11-215-009STATI❑N u�.. GENERAL NOTES • w ....• YY• •• f Y Y fu••.• • • • DEMOLITION NOTES. • �W . •. • 4 w EL V 7 1. AREA OF CONSTRUCTION SHALL BE MAINTAINED UNDER NEGATIVE : • ` ` w LiT PRESSURE IN RELATION TO SURROUNDING AREAS.' THE CONSTRUCTION AREAS TO BE TESTED WEEKLY TO ASSURE A NEGATNE PRESSURE OF S • u • o o: 0.02 INCHES WATER GAUGE IN BEING MAINTAINED WHEN ALL DOORS AND •• °" WINDOWS ARE CLOSED. ALL AIR OUTLETS AND WALL PENETRATIONS 0. w f • f �:.. • . :*660 DIET, I I SHALL BE BLOCKED OF TO MAINTAIN NEGATIVE PRESSURE IN THE SPACE. 14) DIFFUSERS \, OFFICE I I 100 CFM EA. CONTRACTOR WILL PROVIDE A TEMPORARY EXHAUST FAN TO MAINTAIN �C = =C = c �C LOUIS J, AGUIRRE & ASSOCIATES, P.A. - - - _ _ = = NEGATIVE PRESSURE {N THE SPACE. =USER 9X4 / I I b•0 6'C = c = 2. WORK SHALL SCHEDULE TO MINIMIZE IMPACT 70 THE NORMAL C d n S u I t I n Engineers 9 10 DIFFUSER I I 6 O 6 0 6 0 IIXI2 6 "0 6 "0 OPERATION OF THE HOSPITAL SEE ARCHITECTURAL DRAWING PLAN. " :Flail 9150 South Dadeland 0 _ �- Blvd. Suite 90 �i T � CFM D_ P 1p \00 - 8X12 _ X12 COORDINATE WITH THE AUTHORIZED SMH HOSPITAL REPRESENTATIVE - -= I ❑� - - - - - - _. �EQXI2 Miami •Florida 33156 . CA 924 11 I X5.4, \ / I I 8X8 IIXI2 I� 8X8 MINIMUM OF 72 HOURS PRIOR TO ANY SHUTDOWN REQUIRED TO Telephone 305.670.0141 x i 10" DIFFUSER 6.0 PERFORM WORK ON H.V.A.C. SYSTEMS. � I i 6 "O 6" 6 "0 6'0 I I Facsimile 305 670 0144 1z Il /) I \400 CFM I I 0 _ I I 6 0 www.ljaapa.com IOX5 = 14XI1 12X8 = _ "! _ 3. PROVIDE VISUAL NEGATIVE PRESSURE GAUGE TO MONITOR THE 1. / - - _ _ _ ^^_ Project No.: 20046 13 = = = - ^ _�_ _ �J,�, PRESSURE RELATIONSHIP BETWEEN THE CONSTRUCTION AREA AND THE 1 - - - - - - - - - WASHING I I 8 "O I REMOVE WINDOW PANE AND PROVIDE SWEET METAL (SAME ADJACENT SPACE TO PROVIDE NEGATIVE PRESSURE OF 0.02 W.G. =USER - A A I I I I 3"O WITHIN THE SPACE. r I M /10" DIFFUSER F ``,�1 I I I SIZE AS WINDOW PANE) WI7N INTERIOR BOOT TO FIT rr �rr.4.�rk ROUND DUCT. REPLACE WINDOW PANE AT END OF \500 CFM 1 110 " ? II I L�� CONSTRUCTION. `r' p 1 12X8 - -I I SE R I II I II) DIFFUSERS _ _ >s O CFM = = ff .� _ • 6 = _ �' 4 =USER I N i \I i'(0" DIFFUSE II I � �' = = I I 150 CFM :FM ®\00CFM I�,,4 =C — �C EQUIPMENT SPECIFICATIONS: - -� . _ _ - - - - - - I I 6 0 6-0 SXI2 6.0 6"0 60 6-0 6 0 150 CFM TO BE EXHAUSTED TO THE OUTSIDE. THE EXHAUST rINTNr A o 8X12 - - -,-� -II I - - - - ,,.._ - _ - CFM AMOUNT TO BE INCREMENTALLY MODULATED IN THE FIELD - - a - -- — - [13X12 _„- ]� - - _ - SUPPLY, RETURN, TRANSFER, AND EXHAUST AIR DUCTWORK: SHALL BE a / -L 8X8 IIXI2 - X12 8X8 IN ORDER TO SATISFY ICRA REQUIREMENT OF 0.02" W.G. GALVANIZED SHEET STEEL, DESIGNED, CONSTRUCTED AND INSTALLED PER 10" DIFFUSER I I ITO 6'0 I I ITT STATIC PRESSURE. 1 3 JSEIR- - - - - �� - - - - I I b "0 6 "0 6'0 I I 7� SMACNA S HVAC DUCT CONSTRUCTION STANDARDS- METAL AND FLEXIBLE" MANUAL, LATEST EDITION. STATIC PRESSURE CLASSIFICATION AS FOLLOWS: „ 7 i -9X4 27X15 FT�11�Z�G . I I ❑ _ �° _ �_ _ �_ �1= I 12 O 1 3" STATIC PRESSURE: SUPPLY AIR AND RETURN AIR DUCTWORK. 2" STATIC I I � I 26X24 PRESSURE: OUTSIDE AIR, TRANSFER DUCTS AND EXHAUST AIR DUCTWORK. II 2 - ` I I I I \ I I I -- -- FLEXIBLE DUCTWORK: SHALL BE CLASS 1, UL STANDARD 181, INSULATED ReVISed: x I I I II 'S� ANU ROUND DUCT BY THERMAFLEX MKE OR FLEXMASTER IM: R -6 MINIMUM. - I I I /�� I ❑ L❑❑ - � - J_ FACTORY FABRICATED WITH AN OUTER JACKET ENCLOSING 1 -1/2 INCH THICK �❑ cO II I I I I I 8" DIFFUSER IIIIII I GLASS FIBER I NSULATION AROUND A CONTINUOUS METAL INNER LINER. 8 0 TEMPORRY TEMPORARY PARTITION DETAIL GLASS- REINFORCED SILVER MYLAR OUTER JACKET WITH A CONTINUOUS 235 CFM ER 2) DIFFUSC DUCT (UL 181 CLASS 1) HANGING TAB. 100 CFM EA.= DIFFUSE I I I I I I IIX6 III I HU❑D COURT I _ _ _ _ RECTANGULAR MANUAL VOLUME DAMPERS: SHALL BE RUSKIN MODEL MD35 _ 0 CFM 14X8 L-L�.. 20X11 I i I III I 18X18 OR EQUAL. MULTIPLE OPPOSED BLADE OR SINGLE BLADE, FURNISHED _ _ _ -•- _ - -L r� �- - - ^ - - - - - -I - - COMPLETE WITH FACTORY FABRICATED LOCKING HAND QUADRANT. - -_ ®n. 17X9 I L -- �I T IL - - - - - ® i - �A 20X14 - - - - - ^ J I I UTILITY FAN WITH HEPA FILTER AND SPEED CONTROL (150 CFM) PROVIDE WITH 2" STAND -OFF WHEN INSTALLED ON EXTERNALLY INSULATED r I " ( I I I I TO CLEAN AND RECIRCULATE THE AIR IN THE CONSTRUCTION DUCT. _ 10 DIFFUSER 10- -- 500 CFM I I 500 CFM ER I I I AREA, MAINTAINING NEGATIVE PRESSURE OF 0,02" W.G Ic�I I I I I I BETWEEN CONSTRUCTION AREA AND ADJACENT SPACES (SEE x TEMPORARY ( I DEMOLITION NOTES ON THIS DRAWING) Client ... 14 HEPA FILTER -ANA I I I i I -I I I PARTITION 3 I / I (99.99x EFF.) ANTEROOMI I) I - -16X10 - - -� - 16XIO E/A INFECTION G NTROL RISK f I I I I ❑ I I I I VD -, I ASSESSMENT KIT C H E N 44- �❑❑ 175 .CFM I 2ND. FL. IOh DIFI =USER 2 3 6X10 1. TO THE EXTEND THAT IT IS REQUIRED BY THE ICRA, THE CONTRACTOR TIC 3 O C M IN EXISTING LEVELS OF INDOOR AIR QUALITY IN MAGNE ALL MAINTAIN - - - - SHALL E/A DUCT DRAFT ICI fl.. I TEMPORARY LE 11 SURROUNDING AND ADJACENT AREAS TO THE CONSTRUCTION AREA, AND / i I GAUGE � I I � 'C ,.�L PARTITION (UP) -r - -�-- -- =c ELSEWHERE IN THE FACILITY. IT SHOULD BE ANTICIPATED THAT THE ICRA _ REPORT WILL REQUIRE ERECTION OF CONSTRUCTION ZONE BARRIERS / I I ASS I 4X8 I ��k T 32X10 9X10 26X10 23X10 19X10 - -r-- - -I -- 9 6 (� 14X8 i I I _ _ I= - - _ 9 DIET -11X7 AND PROVISION OF NEGATIVE PRESSURE IN THE CONSTRUCTION ZONE South Mlallll Hospital I--- — T I,XIO ST❑FIES / pJ I I RELATIVE TO SURROUNDING AREAS. I / UTILITY F N WITH HEPA FILTER AND SPEED CONTROL (3400 CFM) r % \ I I I I 2 3 12X24 CD 4 r - � \8X16 CD TO CLEAN AND RECIRCULATE THE AIR IN THE CONSTRUCTION B H S it DIFFUSE I I 10" DIFFUSER x I 300 CF B.H.S.F. i I I m - - -�' -- 500 CFM / � / � AREA. 2. IN ADDITION TO MEETING THE REQUIREMENTS OF THE ICRA REPORT, THE 0 CFM I I I I 500 CFM I I - — KITCHEN / I I 6X10 CID CONTRACTOR SHALL PROVIDE THE EQUIPMENT NECESSARY TO CREATE A I I 40X2 E/ ` _ — = _ — 6200 S.W. 73 RD. Street I IDUCT P I WOOD / \ I I 190 CFM NEGATIVE PRESSURE IN THE CONSTRUCTION AREA, RELATIVE TO THE ` _ / ADJACENT AREA. EXISTING HVAC SYSTEM AND COMPONENTS SHALL NOT Miami, FL. 33143 �_ L � 350 F� � 121X10 � I X OI XIQ I - I � NEPq TER '� BE USED FOR THIS FUNCTION, UNLESS SPECIFICALLY APPROVED BY THE -- j / I (99.9 EFFJ "� I - RECEIVING r T OWNER'S INFECTION CONTROL OFFICER. THE CONCEPT AND ALL ASPECTS - - L _ J - - - - - - y I� OXI IQ FD /_ _ - D ❑CK OF THIS WORK SHALL BE DONE IN ACCORDANCE WITH THE ICRA Q DER � cp '—° � 1- - - I 2 3 J O I ` � / F❑ ❑D PREP. REP 2 3 - FDI I REQUIREMENTS AND AS A MINIMUM THE FOLLOWING: F- _ - -�-- O Z W I 75 CFM 2 H R RATED E I A. VERIFY ALL EXISTING DUCTWORK WHICH PASSES THROUGH THE 12X24 CD / I I O W c� 12X24 CD 750 CFiM / \ I I SMOKE PARTITION CONSTRUCTION ZONE, AND IS TO REMAIN, IS SEALED AND � � 'Cr I_ I _ _ - 750 CFM, :. - - — L 12X8 = _❑ _ - - jj PROTECTED DURING CONSTRUCTION. 4X8 I - 34X1 \ _ - - CI�I _ �- - -�- — - - - - - - -. --�� - 4H R RATED B. AIR REMOVED FROM THE CONSTRUCTION ZONE SHALL BE FILTERED _ p M _ - \ /10- DIFFU ER� - }-- - - -.. ®20X9 / I I S �'� P A R T I TI ION AND /OR DISCHARGED AS DIRECTED BY THE ICRA REPORT. W � J - DIET 6X12 CD -I I Z u.. - C. PRESENT THE NEGATIVE AIR PRESSURE PLAN TO THE OWNER FOR 10" IFrFU R I I - T - ^ STOP. I I 200 CFM / I I - APPROVAL BY THE INFECTION CONTROL OFFICER. W ~ 500 CFM - - I I / 487C12 y I I I I I D. PROVIDE MEANS TO MONITOR AND VERIFY NEGATIVE PRESSURE IS `n Q Cn ❑ I IF / il: FREEZER I RECEIVING d II8X7 I a) V♦ i (D — i` L _ EEZER _J_ .,�❑EER ST ❑R. T BEING MAINTAINED IN ACCORDANCE WITH THE ICRA REPORT, AND E _0 SER I yCCQ ❑LIER50X20 C ❑❑ iEF I �(� I /� i "� - I I �I I VEST �1 CART WASH PROVIDE DOCUMENTS TO THE OWNER AS REQUIRED z 0 p RIEEZIER / I I�I I ST ❑26X12 CD c� CD - -- ANU -2 X24-- I I / ---- i- - - - --1 II- .� 6.. I 200 CFM �_ W t FD -r�_ c�rrQ Ia❑r� I ��a _ CODES AND STANDARDS: Cr CL �r- �---- �-�IC� FD II I II I - S ANU -7 I I APPLICABLE CODES AND STANDARDS SHALL INCLUDE ALL STATE LAWS, KEY PLAN I r I I II I I 7r S I ( LOCAL ORDINANCES, UTILITY COMPANY REGULATIONS AND THE 17 " ?;---, S.M.H. I lL APPLICABLE REQUIREMENTS OF THE FOLLOWING ACCEPTED CODES AND STANDARDS, WITHOUT LIMITING THE NUMBER, AS FOLLOWS. 1. FLORIDA BUILDING CODE - 2007 W/ 2009 SUPPLEMENTS. 2. GUIDELINES FOR DESIGN AND CONSTRUCTION OF HEALTH DEPARTMENT CARE FACILITIES 2006 EDITION. 3. NATIONAL ELECTRICAL CODE (NEC 2008). 4. ENVIRONMENTAL PROTECTION AGENCY (EPA). ANU -10 i u I x I X X X X X x I I -- -----------------^----- y I� 32X12 /� EXPANDED _-- __ —_ — TRANSFORMER MECHANICAL /ELECTRICAL ROOM — 68X36 — �_ ---- -� - - -- VAULT III -- � 84X3 X I VAULT ROOM �L ELECTRICAL P❑ ❑M �❑ I I UP ENG ❑F-EICE 77, VEST. i STAIR 8 I� I I_ r --F F r CODED NOTES: TEMPORARY FLEXIBLE DUCT. REMOVE FLEXIBLE DUCT AFTER DEMOLITION IS COMPLETED INSTALL AGAINST AIR DEVICE TEMPORARY BLANKET TYPE, DISPOSABLE 1" THICK SYNTHETIC MEDIA. REMOVE SYNTHETIC MEDIA AFTER DEMOLITION IS COMPLETED. INSTALL TEMPORARY CAP IN SUPPLY AIR DUCT AND SEAL AIR TIGHT, REMOVE AT END OF CONSTRUCTION. DOOR SHALL BE SEALED AIR TIGHT AND KEPT CLOSED DURING CONSTRUCTION. 5. DEPT. OF ENVIRONMENTAL REGULATION MANAGEMENT (DERM). Seal OCATION )F WORK a 6. LOCAL ORDINANCES, REGULATIONS OF THE BUILDING DEPTS. AND FIRE � i" DEPTS. 7. RECOMMENDATIONS OF NFPA, IN GENERAL AND IN PARTICULAR: A. LIFE SAFETY, NFPA 101 (2006) B. HVAC, NFPA 90A, (2002) MECHANICA ' C„;, $ C. HVAC, NFPA 90B, (2006) ED"f,4t2 A,..SUAZ,P,1 D. HVAC, NFPA 96 (2004)ICESE IK'64759 . E. HOSPITALS, NFPA 99, (2005) +� , r a� RELATIVE PRESSURE (0) = EQUAL PRESSURE ( -) NEGATIVE PRESSURE ( +) = POSITIVE PRESSURE C RA Sheet Title: 1 TYPE "C CLASS - III EXISTING AHU -5 (100% O /A) PERFORMANCE DURING NORMAL OPERATION: SUPPLY AIR - 12369 CFM (T &B REPORT DATED 12/2/2010) OUTSIDE AIR 12369 CFM EXISTING AHU -5 PERFORMANCE DURING CONSTRUCTION: ADJUST AHU -5 TO DELIVER 7769 CFM EXISTING AHU -5 PERFORMANCE AFTER CONSTRUCTION: SUPPLY AIR = 12000 CFM RETURN AIR = 2400 CFM OUTSIDE AIR - 9600 CFM ICRA - FIRST FLOOR PLAN HVAC Project No.: 20046 Date: 02.18.2011 Scale: AS NOTED Drawn by: J. H., F.P.,J.B. t, Checked by: V.A.,E.Z. Sheet Number: I M1 woo l"