11-215-0083 r GENERAL NOTES: 1. THE CONTRACTOR SHALL FURNISH ALL LABOR MATERIALS AND EQUIPMENT NECESSARY FOR THE INSTALLATION OF THE HVAC SYSTEM IN ACCORDANCE WITH THESE DRAWINGS. FLORIDA BUILDING CODE - 2007 W/ 2009 SUPPLEMENTS. GUIDELINES FOR DESIGN AND CONSTRUCTION OF HEALTH DEPARTMENT CARE FACILITIES 2006 EDITION. - NATIONAL ELECTRICAL CODE (NEC 2008). - ENVIRONMENTAL PROTECTION AGENCY (EPA). - DEPT. OF ENVIRONMENTAL REGULATION MANAGEMENT (DERM). LOCAL ORDINANCES, REGULATIONS OF THE BUILDING DEPTS. AND FIRE DEPTS. RECOMMENDATIONS OF NFPA, IN GENERAL AND IN PARTICULAR: A. LIFE SAFETY, NFPA 101 (2006) B. HVAC, NFPA 90A, (2002) C. HVAC, NFPA 906, (2006) D. HVAC, NFPA 96 (2004) E. HOSPITALS, NFPA 99, (2005) 2. THE CONTRACTOR IS RESPONSIBLE FOR VISITING THE SITE OF THE WORK AND BECOMING FAMILIAR WITH THE CONDITIONS OF THE WORK PRIOR TO SUBMITTING A BID. THE CONTRACTOR IS REQUIRED TO BECOME FAMILIAR WITH ALL THE CONTRACT DOCUMENTS PERTAINING TO THE PROPOSED WORK. THE SUBMISSION OF A BID SHALL BE SUFFICIENT TO ESTABLISH THAT THE CONTRACTOR HAS INVESTIGATED THE SITE OF THE WORK AND IS SATISFIED AS TO ALL REASONABLE CONDITIONS TO BE ENCOUNTERED, THE WORK TO BE PERFORMED AND THE MATERIALS TO BE PROVIDED IN THE COMPLETION OF THE PROJECT, 3. FAILURE OF BIDDERS TO MAKE REQUIRED VISITATIONS AND /OR INVESTIGATIONS TO INFORM THEMSELVES FULLY OF EXISTING CONDITIONS, AND TO INCLUDE IN THEIR PROPOSALS A SUM SUFFICIENT TO COVER ALL POSSIBLE FIELD CONDITIONS, WILL NOT IN ANY WAY ENTITLE THEM TO ANY EXTRA CHARGES OVER AND ABOVE THEIR ORIGINAL PROPOSALS. 4. ALL WORK SHALL BE COORDINATED WITH ALL OTHER TRADES AT JOB SITE PRIOR TO FABRICATION AND INSTALLATION OF EQUIPMENT. ANY DISCRIPANCIES BETWEEN THE WORK DEPICTED ON THESE DOCUMENTS AND THE ACTUAL CONDITIONS ENCOUNTERED SHALL BE BROUGHT PROMPTLY TO THE ENGINEER FOR REVIEW AND CLARIFICATION. 5. CONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONS TO PROTECT PROPERTY IN AREAS WHERE WORK IS BEING CONDUCTED. THE CONTRACTOR IS RESPONSIBLE FOR ANY DAMAGES CAUSED TO BUILDING COMPONENTS DUE TO NEW WORK OPERATIONS. PATCH AND REPAIR EXISTING SURFACES DAMAGED AS REQUIRED TO MATCH ADJACENT SURFACES. 6. CONTRACTOR SHALL PROVIDE DURING CONSTRUCTION ALL SAFETY MEASURES AND FEATURES AS REQUIRED BY THE APPLICABLE CODES, RULES AND REGULATIONS HAVING JURISDICTION OVER THE PROJECT, 7. ALL WORK SHALL BE COORDINATED WITH ALL OTHER TRADES AT JOB SITE PRIOR TO FABRICATION AND INSTALLATION OF EQUIPMENT. ANY DISCREPANCIES BETWEEN THE WORK DEPICTED ON THESE DOCUMENTS AND THE ACTUAL CONDITIONS ENCOUNTERED SHALL BE BROUGHT PROMPTLY TO THE ENGINEER FOR REVIEW AND CLARIFICATION. S. THE WORK THAT IS TO BE DONE UNDER THIS CONTRACT INCLUDES THE FURNISHING OF ALL LABOR, MATERIALS AND EQUIPMENT, PERMITS, FEES, INSPECTIONS, TESTS, INSURANCE, ETC., REQUIRED FOR THE COMPLETION OF THE HEATING, VENTILATING AND AIR CONDITIONING SYSTEMS SHOWN ON DRAWINGS. 9. THE DRAWINGS ARE GENERALLY DIAGRAMMATIC. THEY DO NOT SHOW EVERY BEND, OFF -SET, ELBOW OR OTHER FITTINGS WHICH MAY BE REQUIRED FOR THE INSTALLATION IN THE SPACE ALLOCATED. 10. DRAWINGS ARE NOT TO BE SCALED, UNLESS SPECIFIC DIMENSIONS ARE SHOWN, THE STRUCTURAL DRAWINGS AND SITE CONDITIONS SHALL GOVERN EXACT LOCATION OF MECHANICAL EQUIPMENT TO BE INSTALLED. 11. IT IS THE INTENT OF THE PLANS AND GENERAL NOTES TO PROVIDE A COMPLETE AND OPERATING INSTALLATION INCLUDING ALL NECESSARY ITEMS REQUIRED, EVEN THOUGH ITEMS ARE NOT INDICATED ON THE DRAWINGS OR IN THE NOTES. ALL WORK CONSIDERED NECESSARY FOR THE COMPLETION OF THE WORK IN PROPER MANNER NOT SHOWN ON THE PLANS OR NOTES SHALL BE BROUGHT TO THE ATTENTION OF THE ENGINEER IN WRITING PRIOR TO BIDS OTHERWISE WORK SHALL NOT BE ADDITIONALLY CHARGED AFTER BID IS AWARDED. 12. SUBMIT SHOP DRAWINGS OF ALL MATERIALS, DUCTWORK, DUCT LAYOUT AND EQUIPMENT FOR REVIEW BY ENGINEER PRIOR TO FABRICATION AND /OR INSTALLATION. 13, ALL DUCT SIZES SHOWN ON DRAWINGS ARE CLEAR INSIDE DIMENSIONS. 14. THE CONTRACTOR SHALL TEST ALL EQUIPMENT, MAKE PRELIMINARY ADJUSTMENTS AND CALIBRATE ALL CONTROLS PRIOR TO REQUESTING TEST AND BALANCE SERVICES. 15. NO PORTION OF THE NEW DUCTWORK OR ITS SUPPORTS SHALL MAKE CONTACT WITH PARTITIONS, CEILING, LIGHTS, ETC. 16. CONTRACTOR SHALL WARRANT ALL WORK TO BE FREE OF DEFECTS IN WORKMANSHIP AND MATERIALS FOR A PERIOD OF ONE YEAR AFTER ACCEPTANCE OF THE INSTALLATION. 17. PROVIDE OWNER WITH (3) HARD BOUND SETS OF SYSTEM OPERATING INSTRUCTIONS FOR ALL EQUIPMENT INCLUDING CONTROLS. 18. ALL MATERIALS SHALL BE NEW. ANY DAMAGED EQUIPMENT SHALL BE REPLACED OR RESTORED TO ORIGINAL CONDITION. 19. PROVIDE CEILING/WALL ACCESS PANELS WHERE INDICATED IN THE DRAWINGS AND WHERE REQUIRED TO ACCESS HVAC EQUIPMENT. PANELS SHALL BE RECESSED TYPE, FIRE RATED IF IN FIRE RATED WALLS OR CEILINGS. LOCATION OF PANELS SHALL BE COORDINATED WITH ALL THE OTHER TRADES. 20. CONTRACTOR SHALL OBTAIN THE SERVICES OF AN INDEPENDENT, CERTIFIED TEST AND BALANCE COMPANY TO BALANCE THE AIR SYSTEMS ASSOCIATED WITH THE NEW AND EXISTING MECHANICAL EQUIPMENT AS SHOWN TO THE QUANTITIES AND CAPACITIES INDICATED ON THE PLANS. CONTRACTOR SHALL SUBMIT (3) COPIES OF REPORT TO ENGINEER UPON COMPLETION FOR REVIEW. 21. DURING CONSTRUCTION, ALL SUPPLY DUCTWORK OPENINGS SHALL BE FITTED WITH BLANKET TYPE, DISPOSABLE 1" THICK SYNTHETIC MEDIA IN ORDER TO PREVENT CONSTRUCTION DEBRIS FROM ENTERING AND ACCUMULATING INSIDE= THE DUCT SURFACES. 22, UPON COMPLETION, CONTRACTOR SHALL CLEAN ALL DUST AND DEBRIS IN AREAS WHERE WORK WAS CONDUCTED. 23, ALL WORK SHALL CONFORM WITH THE 2007 FLORIDA BUILDING CODE WITH 2009 SUPPLEMENTS AND ALL APPLICABLE CODES AND REGULATIONS. 24. DUCTWORK LEAKAGE TESTS: A) ALL DUCTWORK SHALL BE LEAKAGE TESTED IN STRICT CONFORMANCE WITH THE PROCEDURES DESCRIBED IN THE LATEST EDITION OF SMACNA'S "HVAC AIR DUCT LEAKAGE TEST MANUAL ". TEST SHALL BE CONDUCTED AT A STATIC PRESSURE EQUAL TO THE STATIC PRESSURE CLASSIFICATION OF MEDIUM PRESSURE DUCTWORK AND /OR LOW PRESSURE CONSTRUCTION. FOR INSTANCE, IF MEDIUM PRESSURE DUCTWORK IS CONSTRUCTED TO A 3" STATIC PRESSURE CLASSIFICATION, THE LEAKAGE TEST SHALL BE CONDUCTED AT 3" WG STATIC PRESSURE TEST. RECOMMENDATIONS W THE MANUAL AS TO WHAT DUCTS MAY OR MAY NOT BE TESTED ARE IRRELEVANT; LEAKAGE TESTING MUST BE PERFORMED. B) SMACNA "HVAC AIR DUCT LEAKAGE TEST MANUAL" SHALL BE USED AS A MANUAL OF GOOD PRACTICES FOR ALL PRE =SSURE TESTS. C) THE CONTRACTOR SHALL USE NO SMACNA PUBLICATION, AS A REFERENCE IN AN ATTEMPT TO INVALIDATE OR NOT TO PERFORM ANY AND ALL DUCTWORK PRESSURE TESTING REQUIRED UNDER THIS CONTRACT. HVAC SYSTEM ABBREVIATIONS A AMPERES AC AIR CONDENSING UNIT (DX TYPE) AD ACCESS DOOR AFC AIR FAN CURTAIN AFF ABOVE FINISHED FLOOR AFMD AIR FLOWING MEASURING DEVICE AMU AIR HANDLING UNIT A PID AIR PR ESSU R E DIFFERENTIAL ASHRAE AMERICAN SOCIETY OF HEATING REFRIGERATING AND AIR CONDITIONING ENGINEERS BD BACKDRAFT DAMPER BHP BRAKE HORSEPOWER BTU BRITISH THERMAL UNIT BTUH BRITISH THERMAL UNITS PER HOUR BOP BOTTOM OF PIPE BOD BOTTOM OF DUCT CF CUBIC FOOT CFM CUBIC FEET PER MINUTE CHW CHILLED WATER CO CLEAN OUT CU CONDENSING UNIT CV CONSTANT VOLUME CW CONDENSER WATER DA DRY AIR DB DRY BULB (TEMPERATURE) DB DECIBEL (UNIT OF LOGARITHMIC SOUND POWER OR SOUND PRESSURE RATIO) DDC DIRECT DIGITAL CONTROL DG DOOR GRILLE DIP DIFFERENTIAL PRESSURE DT ' DIFFERENTIAL TEMPERATURE DX DIRECT EXPANSION (COIL) EA EACH E/A EXHAUST AIR EAT ENTERING AIR TEMPERATURE EDH ELECTRIC DUCT HEATER EEF EMERGENCY EXHAUST FAN (E.H.P.A.) EF EXHAUST FAN EG EXHAUST GRILLE EMCS ENERGY MANAGEMENT & CONTROL SYSTEM ESP EXTERNAL STATIC PRESSURE EWT ENTERING WATER TEMPERATURE F&BPD FACE & BY -PASS DAMPER FBC FLORIDA BUILDING CODE - BUILDING FBC -M FLORIDA BUILDING CODE - MECHANICAL F FIRE DAMPER FEEC FLORIDA ENERGY EFFICIENCY CODE FLA FULL LOAD AMPS FPF FINS PER FOOT (IN THE COIL) FPI FINS PER INCH (IN THE COIL) FPM FEET PER MINUTE FPS FEET PER SECOND GPM GALLONS PER MINUTE H HUMIDISTAT HP HORSEPOWER HVAC HEATING VENTILATION AND AIR CONDITIONING IAQ INDOOR AIR QUALITY ID INSIDE DIAMETER KW KILOWATT = 1000 WATTS LAT LEAVING AIR TEMPERATURE LAT LATENT (HEAT LOAD) LB POUND (UNIT OF MASS) LWT LEAVING WATER TEMPERATURE MAT MIXED AIR TEMPERATURE MAX MAXIMUM M MOTORIZED MBH THOUSANDS OF BTUS PER HOUR MUA MAKE UP AIR NC NOISE CRITERIA O/A OUTDOOR AIR OAD OUTDOOR AIR DAMPER OAF OUTSIDE AIR FAN OAI OUTDOOR AIR INTAKE OAL OUTDOOR AIR LOUVER OAR OUTDOOR AIR RELIEF PCF POUNDS PER CUBIC FOOT PD PRESSURE DIFFERENTIAL PSI POUNDS PER SQUARE INCH R/A RETURN AIR RE RELIEF EXHAUST CAP REF RELIEF EXHAUST FAN RG RETURN GRILLE RH RELATIVE HUMIDITY (•l.) RPM REVOLUTIONS PER MINUTE RV RELIEF VENT S SMOKE DAMPER S/A SUPPLY AIR SAT SUPPLY AIR TEMPERATURE SAT SATURATION, SATURATED SCBA SELF CONTAINED BREATHING APPARATUS SCT SATURATION CONDENSING TEMPERATURE SD SMOKE DETECTOR SEN SENSIBLE (HEAT LOAD) SF SUPPLY FAN SH SENSIBLE HEAT SHG SENSIBLE HEAT GAIN SHR SENSIBLE HEAT RATIO SMACNASHEET METAL AND AIR CONDITIONING CONTRACTORS NATIONAL ASSOCIATION SREF STATE= REQUIREMENTS FOR EDUCATIONAL FACILITIES SST SATURATION SUCTION TEMPERATURE SZ SINGLE ZONE (TYPE OF AHU) T THERMOSTAT TD TRANSFER DUCT TG TRANSFER GRILLE TR TRANSFER REGISTER TSP TOTAL STATIC PRESSURE TU TERMINAL UNIT UC DOOR UNDERCUT (IN HVAC DRAWINGS) V VOLTS VAV VARIABLE AIR VOLUME (TYPE OF HVAC EQUIPMENT) VD VOLUME DAMPER VFD VARIABLE FREQUENCY DRIVE W WATT (UNIT OF POWER) WB WET BULB (TEMPERATURE) WPD WATER PRESSURE DIFFERENTIAL EQUIPMENT SPECIFICATIONS: SUPPLY AND RETURN AIR DUCTWORK: SHALL BE GALVANIZED SHEET STEEL, DESIGNED, CONSTRUCTED AND INSTALLED PER 2" STATIC PRESSURE CLASSIFICATION OF THE SMACNA'S "HVAC DUCT CONSTRUCTION STANDARDS- METAL AND FLEXIBLE" MANUAL, LATEST EDITION. EXTERIOR DUCTWORK INSULATION: SHALL BE 2.2 INCH THICK, 3/4 PCF DENSITY FIBERGLASS BLANKET WITH UL APPROVED ALUMINUM FOIL VAPOR SEAL JACKET REINFORCED WITH FIBERGLASS SCRIM, LAMINATED TO 30 LB. KRAFT PAPER, R = 6.0 MINIMUM. JACKET TO BE LAPPED NOT LESS THAN TWO INCHES AT ALL JOINTS AND SEAMS, AND SEALED WITH A VAPOR - RETARDER MASTIC. INSTALLED THICKNESS OF INSULATION SHALL NOT BE LESS THAN TWO INCHES. INSULATE THE FOLLOWING DUCT SYSTEMS: INDOOR CONCEALED / EXPOSED RETURN AIR DUCTWORK. . FLEXIBLE CONNECTORS: SHALL BE STANDARD METAL -EDGED CONNECTOR BY VENTFABRICS OR EQUAL. FACTORY FABRICATED WITH A STRIP OF NONCOMBUSTIBLE FABRIC 3 -1/2" INCHES WIDE ATTACHED TO TWO STRIPS OF 2 -3/4 INCH WIDE, .028- INCH - THICK, GALVANIZED SHEET STEEL. RECTANGULAR MANUAL VOLUME DAMPERS: SHALL BE RUSKIN MODEL MD35 OR EQUAL. MULTIPLE OPPOSED BLADE OR SINGLE BLADE, FURNISHED COMPLETE WITH FACTORY FABRICATED LOCKING HAND QUADRANT. PROVIDE WITH 2" STAND -OFF WHEN INSTALLED ON EXTERNALLY INSULATED DUCT. DUCT SUPPORTS: SHALL BE GALVANIZED SHEET STEEL STRAP. WIDTH, GAGE AND SUPPORT INTERVALS PER SMACNA'S "HVAC DUCT CONSTRUCTION STANDARDS - -METAL AND FLEXIBLE" MANUAL, LATEST EDITION. CEILING DIFFUSER, RETURN, EXHAUST GRILLE /REGISTER: AS SCHEDULED. KITCHEN HOOD EXHAUST DUCT: SHALL BE 16 GAGE CARBON STEEL (OR 18 GAGE STAINLESS STEEL) WITH CONTINUOUS LIQUID -TIGHT WELDS MADE ON THE EXTERNAL SURFACE OF THE DUCT SYSTEM. FIRE BARRIER DUCT WRAP: SHALL BE UL1978, 3M FIRE BARRIER DUCT WRAP 20A FOR 2 -HR FIRE RESISTANCE, TO BE USED TO FIRE RATE COMMERCIAL KITCHEN GREASE DUCT. KITCHEN HOOD EXHAUST FAN: AS SCHEDULED. KITCHEN HOOD MAKE -UP FAN: AS SCHEDULED. AIR DISTRIBUTION LEGEND DOUBLE WALL INSULATED DUCT _ DIRECTION OF FLOW EXISTING CONSTRUCTION, INCLUDING EXISTING TO REMAIN (SEE NOTE x3) - _ _ AND TO BE REMOVED. ITEMS AND DEBRIS TO BE REMOVED WILL too OF THE WORK AND BECOMING FAMILIAR WITH THE BE PROPERLY DISPOSED OF BY THE CONTRACTOR, WITHIN HIS TYPE OF DIFFUSER 6 X 6 CONTRACT, AT NO COST TO THE OWNER. DUCT: FIRST FIGURE IS SIDE 20 X 10 SIZE OF DIFFUSER rJ SHOWN. SIZES ARE INSIDE • • r � w u • • a 20X10 SUFFICIENT TO ESTABLISH THAT THE CONTRACTOR HAS REQUIRED . BY THE APPLICABLE CODES, RULES AND OVAL DUCT SECTION NUMBER REGULATIONS HAVING JURISDICTION OVER THE PROJECT. DRAWING NUMBER AIR DISTRIBUTION LEGEND DOUBLE WALL INSULATED DUCT _ DIRECTION OF FLOW EXISTING CONSTRUCTION, INCLUDING EXISTING TO REMAIN (SEE NOTE x3) - _ _ AND TO BE REMOVED. ITEMS AND DEBRIS TO BE REMOVED WILL A 1W OF THE WORK AND BECOMING FAMILIAR WITH THE BE PROPERLY DISPOSED OF BY THE CONTRACTOR, WITHIN HIS TYPE OF DIFFUSER 6 X 6 CONTRACT, AT NO COST TO THE OWNER. DUCT: FIRST FIGURE IS SIDE 20 X 10 SIZE OF DIFFUSER rJ SHOWN. SIZES ARE INSIDE 7. CONTRACTOR SHALL PROVIDE DURING DEMOLITION AMOUNT OF CFM PROPOSED WORK. THE SUBMISSION OF A BID SHALL BE DIMENSION. 20X10 SUFFICIENT TO ESTABLISH THAT THE CONTRACTOR HAS REQUIRED . BY THE APPLICABLE CODES, RULES AND OVAL DUCT SECTION NUMBER REGULATIONS HAVING JURISDICTION OVER THE PROJECT. DRAWING NUMBER 200 WHERE LOCATED CLAD ROUND DUCT DUCT MTD. SMOKE DETECTOR W /REMOTE E TEST LIGHT SWITCH 2. FAILURE OF BIDDERS TO MAKE REQUIRED VISITATIONS REMOVE ALL EXISTING ITEMS AS REQUIRED TO PROPERLY (PROVIDE ACCESS DOOR) SD AP AD 0 EXISTING DUCTWORK OR ACCESS PANEL/DOOR EQUIPMENT TO REMAIN - -- - - - FC EXISTING DUCTWORK OR FLEXIBLE DUCT, FLEXIBLE EQUIPMENT TO BE REMOVED 9. ANY UTILITY LINES TO REMAIN AND THAT ARE BROKEN OR CONNECTION (FC) V V V 1 Mw DUCT RISE IN DIRECTION OF FLOW REPAIRED BY THE CONTRACTOR AT NO ADDITIONAL CHARGE TO ELECT, STRIP HEATER (MUST AD ❑ THE CONTRACT PRICE. 3. USE ACC. DOOR) EDH DUCT DROP IN DIRECTION p CONDUCTED. THE CONTRACTOR IS RESPONSIBLE FOR ANY OF FLOW FAN, WALL, ROOF � 0 DEMOLIION OPERATIONS. PATCH AND REPAIR EXISTING TRANSITION RECTANGULAR SURFACIS DAMAGED AS REQUIRED TO MATCH ADJACENT TO ROUND UNDERCUT DOOR U.C. DUCT WITH CAPPED END TRADES AT JOB SITE PRIOR TO FABRICATION AND INSTALLATION 4. AIR FLOW OF EQUIPMENT. ANY DISCREPANCIES BETWEEN THE WORK EXISTING WORK AS NECESSARY TO INSTALL NEW WORK, MEASURING DEVICE A.F.M.D. EXCEPTS OTHERWISE SHOWN OR SPECIFIED. DO NOT DUCT SECTION: SUPPLY CUT AL7R OR REMOVE ANY STRUCTURAL WORK AND DO THE ENGINEER FOR REVIEW AND CLARIFICATION. RETURN j THERMOSTAT TO ALL ELBOWS MUST BE PROVIDED 12. DUST CONTAINMENT: CONTRACTOR SHALL PROVIDE WITH TURNING VANES WHETHER AND ELDTRICAL WORK DISTURBED OR REMOVED AS A HUMIDISTAT H� SHOWN OR NOT ON DWGS, DEMOLITION WORK IS BEING PERFORMED. BARRIERS SHOULD REFINISE -D AND LEFT IN AS GOOD CONDITION AS EXISTED HAVE NO HOLES OR GAPS BETWEEN THEM. THERE SHALL ALSO TYP. 45• TAP -OFF WITH I POINT OF CONNECTION ALTEREE OR EXTENDED AND THAT IS FOUND TO BE VOLUME DAMPER 1 BETWEEN NEW AND EXISTING BARRIERS SHALL BE COMPLETELY SEALED OFF. CONTRACTOR VD WORK MOTORIZED DAMPER CAP WITH ACCESS DOOR D CONFOR IN TYPE AND QUALITY TO THAT OF ORIGINAL DEMOLITION TO THIS POINT 13. AREA OF CONSTRUCTION SHALL BE MAINTAINED UNDER SPUTTER DAMPER OR SPEO IED. NEGATIVE PRESSURE IN RELATION TO SURROUNDING AREAS. THE CONSTRUCTION AREAS TO BE TESTED WEEKLY TO ASSURE A.D. ❑ COMBINATION FIRE /SMOKE DAMPER (MUST USE ACCESS A NEGATIVE PRESSURE OF 0.02 INCHES WATER GAUGE IN BEING FIRE DAMPER A.D. 0 DOOR) (MUST USE ACCES DOOR) F A.D. ❑ ENTIREL REMOVED SHALL BE SEALED, CAPPED OR OF TO MAINTAIN NEGATIVE PRESSURE IN THE SPACE. THE SMOKE DAMPER PLUGGE IN CEILINGS, WITHIN FURRED SPACES, IN CONTRACTOR SHALL UTILIZE ALL EXISTING EXHAUST FANS TO (MUST USE ACCESS DOOR) S THAT TEY ARE COMPLETELY BEHIND PLASTERED AREAS, NOTES I. 45rTAP -OFFS, SPUTTERS AT EACH TAP -OFF AND TEE, AND ACCESS DOORS SHALL BE USED WHERE REQUIRED, WHETHER OR NOT INDICATED IN THE DRAWINGS. 2. IN AREAS WHERE NON- REMOVABLE CEILINGS ARE USED, PROVIDE 450 TAP -OFFS OF THE FIXED TYPE, WITH WIDTH PROPORTIONAL TO BRANCH CFM. - GENERAL DEMOLITION NOTES: 6. THE CONTRACTOR WILL BE HELD RESPONSIBLE FOR ALL NO DUCT SMOKE DETECTOR EXISTING CONSTRUCTION, INCLUDING EXISTING TO REMAIN 1. THE CONTRACTOR IS RESPONSIBLE FOR VISITING THE SITE AND TO BE REMOVED. ITEMS AND DEBRIS TO BE REMOVED WILL OF THE WORK AND BECOMING FAMILIAR WITH THE BE PROPERLY DISPOSED OF BY THE CONTRACTOR, WITHIN HIS E6 Z J z C.)aa CONDITIONS OF THE WORK PRIOR TO SUBMITTING A BID. CONTRACT, AT NO COST TO THE OWNER. THE CONTRACTOR IS REQUIRED TO BECOME FAMILIAR WITH X ALL THE CONTRACT DOCUMENTS PERTAINING TO THE 7. CONTRACTOR SHALL PROVIDE DURING DEMOLITION PROPOSED WORK. THE SUBMISSION OF A BID SHALL BE OPERATIONS ALL SAFETY MEASURES AND FEATURES AS X SUFFICIENT TO ESTABLISH THAT THE CONTRACTOR HAS REQUIRED . BY THE APPLICABLE CODES, RULES AND INVESTIGATED THE SITE OF THE WORK AND IS SATISFIED AS REGULATIONS HAVING JURISDICTION OVER THE PROJECT. TO ALL ZEASONABLE CONDITIONS TO BE ENCOUNTERED, THE WOEK TO BE PERFORMED AND THE MATERIALS TO BE 8. THE DEMOLITION DRAWINGS ARE ONLY TO ASSIST IN PROVIDE) IN THE COMPLETION OF THE PROJECT. SHOWING THE SCOPE OF DEMOLITION WORK AND ARE NOT INTENDED TO INDICATE ALL DEMOLITION. CONTRACTOR SHALL 2. FAILURE OF BIDDERS TO MAKE REQUIRED VISITATIONS REMOVE ALL EXISTING ITEMS AS REQUIRED TO PROPERLY AND /OR INVESTIGATIONS TO INFORM THEMSELVES FULLY COMPLETE ALL THE WORK INDICATED IN THE CONTRACT OF EXISTING CONDITIONS, AND TO INCLUDE IN THEIR DOCUMENTS. PROPOSALS A SUM SUFFICIENT TO COVER ALL POSSIBLE FIELD CQNDITIONS, WILL NOT IN ANY WAY ENTITLE THEM TO 9. ANY UTILITY LINES TO REMAIN AND THAT ARE BROKEN OR ANY EX-RA CHARGES OVER AND ABOVE THEIR ORIGINAL DAMAGED DURING DEMOLITION OPERATIONS SHALL BE PROPOSALS. REPAIRED BY THE CONTRACTOR AT NO ADDITIONAL CHARGE TO THE CONTRACT PRICE. 3. CONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONS TO PROTECT PROPERTY IN AREAS WHERE WORK IS BEING 10. HOLES AND OPENINGS ON THE BUILDING CEILING SLAB CONDUCTED. THE CONTRACTOR IS RESPONSIBLE FOR ANY AND WALLS THAT REMAIN AFTER THE DEMOLITION SHALL BE DAMAGE+ CAUSED TO BUILDING COMPONENTS DUE TO PATCHED TO MATCH THE EXISTING CEILING SLAB AND WALL DEMOLIION OPERATIONS. PATCH AND REPAIR EXISTING CONSTRUCTION. SURFACIS DAMAGED AS REQUIRED TO MATCH ADJACENT SURFACIS. 11. ALL WORK SHALL BE COORDINATED WITH ALL OTHER TRADES AT JOB SITE PRIOR TO FABRICATION AND INSTALLATION 4. REMOVE CUT, ALTER, REPLACE, PATCH AND REPAIR OF EQUIPMENT. ANY DISCREPANCIES BETWEEN THE WORK EXISTING WORK AS NECESSARY TO INSTALL NEW WORK, DEPICTED ON THESE DOCUMENTS AND THE ACTUAL EXCEPTS OTHERWISE SHOWN OR SPECIFIED. DO NOT CONDITIONS ENCOUNTERED SHALL BE BROUGHT PROMPTLY TO CUT AL7R OR REMOVE ANY STRUCTURAL WORK AND DO THE ENGINEER FOR REVIEW AND CLARIFICATION. NOT DISURB ANY DUCTS, PLUMBING, ELECTRICAL WORK, WALLS, :EILING, PARTITIONS OR FLOORS. MECHANICAL 12. DUST CONTAINMENT: CONTRACTOR SHALL PROVIDE AND ELDTRICAL WORK DISTURBED OR REMOVED AS A VISQUEEN BARRIERS AROUND CORRIDOR AREAS WHERE RESULT 1F PERFORMING REQUIRED NEW WORK SHALL BE DEMOLITION WORK IS BEING PERFORMED. BARRIERS SHOULD REFINISE -D AND LEFT IN AS GOOD CONDITION AS EXISTED HAVE NO HOLES OR GAPS BETWEEN THEM. THERE SHALL ALSO BEFORE COMMENCING WORK. EXISTING WORK TO BE BE NO GAPS BETWEEN THE CEILING AND THE BARRIER, AND ALTEREE OR EXTENDED AND THAT IS FOUND TO BE BETWEEN THE FLOOR AND THE BARRIER. ALL EDGES OF DEFECTIE IN ANY WAY, SHALL BE REPORTED TO THE BARRIERS SHALL BE COMPLETELY SEALED OFF. CONTRACTOR ARCHITET BEFORE IT IS DISTURBED. MATERIALS AND SHALL ALSO HAVE STICKY FLOOR MATS IN PLACE AROUND THE WORKMASHIP USED IN RESTORING WORK, SHALL WORK AREAS, CONFOR IN TYPE AND QUALITY TO THAT OF ORIGINAL EXISTIN( CONSTRUCTION, EXCEPT AS OTHERWISE SHOWN 13. AREA OF CONSTRUCTION SHALL BE MAINTAINED UNDER OR SPEO IED. NEGATIVE PRESSURE IN RELATION TO SURROUNDING AREAS. THE CONSTRUCTION AREAS TO BE TESTED WEEKLY TO ASSURE 5. ALL SERICE LINES SUCH AS WIRES, CABLES, CONDUITS, A NEGATIVE PRESSURE OF 0.02 INCHES WATER GAUGE IN BEING DUCTS, IPES AND THEIR HANGERS OR SUPPORTS, WHICH MAINTAINED WHEN ALL DOORS AND WINDOWS ARE CLOSED. ARE T03E ABANDONED BUT ARE NOT REQUIRED TO BE ALL AIR OUTLETS AND WALL PENETRATIONS SHALL BE BLOCKED ENTIREL REMOVED SHALL BE SEALED, CAPPED OR OF TO MAINTAIN NEGATIVE PRESSURE IN THE SPACE. THE PLUGGE IN CEILINGS, WITHIN FURRED SPACES, IN CONTRACTOR SHALL UTILIZE ALL EXISTING EXHAUST FANS TO UNFINISED AREAS, OR WITHIN WALL OR PARTITIONS SO EXHAUST THE CONSTRUCTION AREA TO MAINTAIN NEGATIVE THAT TEY ARE COMPLETELY BEHIND PLASTERED AREAS, PRESSURE. IF ADDITIONAL EXHAUST IS REQUIRED, OR OTHR FINISHED SURFACES. ABANDONED LINES MUST CONTRACTOR WILL PROVIDE A TEMPORARY EXHAUST FAN. BE CAPER AT BOTH ENDS, SO THAT NO DEAD ENDS ARE LEFT. HVAC DESIGN REQUIRES: YES NO DUCT SMOKE DETECTOR X FIRE DAMPERS) X SMOKE DAMPERS) X E6 Z J z C.)aa FIRE RATED ENCLOSURE X FIRE RATED ROOF /FLOOR CEILING ASSEMBLY X FIRE STOPPING X SMOKE CONTROL X South Miami Hospital B.H.S.F. 6200 S.W. 73 RD. Street Miami, FL. 33143 i 0 Z ~ W w W O li M Mr r f! M M co W Q) a_ � Ir 0- KEY PLAN S.M,H. LOCATION Lr OF WORK Seal v,; .r . 1 :JMECNANI� EDUA';DC .A. SUAR[�Z, P,E: +SENSE x 64769',,` Sheet Title: GENERAL NOTES, SYMBOL LEGEND HVAC f Project No.: 20046 Date: 02.18.2011 Scale: AS NOTED Drawn by: J. H., F.P.,J.B. Checked by: V.A.,E.Z. Sheet Number: M0000 r z ❑ M LLL. 0 Ch x �� Q E6 Z J z C.)aa a �N co W Q) a_ � Ir 0- KEY PLAN S.M,H. LOCATION Lr OF WORK Seal v,; .r . 1 :JMECNANI� EDUA';DC .A. SUAR[�Z, P,E: +SENSE x 64769',,` Sheet Title: GENERAL NOTES, SYMBOL LEGEND HVAC f Project No.: 20046 Date: 02.18.2011 Scale: AS NOTED Drawn by: J. H., F.P.,J.B. Checked by: V.A.,E.Z. Sheet Number: M0000