ADJACENT TO LATCH SIDE OF DOOR IN SPACE INDICATED. U.N.O. L CONTRACTORS SHALL SEAL ALL LEAKS IN EXISTING DUCTWORK AND NEW DUCTWORK. INDICATED LOCATIONS ARE APPROXIMATE AVOID HEAT PRODUCING EQUIPMENT. FINAL SPACE THERMOSTAT /SENSOR LOCATIONS SHALL BE AS DIRECTED BY THE ARCHITECT. M. EXISTING EQUIPMENT AND DUCTWORK HAS BEEN LIGHTLY DRAWN TO SHOW THE X APPROXIMATE LOCATION. NEW EQUIPMENT AND DUCTWORK IS SHOWN BY HEAVY LINES. S ui 'I AND EXHAUST DUCTS. (NONE ALLOWED IN COMBUSTION AIR DUCTS). N. CONTRACTOR SHALL BE RESPONSIBLE FOR REMOVING AND /OR DISPOSING OF ALL ITEMS THAT ARE NOT NECESSARY IN THE COMPLETION OF THE PROJECT AND SHALL CLEAN T. LOCATE ISOLATION VALVES FOR EQUIPMENT AS CLOSE TO THE MAIN THE AREA OF CONSTRUCTION AFTER THE COMPLETION OF THE PROJECT. AS POSSIBLE 0. J U, MULTI -BLADE DAMPERS OF ANY TYPE INSTALLED WITHIN 36" OF AN ELL OR OTHER FITTING SHALL ; E_ BE INSTALLED WITH THE DAMPER BLADE SHAFTS PARALLEL TO THE AIRSTREAM FLOW DIRECTION iii P. ANY EXISTING WALLS DAMAGED FROM PIPING OR DUCTWORK THAT WAS REMOVED SHALL BE PATCHED AND SEALED TO MEET THE FULL INTEGRITY OF THE REMAINING WALL V. FIRE, SMOKE, AND FIRE /SMOKE DAMPERES WILL BE REQUIRED AT ALL DUCT PENETRATIONS THRU RATED WALLS. COORDINATE z WITH ARCHITECTURAL DRAWINGS. MECHANICAL CONTRACTOR SHALL BE RESPONSIBLE FOR PRICING ALL FIRE, SMOKE, AND FIRE /SMOKE DAMPERS REQUIRED BY CODE MECHANICAL CONTRACTOR SHALL REPORT EXISTING FIRE, SMOKE, FIRE /SMOKE w W DEMONSTRATE TO OWNER'S REPRESENTATIVE THAT ALL INSTALLED CONTROLS ARE WORKING PROPERLY WITHOUT ERRORS PRIOR TO RELEASING SYSTEM TO OWNER. LL FIRE ALARM SEQUENCE OF OPERATION UPON FIRE ALARM AHU• -EN AND ASSOCIATED EXHAUST FAN(S) SHALL SHUT DOWN. HVAC DESIGN REQUIRES YES — HPS HIGH PRESSURE STEAM — HPR HIGH PRESSURE CONDENSATE RETURN - - -LPS - -- LOW PRESSURE STEAM - - -LPR - -- LOW PRESSURE CONDENSATE RETURN —PCP PUMPED CONDENSATE RETURN - DOMESTIC COLD WATER -- — DOMESTIC HOT WATER — - -- — DOMESTIC HOT WATER RETURN FIRE STOPPING SANITARY WASTE LINE CD CONDENSATE DRAIN P PUMPED SANITARY LINE - - - - - - VENT LINE 4,896 DIRECTION OF SLOPE 8,422 DIRECTION OF FLOW B. EXPANSION LOOP � 4 GATE VALVE NONE BUTTERFLY VALVE HORIZONTAL BALL VALVE -- - -/•� -- GLOBE VALVE 11,265 TEMPERATURE AND PRESSURE RELIEF VALVE C. AUTOMATIC 2 -WAY CONTROL VALVE —► AUTOMATIC 3 -WAY CONTROL VALVE NONE PLUG VALVE /BALANCING COCK HORIZONTAL SOLENOID VALVE —��-- CHECK VALVE Q HYDRAULIC SHOCK ARRESTOR <X:I+ VALVE IN VERTICAL — UNION NONE VACCUUM BREAKER DO P -TRAP E FLOOR DRAIN W/ P -TRAP otJ HUB DRAIN O FLOOR CLEANOUT OR GRADE CLEANOUT �I CLEANOUT OR WALL CLEANOUT F. PETE'S PLUG GAUGE COCK yTHERMOMETER ARCHITECTURAL DRAWINGS. COORDINATE THE LOCATION OF DUCTWORK AND PIPING AND PROVIDE OFFSETS IN DUCTWORK AND - LF THERMOMETER WELL !s STRAINER WITH BLOW-OFF VALVE D. F & T STEAM TRAP —�— STEAM BUCKET TRAP G. CONNECT TO EXISTING IP ELECTRIC PNEUMATIC SWITCH FIRE ALARM SEQUENCE OF OPERATION UPON FIRE ALARM AHU• -EN AND ASSOCIATED EXHAUST FAN(S) SHALL SHUT DOWN. HVAC DESIGN REQUIRES YES NQ DUCT SMOKE DETECTOR A. X FIRE DAMPER(S) ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE APPLICABLE FLORIDA UNIFORM STATEWIDE BUILDING CODE STATE AND SMOKE DAMPER(S) TOTAL CFM X FIRE RATED ENCLOSURE PATCHED AS PER ITEM B BELOW. X F1RE RATED ROOF/ FLOOR CEILING ASSEMBLY CFM X FIRE STOPPING FACILITY STANDARDS OR IF APPROVED BY THE OWNER, BE OF THE SAME QUALITY AS REPRESENTED BY THE SCHEDULED ITEM. X SMOKE CONTROL NOTE 1 X �4111-' GENERAL DEMOLITION NOTES: DESIG./ SERVES GENERAL NOTES - ALL HVAC SHEETS EXISTING DESIGN CFM A. ALL CARPED DUCT TAPS AND CONNECTING DUCTS THAT ARE NOT A. ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE APPLICABLE FLORIDA UNIFORM STATEWIDE BUILDING CODE STATE AND NOTES: BEING USED ARE TO BE REMOVED BACK TO THE MAIN DUCT AND TOTAL CFM LOCAL CODES IBC, AIA, IMC, NEC THE NATIONAL FIRE PROTECTION ASSOCIATION (NFPA). AND THE LOCAL AUTHORITIES HAVING OUTSIDE AIR CFM PATCHED AS PER ITEM B BELOW. 16x16 JURISDICTION. ALL EQUIPMENT, MATERIALS, CONTROLS, ETC.SHALL BE NEW UNLESS NOTED OTHERWISE AND SHALL MATCH ALL CFM S1 24x24 FACILITY STANDARDS OR IF APPROVED BY THE OWNER, BE OF THE SAME QUALITY AS REPRESENTED BY THE SCHEDULED ITEM. B. PATCH OPENINGS IN EXISTING DUCTWORK THAT IS TO REMAIN NOTE 1 AHU -EN EAST WING HORIZONTAL INCLUDING OPENINGS. WHERE TAPS OR DUCTWORK ARE TO RE 4,896 2,636 8,422 REMOVED, THE FOLLOWING SHALL OCCUR: B. CONTRACTOR SHALL OBTAIN ALL NECESSARY PERMITS, PAY ALL FEES, AND COMPLY WITH ALL NATIONAL, STATE, AND MUNICIPAL 90% EXISTING TO REMAIN NONE LAWS, CODES, AND ORDINANCES RELATING TO BUILDING AND PUBLIC SAFETY. HORIZONTAL • OPENINGS IN THE MAIN DUCTS ARE TO BE COVERED WITH A 7,350 3,925 11,265 SHEET METAL PATCH. THE PATCH IS TO BE LARGER THAN THE C. CONTRACTOR SHALL FURNISH ALL MATERIALS, EQUIPMENT, AND LABOR REQUIRED FOR A COMPLETE WORKING AND COORDINATED 90% EXISTING OPENING AND IS TO BE SECURED WITH SHEET METAL NONE SYSTEM HORIZONTAL SCREWS FOUR INCHES ON CENTERS. D. COORDINATE THE EXACT LOCATION OF MECHANICAL AND PLUMBING EQUIPMENT WITH THE LOCATIONS OF LIGHT FIXTURES, PIPING, 10,250 8,650 1,600 CONDUIT, AND OTHER CONSTRUCTION, TO ALLOW FOR PROPER ACCESS TO SERVICE EQUIPMENT. 909. • A LIBERAL QUANTITY OF FIRE RESISTANT ADHESIVE IS TO BE NONE APPLIED TO THE EDGES OF THE METAL PATCH AND THE E COORDINATE THE LOCATION OF DUCTWORK AND PIPING WITH OTHER TRADES AND PROVIDE OFFSETS IN DUCTWORK AND PIPING AS ASSEMBLY SCREWED IN PLACE. REQUIRED. C. ALL WORK SHALL BE PERFORMED IN STRICT COORDINATION WITH HOSPITAL SCHEDULES, F. IT IS THE INTENT OF THESE DOCUMENTS TO ALLOW ALL CEILING CONSTRUCTION AND HEIGHTS TO RE AS SHOWN ON THE OCCUPANCIES AND WORK. CONTRACTOR SHALL COORDINATE WITH HOSPITAL REPRESENTATIVE. ARCHITECTURAL DRAWINGS. COORDINATE THE LOCATION OF DUCTWORK AND PIPING AND PROVIDE OFFSETS IN DUCTWORK AND PIPING AS REQUIRED TO MEET THIS INTENT. D. ALL NECESSARY SHUTDOWNS OR OUT OF PHASE WORK SHALL BE SCHEDULED WITH THE HOSPITAL REPRESENTATIVE. G. CONDUIT, PIPING, AND DUCTWORK SHALL BE INDEPENDENTLY SUPPORTED, AND EACH SUPPORT SHALL BE INDEPENDENT OF PARTITION AND CEILING SYSTEM SUPPORTS. WHERE INDEPENDENT SUPPORT IS NOT POSSIBLE AN ENGINEERED SUPPORT SYSTEM SHALL BE UTILIZED. E. FIELD VERIFY THE EXACT SIZES AND LOCATIONS OF ALL EXISTING DUCTWORK AND PIPING PRIOR TO DEMOLITION OF ANY EXISTING WORK. THE DEMOUTION WORK SHALL BE H. ALL WORK SHALL BE SCHEDULED AND PERFORMED IN STRICT COORDINATION WITH ARCHITECTURAL PHASING PLANS AND WITH COORDINATED WITH THE NEW WORK TO ASSURE PROPER LIMITS OF DEMOLITION. HOSPITAL SCHEDULES, OCCUPANCIES, AND WORK. 1. PROTECT EQUIPMENT AND WORK FROM DAMAGE DURING HANDLING AND INSTALLATION UNTIL COMPLETION OF CONSTRUCTION. F. REMOVE ALL EXISTING EQUIPMENT AND ASSOCIATED PIPING, WHETHER SPECIFICALLY INDICATED OR NOT, THAT IS NO LONGER REQUIRED. J. REMOVE ALL EXCESS MATERIAL AND DEBRIS AND CLEAN ALL EQUIPMENT UPON COMPLETION OF WORK. TOUCH UP WITH PAINT WHERE REQUIRED. G- REMOVE AND CAP EXISTING BRANCH PIPING AND DUCTWORK NO LONGER REQUIRED TO REMAIN AS PART OF AN ACTIVE SYSTEM, AT THE APPROPRIATE MAIN. REINSULATE PIPING AND K. ALL CONNECTION BETWEEN PIPES OF DISSIMILAR MATERIALS SHALL BE MADE NTH DIELECTRIC UNIONS. DUCTWORK THAT HAS MISSING OR DAMAGED INSULATION PER SPECIFICATIONS. L ARCHITECT SHALL HAVE FINAL APPROVAL OF ALL GRILLE, DIFFUSER, AND THERMOSTAT LOCATIONS. H. ANY PIPING AND DUCTWORK WHICH MUST REMAIN AS PART OF AN ACTIVE SYSTEM AND IS IN CONFLICT WITH THE NEW LAYOUT SHALL BE RELOCATED AT NO ADDITIONAL COST OVER THE M. COORDINATE ALL AIR DEVICE LOCATIONS AND MOUNTING FRAME STYLES WITH LIGHTING PLANS AND ARCHITECTURAL REFLECTED CONTRACT AMOUNT. CEILING PLANS. I. ALL EXISTING DIFFUSERS, EQUIPMENT AND PIPING REMOVED DURING CONSTRUCTION SHALL N. COORDINATE ALL WALL MOUNTED DEVICE LOCATIONS WITH ARCHITECTURAL INTERIOR ELEVATIONS. REMAIN THE PROPERTY OF THE OWNER AND SHALL BE STORED, REMOVED FROM THE JOB SITE OR DISPOSED OF AS DIRECTED BY THE OWNER'S REPRESENTATIVE. 0. DUCT SIZES ARE NET FREE AREA. J. WHERE EXISTING EQUIPMENT IS TO BE RELOCATED, EXTREME CARE SHALL BE TAKEN TO P. PROVIDE ROUND DUCTS TO ALL AIR DEVICES UNLESS NOTED OTHERWISE. DUCT SIZE SHALL MATCH AIR DEVICE PREVENT DAMAGE DURING THE REMOVAL AND REINSTALLATION. WHERE DAMAGE OCCURS, NECK SIZE OR THE TABLE IN AIR DEVICE SCHEDULE, WHICHEVER IS LARGER. FLEXIBLE DUCTS SHALL BE SITED THE EQUIPMENT SHALL BE REPLACED OR REPAIRED TO THE SATISFACTION OF THE SIMILARLY. ARCHITECT, AT NO ADDITIONAL COST TO THE OWNER. K. ALL EXISTING CEILING DIFFUSERS SHALL BE REUSED, REMOVED AND STORED OR Q. PROVIDE MANUAL VOLUME DAMPER IN EACH AIR DEVICE RUNOUT DUCT AS FAR FROM AIR DEVICE AS POSSIBLE DISPOSED OF AS DIRECTED BY THE OWNER'S REPRESENTATIVE R. INSTALL SPACE THERMOSTAT ADJACENT TO LATCH SIDE OF DOOR IN SPACE INDICATED. U.N.O. L CONTRACTORS SHALL SEAL ALL LEAKS IN EXISTING DUCTWORK AND NEW DUCTWORK. INDICATED LOCATIONS ARE APPROXIMATE AVOID HEAT PRODUCING EQUIPMENT. FINAL SPACE THERMOSTAT /SENSOR LOCATIONS SHALL BE AS DIRECTED BY THE ARCHITECT. M. EXISTING EQUIPMENT AND DUCTWORK HAS BEEN LIGHTLY DRAWN TO SHOW THE APPROXIMATE LOCATION. NEW EQUIPMENT AND DUCTWORK IS SHOWN BY HEAVY LINES. S INSTALL TURNING VANES IN ALL 90 DEGREE SQUARE ELLS IN SUPPLY, RETURN, AND EXHAUST DUCTS. (NONE ALLOWED IN COMBUSTION AIR DUCTS). N. CONTRACTOR SHALL BE RESPONSIBLE FOR REMOVING AND /OR DISPOSING OF ALL ITEMS THAT ARE NOT NECESSARY IN THE COMPLETION OF THE PROJECT AND SHALL CLEAN T. LOCATE ISOLATION VALVES FOR EQUIPMENT AS CLOSE TO THE MAIN THE AREA OF CONSTRUCTION AFTER THE COMPLETION OF THE PROJECT. AS POSSIBLE 0. THE MECHANICAL CONTRACTOR SHALL ADJUST AND REBALANCE THE AIR CONDITIONING U, MULTI -BLADE DAMPERS OF ANY TYPE INSTALLED WITHIN 36" OF AN ELL OR OTHER FITTING SHALL SYSTEM AND EXHAUST SYSTEM TO PROPER DESIGN VOLUME AS SHOWN ON PLAN. BE INSTALLED WITH THE DAMPER BLADE SHAFTS PARALLEL TO THE AIRSTREAM FLOW DIRECTION UPSTREAM OF THE FITTING. P. ANY EXISTING WALLS DAMAGED FROM PIPING OR DUCTWORK THAT WAS REMOVED SHALL BE PATCHED AND SEALED TO MEET THE FULL INTEGRITY OF THE REMAINING WALL V. FIRE, SMOKE, AND FIRE /SMOKE DAMPERES WILL BE REQUIRED AT ALL DUCT PENETRATIONS THRU RATED WALLS. COORDINATE COORDINATE WITH ARCHITECTURAL PLANS FOR RATINGS OF WALLS. WITH ARCHITECTURAL DRAWINGS. MECHANICAL CONTRACTOR SHALL BE RESPONSIBLE FOR PRICING ALL FIRE, SMOKE, AND FIRE /SMOKE DAMPERS REQUIRED BY CODE MECHANICAL CONTRACTOR SHALL REPORT EXISTING FIRE, SMOKE, FIRE /SMOKE DAMPERS TO THE ARCHITECT AND ENGINEER BEFORE PRICING. W DEMONSTRATE TO OWNER'S REPRESENTATIVE THAT ALL INSTALLED CONTROLS ARE WORKING PROPERLY WITHOUT ERRORS PRIOR TO RELEASING SYSTEM TO OWNER. EXISTING AHU SCHEDULE DESIG./ SERVES UNIT TYPE EXISTING DESIGN CFM NEW DESIGN CFM PRE FILT. FINAL FILT. MANUFACTURER /MODEL N0. NOTES: TOTAL RETURN OUTSIDE CFM CFM AIR CFM TOTAL CFM RETURN CFM OUTSIDE AIR CFM CFM 16x16 451 -800 CFM S1 24x24 YES WHITE 4 -WAY U.N.O NOTE 1 AHU -EN EAST WING HORIZONTAL 7,532 4,896 2,636 8,422 5,831 2,591 30% 90% EXISTING TO REMAIN NONE AHU -NE NORTH WING HORIZONTAL 11,275 7,350 3,925 11,265 7,340 3,825 30% 90% EXISTING TO REMAIN NONE AHU -SE SOUTH WING HORIZONTAL 10,250 5,650 1,600 10,250 8,650 1,600 307: 909. EXISTING TO REMAIN NONE AIR DEVICE SCHEDULE DESIG. FRAME SIZE OBD FINISH THROW NECK SIZE MANUFACTURER /MODEL NO. REMARKS/NOTES 351 -560 CFM 14-"0_1561-S50 CFM 361 -450 CFM 16x16 451 -800 CFM S1 24x24 YES WHITE 4 -WAY U.N.O NOTE 1 TITUS / TDC -AA ALUMINUM LOUVERED SUPPLY DIFFUSER /3,4,5,6,7,8 S2 24x24 YES WHITE 3 -WAY U.N.O NOTE 1 TITUS / TDC -AA ALUMINUM LOUVERED SUPPLY DIFFUSER /3,4,5,6,7,8 R1 24x24 YES WHITE N/A NOTE 2 TITUS / 350FL ALUMINUM RETURN GRILLE/3,4,5,6,7,8,9 S3 SEE PLANS YES WHITE ADJUSTABLE DOUBLE DEFLECTION NOTE 1 TAUS / 300FL ALUMINUM SIDEWALL REGISTER /3,7,8 R2 SEE PLANS YES WHITE N/A I NOTE 2 TITUS / 350FL ALUMINUM SIDEWALL REGISTER /3,7,8,9 ►N 1 NECK* AIRFLOW 6 "0 0 -99 CFM 8 "o 100 -200 CFM 10 "0 201 -350 CFM 12 "40 351 -560 CFM 14-"0_1561-S50 CFM *AND /OR DUCT RUNOUT 2. NECK* AIRFLOW 6x6 0 -100 CFM 8x8 101 -230 CFM 10x10 231 -360 CFM 12x12 361 -450 CFM 16x16 451 -800 CFM 22x22 801 -1200 CFM *AND /OR DUCT RUNOUT 3, DIFFUSER RUNOUT SIZE SHALL BE DIFFUSER NECK SIZE, UNLESS OTHERWISE NOTED ON PLANS 4. PROVIDE SURFACE MOUNT HARDWARE IN ALL INACCESSABLE CEILING SYSTEMS 5. PROVIDE LAY -IN MOUNT HARDWARE IN ALL SUSPENDED CEILING SYSTEMS 6. REFER TO ARCHITECTURAL REFLECTED CEILING PLAN FOR LOC. OF DIFFUSERS 7. PROVIDE SELECTION BASED ON A MAXIMUM RADIATED NOISE OF NC-2-5 S. PROVIDE DIFFUSERS, GRILLES, AND REGISTERS MANUFACTURED FROM ALUMINUM UNLESS NOTED OTHERWISED. 9. 35 DEGREE BLADES, 3/4" SPACING. -XI <S 2121 Ponce de Leon Blvd., Suite 350 Coral Gables, FL 33134 phone: 305.569.1692 OLYNER professional Consulting Engineers fax: 305.56?. 1693 SF,F TIST HEALTh SC U H FLORIDA Austin Dallas • Denver - Houston • Nashville 6865 RED ROAD Miami Phoenix Richmond - Washington D.C. CORAL GABLES, FLORIDA 33146 cord project number: 410393.000 ARCHITECT EB00007658 FL AA F000119 HKS ARCHITECTS, INC. 1221 BRICKELL AVENUE, SUITE 1220 MIAMI, FL 33131 M.E.P. ENGINEERS CCRD PARTNERS 2121 PONCE DE LEON BOULEVARD SUITE 350 CORAL GABLES, FL 33134 INTERIORS IN.DESIGN, INC. 2080 NW BOCA RATON BOULEVARD SUITE 3 BOCA RATON, FL 33146 M O 0 .j � L O PROJECT DESIGN CRITERIA LOCATION: CITY /STATE MIAMI , FLORIDA APPLICABLE CODES: BUILDING 2007 FBC NTS W/ 2008, 2009 REV. MECHANICAL 2007 FMC W/ REV. PLUMBING 2007 FPC W/REV. HOSPITAL AND 2006 AIA HEALTH CARE GUIDELINES NTS LATITUDE: THIRD FLOOR MECHANICAL ICRA PLAN DEG. N. LAT. 25.8 LQNGITUDE: DEG. W. LONG. 80.3 ELEVATION: FT. ABOVE SEA LEVEL 13.0 ASHRAE SUMMER DESIGN CONDITIONS 0.4% DB MWB 91/78 ASHRAE WINTER DESIGN CONDITIONS 99% DB 47 BUILDING SPACE DESIGN TEMPERATURES SUMMER DB 72 WINTER DB 68 ROOF: U FACTOR - WALL U FACTOR - SUPPLY AIR TEMPERATURE: DEG. F. DRY BULB 55 MECHANICAL SHEET LIST DWG No. DRAWING TITLE SCALE MO.00 GENERAL INFORMATION — MECHANICAL NTS MD2.30 THIRD FLOOR DEMOLITION PLAN — MECHANICAL M2.30 THIRD FLOOR PLAN — MECHANICAL M7.00 MECHANICAL DETAILS NTS M.ICRA THIRD FLOOR MECHANICAL ICRA PLAN 1/a "-1' h+� it i I KEY PLAN GH C O 1A GL REVISION HKS PROJECT NUMBER 14262.000 DATE 04.11.2011 ISSUE BIDDING & PERMITTING SET SHEET TITLE MECHANICAL LEGEND, NOTES, & SCHEDULES SHEET NO. 02011 HKS, INC.