Loading...
11-233-013INFECTION CONTROL RISK ASSESSMENT ALL WORK SHALL CONFORM WITH THE OWNER'S INFECTION CONTROL AND CONSTRU!C h `,j PROCESSES AND OWNER'S PROJECT - SPECIFIC INFECTION CONTROL RISK AS ,.,SSMENT PLAN. ICRA MATRIX IC RISK CONSTRUCTION ACTIVITY TYPE LEVEL TYPE A TYPE B TYPE t.- TYPE D GROUP 1 CLASS I CLASS II CLASS II CLASS III /IV GROUP 2 CLASS I CLASS II CLASS III CLASS TV -A GROUP 3 CLASS I CLASS III CLASS III /TV GROUP 4 CLASS III CLASS III /IV CLASS III/ I/ .. CLASS IV INFECT1aN CONTROL FRISK LFCELS GROUP 1 GROUP 2 GROUP 3 I 4> o LOWEST OFFICE AREAS MEDIUM ALL PATIENT CARE UNITS MEDIUM HIGH EMERGENCY ROOM HIGHEST TRANSPLANT CLINIC CONFERENCE ROOMS WAITING ROOMS* RADIOLOGY AREAS SURGERY SUITES PUBLIC BATHROOMS C> C-D - t a F ROCP RECOVERY ROOMS WAITING ROOMS* E L Y Cl! o x 3 m LABOR AND DELIVERY i A,F r E! J � a � NURSERIES `v A !�; IO o ,_ C3 r CD CD PEDIATRICS CVICU t- o RIO SURGERY OUTPATIENT UNITS cr7 ALL INTENSIVE CARE AREAS DIALYSIS AND TRANSPLANT NUCLEAR MEDICINE (y) ADMISSION / DISCHARGE AREA ' J PHYSICAL THERAPY TANK AREF'. H PERBARIC MEDICINE 11 YSVA^ CAFETERIA ENDOSCOPY ECHOCARDIOGRAPHY PHARMACY ADMIXTURE LABORATORIES PHARMACY x ji * DEPENDENT ON LOCATION t ES CONES 1 E = { i'ON AC 1 111 1 1 T' ?E%9 INSPECTIONS AND NON- INVASIVE ACTIVITIES. INCLUDES, BUT IS NOT LIMITED T0, REMOVAL OF CEILING TILES FOR VISUAL INSPECTION LIMITED TO 1 TYPE A TILE PER 50 SQUARE FEET, PAINTING (BUT NOT SANDING) WALL COVERING, ELECTRICAL TRIM WORK, MINOR PLUMBING, AND ACTIVITIES WHICH r)() NPT R GENERATE DUST OR REQUIRE CUTTING OF WALLS OR ACCESS TO CEILINGS OTHER THAN FOR VISUAL INSPECTIONI. SMALL SCALE, SHORT DURATION ACTIVITIES WHICH CREATE MINIMAL DUST. INCLUDES, BUT IS NOT LIMTIP INS -1 AL < <�:�1iN OF T �LPHONE AN! TYPE B COMPUTER CABLING, ACCESS TO CHASE SPACES, CUTTING OF WALLS OR CEILING WHERE DUST MIGRATION CAN iK '.ONTFt1L %, i ANY WORK WHICH GENERATES A MODERATE TO HIGH LEVEL OF DUST OR REQUIRES DEMOLITION OR REMOVAL OF ANY FLED BUILDING COMPONENTS OR C ASSEMDLIES. INCLUDES, BUT IS NOT LIMITED 'TO, SANDING OF WALL FOR PAINTING OR WALL COVFRIING, R .MUVAL OF FLOOR COVERINGS, CEILING TILES TYPE AND CASEWORK, NEW WALL CONSTRUCTION, MINOR DUCTWORK OR ELECTRICAL WORK ABOVE CEILINGS, MAJOR CABLING ACTIVITIES, AND ANY ACTIVITY j WHICH CANNOT BE COMPLETED WITHIN A SINGLE WORKSHIFT. MAJOR DEMOLITION AND CONSTRUCTION PROJECTS. INCLUDES, BUT IS NOT LIMITED TO, ACTIVITIES WHICH REQUIRE CONSECUTIVE WORK SHIFTS, TYPE D REQUIRE HEAVY DEMOLITION OR REMOVAL OF A COMPLETE CEILING SYSTEM, AND NEW CONSTRUCTION. �i ❑ ICRA CLA 19CATION SCHEDUI E CLASS I 1. EXECUTE WORK BY METHODS TO MINIMIZE RAISING DUST FROM CONSTRUCTION OPERATIONS. - - -` A-` caw 2 IMMEDIATELY REPLACE ANY CEILING TILE DISPLACED FOR VISUAL INSPECTION. ❑ 3. MINOR DEMOLITION FOR REMODELING. 1. PROVIDES ACTIVE MEANS TO PREVENT AIRBORNE DUST FROM DISPERSING INTO ATMOSPHERE.I 2, WATER MIST WORK SURFACES TO CONTROL DUST WHILE CUTTING. 3. SEAL UNUSED DOORS WITH DUCT TAPE. CLASS II 4. BLOCK OFF AND SEAL AIR VENTS. i d 5. WIPE SURFACES WITH DISINFECTANT. 6. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINERS. 7. WET MOP AND /OR VACUUM WITH HEPA FILTERED VACUUM BEFORE LEAVING WORK AREA. 1 S. PLACE DUST MAT AT ENTRANCE AND EXIT OF WORK AREA. pow* 9, REMOVE OR ISOLATE HVAC SYSTEM IN AREAS WHERE WORK IS BEING PERFORMED, I 1. OBTAIN INFECTION CONTROL PERMIT BEFORE CONSTRUCTION BEGINS. 2. ISOLATE HVAC SYSTEM IN AREA WHERE WORK IS BEING DONE TO PREVENT CONTAMINATION OF THE DUCT SYSTEM. 3. COMPLETE ALL CRITICAL BARRIERS OR IMPLEMENT CONTROL CUBE METHOD BEFORE CONSTRUCTION BEGINS. U 4. MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORK SITE UTILIZING HEPA EQUIPPED AIR FILTRATION UNITS AND MONITOR WITH MAGNEHELIC GAUGES. 5, DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL COMPLETE PROJECT IS THOROUGHLY CLEANED BY ENVIRONMENTAL SERVICES DEPARTMENT. CL III 6. VACUUM WORK WITH HEPA FILTERED VACUUMS. ❑ 7. WET MOP WITH DISINFECTANT. a. REMOVE BARRIER MATERIALS CAREFULLY TO MINIMIZE SPREADING OF DIRT AND DEBRIS ASSOCIATED WITH CONSTRUCTION. 1 9. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINERS. 10, COVER TRANSPORT RECEPTACLES OR CARTS, TAPE COVERING. 11. REMOVE OR ISOLATE HVAC SYSTEM IN AREAS WHERE WORK IS BEING PERFORMED. 1. OBTAIN INFECTION CONTROL PERMIT BEFORE CONSTRUCTION BEGINS. 2. ISOLATE HVAC SYSTEM IN AREA WHERE WORK IS BEING DONE TO PREVENT CONTAMINATION OF THE DUCT SYSTEM. 3. COMPLETE ALL CRITICAL BARRIERS OR IMPLEMENT CONTROL CUBE METHOD BEFORE CONSTRUCTION BEGINS. 4. MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORK SITE UTILIZING HEPA EQUIPPED AIR FILTRATION UNITS AND MONITOR WITH MAGNEHELIC GAUGES. 5. SEAL HOLES, PIPES, CONDUITS, AND PUNCTURES APPROPRIATELY. 6. CONSTRUCT ANTEROOM AND REQUIRE ALL PERSONNEL TO PASS THROUGH THIS ROOM SO THEY CAN BE VACUUMED USING A HEPA VACUUM CLEANER BEFORE LEAVING WORK SITE OR THEY CAN WEAR CLOTH OR PAPER COVERALLS THAT ARE REMOVED EACH TIME THEY LEAVE THE WORK SITE. CLASS IV 7. ALL PERSONNEL ENTERING WORK SITE ARE REQUIRED TO WEAR SHOE COVERS. 8. DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL COMPLETED PROJECT IS THOROUGHLY CLEANED BY THE ENVIRONMENTAL SERVICES DEPARTMENT AND RELEASED BY SAFETY AND INFECTION CONTROL. 9, VACUUM WORK AREA WITH HEPA FILTERED VACUUMS. 2. 10. WET MOP WITH DISINFECTANT. 0 11. REMOVE BARRIER MATERIALS CAREFULLY'TO MINIMIZE SPREADING OF DIRT AND DEBRIS ASSOCIATED WITH CONSTRUCTION. O 12. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINERS. 0 13. COVER TRANSPORT RECEPTACLES OR CARTS. TAPE COVERING. Revisions Date 14. REMOVE OR ISOLATE HVAC SYSTEM IN AREAS WHERE CONSTRUCTION IS BEING DONE, SPIN -IN FITTING W /VOLUME CONTROL DAMPER (INSUL. PER SPEC.) BLANK -OFF PLATES WHERE REQUIRED CEILING 1EE-"' EXTENDED OPERATOR ON BALANCE DAMPER FLEXIBLE DUCT MAX. 8' -0" IN LENGTH FULLY EXTENDED, DIFFUSER MOUNTING No Scale I II I 0 II I DRAW BAND FLEXIBLE DUCT W BAND USER NECK (INSUL PER SPEC.) USER CONE (INSUL. PER SPEC.) SPIN -IN FITTING W /VOLUME CONTROL DAMPER (INSUL. PER SPEC. REQID.) LIGHT RETAINING ANGLES 11/2% 11/2% 1/8" MIN. FIRE RESISTIVE ALL SIDES (SEE NOTE #2) MATERIAL (TYP.) MANUFACTURER OR FIELD FABRICATED �L STEEL SLEEVE 16 GA. MIN. J - - - -; CAULKING (TYP. OF 2) NOTE #5 d DUCT MOUNTED SMOKE DETECTOR TO BE INSTALLED WITHIN 5' -0" OF 165'F FUSIBLE LINK--______ Vol MPER PER MANUFACTURER'S WRAPPED SHEET METAL DUCT �_ � -� RECOMMENDATIONS, WITH NO AIR _ INLETS OR OUTLETS BETWEEN THE DETECTOR AND THE DAMPER. U.L. (555S) LABELED FIRE /SMOKE -` - DAMPFR, SECURE TO SLEEVE =- CLEARANCE 1/8" PER LINEAR NOTE #1 FOOT BOTH DIMENSIONS. PLAIN "S" SLIP (TYP.) BREAK; AWAY CONNECTION DUCT WRAP W /VAPOR BARRIER (TYP.) MOUNTING ANGLE 1" MIN. OVERLAP ALL SIDES. CLOSURE TAPE 6" MAX. '--METAL STUD CONSTRUCTION NOTES: 1. PROVIDE ACCESS DOOR do LABEL ON SIDE OR BOTTOM OF DUCT AS FOLLOWS: DUCT WIDTH DOOR SIZE 10" THRU 12" 8" x I" 14" THRU 20" 12" x 12" 22" AND ABOVE la" x 18" 2. 11/2" x 11/2" x 14" RETAINING ANGLES SHALL LAP STRUCTURAL OPENING I" MIN. & COVER CORNERS OF OPENINGS. ANGLES ATTACH TO SLEEVE ONLY AND MUST NOT BE ATTACHED TO EACH OTHER AT CORNERS OR TO WALL. 3. ALL ATTACHMENTS PER MANUFACTURER'S APPROVED INSTALLATION INSTRUCTION. 4. VERTICAL POSITION SHOWN. HORIZONTAL INSTALLATION SIMILAR. 5. ACTUATOR TO BE MOUNTED ON OUTSIDE OF DAMPER SLEEVE ON ACCESIBLE SIDE, ACTUATOR SHALL NOT INTERFERE WITH "S" JOINT. ACTUATOR ASSEMBLY TO BE U.L. LABELED. 6. VERIFY THAT ACCESS IS PROVIDED ON THE ACTUATOR SIDE OF THE WALL /FLOOR SO THAT THE LINK MAY BE SERVICED WITH THE DAMPER IN CLOSED POSITION. 3 FIRE & SMOKE DAMPER INSTALLATION No Scale TYPICAL FLEX DUCT CONNECTION 4 TYPICAL LOW PRESSURE DUCTWORK No Scale No Scale ;AL 45 OCT TYPICAL ALANCING _BOWS MAY BE USED F SQUARE ELBOWS 2 AHCA Project ID - Submission no. 164 -001 Heery International Inc. 811 Ponce De Leon Blvd. Coral Gables, FL 33134 TEL (305) 441 -1556 FAX: (305) 445 -2374 evil littp://www.s-garchitects.com httla://www.Heery.com f AA 0002293 EB 0005176 k Project Number 1022801 I I I 4> o E CM •C CD oy ca (>f © A•� U C> C-D - t a F C,6 O u ��w� E L Y Cl! o x 3 m 1 N [!) O c� E! J � a � OIL o ,_ C3 r CD CD NE' t- o cr7 (y) Cy') ' J 11 Q z i � H R � O i C0 W j I Q �i ❑ A-` caw N 7 CD pow* U • RMO z F" CL Q M (" IL Q UJ > :D 2. 0 Ri O 0 cn Revisions Date DAHCA Comments 2/23/11 i Seal: - -- Dnh.�iloyx E 67 „ , j- r' 4 � Seal y Checked By DCB Drawn By: EMF Date: 02 -18 -2011 Issue: 02 -18 -2011 Sheet Index: DETAILS' & SCHEDULES HVAC Sheet Numberr://��� II+II�J'.O f